S S M T W T F

%
Item Description Compliance
completado
UND 13-Jan 14-Jan 15-Jan 16-Jan 17-Jan 18-Jan 19-Jan

1.0 Km 0+731.90 - Km 0+833.00 TYPE V

Jet grouting und 10.00 10.00 10.00 10.00 10.00 3.00


1.1 COMPLETED 100%
Jet grouting und 7.00 11.00 11.00 10.00 5.00 9.00

0+776.60
Tunnel support und 0+775.80 0+777.40
0+778.20
1.2 INCOMPLETED 50.0%
0+775.80
Tunnel support und
0+776.60

2.0 CI - Bench (Phase II)

Jet grouting und 15.00 18.00 6.00


2.1 COMPLETED 100%
Jet grouting und 15.00 27.00

0+762.20 0+763.80 0+765.40


Left side elephant foot und
0+763.00 0+764.60 0+766.20
2.2 INCOMPLETED 83.3%
0+763.80
Left side elephant foot und 0+762.20 0+763.00 0+764.60
0+765.40

Right side elephant foot und 0+765.40 0+767.00 0+768.60


0+766.20 0+767.80 0+769.40
2.3 INCOMPLETED 83.3%
0+767.00
Right side elephant foot und 0+765.40
0+767.80
0+766.20
0+768.60

3.0 CI - Bench (Phase III)

Jet grouting und 10.00 10.00


3.1 COMPLETED 100%
Jet grouting und 25.00 35.00 26.00 32.00 34.00

0+743.00 0+744.60
Right side bench foot und 0+742.20
0+743.80 0+745.40
3.2 INCOMPLETED 80.0%
0+742.20 0+743.80
Right side bench foot und
0+743.00 0+744.60
S S M T W T F
%
Item Description Compliance
completado
UND 13-Jan 14-Jan 15-Jan 16-Jan 17-Jan 18-Jan 19-Jan

1.0 ZOP - Roof - Left Gallery

Micropile drilling und 5.00 11.00 6.00


1.1 COMPLETED 100%
Micropile drilling und 2.00 13.00 7.00 10.00 9.00

Micropile injections und 22.00


1.2 COMPLETED 100%
Micropile injections und 12.00 10.00 19.00

1+742.90 1+740.50 1+738.10


1+735.70
Tunnel support und 1+742.10 1+739.70 1+737.30
1+734.90
1+741.30 1+738.90 1+736.50
1.3 INCOMPLETED 0.0%
Tunnel support und

2.0 ZOP - Roof - Right Gallery

Micropile drilling und 15.00


2.1 COMPLETED 100%
Micropile drilling und 15.00

Micropile injections und 38.00


2.2 COMPLETED 100%
Micropile injections und 38.00

1+789.30
1+795.70 1+794.10 1+792.50 1+790.90
Tunnel support und 1+788.50
1+794.90 1+793.30 1+791.70 1+790.10
1+787.70
2.3 1+795.70 1+792.50 COMPLETED 100%
1+789.30
1+794.90 1+791.70
Tunnel support und 1+788.50
1+794.10 1+790.90
1+787.70
1+793.30 1+790.10

3.0 ZOP - Bench

1+827.80 1+826.30
Left Side Bench und
1+827.05 1+825.55
3.1 COMPLETED 100%
1+827.80 1+826.30
Left Side Bench und
1+827.05 1+825.55

1+841.30 1+839.80
Right Side Bench und
1+840.55 1+839.05

3.2 1+841.30 COMPLETED 100%


1+840.55 1+838.30 1+836.80
Right Side Bench und
1+839.80 1+837.55 1+836.05
1+839.05
S S M T W T F
%
Item Description Compliance
completado
Und 13-Jan 14-Jan 15-Jan 16-Jan 17-Jan 18-Jan 19-Jan

1.00 Invert reinforcement CI

25th Section 25th Section 25th Section


Invert Section Profiling m2 H.I.A H.I B H.I C
(32.64 m2) (32.64 m2) (30.72 m2)
1.1 COMPLETED 100%
25th Section 25th Section 25th Section
Invert Section Profiling m2 H.I.A H.I.A H.I C
(32.64 m2) (32.64 m2) (30.72 m2)
S S M T W T F
%
Item Description Compliance Observaciones Recomendaciones
completado
UND 13-Jan 14-Jan 15-Jan 16-Jan 17-Jan 18-Jan 19-Jan

1.0 SUBGRADE IMPROVEMENT - AXIS 650 (ROunitABOUT)

SUBBASE CONFORMATION m3 150.00 150.00


1.1 COMPLETED 100%
SUBBASE CONFORMATION m3 150.00 150.00

LAYER COMPACTION m2 1,500.00


1.2 COMPLETED 100%
LAYER COMPACTION m2 1,500.00
Benkelman beam test on
m2 1.00
subgrade
1.3 COMPLETED 100%
Benkelman beam test on
m2 1.00
subgrade
2.0 GRANULAR SUB-BASE - AXIS 650 (ROunitABOUT)

SUBBASE CONFORMATION m3 207.50 207.50


2.1 COMPLETED 100%
SUBBASE CONFORMATION m3 207.50

LAYER COMPACTION m2 1,660.00


2.2 COMPLETED 100%
LAYER COMPACTION m2 1,660.00

3.0 GRANULAR BASE TREATED WITH ASPHALT - AXIS 5A (651A)

BASE CONFORMATION m3 74.40


3.1 COMPLETED 100%
BASE CONFORMATION m3 74.40

LAYER COMPACTION m2 372.00


3.2 COMPLETED 100%
LAYER COMPACTION m2 372.00
S S M T W T F
%
Item Description Compliance Observaciones Recomendaciones
completado
UND 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec

1.0
Steel box Fabrication - Sector 01 Axis 03.
Cutting kg
4,500.00 9,566.20 9,566.20 5,066.20
1.1
Cutting kg
Planned CI 90%
Real CI 38%
Planned ZOP 90%
Percentage of weekly activities c
Real Zop 100%
Planned CI; 90% Planned ZOP; 90%
Planned AR 90% 90%
Real AR 60% 80%
70%
60%
50%
40% Real CI; 38%

30%
20%
10%
0%
Planned CI Real CI Planned ZOP Real Zop
tage of weekly activities completed
Planned ZOP; 90% Planned AR; 90%

Real AR; 60%

38%

CI Planned ZOP Real Zop Planned AR Real AR