Valvoindustria Ing. Rizzio S.p.A.

(VIR)

MATERIAL SUBMITTAL

Product : PLUMBING VALVES

Project : AGMC BMW SHOWROOM-SHARJAH

Client : AL BATHA REAL ESTATE

Consultant : ARCHCORP ARCHITECTUAL ENGINEERING

Main contractor : TAWAZUN CONSTRUCTION

MEP Contractor : GECO MECHANICAL & ELECTRICAL LTD CO.

VIR ME International
Business Park, Dubai World Central
Dubai, United Arab Emirates
INDEX

1. Material Schedule
2. Project Specification
3. Compliance Statement
4. Catalogue
5. Authorization/ Dealership Letter
6. Test Certificates/ Authority Approvals
7. Company Profile & Trade License
8. Project References
9. Previous Approvals
10. Country Of Origin
11. Draft Warranty
1. Material Schedule
SCHEDULE OF MATERIALS (PLUMBING VALVES)
MATERIALS MODEL DESCRIPTION SIZE (MM) ORIGIN CATALOGUE
REF.
ISOLATION-GATE VALVE 90 BRONZE GATE VALVES, NON RISING STEM, THREADED 15MM-50MM ITALY
TO BS21, PN16
ISOLATION- BUTERFLY VALVE 4025L DUCTILE IRON BUTTERFLY VALVE, SEMI LUG TYPE, 65MM CHINA
STAINLESS STEEL DISC AND STEM, EPDM LINED, LEVER
OPERATED, PN16
CHECK VALVE 765K SPRING-LOADED BRASS CHECK VALVE, THREADED F/F 15MM - 50MM CHINA
(ISO 7/1 RP), PN25
ISOLATION- BALL VALVE 33FF NICKEL PLATED BRASS BALL VALVE, FULL BORE, 15MM-50MM ITALY
THREADED TO BS21,PN32
AIR VENT 9390 BRASS AUTOMATIC AIR VENT, THREADED TO BS21, PN10 15MM CHINA

FOOT VALVE 765K+STRAINER SPRING-LOADED BRASS CHECK VALVE, THREADED F/F 15MM-50MM CHINA
(ISO 7/1 RP), PN25 WITH SS MESH
FLOAT VALVE FV-C BRASS FLOAT VALVE, THREADED END WITH COPPER 15MM-50MM ITALY
FLOAT
BIB TAP 293LK BRASS BIBCOCK WITH LOCKSHIELD AND KEY, THREADED 15MM CHINA
WITH HOSE UNION, PN16
2. Poject Specification
3. Compliance Statement
Not part of the submittal

Not part of the submittals

Not part of the submittal

Proposed Model 293 LK, Lockshiedl Bib tap

Comply with equivalent EN standards


Comply
Comply with brass body
Comply with Brass disc with PTFE Gasket
Comply with threaded ends
Comply
Comply
Deviation
Comply with polished brass
Comply with wheel with
lockable key
Not part of the submittal

Proposed Model 33FF Nickel Plated Brass Ball Valves


Comply with Equivalent EN standards
Comply Comply with PN32
Comply with Nickel plated Brass
Comply
Comply
Comply
Comply
Not applicable

Proposed Model 4025L for isolation Proposed Model 90 Bronze gate valves for Isolation upto 2"
valves above 2" Comply with equivalent EN standards
Ductile Iron Body , SS disc & stem, Comply with PN 16
PN16, Semi Lugged, WRAS Comply with Iso7/1 Rp female thread
Comply
approved Comply with threaded ends
Not applicable

Not part of the submittal

Proposed Model 9390 Airvent


Comply with Brass Body
Comply
Comply with PP float
Comply
Comply
Comply
4. Catalogues
Via Circonvallazione, 10 ®

90, 90LK 13018 Valduggia (VC), Italy


Tel: +39 0163 47891
Fax: +39 0163 47895
www.vironline.com
Bronze Metal Sealed Gate Valve

Bronze gate valve


Threaded F/F (ISO 7/1 Rp)
EN12288/B (ex BS5154/B) compliant
Air testing according to EN12266-1
Non rising blow-out proof stem
Adjustable packing
Metal seal
Available in the following versions:
● Fig. 90, with aluminum handwheel
● Fig. 90LK, with lockshield (require dedicated tool to be operated)
WRAS and TR CU 010 compliant

PN16 (Max 16bar up to 100°C, max 7bar at 170°C)


Free of CE marking (cat. according to Art. 4.3 Dir. 2014/68/EU)

Working conditions
● Suitable for: water, -10°C to +170°C
below 0°C only for water with added antifreeze fluids
● Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/EU)

Fig. 90
Fig. 90LK
PARTLIST 11
10
N. Part Material Norm
1 Body Bronze EN1982 CB491K 9
2 Wedge DZR Brass EN12164 CW602N 8
3 Ring Brass EN12164 CW617N
7
4 Stem DZR Brass EN12164 CW602N
5 Gasket PTFE - 6
6 Bonnet Bronze EN1982 CB491K 5
7 Packing ring Graphite -
8 Packing nut Brass EN12164 CW617N 4
9 Handwheel Aluminum - 3
10 Disc Aluminum -
2
11 Nut Steel EN10025 Fe42
1

DIMENSIONS ØV
ØD
L C P H1 ØV ØD-□Q Kv Weight1 □Q
DN T
[mm] [mm] [mm] [mm] [mm] [mm] [m3/h] [g]
015 ½" 49 15,5 13 66/68 60 13,5-□6 9 240/230
020 ¾" 52 16,5 19 77/77 60 13,5-□7 20 320/310 H
025 1" 61 19,5 25 89/85 70 13,5-□7 35 485/465
032 1¼" 70 21,5 32 111/104 85 16,0-□7 62 760/730 Fig. 90LK
040 1½" 72 21,5 38 124/115 85 18,8-□8 104 1120/1080
050 2" 84 26 49 143/134 100 18,8-□8 169 1615/1565 T P
1
Fig. 90 / Fig. 90LK

C
L
200408

Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®

402W, 4025 13018 Valduggia (VC), Italy


Tel: +39 0163 47891
Fax: +39 0163 47895
www.vironline.com
Ductile Iron Wafer Butterfly Valve for Drinking Water

Ductile iron Wafer butterfly valve for drinking water


For EN1092 PN16 flanges (also PN10 for DN≤300)
Lengths according to EN558-1 series 20 (ex DIN3202 K1) ACS
Design according to EN593, testing according to EN12266-1
Epoxy coating (min. 150μm)
With lever (lockable in both open and close position) or manual gear
ACS, WRAS (DN32-DN300) and TR CU 010 compliant

PN16
Max differential pressure 10bar for DN≥350
(versions for Max differential pressure 16bar available)
Free of CE marking for DN≤300 (cat. according to Art. 4.3 Dir. 2014/68/EU)

Working conditions
● Suitable for: water, -10°C to +110°C (max 85°C for WRAS)
below 0°C only for water with added antifreeze fluids
● Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/EU)

PARTLIST
402W series 4025 series
N. Part
Material Norm Material Norm
1 Body D.I. + epoxy GGG40 D.I. + epoxy GGG40
2 Disc D.I. + epoxy GGG40 Stainless steel SS316
3 Stem Stainless steel SS416 Stainless steel SS416
4 Taper pin Stainless steel - Stainless steel -
5 Seat EPDM - EPDM -
6 Seat support Plastic - Plastic -
7 Bushing PTFE - PTFE -
8 O-ring EPDM - EPDM -
9a Lever Cast iron - Cast iron -
9b Manual gear Cast iron - Cast iron -

A Section A-A
8

1
A

200706
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
DIMENSIONS WITH LEVER OR GEAR
GA GB GC
L HL GA GB GC HG ØG Weight1
DN
[mm] [mm] [mm] [mm] [mm] [mm] [mm] [kg]
032 267 152 153 53 125 229 146 2,8 / 6,9 ØG
040 267 152 153 53 125 229 146 3,1 / 7,2 HG
050 267 194 153 53 125 271 146 3,8 / 7,9
065 267 207 153 53 125 284 146 4,5 / 8,6
080 267 213 153 53 125 290 146 5,0 / 9,1
100 267 232 153 53 125 309 146 6,6 / 10,7
125 267 245 153 53 125 322 146 7,9 / 12,0
150 267 257 153 53 125 334 146 9,3 / 13,4
200 359 296 236 73 216 442 289 14,7 / 25,7
L
250 359 328 236 73 216 474 289 21,2 / 32,2
300 359 373 231 80 237 521 289 33,0 / 46,0
350 - - 231 80 237 552 289 - / 58,8
400 - - 243 111 319 680 290 - / 101,2 HL
450 - - 243 111 319 702 290 - / 117,7
500 - - 243 111 319 759 290 - / 160,1
600 - - 296 133 385 902 375 - / 257,5
1
Weight for version with lever / weight for version with gear

OTHER DIMENSIONS
HA HB HC NxØP ØK L ØF S MxØB ØC ISO-□Q Torque Kv Wgt
DN
[mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [Nm] [m3/h] [kg]
032 65 120 32 4x19 100 33 90 11 4x9 70 F07 - □9 10 40 1,9
040 75 120 32 4x19 110 33 90 11 4x9 70 F07 - □9 12 50 2,2
050 76 162 32 4x19 125 43 90 13 4x9 70 F07 - □9 14 99 2,9
065 89 175 32 4x19 145 46 90 13 4x9 70 F07 - □9 20 170 3,6
080 95 181 32 8x191 160 46 90 13 4x9 70 F07 - □9 27 261 4,1
100 114 200 32 4x19 180 52 90 13 4x9 70 F07 - □11 49 519 5,7
125 127 213 32 4x19 210 56 90 13 4x9 70 F07 - □14 80 884 7,0
150 140 225 32 4x23 240 56 90 13 4x9 70 F07 - □14 119 1366 8,4
200 173 260 36 4x23 295 60 125 14 4x11 102 F10 - □17 229 2713 12,7
250 203 292 36 4x28 355 68 125 14 4x11 102 F10 - □22 380 4697 19,2
300 242 337 36 4x28 410 78 150 20 4x14 125 F12 - □22 552 7136 31,0
350 267 368 45 4x28 470 78 150 20 4x14 125 F12 - □24 650 10308 43,8
400 298/3092 400 51 4x31 525 102 210 20 4x22 165 F16 - □27 922 14175 61,2
450 318/3282 422 51 4x31 585 114 210 20 4x22 165 F16 - □27 1194 18774 77,7
500 349/3612 479 64 4x34 650 127 210 22 4x22 165 F16 - □32 1706 24140 105,1
600 410/4592 562 70 4x37 770 154 210 22 4x22 165 F16 - □36 3080 37294 195,5
1
Additional holes for compatibility with PN10 flanges with four holes
2
Version for Max differential pressure 10bar / version for Max differential pressure 16bar

ØF

HC
S

ISO 5211
connection ØK HB
MxØB NxØP ®

ØC
□Q HA
Via Circonvallazione, 10
13018 Valduggia (VC), Italy
L Tel: +39 0163 47891
Fax: +39 0163 47895
www.vironline.com

Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
FITTING VIR ACTUATORS
Cutter-AQ electric actuators Jackup electric actuators1 Hovercraft pneumatic act.2
DN
230VAC 24VDC 230VAC 24VAC Double eff. Spring ret.
032 KACUTAQ00.800 KACUTAQ00.800 KAJACKP00/07.800 KAJACKP14/21.800 KAHOVER15.801 KAHOVER29.801
040 KACUTAQ00.800 KACUTAQ00.800 KAJACKP00/07.800 KAJACKP14/21.800 KAHOVER15.801 KAHOVER29.801
050 KACUTAQ01.800 KACUTAQ01.800 KAJACKP00/07.800 KAJACKP14/21.800 KAHOVER15.801 KAHOVER29.801
065 KACUTAQ01.800 KACUTAQ01.800 KAJACKP00/07.800 KAJACKP14/21.800 KAHOVER15.801 KAHOVER30.801
080 KACUTAQ01.800 KACUTAQ01.800 KAJACKP00/07.800 KAJACKP14/21.800 KAHOVER15.801 KAHOVER31.801
100 KACUTAQ02.800 KACUTAQ02.800 KAJACKP01/08.800 KAJACKP15/22.800 KAHOVER17.801 KAHOVER32.801
125 KACUTAQ03.800 KACUTAQ08.800 KAJACKP02/09.800 KAJACKP16/23.800 KAHOVER18.801 KAHOVER34.801
150 KACUTAQ04.800 KACUTAQ09.800 KAJACKP02/09.800 KAJACKP16/23.800 KAHOVER19.801 KAHOVER35.801
200 KACUTAQ06.800 KACUTAQ10.800 KAJACKP03/10.800 KAJACKP17/24.800 KAHOVER21.801 KAHOVER36.801
250 KACUTAQ07.800 on request KAJACKP03/10.800 KAJACKP17/24.800 KAHOVER23.801 KAHOVER38.801
300 KACUTAQ11.800 on request KAJACKP04/11.800 KAJACKP18/25.800 KAHOVER24.801 KAHOVER39.801
350 KACUTAQ11.800 on request KAJACKP04/11.800 KAJACKP18/25.800 KAHOVER24.801 KAHOVER40.801
400 KACUTAQ12.800 on request KAJACKP05/12.800 KAJACKP19/26.800 KAHOVER25.8013 KAHOVER40.801
450 KACUTAQ12.800 on request KAJACKP05/12.800 KAJACKP19/26.800 KAHOVER26.8013 on request
500 KACUTAQ13.800 on request KAJACKP06/13.800 KAJACKP20/27.800 KAHOVER27.801 on request
600 KACUTAQ13.800 on request KAJACKP06/13.800 KAJACKP20/27.800 on request on request
1
3 points control versions / 0-10V control versions
2
Pneumatic actuators sized on 6bar air supply
3
Flange adaptors required
Mounting of proposed actuators may require specific square connection adaptors
Technical description and dimensions of actuators as reported in their specific technical sheets

Via Circonvallazione, 10
13018 Valduggia (VC), Italy
Tel: +39 0163 47891
Fax: +39 0163 47895
www.vironline.com

Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®

293LK 13018 Valduggia (VC), Italy


Tel: +39 0163 47891
Fax: +39 0163 47895
www.vironline.com
Brass Sillcock with Lockshield and Key

Brass sillcock
Threaded M (ISO 228/1) with hose union
With lockshield and key
Design according to BS1010-2

PN16
Free of CE marking (cat. according to Art. 4.3 Dir. 2014/68/EU)

Working conditions
● Suitable for: water, 0°C to +100°C
● Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/EU)

13
PARTLIST 12

N. Part Material Norm 11


1 Body Brass CW617N 10
2 Hose union Brass CW617N
9
3 O-ring NBR -
4 Ring Brass CW617N 8
5 Seal NBR - 7
6 Disc Brass CW617N
7 Gasket PTFE - 6
8 Bonnet Brass CW617N 5
9 Stem Brass CW617N
4
10 Packing rink PTFE -
11 Packing nut Brass CW617N 3
12 Lockshield Brass CW617N
2
13 Key Brass CW617N
1

DIMENSIONS
L
D E AA AB HA HB L Weight
DN T
[mm] [mm] [mm] [mm] [mm] [mm] [mm] [g]
015 ½" 12 15,5 28 65 33 95 50 255

HB

D HA
E

AA AB

220831
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®

765K 13018 Valduggia (VC), Italy


Tel: +39 0163 47891
Fax: +39 0163 47895
www.vironline.com
Spring-loaded Brass Check Valve

Spring-loaded brass check valve


Threaded F/F (ISO 7/1 Rp)
Optional stainless steel foot strainer (mesh 1000μm)
To be installed horizontally or vertically
Minimum opening pressure 0,03bar

PN25
Free of CE marking (cat. according to Art. 4.3 Dir. 2014/68/EU)

Working conditions
● Suitable for: water, 0°C to +100°C
● Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/UE)

PARTLIST 7

N. Part Material Norm 6


1 Fixed End Brass EN12165 CW617N
2 Retaining disk Brass EN12164 CW617N 5
3 Gasket EPDM Perox -
4 Shutter disk Brass EN12164 CW617N 4
5 Stem Brass EN12164 CW617N
6 Spring Stainless steel AISI 302
3
7 Body Brass EN12165 CW617N
2

DIMENSIONS
D L Val. wgt
DN G
[mm] [mm] [g] D
015 ½" 30,4 54,5 123 G
020 ¾" 37,2 59,3 192
025 1" 45,2 68,5 299
032 1¼" 56,8 76,9 481
040 1½" 65,2 81,8 627
050 2" 81,9 97,5 999

221123

Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®

765K 13018 Valduggia (VC), Italy


Tel: +39 0163 47891
Fax: +39 0163 47895
www.vironline.com

Spring-loaded brass check valve


Threaded F/F (ISO 7/1 Rp)

To be installed horizontally or vertically


Minimum opening pressure 0,03bar
TR CU 010 compliant

PN25
Free of CE marking (cat. according to Art. 4.3 Dir. 2014/68/EU)

Working conditions
Suitable for: water, 0°C to +100°C
Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/UE)

N. Part Material Norm


6
1 Fixed End Brass EN12165 CW617N
2 Retaining Disk Brass EN12165 CW617N
Gasket 5
3 EPDM Perox AISI 304
4 Shutter Disk Brass EN12165 CW617N
5 Stem Brass EN12165 CW617N 4
6 Spring Stainless Steel AISI 302
7 Body Brass EN12165 CW617N 3
8
8 Strainer Stainless steel
2

DIMENSIONS
D L Val. wgt
DN G D
[mm] [mm] [g]
015 ½" 30,4 54,5 123 G
020 ¾" 37,2 59,3 192
025 1" 45,2 68,5 299
032 1¼" 56,8 76,9 481
040 1½" 65,2 81,8 627
050 2" 81,9 97,5 999

170217
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®

9390, 9393 13018 Valduggia (VC), Italy


Tel: +39 0163 47891
Fax: +39 0163 47895
www.vironline.com
Brass Automatic Air Vent

Brass automatic air vent


Threaded M (ISO 228/1)
TR CU 010 compliant (Fig. 9390)
WRAS compliant (Fig. 9393)

Available in the following versions:


● Fig. 9390, automatic air vent
● Fig. 9393, automatic air vent with check valve (1/2")

PN10
Free of CE marking (cat. according to Art. 4.3 Dir. 2014/68/EU)

Working conditions
● Suitable for: water, 0°C to +110°C
over 100°C only for water with added anti-boiling fluids
● Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/UE)
11

PARTLIST 10
9
N. Part Material Norm 8
1 Body Brass EN12165 CW617N
7
2 Floating Polypropylene1 -
3 Cursor Plastic - 6
4 Spring Stainless steel AISI 304
5
5 Shutter Plastic -
6 Shutter gasket EPDM Perox - 4
7 Vent Brass EN12164 CW617N 3
8 Cursor mount Stainless steel AISI 304
9 O-ring EPDM Perox - 2
10 Plug Brass EN12165 CW617N 1
11 Vent plug Polypropylene1 - 15
12 O-ring2 EPDM Perox -
13 Check valve body2 Brass EN12164 CW617N For Fig. 14
14 Check valve spring2 Stainless steel AISI 302 9393
13
15 Shutter2 Brass EN12164 CW617N
1
for high temperature
2
12
Check valve Fig.9393 components

DIMENSIONS
D H P1 E1 L1 Weight2
DN G
[mm] [mm] [mm] [mm] [mm] [g] H
010 ⅜" 10,5 60 - - - 156
015 ½" 10,5 60 15,5 20,8 35,3 165 / 213 D L
1
only for Fig. 9393 E
2
Fig. 9390 / Fig. 9393

P D
G G

230626
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®
13018 Valduggia (VC), Italy
Tel: +39 0163 47891
Fax: +39 0163 47895
www.vironline.com

Full port brass ball valve


Threaded F/F (ISO 228/1)
Air testing according to EN12266-1
Blow-out proof stem
Reversible handle
WRAS and TR CU 010 compliant

PN32 (Max 32bar up to 85°C, max 10bar at 130°C)


When used with air Max 20bar up to 110°C, max 10bar at 130°C
Free of CE marking (cat. according to Art. 4.3 Dir. 2014/68/EU)

Working conditions
Suitable for: water, 0°C to +130°C
Suitable for: air, -10°C to +130°C
Not suitable for: gases and liquids group 1 (Dir. 2014/68/EU)

9
N. Part Material Norm 8
1 Fixed end Nickel plated brass1 EN12165 CW617N
2 Seat PTFE - 7
3 Ball Chromium pl. brass EN12164 CW617N 6
4 Body Nickel plated brass1 EN12165 CW617N
5
5 Stem Brass EN12164 CW617N
6 O-ring NBR 70SH - 4
7 O-ring FKM -
3
8 Handle Dacromet steel2 EN10111 Fe P11
9 Screw Zinc plated steel EN10025 Fe42 2
1
Threads and internal parts not plated
2
With red PVC cover
1

A C P HL L Weight
DN T
[mm] [mm] [mm] [mm] [mm] [g]
L
010 40,7 10,0 8,5 32 81,0 85
015 ½" 47,6 11,5 12,7 44 91,5 165
020 ¾" 53,7 12,0 18,5 47 91,5 230
025 1" 65,0 14,5 24,0 51 126,5 390 HL
032 1¼" 77,8 16,0 31,0 57 126,5 560
040 1½" 85,0 17,0 37,0 69 141,5 830
050 2" 103,0 19,0 49,5 78 141,5 1310 T P

C
A

190225
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®

FV-C 13018 Valduggia (VC), Italy


Tel: +39 0163 47891
Fax: +39 0163 47895
www.vironline.com
Five Cotter Pin Float Valve with Flat Rod

Five cotter pin float valve with flat rod


Threaded M (ISO 228/1)
Adjustable sphere position for opening pressure range 2-5bar
For atmospehric pressure tanks
Not suitable with pressurized containers in "CI - CII - CIII -CIV" categories

PN5
Free of CE marking (cat. according to Art. 4.3 Dir. 2014/68/EU)

Working conditions
● Suitable for: water, 0°C to +100°C
● Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/EU)

PARTLIST
N. Part Material Norm
1 Rod Brass CW617N 10 11
8 9
2 Joint Tin alloy - 7
3 Floater Copper2 - 5
4
3
4 Floater lock Brass - 1
2
5 Levers Brass1 CW617N
6 Cotter-pin Brass CW508L
7 Lever Brass1 CW617N
8 Shutter Brass1 CW617N 6
9 Gasket NBR -
10 Body Brass1 CB 7535
11 Lock-nut Brass1 CW614N
1
CC491K bronze for DN≥65
2
Available also with plastic HDPE-BL3 floater

DIMENSIONS
C A L ØG1 Weight1 A C
DN T
[mm] [mm] [mm] [mm] [g]
015 ½" 30 41 215 100/ - 289/ - T
020 ¾" 30 51 270 120/120 444/416 L
025 1" 35 54 320 150/150 686/593
032 1¼" 44 80 430 180/180 1351/1257
040 1½" 56 85 480 200/220 1823/1663
050 2" 62 101 525 220/220 2393/2141
065 2½" 73 113 750 250/300 4535/4210
080 3" 73 120 750 300/300 6240/5901
100 4" 81 156 750 300/300 9240/8901 ØG
1
Copper floater version / plastic floater version

230216
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
5. Authorization/ Dealership
Letter
Not Applicable
6. Test Certificates/ Authority
Approvals
This certifies that

VIR VALVOINDUSTRIA ING RIZZIO SPA

has had the undermentioned product examined, tested and found,


when correctly installed, to comply with the requirements of the
United Kingdom Water Supply (Water Fittings) Regulations and
Scottish Water Byelaws.

FIG. 90 & FIG. 90LK RANGES OF GATE VALVES

The certificate by itself is not evidence of a valid WRAS Approval. Confirmation of the current
status of an approval must be obtained from the WRAS Directory (www.wras.co.uk/directory)

The product so mentioned will be valid until the end of:

November 2023

1811304

Certificate No.

Secretary Chairman, Product Assessment Group

June 2017
This certifies that

VIR VALVOINDUSTRIA ING RIZZIO SPA

has had the undermentioned product examined, tested and found,


when correctly installed, to comply with the requirements of the
United Kingdom Water Supply (Water Fittings) Regulations and
Scottish Water Byelaws.

FFIG. 33FF (PRODUCT CODE: F33FF0MIS), FIG. 33MF (PRODUCT CODE:


F33MF0MIS), FIG. 33MM (PRODUCT CODE: F33MM0MIS) SPHERICAL VALVES

The certificate by itself is not evidence of a valid WRAS Approval. Confirmation of the current
status of an approval must be obtained from the WRAS Directory (www.wras.co.uk/directory)

The product so mentioned will be valid until the end of:

January 2024

1901359

Certificate No.

Secretary Chairman, Product Assessment Group

June 2017
This certifies that

VIR VALVOINDUSTRIA ING RIZZIO SPA

has had the undermentioned product examined, tested and found,


when correctly installed, to comply with the requirements of the
United Kingdom Water Supply (Water Fittings) Regulations and
Scottish Water Byelaws.

4025L, 4025G, 402WL, 402WG, 4325L, 4325G, 432WL & 432WG BUTTERFLY
VALVES

The certificate by itself is not evidence of a valid WRAS Approval. Confirmation of the current
status of an approval must be obtained from the WRAS Directory (www.wras.co.uk/directory)

The product so mentioned will be valid until the end of:

November 2024

1911319

Certificate No.

Secretary Chairman, Product Assessment Group

June 2017
REPORT ON WATER POTABILITY OF 1/2" Brass Bib tap (Lock shield)

Page 01 of 04

Client : VIR ME International DWC-LLC Report No : ALR-2112/5502


Address : Dubai South Business Park, Dubai, U.A.E. Lab Project No : ALQ-2112/2759
Contractor : Not Provided Lab Reference No : OG-1193
Consultant : Not Provided Date sample Received : 29/12/2021
Project : Material Testing Date test started : 29/12/2021
Sample Description : 1/2" Brass Bib tap (Lock shield) Date test completed : 30/12/2021
Model No. : 293LK Report Date : 16/01/2022
Source of sample : Client Temp. of water used for extraction : 60ºC
Sampled by : Client Total number of extraction. : After 1st Extraction
Test Location : Mlab Al Quoz
Tested by : IKN

1/2" Brass Bib tap (Lock shield)

Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 24 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 30/12/2021

Test Test Result


Test Method Specification
Parameter Blank* Final Extract#
No Discernible
Odour BS 6920-Part 2 - Clause 2.2.2 - No Discernible Odour$
Odour
No Discernible
Flavour BS 6920-Part 2 - Clause -2.2.2 - No Discernible Odour$
Odour

*Blank: Chlorine free wat


#Sample Extract: Chlorine free water after 24hours immersion of the test specimen
$:Not detected in the first extract
Note: First extract turn out to be final extract.
Remarks: The test specimen complies with BS 6920 Part 1:2014 Clause 4.

Continued P/2

Results relate only to the items tested.


This report shall not be reproduced except in full, without the written approval of the laboratory.
REPORT ON WATER POTABILITY OF 1/2" Brass Bib tap (Lock shield)

Page 02 of 04

Client : VIR ME International DWC-LLC Report No : ALR-2112/5502


Address : Dubai South Business Park, Dubai, U.A.E. Lab Project No : ALQ-2112/2769
Contractor : Not Provided Lab Reference No : OG-1193
Consultant : Not Provided Date sample Received : 29/12/2021
Project : Material Testing Date test started : 29/12/2021
Sample Description : 1/2" Brass Bib tap (Lock shield) Date test completed : 30/12/2021
Model No. : 293LK Report Date : 16/01/2022
Source of sample : Client Temp. of water used for extraction : 60ºC
Sampled by : Client Total number of extraction. : After 1st Extraction
Test Location : Mlab Al Quoz
Tested by : IKN

Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 24 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 30/12/2021

Test Result
Test
Test Method Specification
Parameter
Blank* Final Extract#

Colour BS 6920-Part 2 - Clause 2.3 <5 Pt.Co <5 Pt.Co Max. 5 Pt.Co

Turbidity BS 6920-Part 2 - Clause 2.3 <0.5 NTU <0.5 NTU Max 0.5 NTU

Note: First extract turn out to be final extract.


Remarks: The test specimen complies with BS 6920 Part 1:2014 Clause 5.

Continued P/3

Results relate only to the items tested.


This report shall not be reproduced except in full, without the written approval of the laboratory.
REPORT ON WATER POTABILITY OF 1/2" Brass Bib tap (Lock shield)

Page 03 of 04

Client : VIR ME International DWC-LLC Report No : ALR-2112/5502


Address : Dubai South Business Park, Dubai, U.A.E. Lab Project No : ALQ-2112/2769
Contractor : Not Provided Lab Reference No : OG-1193
Consultant : Not Provided Date sample Received : 29/12/2021
Project : Material Testing Date test started : 29/12/2021
Sample Description : 1/2" Brass Bib tap (Lock shield) Date test completed : 05/01/2022
Model No. : 293LK Report Date : 16/01/2022
Source of sample : Client Temp. of water used for extraction : 60ºC
Sampled by : Client Total number of extraction. : After 1st Extraction
Test Location : Mlab Al Quoz
Tested by : IKN

Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 168 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 05/01/2022
Test Method : BS 6920 Part 2:2014 section 2.6.

Results
BS 6920: Part 1 2014 Spec.
Parameter Unit
Limits (Max.) Blank* Final Extract#

Aluminum Al µg/L 200 <20 <20

Iron Fe µg/L 200 <20 <20

Manganese Mn µg/L 50 <5 <5

Chromium Cr µg/L 50 <5 <5

Cadmium Cd µg/L 5 <0.5 <0.5

Nickel Ni µg/L 50 <2 <2

Lead Pb µg/L 50 <1 <1

Silver Ag µg/L 10 <1 <1

Arsenic As µg/L 50 <1 <1

Mercury Hg µg/L 1 <0.1 <0.1

Selenium Se µg/L 10 <1 <1

Antimony Sb µg/L 10 <0.5 <0.5

Barium Ba µg/L 1000 <100 <100

*Blank: Chlorine free distilled water


#
Sample Extract: Chlorine free distilled water after 24hours immersion of the test specimen
Note: First extract turn out to be final extract.
Remarks: The test specimen complies with BS 6920 Part 1:2014 Clause 8.

Continued P/4

Results relate only to the items tested.


This report shall not be reproduced except in full, without the written approval of the laboratory.
REPORT ON WATER POTABILITY OF 1/2" Brass Bib tap (Lock shield)
Page 04 of 04

Client : VIR ME International DWC-LLC Report No : ALR-2112/5502


Address : Dubai South Business Park, Dubai, U.A.E. Lab Project No : ALQ-2112/2769
Contractor : Not Provided Lab Reference No : OG-1193
Consultant : Not Provided Date sample Received : 29/12/2021
Project : Material Testing Date test started : 29/12/2021
Sample Description : 1/2" Brass Bib tap (Lock shield) Date test completed : 10/01/2022
Model No. : 293LK Report Date : 16/01/2022
Source of sample : Client Temp. of water used for extraction : 60ºC
Sampled by : Client Total number of extraction. : After 1st Extraction
Test Location : Dubai
Tested by : Subcontractor

Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 168 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 05/01/2022
Test Method : BS 6920 Part 2:2014 section 2.5.

Description Observation Result


Confluent growth of cells, and presence of regularly shaped
Negative Control Non-cytotoxic
cells
Zinc Sulphate Solution Fail to exhibit confluent growth, and significant irregularly
Positive
(Positive Reference) shaped cells
Water sample in contact with test Confluent growth of cells, and presence of regularly shaped
Non-cytotoxic
specimen cells
Remarks: The test specimen complies with BS 6920 Part 1:2014 Clause 7.

RESULT OF MICROBIOLOGICAL ANALYSIS


Parameters Test Methods Units Results Specifications

Total Coliforms APHA 9222 B CFU/100ml <1 Zero


Total Bacterial Count APHA 9215 B CFU/ml <1 500*
Pseudomonas Aeruginosa APHA 9213 E CFU/100ml <1 Zero
Fecal Coliforms APHA 9222 D CFU/100ml <1 Zero
Escherichia Coli APHA 9222 G CFU/100ml <1 Zero

Remarks : The microbiological status of the above sample are within the limits of Specifications.
Note : As per the test report, the water in contact with sample was found to be non-toxic and suitable for
drinking purpose.
CFU-Colony forming unit
APHA (American Public Health Association) Standard method for the examination of water and waste
water 22nd Edition:2012
*Specification Reference: Guidelines for the control of legionella in water system public health & safety
department, Public safety section, Dubai Municipality (Guidelines value for TBC is not available in GSO
149/2014 specification)

Authorized Signatory

Results relate only to the items tested.


This report shall not be reproduced except in full, without the written approval of the laboratory.
REPORT ON WATER POTABILITY OF 1/2" Brass Spring Loaded Check Valve

Page 01 of 04

Client : VIR ME International DWC-LLC Report No : ALR-2112/5510


Address : Dubai South Business Park, Dubai, U.A.E. Lab Project No : ALQ-2112/2763
Contractor : Not Provided Lab Reference No : OG-1193
Consultant : Not Provided Date sample Received : 29/12/2021
Project : Material Testing Date test started : 29/12/2021
Sample Description : 1/2" Brass Spring Loaded Check Valve Date test completed : 30/12/2021
Model No. : 765 Report Date : 16/01/2022
Source of sample : Client Temp. of water used for extraction : 60ºC
Sampled by : Client Total number of extraction. : After 1st Extraction
Test Location : Mlab Al Quoz
Tested by : IKN

1/2" Brass Spring Loaded Check Valve

Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 24 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 30/12/2021

Test Test Result


Test Method Specification
Parameter Blank* Final Extract#
No Discernible
Odour BS 6920-Part 2 - Clause 2.2.2 - No Discernible Odour$
Odour
No Discernible
Flavour BS 6920-Part 2 - Clause -2.2.2 - No Discernible Odour$
Odour

*Blank: Chlorine free wat


#Sample Extract: Chlorine free water after 24hours immersion of the test specimen
$:Not detected in the first extract
Note: First extract turn out to be final extract.
Remarks: The test specimen complies with BS 6920 Part 1:2014 Clause 4.

Continued P/2

Results relate only to the items tested.


This report shall not be reproduced except in full, without the written approval of the laboratory.
REPORT ON WATER POTABILITY OF 1/2" Brass Spring Loaded Check Valve

Page 02 of 04

Client : VIR ME International DWC-LLC Report No : ALR-2112/5510


Address : Dubai South Business Park, Dubai, U.A.E. Lab Project No : ALQ-2112/2763
Contractor : Not Provided Lab Reference No : OG-1193
Consultant : Not Provided Date sample Received : 29/12/2021
Project : Material Testing Date test started : 29/12/2021
Sample Description : 1/2" Brass Spring Loaded Check Valve Date test completed : 30/12/2021
Model No. : 765 Report Date : 16/01/2022
Source of sample : Client Temp. of water used for extraction : 60ºC
Sampled by : Client Total number of extraction. : After 1st Extraction
Test Location : Mlab Al Quoz
Tested by : IKN

Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 24 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 30/12/2021

Test Result
Test
Test Method Specification
Parameter
Blank* Final Extract#

Colour BS 6920-Part 2 - Clause 2.3 <5 Pt.Co <5 Pt.Co Max. 5 Pt.Co

Turbidity BS 6920-Part 2 - Clause 2.3 <0.5 NTU <0.5 NTU Max 0.5 NTU

Note: First extract turn out to be final extract.


Remarks: The test specimen complies with BS 6920 Part 1:2014 Clause 5.

Continued P/3

Results relate only to the items tested.


This report shall not be reproduced except in full, without the written approval of the laboratory.
REPORT ON WATER POTABILITY OF 1/2" Brass Spring Loaded Check Valve

Page 03 of 04

Client : VIR ME International DWC-LLC Report No : ALR-2112/5510


Address : Dubai South Business Park, Dubai, U.A.E. Lab Project No : ALQ-2112/2763
Contractor : Not Provided Lab Reference No : OG-1193
Consultant : Not Provided Date sample Received : 29/12/2021
Project : Material Testing Date test started : 29/12/2021
Sample Description : 1/2" Brass Spring Loaded Check Valve Date test completed : 05/01/2022
Model No. : 765 Report Date : 16/01/2022
Source of sample : Client Temp. of water used for extraction : 60ºC
Sampled by : Client Total number of extraction. : After 1st Extraction
Test Location : Mlab Al Quoz
Tested by : IKN

Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 168 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 05/01/2022
Test Method : BS 6920 Part 2:2014 section 2.6.

Results
BS 6920: Part 1 2014 Spec.
Parameter Unit
Limits (Max.) Blank* Final Extract#

Aluminum Al µg/L 200 <20 <20

Iron Fe µg/L 200 <20 <20

Manganese Mn µg/L 50 <5 <5

Chromium Cr µg/L 50 <5 <5

Cadmium Cd µg/L 5 <0.5 <0.5

Nickel Ni µg/L 50 <2 <2

Lead Pb µg/L 50 <1 <1

Silver Ag µg/L 10 <1 <1

Arsenic As µg/L 50 <1 <1

Mercury Hg µg/L 1 <0.1 <0.1

Selenium Se µg/L 10 <1 <1

Antimony Sb µg/L 10 <0.5 <0.5

Barium Ba µg/L 1000 <100 <100

*Blank: Chlorine free distilled water


#
Sample Extract: Chlorine free distilled water after 24hours immersion of the test specimen
Note: First extract turn out to be final extract.
Remarks: The test specimen complies with BS 6920 Part 1:2014 Clause 8.

Continued P/4

Results relate only to the items tested.


This report shall not be reproduced except in full, without the written approval of the laboratory.
REPORT ON WATER POTABILITY OF 1/2" Brass Spring Loaded Check Valve
Page 04 of 04

Client : VIR ME International DWC-LLC Report No : ALR-2112/5510


Address : Dubai South Business Park, Dubai, U.A.E. Lab Project No : ALQ-2112/2763
Contractor : Not Provided Lab Reference No : OG-1193
Consultant : Not Provided Date sample Received : 29/12/2021
Project : Material Testing Date test started : 29/12/2021
Sample Description : 1/2" Brass Spring Loaded Check Valve Date test completed : 10/01/2022
Model No. : 765 Report Date : 16/01/2022
Source of sample : Client Temp. of water used for extraction : 60ºC
Sampled by : Client Total number of extraction. : After 1st Extraction
Test Location : Dubai
Tested by : Subcontractor

Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 168 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 05/01/2022
Test Method : BS 6920 Part 2:2014 section 2.5.

Description Observation Result


Confluent growth of cells, and presence of regularly shaped
Negative Control Non-cytotoxic
cells
Zinc Sulphate Solution Fail to exhibit confluent growth, and significant irregularly
Positive
(Positive Reference) shaped cells
Water sample in contact with test Confluent growth of cells, and presence of regularly shaped
Non-cytotoxic
specimen cells
Remarks: The test specimen complies with BS 6920 Part 1:2014 Clause 7.

RESULT OF MICROBIOLOGICAL ANALYSIS


Parameters Test Methods Units Results Specifications

Total Coliforms APHA 9222 B CFU/100ml <1 Zero


Total Bacterial Count APHA 9215 B CFU/ml 400 500*
Pseudomonas Aeruginosa APHA 9213 E CFU/100ml <1 Zero
Fecal Coliforms APHA 9222 D CFU/100ml <1 Zero
Escherichia Coli APHA 9222 G CFU/100ml <1 Zero

Remarks : The microbiological status of the above sample are within the limits of Specifications.
Note : As per the test report, the water in contact with sample was found to be non-toxic and suitable for
drinking purpose.
CFU-Colony forming unit
APHA (American Public Health Association) Standard method for the examination of water and waste
water 22nd Edition:2012
*Specification Reference: Guidelines for the control of legionella in water system public health & safety
department, Public safety section, Dubai Municipality (Guidelines value for TBC is not available in GSO
149/2014 specification)

Authorized Signatory

Results relate only to the items tested.


This report shall not be reproduced except in full, without the written approval of the laboratory.
REPORT ON WATER POTABILITY OF 1" Brass Float Valve

Page 01 of 04

Client : VIR ME International DWC-LLC Report No : ALR-2112/5508


Address : Dubai South Business Park, Dubai, U.A.E. Lab Project No : ALQ-2112/2762
Contractor : Not Provided Lab Reference No : OG-1193
Consultant : Not Provided Date sample Received : 29/12/2021
Project : Material Testing Date test started : 29/12/2021
Sample Description : 1" Brass Foot Valve Date test completed : 30/12/2021
Model No : FV-C Report Date : 16/01/2022
Source of sample : Client Temp. of water used for extraction : 60ºC
Sampled by : Client Total number of extraction. : After 1st Extraction
Test Location : Mlab Al Quoz
Tested by : IKN

1" Brass Foot Valve

Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 24 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 30/12/2021

Test Test Result


Test Method Specification
Parameter Blank* Final Extract#
No Discernible
Odour BS 6920-Part 2 - Clause 2.2.2 - No Discernible Odour$
Odour
No Discernible
Flavour BS 6920-Part 2 - Clause -2.2.2 - No Discernible Odour$
Odour

*Blank: Chlorine free wat


#Sample Extract: Chlorine free water after 24hours immersion of the test specimen
$:Not detected in the first extract
Note: First extract turn out to be final extract.
Remarks: The test specimen complies with BS 6920 Part 1:2014 Clause 4.

Continued P/2

Results relate only to the items tested.


This report shall not be reproduced except in full, without the written approval of the laboratory.
REPORT ON WATER POTABILITY OF 1" Brass Float Valve

Page 02 of 04

Client : VIR ME International DWC-LLC Report No : ALR-2112/5508


Address : Dubai South Business Park, Dubai, U.A.E. Lab Project No : ALQ-2112/2762
Contractor : Not Provided Lab Reference No : OG-1193
Consultant : Not Provided Date sample Received : 29/12/2021
Project : Material Testing Date test started : 29/12/2021
Sample Description : 1" Brass Foot Valve Date test completed : 30/12/2021
Model No. : FV-C Report Date : 16/01/2022
Source of sample : Client Temp. of water used for extraction : 60ºC
Sampled by : Client Total number of extraction. : After 1st Extraction
Test Location : Mlab Al Quoz
Tested by : IKN

Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 24 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 30/12/2021

Test Result
Test
Test Method Specification
Parameter
Blank* Final Extract#

Colour BS 6920-Part 2 - Clause 2.3 <5 Pt.Co <5 Pt.Co Max. 5 Pt.Co

Turbidity BS 6920-Part 2 - Clause 2.3 <0.5 NTU <0.5 NTU Max 0.5 NTU

Note: First extract turn out to be final extract.


Remarks: The test specimen complies with BS 6920 Part 1:2014 Clause 5.

Continued P/3

Results relate only to the items tested.


This report shall not be reproduced except in full, without the written approval of the laboratory.
REPORT ON WATER POTABILITY OF 1" Brass Float Valve

Page 03 of 04

Client : VIR ME International DWC-LLC Report No : ALR-2112/5508


Address : Dubai South Business Park, Dubai, U.A.E. Lab Project No : ALQ-2112/2762
Contractor : Not Provided Lab Reference No : OG-1193
Consultant : Not Provided Date sample Received : 29/12/2021
Project : Material Testing Date test started : 29/12/2021
Sample Description : 1" Brass Foot Valve Date test completed : 05/01/2022
Model No. : FV-C Report Date : 16/01/2022
Source of sample : Client Temp. of water used for extraction : 60ºC
Sampled by : Client Total number of extraction. : After 1st Extraction
Test Location : Mlab Al Quoz
Tested by : IKN

Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 168 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 05/01/2022
Test Method : BS 6920 Part 2:2014 section 2.6.

Results
BS 6920: Part 1 2014 Spec.
Parameter Unit
Limits (Max.) Blank* Final Extract#

Aluminum Al µg/L 200 <20 <20

Iron Fe µg/L 200 <20 <20

Manganese Mn µg/L 50 <5 <5

Chromium Cr µg/L 50 <5 <5

Cadmium Cd µg/L 5 <0.5 <0.5

Nickel Ni µg/L 50 <2 <2

Lead Pb µg/L 50 <1 <1

Silver Ag µg/L 10 <1 <1

Arsenic As µg/L 50 <1 <1

Mercury Hg µg/L 1 <0.1 <0.1

Selenium Se µg/L 10 <1 <1

Antimony Sb µg/L 10 <0.5 <0.5

Barium Ba µg/L 1000 <100 <100

*Blank: Chlorine free distilled water


#
Sample Extract: Chlorine free distilled water after 24hours immersion of the test specimen
Note: First extract turn out to be final extract.
Remarks: The test specimen complies with BS 6920 Part 1:2014 Clause 8.

Continued P/4

Results relate only to the items tested.


This report shall not be reproduced except in full, without the written approval of the laboratory.
REPORT ON WATER POTABILITY OF 1" Brass Float Valve
Page 04 of 04

Client : VIR ME International DWC-LLC Report No : ALR-2112/5508


Address : Dubai South Business Park, Dubai, U.A.E. Lab Project No : ALQ-2112/2762
Contractor : Not Provided Lab Reference No : OG-1193
Consultant : Not Provided Date sample Received : 29/12/2021
Project : Material Testing Date test started : 29/12/2021
Sample Description : 1" Brass Foot Valve Date test completed : 10/01/2022
Model No. : FV-C Report Date : 16/01/2022
Source of sample : Client Temp. of water used for extraction : 60ºC
Sampled by : Client Total number of extraction. : After 1st Extraction
Test Location : Dubai
Tested by : Subcontractor

Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 168 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 05/01/2022
Test Method : BS 6920 Part 2:2014 section 2.5.

Description Observation Result


Confluent growth of cells, and presence of regularly shaped
Negative Control Non-cytotoxic
cells
Zinc Sulphate Solution Fail to exhibit confluent growth, and significant irregularly
Positive
(Positive Reference) shaped cells
Water sample in contact with test Confluent growth of cells, and presence of regularly shaped
Non-cytotoxic
specimen cells
Remarks: The test specimen complies with BS 6920 Part 1:2014 Clause 7.

RESULT OF MICROBIOLOGICAL ANALYSIS


Parameters Test Methods Units Results Specifications

Total Coliforms APHA 9222 B CFU/100ml <1 Zero


Total Bacterial Count APHA 9215 B CFU/ml 380 500*
Pseudomonas Aeruginosa APHA 9213 E CFU/100ml <1 Zero
Fecal Coliforms APHA 9222 D CFU/100ml <1 Zero
Escherichia Coli APHA 9222 G CFU/100ml <1 Zero

Remarks : The microbiological status of the above sample are within the limits of Specifications.
Note : As per the test report, the water in contact with sample was found to be non-toxic and suitable for
drinking purpose.
CFU-Colony forming unit
APHA (American Public Health Association) Standard method for the examination of water and waste
water 22nd Edition:2012
*Specification Reference: Guidelines for the control of legionella in water system public health & safety
department, Public safety section, Dubai Municipality (Guidelines value for TBC is not available in GSO
149/2014 specification)

Authorized Signatory

Results relate only to the items tested.


This report shall not be reproduced except in full, without the written approval of the laboratory.
This cer)fies that

TAIZHOU VIR VALVE MANUFACTURING CO., LTD


has had the undermen)oned product(s) examined, tested and
cer)fied as being of an appropriate quality and standard as required
in the Water Supply (Water Fi@ngs) Regula)ons and Sco@sh Water
Byelaws, subject to scheme requirements being met when installed.

Model Numbers

FIG. 9393 AIR VENT VALVE .

The cer)ficate by itself is not evidence of a valid WRAS Approval. Confirma)on of the current
status of an approval must be obtained from the WRAS Approvals Directory (www.wras.co.uk/
directory)

The product so men)oned will be valid un)l the end of:

May 2028

Cer)ficate No.

2305328

Ian Hughes,
WRAS Approvals Manager
7. Company Profile &
Trade License
Valvoindustria Ing. Rizzio S.p.A.

PAG-1
TAPPE DI UNA STORIA MILESTONES

PAG-2
LA FONDAZIONE THE BEGINNING
Corre l’anno 1971 quando a Valduggia nasce VIR S.p.A. Perché VIR?
Il nome scelto è un acronimo di Valvoindustria Ing. Rizzio, dal fondatore, Ing. Savino
Rizzio. In oltre 40 anni di attività VIR S.p.A. è divenuta leader internazionale nella
produzione di valvole, con oltre 10 milioni di pezzi prodotti all’anno.
VIR S.p.A. was established in Valduggia in 1971. Why VIR?
The name chosen is an acronym of Valvoindustria Ing. Rizzio, from the founder, Ing. Savino
Rizzio. In more than 40 years of activity, VIR S.p.A. has become an international leader in
the production of valves, with an annual production of over 10 million pieces.

NON SOLO METALLO NOT ONLY METAL


Nel 1992 Vir decide di introdurre un nuovo materiale per la produzione delle proprie valvole:
la plastica. Viene infatti acquisita una ditta per la produzione di valvole a sfera in polipropi-
lene (oggi Blue Tag), cui due anni dopo si aggiunge la produzione di valvole in PP-R80.
In 1992 VIR decided to introduce a new material for the production of their valves, which
was plastic. It therefore acquired a company for the production of ball valves in polypropy-
lene (Blue Tag), to which two years later they added the production of valves in PP-R80.

UN SALTO OLTREOCEANO A LEAP ACROSS THE OCEAN


Nel 2003 inizia l’espansione di VIR al di fuori del territorio europeo. Il primo continente
prescelto è l’America del Nord. A seguito dell’acquisizione della ditta Red-White Valve
Corp., VIR consegue infatti una presenza diretta sul mercato Nordamericano.
In 2003 VIR began its expansion outside Europe. The first continent they selected was
the United States of America, and with the acquisition of Red-White Valve Corp., VIR
attained, in fact, a direct presence in the North American market.

ESPANSIONE IN ASIA EXPANSION INTO ASIA


Con l’inaugurazione a Taizhou nel 2008 di una nuova azienda produttiva (la Taizhou VIR
Valve Manufacturing Co. Ltd.) VIR sbarca così in Cina. Nel 2010 inaugura quindi VIR
Shanghai, società che ha lo scopo di creare una rete di distribuzione in Cina per i
prodotti VIR ad alta qualità e contenuto tecnologico.
With the inauguration in 2008 in Taizhou of a new production company (Taizhou VIR
Valve Manufacturing Co. L.td.) VIR also disembarked in China. VIR Shanghai was then
inaugurated in 2010 with the aim of creating a distribution network in China for the
high-quality and technological VIR products.

AL CENTRO DEI NUOVI MERCATI AT THE CENTRE OF THE NEW MARKETS


E’ a Dubai, nella prestigiosa area del Dubai World Central, che VIR inaugura nel 2017 la sua
divisione commerciale per tutto il medio oriente (VIR ME International DWC LCC). Una città
all’avanguardia nell’architettura necessita di soluzioni all’avanguardia nella tecnologia!
VIR later inaugurated in Dubai, in 2017 in the prestigious Dubai World Central area, its
sales division for the whole of the Middle East (VIR ME International DWC LLC). A city at
the cutting edge of architecture requires products at the cutting edge of technology!

PAG-3
QUALCOSA IN PIU’ SOMETHING MORE

VICINI PER TRADIZIONE UNITED IN TRADITION


Valduggia, paese che ospita VIR S.p.A., è nel cuore del distretto Cusio-Valsesia.
Le aziende dell’area, che devono il proprio know-how alla tradizionale produzione delle campane
in bronzo, specializzandosi su valvolame e rubinetteria, hanno consolidato un polo produttivo,
ove regna il confronto costante e la collaborazione.
Valduggia, where VIR S.p.A. is located, is in the heart of the Cusio-Valsesia district.
The companies of this area, who owe their know-how to the traditional production of bronze
bells, have specialised in the production of valves and taps, consolidating a manufacturing hub,
where open dialogue and collaboration reign supreme.

DALLA TEORIA ALLA PRATICA FROM THEORY TO PRACTICE


Progettare bene per costruire meglio: i software BIM (Building Information Modeling) permetto-
no di costruire un modello digitale dettagliato di un edificio comprensivo di impianti e
arredamenti. VIR già mette a disposizione una selezione di modelli digitali dei suoi prodotti (in
formato Revit) utilizzabili in tali strumenti (vir.magicloud.com).
A better design for better buildings: BIM (Building Information Modeling) tools allow to build a
detailed digital model of a building, including its systems and furniture. VIR already offers a
selection of digital models (in Revit format) that can be used in these tools (vir.magicloud.com).

VICINI A VOI CON SEMPLICITÀ SIMPLY CLOSE TO YOU


La nostra applicazione per smartphone mette a disposizione comode utility e informazioni
tecniche sui nostri prodotti in pochi tocchi... e a portata di tasca!
Our App for smartphones provides useful utilities and technical information on all our products
with just a few clicks… and it is in your pocket!

DISSETARSI SENZA PIOMBO LEAD-FREE DRINKING


Attenta alla salute e all’ambiente già dagli anni 80 VIR ha introdotto le leghe DZR per prevenire
la contaminazione dello zinco nell’acqua potabile. Nel 2010 abbiamo inoltre creato una linea di
valvole certificate a ridotto contenuto di piombo, per tornare a bere l’acqua di rubinetto, ma con
un nuovo rispetto per la salute.
Already in the 80’s VIR, always scrupulous about health and the environment, introduced the
DZR alloys to prevent zinc contamination of drinking water. In 2010 they then created a line of
valves certified as having a reduced lead content, allowing a return to drinking tap water, but
with a new respect for health.

PAG-4
PAG-5
OLTRE LA PRODUZIONE BEYOND PRODUCTION

PAG-6
DARE FORMA ALLE IDEE GIVING SHAPE TO IDEAS
Grazie ad un competente ufficio tecnico interno, studiamo progetti cercando di anticipare le
esigenze del mercato e troviamo nuove soluzioni alle necessità dei nostri clienti.
Thanks to a highly competent in-house technical office, VIR studies projects aimed at anticipa-
ting the needs of the market and finding new solutions for the customers’ requirements.

CREARE PER CREARE CREATING TO CREATE


Generalmente chi produce un oggetto si rivolge a terzi per l’acquisto delle macchine che gli
permettono tale produzione. In VIR non ci accontentiamo di questo. Ecco perché i macchinari di
alcune linee produttive sono stati prodotti internamente: realizziamo con precisione e cura la
macchine particolari di cui abbiamo bisogno.
Normally, whoever produces an object turns to a third party for the acquisition of the machinery
that allows for its production. VIR is not satisfied with this, and for this reason the machinery
of some production lines are made internally, creating the special machines required with
precision and care.

PROVATE AL 100% 100% TESTING


La produzione VIR è testata al 100% affinché ogni valvola prodotta garantisca al cliente qualità,
resistenza e durata.
VIR production is fully tested, so that every valve produced guarantees the customer quality,
resistance and durability.

ALL'AVANGUARDIA NELLA TECNICA ON THE CUTTING EDGE OF TECHNOLOGY


VIR è da sempre attenta alle nuove tecnologie incorporandole sia nei suoi prodotti che nei suoi
processi produttivi.
VIR has always been focused on new technologies, embodying them in both its products as well
as in its manufacturing processes.

ALL’AVANGUARDIA NELLA QUALITÀ ON THE CUTTING EDGE OF QUALITY


Eseguiamo per le parti più critiche controlli con uno speciale scanner tridimensionale, che verifica
automaticamente la perfetta corrispondenza di misure tra progetto e prodotto finale.
For the more critical parts and components special quality checks are carried out by means of
a three-dimensional scanner, which automatically verifies the perfect correspondence of
measurement between project and final product.

PAG-7
VALVOLE A SFERA BALL VALVES

MATERIALI MATERIALS
Le Valvole a sfera VIR sono disponibili in differenti tipologie di materiali: Bronzo, Ottone, Ottone
DZR, Ottone a basso livello di piombo, PP, PP-R80 e ghisa.
VIR ball valves are available in different types of materials: bronze, brass, DZR brass, low-lead
brass, PP, PP-R80 and cast-iron.

COLORE COLOUR
La personalizzazione dei nostri prodotti passa anche attraverso il colore. I modelli in plastica,
infatti, possono essere realizzati in una vasta gamma di cromie differenti.
The personalisation of our products is also obtained by means of colour. The items made in
plastic can, in fact, be realised in a vast range of different shades.

CONNESSIONI END CONNECTIONS


A diverse esigenze di impianto, rispondiamo offrendo anche una varietà di connessioni: Filettate,
a stringere, a pressare, a saldare, ad innesto rapido sono solo alcune delle tipologie offerte.
For different plant systems we also offer a variety of end connections: threaded, compres-
sion-end, press-end, solder and quick-fit are some of the types offered.

ESPERIENZA EXPERIENCE
L’alta qualità delle nostre valvole a sfera nasce da una esperienza produttiva quaran-
tacinquennale.
The high quality of our ball valves stems from over forty-five years’ production experience in
this field.

PAG-8
PAG-9
VALVOLE DI BILANCIAMENTO BALANCING VALVES

PAG-10
MATERIALI MATERIALS
Le valvole di bilanciamento VIR sono realizzate nei materiali della tradizione che più resistono
alla corrosione dei fluidi utilizzati negli impianti di riscaldamento: ottone DZR e bronzo.
The VIR balancing valves are made of the materials that traditionally have a higher resistance
to the corrosive action of heating system fluids : DZR brass and bronze.

STATICO E DINAMICO STATIC AND DYNAMIC


VIR realizza valvole sia per il bilanciamento statico che per quello dinamico. I benefici del loro
utilizzo sono il risparmio energetico, la regolazione della migliore portata, la riduzione della
velocità del fluido atta a prevenire rumorosità indesiderate.
VIR produces valves for both static and dynamic balancing. The benefits of their use are the
lower energy consumption, the regulation of the best flow-rate and the reduction of the fluid
speeds, which prevent any undesired noise in the system.

MISURA MEASUREMENT
Per effettuare una corretta messa in opera dei nostri prodotti, è importante eseguire le corrette
misurazioni. A tale scopo mettiamo a disposizione strumenti e accessori per la misurazione,
anche attraverso smartphone.
In order to obtain an optimal commissioning of our products, it is imperative to obtain the
correct measurements. For that reason, we ensure that our customers have at their disposal
the necessary instruments and accessories for measuring, some of which work even via
smartphone.

ESPERIENZA EXPERIENCE
Realizziamo valvole di bilanciamento dal 1988 e possiamo quindi vantare un’esperi-
enza produttiva ultratrentennale nel settore.
VIR has been producing balancing valves since 1988 and can, therefore, boast an over
thirty-year production experience in the sector.

PAG-11
COMPLEMENTI PER L’HVAC ACCESSORIES FOR HVAC

GAMMA RANGE
Mettiamo a disposizione una gamma completa non solo di valvole, ma anche di accessori per
l’HVAC quali, ad esempio, filtri e giunti flessibili in un vasto assortimento di materiali e
tipologie.
VIR has a complete range not only of valves, but also accessories for HVAC such as, for
example, filters and flexible joints, in a vast assortment of materials and types.

MISURE SIZES
Per soddisfare ogni tipo di esigenza, forniamo una gamma di misure da ¼” a 24” ; da 8mm a
600 mm.
To satisfy every type of necessity, we supply a range of sizes from ¼” to 24”; from 8mm to
600mm.

MOTORI MOTORS
VIR strizza l’occhio all’automazione e propone una serie di valvole motorizzate elettricamente,
pneumaticamente e relativi accessori.
VIR walks hand-in-hand with automation and proposes a series of electrically and pneumatical-
ly motorized valves, as well as their relative accessories.

INSTALLAZIONE INSTALLATION
VIR produce anche un innovativo kit per l’installazione su unità terminali, che permette in
cantiere un'installazione rapida e ordinata.
VIR also produces an innovative kit to be fitted onto terminal units, thus allowing a rapid and
clean on-site installation.

PAG-12
PAG-13
ICONIC REFERENCE LIST

HOSPITAL 1- Msida - Malta - Mater Dei Oncology Center


2- Karachi - Pakistan - Aga Khan Hospital and Medical College
3- Mladá Boleslav - Czech Rep. - Nemocnice Mladá Boleslav
4- Riyadh - Saudi Arabia - Dr. Sulaiman Al Habib Group - Sweidi Hospital
5- Riyadh - Saudi Arabia - King Khalid Medical City
6- Chablais Villeneuve - Switzerland - Ospedale Riviera

UNIVERSITY 7- Mecca - Saudi Arabia - Umm Al-Qura University


8- Liberec - Czech Rep. - TUL University

HOTEL - RESIDENCIAL 9- St. Julian’s - Malta - Hilton Hotel


10- Accra - Ghana - Movenpick Ambassador Hotel
11- Irkutsk - Russia - Modernization of central heating system of domestic buildings
12- Dubai - United Arab Emirates - Sweden Island – The Heart of Europe
13- Dubai - United Arab Emirates - Fountain View Towers
14- Abu Dhabi -United Arab Emirates - Fairmont Abu Dhabi Hotel & Serviced Apartments
15- Milano - Italy - City Life
16- Doha - Quatar - The Bay - La Plage South, The Pearl Qatar
17- Milano - Italy - Bosco verticale

CONVENTION CENTER 18- Roma - Italy - Nuvola Fuksas

SHOPPING CENTER 19- Salalah - Oman - Salalah Grand Mall


20- Roma - Italy - Maximo Laurentino

MUSEUM 21- Athens - Greece - National Gallery


22- Firenze - Italy - Galleria Uffizi

STADIUM 23- Cape Town - South Africa - Cape Town Stadium

DISTRICT HEATING - COOLING 24- Kharkiv - Ucraine - Kharkiv district heating


25- Odessa - Ucraine - Odessa district heating:

BANK 26- Milano - Italy - Diamond Tower

PAG-14
5 13

15
14

17

16 22

26

20
23 8

18

19

PAG-15
CERTIFICAZIONI CERTIFICATIONS

UNI EN
331
EN331- Europe

TR CU 010 - Russia, Belarus and Kazakhstan

STF - Finland

ACS - France

IAPMO - USA

VA - Denmark

UL-FM - USA

CSA - USA, Canada

NSF 61 - USA

WRAS - UK

PAG-16
Per ogni informazione sui punti vendita dei prodotti VIR in Italia e
nel mondo contattateci ai seguenti riferimenti:
For information about VIR’s products and points of sale, in Italy and
in the world, please contact us at:

VIR – Valvoindustria Ing. Rizzio S.p.A.


Via Circonvallazione 10
13018 Valduggia (VC)
Tel. +39 0163 47891 – Fax +39 0163 47895

sales@vironline.com
Ordini, trattative e informazioni commerciali
Orders and commercial information

tcnsales@vironline.com
Informazioni di carattere tecnico
Technical information

www.vironline.com
Per scaricare cataloghi e brochure
To download catalogues and brochures

PAG-17
8. Project References
Office 305 Building A4

Middle East Reference List DWC Dubai, UAE


Tel: +971 4 8844 007
Fax: +971 4 8844 008
(December 20, 2022) www.vironline.com

Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves

Dubai Creek Harbour Development - SSHIC International


1 2022 UAE Dubai High Rise (15+) Emaar Properties PJSC HVAC, PLUMBING
Creek Beach - Phase 3 Engineering Consultants

Emaar South Greenview Townhouses Mirage Leisure and


2 2022 UAE Dubai Low Rise (1 - 3) Emaar Properties PJSC PLUMBING
(Community Center & Guard Houses) Developments LLC

Mirage Leisure and


3 Arabian Ranches III Development 2022 UAE Dubai Low Rise (1 - 3) Emaar Properties PJSC HVAC
Developments LLC
Mirage Leisure and
4 The Valley Development Townhouses 2022 UAE Dubai Low Rise (1 - 3) Emaar Properties PJSC PLUMBING
Developments LLC
Mid-Rise Residential Downtown Jebel Aurora Real Estate Planquadrat Middle East
5 2022 UAE Dubai Mid Rise (4 - 14) HVAC, PLUMBING
Ali Development LLC Engineering
Hannover Consulting
6 Residential Building at Al Raha Beach 2022 UAE Abu Dhabi Mid Rise (4 - 14) Al Rakha HVAC
Engineers

Commercial Building Mr. Saif Alsayed Mr. Saif Alsayed Saleh Ahmed Hannover Consulting
7 2022 UAE Abu Dhabi Mid Rise (4 - 14) HVAC
Saleh Ahmed Alsayed Ashkar Alsayed Ashkar Engineers

Commercial Building Mr. Ali Khadim Mr. Ali Khadim Salem Al Hannover Consulting
8 2022 UAE Abu Dhabi Low Rise (1 - 3) HVAC
Salem Al Mansoori Mansoori Engineers
Residential Building Mr. Saif Bader
9 2022 UAE Abu Dhabi Low Rise (1 - 3) Mr. Saif Bader Haji Sultan Zein Design Consultant HVAC
Haji Sultan
Commercial Building of H.E. Faris Mr. H.E. Faris Khalafan Hannover Consulting
10 2022 UAE Abu Dhabi Mid Rise (4 - 14) HVAC
Khalafan Buhumaid Almazrouei Buhumaid Almazrouei Engineers
Commercial Building of Mr. Ghanem Mr. Ghanem Salem Omair Golden Planners Consultants
11 2022 UAE Abu Dhabi Mid Rise (4 - 14) HVAC
Salem Omair Almansoori Almansoori LLC
Sports Facilities Building for Muay Hannover Consulting
12 2022 UAE Abu Dhabi Low Rise (1 - 3) Ministry of Presidential Affairs HVAC
Thai & Kickboxing Federation Engineers
Vocational Center Building for Al Bayan Engineering
13 2022 UAE Abu Dhabi Low Rise (1 - 3) Ministry of Presidential Affairs HVAC
Emirates National School Consultant
Consistent Engineering
14 Lulu Hypermarket at Dubai South 2022 UAE Dubai Low Rise (1 - 3) Lulu Hypermarket LLC HVAC
Consultants
Shed in Residential District Dubai
15 2022 UAE Dubai Low Rise (1 - 3) Dubai South Al Wasl Al Jadeed Consultant HVAC, PLUMBING
South
Mirage Leisure and
16 Grand Bleu 2022 UAE Dubai High Rise (15+) Emaar Properties PJSC HVAC
Developments LLC
Nshama Reem Community - 364
17 2021 UAE Dubai Low Rise (1 - 3) Nshama AWAJ Consultant PLUMBING
Townhouses
Al Hamah Janoob Real Estate Itqan Architectural Design
18 Eastern Residence Villas - Falcon City 2021 UAE Dubai Low Rise (1 - 3) PLUMBING
Development LLC Consultancy
19 Creek Edge - Dubai Creek Harbour 2021 UAE Dubai High Rise (15+) Emaar Properties PJSC U+A Design & Consultancy HVAC, PLUMBING
The Midtown - Zone - 5 (Mesk) Deyaar (Global Real Estate
20 2021 UAE Dubai Mid Rise (4 - 14) Ramboll Middle East Ltd HVAC, PLUMBING
International Media Production Zone Devt. Co.)
O.R. Mess At Royal Guard of Oman
21 2021 Oman Seeb Low Rise (1 - 3) Royal Guard of Oman Royal Guard of Oman HVAC
HQ Camp, Seeb

1/9
Office 305 Building A4

Middle East Reference List DWC Dubai, UAE


Tel: +971 4 8844 007
Fax: +971 4 8844 008
(December 20, 2022) www.vironline.com

Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves

Sohar Women and Children Hospital


22 2021 Oman Sohar Mid Rise (4 - 14) Ministry of Health Khatib & Alami HVAC
Project
La Vie Tower - Jumeirah Beach
23 2021 UAE Dubai High Rise (15+) Meraas Holding IBA PLUMBING
Residence
24 2020 Al Wasl Tower 2021 UAE Dubai High Rise (15+) WASL Seed Engineering Consultants HVAC
The Address Residences Beachfront -
25 2020 UAE Dubai High Rise (15+) Emaar Properties PJSC Mirage Consultants HVAC
Beach Isle
Burj Crown - Residential Building
26 2021 UAE Dubai High Rise (15+) Emaar Properties PJSC Ramboll Middle East Ltd HVAC
Downtown
Vida Hotel & Branded Apartments -
27 2021 UAE Dubai High Rise (15+) Emaar Properties PJSC WME Consultants HVAC, PLUMBING
Creek Beach
The Address Harbour Point, Dubai
28 2021 UAE Dubai High Rise (15+) Emaar Properties PJSC KEO Consultants PLUMBING
Creek Harbour
Mr. Mazen Fami Moustafa
29 Leerbach Palace - Al Barsha 2021 UAE Dubai High Rise (15+) Canadian Consultant HVAC
Akela
30 Sobha Greens Phase 3 2021 UAE Dubai High Rise (15+) PNC Investments PNC Architects HVAC, PLUMBING
31 Sobha Waves 2021 UAE Dubai High Rise (15+) PNC Investments PNC Architects HVAC, PLUMBING
32 Sobha Town House - Phase 1 2021 UAE Dubai High Rise (15+) PNC Investments PNC Architects HVAC, PLUMBING
33 Sobha Villa - Phase 3 2021 UAE Dubai Low Rise (1 - 3) PNC Investments PNC Architects HVAC, PLUMBING
34 Sobha Water Side Villa 2021 UAE Dubai Low Rise (1 - 3) PNC Investments PNC Architects HVAC, PLUMBING
Vida Dubai Mall - Downtown
35 2020 UAE Dubai High Rise (15+) Emaar Properties PJSC WSP Middle East HVAC
Development
The Midtown - Zone - 4 (Noor) Deyaar (Global Real Estate
36 2020 UAE Dubai Mid Rise (4 - 14) Ramboll Middle East Ltd HVAC, PLUMBING
International Media Production Zone Devt. Co.)

37 Holiday Inn & Kingston Residences 2020 UAE Dubai High Rise (15+) Kingston Holdings FZC Seed Engineering Consultants HVAC, PLUMBING
Khodr Mohamad Mahmood
38 Bahia Residence Wadi Al Shafa 2 2020 UAE Dubai Mid Rise (4 - 14) Al Wasl Al Jadeed Consultant PLUMBING
Aldah
39 Sobha Creek Vista Reserve 2020 UAE Dubai High Rise (15+) PNC Investments PNC Architects HVAC, PLUMBING
Expo 2017 Astana Future
40 Kazakhstan Pavilion - Expo 2020 2020 UAE Dubai Low Rise (1 - 3) Buro Kling, HME PLUMBING
Energy
41 Barraquer Eye Hospital 2020 UAE Dubai Healthcare Barraquer APG Engineering HVAC

42 IMPZ District Cooling Plant 2020 UAE Dubai Low Rise (1 - 3) Empower Dar-al-Handasah Consultants HVAC, PLUMBING

43 G+4- Dubai South HQ 2020 UAE Dubai Low Rise (1 - 3) Instant Access Prime Engineering Consultants HVAC
Commercial Building, Mr. Saif Al Hannover Consulting
44 2020 UAE Abu Dhabi Mid Rise (4 - 14) Mr.Saif al Sayed HVAC, PLUMBING
Sayed Engineers
2B+G+6 Floors Buiilding on Plot
45 2020 UAE Dubai Mid Rise (4 - 14) Ahmed Butti Ahmed AL Buhairi Ian Ban Ham Associates HVAC, PLUMBING
No.3190132, Oud Metha, Dubai
46 Rove City Walk 2020 UAE Dubai Mid Rise (4 - 14) EMAAR Arch Group PLUMBING

2/9
Office 305 Building A4

Middle East Reference List DWC Dubai, UAE


Tel: +971 4 8844 007
Fax: +971 4 8844 008
(December 20, 2022) www.vironline.com

Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves

47 Sobha Creek Vistas 2020 UAE Dubai High Rise (15+) PNC Investments PNC Architects HVAC, PLUMBING
Carrefour Hypermarket, AL Zahia City
48 2020 UAE Dubai Low Rise (1 - 3) Majid Al Futtaim Nottingham Consultants HVAC
Centre Sharjah
49 One Park Avenue 2020 UAE Dubai High Rise (15+) PNC Investments PNC Architects HVAC, PLUMBING
Dubai Creek Harbour Development - SSH International Engineering
50 2020 UAE Dubai High Rise (15+) EMAAR HVAC, PLUMBING
Dubai Creek Beach Phase 1 Consultant
Residential Building for Mr.Saif Bader
51 2020 UAE Abu Dhabi Mid Rise (4 - 14) Mr. Saif Bader Zein Design Consultant HVAC, PLUMBING
Haji Sultan
Department of International
52 UK Pavillion - Expo 2020 2020 UAE Dubai Low Rise (1 - 3) CKR Consulting Engineers HVAC
Trade
53 Reem Mall 2020 UAE Abu Dhabi Low Rise (1 - 3) Reem Mall Dewan Arhitects HVAC, PLUMBING
Mall Extension - Bin Al Jesrain Co- Bin Al Jesrain Co-operative Hannover Consulting
54 2020 UAE Abu Dhabi Low Rise (1 - 3) HVAC, PLUMBING
operative Society Society Engineers
Dubai Creek Harbour Development
55 2019 UAE Dubai High Rise (15+) Emaar Properties PJSC WME Consultants HVAC, PLUMBING
Icon Bay
Mario Associates Mechanical &
56 Mulberry Park Heights 2019 UAE Dubai Mid Rise (4 - 14) Emaar Properties PJSC Electrical Engineering HVAC
Consultants
Expo 2020 Bureau /
57 Australian Pavilion - Expo 2020 2019 UAE Dubai Low Rise (1 - 3) Department of Foreign Affairs Turner & Townsend PLUMBING
& Trade
HSBC Holdings plc (UK) /
Shankland Cox Ltd./Mace
58 UK Pavilion - Expo 2020 2019 UAE Dubai Low Rise (1 - 3) Department of Trade and PLUMBING
International
Industry
Expo 2020 Bureau / Ministry of
Wanders Werner Falasi
59 Ukraine Pavilion - Expo 2020 2019 UAE Dubai Low Rise (1 - 3) Economic Development & PLUMBING
Architect
Trade
T-018-18 Deira Waterfront Deira Waterfront Development
60 2019 UAE Dubai High Rise (15+) DAR Consultant HVAC
Development Plot 9 LLC
T-018-18 Deira Waterfront Deira Waterfront Development
61 2019 UAE Dubai High Rise (15+) DAR Consultant HVAC
Development Plot 10 LLC
(B+G+4F+R) Labour Accomodation
Farnek Total Facilities
62 Development 599-7499 Jebel Ali 2019 UAE Dubai Mid Rise (4 - 14) Arif & Bintoak PLUMBING
Management
(Farnek)
3B+G+2P+17+R Residential Deyaar (Global Real Estate Kling Consult GMBH/ Conin
63 2018 UAE Dubai High Rise (15+) HVAC
Building (BELLAROSE) Devt. Co.) Consultant
The Heart of Europe Real
St. Petersburg Island - The Heart of Sigma Art Engineering
64 2018 UAE Dubai Mega Urban Development Estate Development - PLUMBING
Europe Consultants
Kleindienst & Partners
The Heart of Europe Real
Sigma Art Engineering
65 Germany Island - The Heart of Europe 2018 UAE Dubai Mega Urban Development Estate Development - PLUMBING
Consultants
Kleindienst & Partners

3/9
Office 305 Building A4

Middle East Reference List DWC Dubai, UAE


Tel: +971 4 8844 007
Fax: +971 4 8844 008
(December 20, 2022) www.vironline.com

Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves

Stay Bridge Suites (2b+G+46


66 Floors+Roof) Plot # 382-773 Al 2019 UAE Dubai High Rise (15+) SRG Properties SRG Properties HVAC
Sufouh Second
Stay Bridge Suites (B+G+49
Floors+Roof) Plot # 335-319 & Car
67 2019 UAE Dubai High Rise (15+) SRG Properties SRG Properties HVAC
Park Building (G+9+Roof) Plot # 335-
350, Trade Center First
D18139: Kingdom of Saudi Arabia
Dubai World Trade Center Khatib and Alami Consolidated
68 Pavilion in Dubai Expo 2018 UAE Dubai Buildings PLUMBING
(DWTC) / ARAMCO Engineering Co.
2020 Main Works Package
Commercial/Residential Building,
69 G+16 at Plot No. 6734098 - Al Barsha 2018 UAE Dubai High Rise (15+) Mizin DAR Consultant/ Ian Ban Ham HVAC
South 3rd (Mizin Tower)
70 Maryam Island Beach Residence 2019 UAE Sharjah High Rise (15+) Eagle Hills SE Design Consultant PLUMBING
71 Ruwais Housing Complex 2016 UAE Abu Dhabi Park ADNOC ADNOC HVAC
Al Mulla Engineering
72 Beavergulf Accomodation at Jebal Ali 2015 UAE Dubai Buildings Beavergulf Contracting L.L.C HVAC
Consultancy
The Address Residence Fountain Dewan Al Emara Architects &
73 2015 UAE Dubai Hotel Apartments EMAAR HVAC
View Project Engineers
TIARA Hotel on Plot 381-0101, Palm Engineering Consortium
74 2015 UAE Dubai Hotel WASL HVAC, PLUMBING
Jumeirah, Dubai Consulting Engineers
Sweden Island, The Heart of Europe ACE International Consulting
75 2014 UAE Dubai Low Rise (1 - 3) THOE Limited HVAC
Dubai Engineers

Commercial/Residential Building,
JVC004 Holdings Al Khawajah Engineering
76 G+3P+17 at Plot No. JVC18TCPO10A 2015 UAE Dubai High Rise (15+) HVAC
Limited/Nakheel Co. LLC Consultants
- Jumeirah Village Circle
Residential Building (G+3) at Wadi Al Mr. Ghulam Ali Abdul Rahman Abdul Rahman Architectural
77 2016 UAE Dubai Mid Rise (4 - 14) HVAC
Safa - 5 Esfandnia Consultants
2B+G+17+Roof Residential & Vezul Real Estate
78 2016 UAE Dubai High Rise (15+) National Engineering Bureau HVAC
Commercial Building - Vezul Tower Development LLC
Viceroy Dubai Jumeirah Village
Atkins Engineering
79 (Suites in the SKAI - Jumeirah Village 2014 UAE Dubai Hotel Five Holdings HVAC
Consultants
Circle )
Residential Building, G+4P+18 at Plot
Al Khawajah Engineering
80 No. JVC13AHRG001B - Jumeirah 2017 UAE Dubai High Rise (15+) Orient Gate HVAC
Consultants
Village Circle
Fairmont Hotels & Serviced Khatib and Alami Consolidated
81 2015 UAE Dubai Hotel Apartments Fairmont Hotels & Resorts HVAC
Apartments - Package 2 Engineering Co.

82 Kingston Tower 01 - City Center 2017 UAE Dubai High Rise (15+) Kingston Holdings FZC Canadian Consultant HVAC
Real Estate Investment
83 Ajman Corniche Residences 2007 UAE Ajman High Rise (15+) WSP Middle East HVAC
Establishment

4/9
Office 305 Building A4

Middle East Reference List DWC Dubai, UAE


Tel: +971 4 8844 007
Fax: +971 4 8844 008
(December 20, 2022) www.vironline.com

Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves

Commercial Building, 5B+G+M+18 at


Mr. Rashed Mubarak Tameer Engineering
84 Plot No. E14-C40 - Al Zahiya, Al Khaili 2015 UAE Abu Dhabi High Rise (15+) HVAC
Mohamed Al Khaili Consultancy (Abu Dhabi)
Project - Abu Dhabi
85 Cooling Plant Extension – AUS 2015 UAE Sharjah University / College American University of Sharjah American University of Sharjah HVAC
Paradise Home Engineering
86 Centro Mall - Dubai 2017 UAE Dubai Shopping Mall Dubailand Residences L.L.C HVAC
Consultancy
G + M Cosmetic Factory (Beauty &
Beauty & Perfume International Mimar Emirates Engineering
87 Perfume International Factory - 2017 UAE Dubai Factory / Plant / Farm HVAC
L.L.C Consultants (Dubai)
Techno Park)
G+17 Typical Floor Residential
88 2018 UAE Dubai High Rise (15+) Ghaleb Kamel Jaber Proarc Engineering Consultant HVAC
Apartment
G+6P+20 Safy al Rashideya Tower
89 (Safy Tower, G+6P+20 at Plot No. 2016 UAE Dubai Mid Rise (4 - 14) Ghaleb Kamel Jaber Canadian Consultants HVAC
1153 - Al Rashidiya 3)
Green Community Phase 3 - Dubai
90 2015 UAE Dubai Low Rise (1 - 3) Union Properties (PJSC) Arif & Bintoak HVAC
Motor City (Casa Flores Townhouse)
Development Consult,
Proposed 3B+G+13+Roof @ Al H.H. Shk. Abdul Aziz Mohd Al
91 2017 UAE Dubai Mid Rise (4 - 14) Architects, Engineers & HVAC
Mamzar Majid
Planners
Al Helal Hotel
Helal Bin Naser Bin Saif Al Gulf Sky Engineering
92 (G+3P+H.C+Ser+15+SP + HP) , 2017 UAE Sharjah Mid Rise (4 - 14) HVAC
Mea’waly Consultants L.L.C
Sharjah
Commercial/Residential Building,
Al Khawajah Engineering
93 G+4P+16 at Plot No. JVC17TCP003A - 2017 UAE Dubai High Rise (15+) JVC003 Holdings Limited HVAC
Consultants
Jumeirah Village Circle
Shopping Center, G+P+M+1 at Plot
Proarc Architects &
94 No. 2037 - Al Hamidiya 1 (Kenz 2018 UAE Ajman Shopping Mall Kenz Hypermarket HVAC
Engineering Consultants
Hypermarket)
95 Hyatt Regency - Addis Ababa 2017 Ethiopia Addis Ababa Hotel ASB Hotel Properties Seed Engineering Consultants HVAC
CA du Toit Consulting
96 Hyatt Regency - Dar Es Salaam 2018 Tanzania Dar Es Salaam Hotel Al Bwardy Investments HVAC
Engineering
Extension of Zamani Resort, Gabi Al Bwardy Engineering
97 2018 Tanzania Zanzibar Resort Zamani Resorts Ltd HVAC
Beach, Zanzibar Enterprises

98 Hyatt Regency - Arusha 2017 Tanzania Arusha Hotel ASB Tanzania Ltd Seed Engineering Consultants HVAC
CA du Toit Consulting
99 Melia Lodges - Serengeti, Tanzania 2017 Tanzania Serengeti Hotel ASB Tanzania Ltd HVAC
Engineering
Proposed 5 Star Hotel & Office Tower
100 2018 Tanzania Tanzania Hotel Rotana Group of Hotels Seed Engineering Consultants HVAC
Project in Tanzania
101 Emiral Project 2013 Algeria Algeria Buildings Emiral Emiral HVAC

5/9
Office 305 Building A4

Middle East Reference List DWC Dubai, UAE


Tel: +971 4 8844 007
Fax: +971 4 8844 008
(December 20, 2022) www.vironline.com

Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves

Kollappally Hypermarket - Kerala,


102 2018 India Kerala Shopping Mall Step International Group Seed Engineering Consultants HVAC
India
Construction of Mega Resevoirs Hyder Consulting Middle East
103 2015 Qatar Doha Dam / Reservoir KAHRAMAA HVAC
PRPS-3, Rawdat Rashed Limited/ Arcadis ME
Modification of Ground and Mezzanine Al Kashaf International Design
104 2017 Qatar Doha Shopping Mall Landmark Group HVAC
floor - Landmark Mall & Engineering Consultant

Doha Metro Network - Red Line North


105 2015 Qatar Doha Metro & Subway Qatar Railways Qatar Railways HVAC
Underground
Energy Transfer Stations (ETS) (Hala
106 & Darwish Tower) Qatar Cool Project- 2018 Qatar Doha West Bay Doha Qatar Cool Qatar Cool HVAC
ETS-Package - 09
107 Doha Metro - Green Line 2015 Qatar Doha Metro & Subway Qatar Rail Qatar Rail HVAC
The Bay - La Plage South – The Pearl United Development Co.
108 2018 Qatar Doha Mega Urban Development MZ & Partners WLL HVAC
Qatar (UDC)
La Plage East at LPE 07 Villa –The United Development Co.
109 2018 Qatar Doha Mega Urban Development Lacasa-Qatar HVAC
Pearl Qatar (UDC)
110 Hilton Garden Inn 2015 Qatar Doha Hotel Laraib Holdings James Cubitt & Partners HVAC
Hay Al Sharooq International School
111 2017 Oman Oman School Oman LNG National Engineering Office HVAC
for Oman LNG
Cinepolis Cinema Interior Fitout at
112 2018 Oman Boushar Cinema Cinepolis Cundall HVAC
Avenues Mall
Independent Water Desalination Plant Oman Power & Water
113 2015 Oman Sohar Water Desalination Plant Mott MacDonald (Oman) HVAC
(IWDP) - Sohar Procurement Co.
Alamur Engineering
114 Salalah Grand Mall 2017 Oman Salalah Shopping Mall Al Madina Group Consultant/Alamur Quantity HVAC
Surveying Consultant
Architecture and Planning
115 Vox Cinemas - City Centre Sohar 2018 Oman Sohar Cinema / Theater Vox Cinemas HVAC
Group (APG)
116 Oman Botanical Garden 2018 Oman Muscat Leisure & Recreation Facilities Ministry of Royal Court Affairs Cowi and Partners L.L.C HVAC
Royal Guard of Oman - Soldier's Design Group Engineering
117 2018 Oman Muscat Accomocation Ministry of Defense HVAC
Accomodation Consultants
Lulu Hypermarket at Grand Mall - Basic Construction Art
118 2019 Oman Salalah Shopping Mall Lulu Group International HVAC
Salalah Services LLC
119 Dana Mall 2018 Bahrain Manama Shopping Mall - MEEB HVAC
Mr. Foud Ebrahim Yousif Al
120 Park Inn Hotel - Al Seef 2018 Bahrain Manama Hotel Apartments GEMAC HVAC
Mutawa
121 Mini Mall Jumeirah Hotel 2018 Bahrain Manama Shopping Mall - 7 Holding HVAC
EMGA (Enrico Mari Grego
122 AXA Insurance HQ at Bahrain Bay 2017 Bahrain Manama Mid Rise (4 - 14) CHAPO/Axa Insurance Gulf HVAC
Architects) / MEEB

6/9
Office 305 Building A4

Middle East Reference List DWC Dubai, UAE


Tel: +971 4 8844 007
Fax: +971 4 8844 008
(December 20, 2022) www.vironline.com

Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves

Mohammad Salahuddin
123 Movenpick Hotel Refurbishment 2017 Bahrain Manama Hotel KONTRA Consulting Engineering Bureau HVAC
(MSCEB)
Mohammad Salahuddin
Avenue Mall (Grand Avenue and The
124 2014 Bahrain Manama Shopping Mall Majid Al Futtaim Consulting Engineering Bureau HVAC
Harbour) (MSCEB)
Upgradation of Sabiya Power & Ministry of Electricity & Water Ministry of Electricity & Water
125 2018 Kuwait Subiyah Power Plant HVAC
Distillation Plant Stage-1 Kuwait Kuwait
Upgradation of Sabiya Power & Ministry of Electricity & Water Ministry of Electricity & Water
126 2018 Kuwait Subiyah Power Plant HVAC
Distillation Plant Stage-3 Kuwait Kuwait
127 King Salaman Hospital 2018 Saudi Arabia Riyadh Healthcare Ministry of Interior Specialized Consultants HVAC
Medial Services Directorate,
Makkah Al Mukarramah Medical
128 2018 Saudi Arabia Makkah Healthcare Ministry of Defense Engineering Works HVAC
Centre Department
King Abdullah Bin Abdul aziz Project
129 2018 Saudi Arabia Various Location Buildings Ministry of Interior JV Gesbau-Italconsult Co HVAC
(KAP 5)
King Abdullah Bin Abdul aziz Project
130 2018 Saudi Arabia Various Location Buildings Ministry of Interior JV Gesbau-Italconsult Co HVAC
(KAP 4)
Obstetrics Gynecology & Pediatric
131 2018 Saudi Arabia - Healthcare Ministry of Health Supervision Consultant HVAC
Hospital
132 Qortuba Oasis Project 2015 Saudi Arabia Riyadh Low Rise (1 - 3) Solidere Qortuba Saudi Diyar Consultants HVAC
Sweidi Hospital (Dr. Sulaiman Al Dr. Sulaiman Al Habib Medical Dr. Sulaiman Al-Habib Medical
133 2015 Saudi Arabia Al Khobar Healthcare HVAC
Habib Group) Group Group

134 King Abdullah Economic City 2019 Saudi Arabia Rabigh-Jeddah Buildings King Abdullah Economic City EHAF Consulting Engineers HVAC

135 Al Talah Gardens 1, Phase 3 2015 Saudi Arabia Riyadh Healthcare King Abdullah Economic City EHAF Consulting Engineers HVAC
300 Bed Obstetrics Gynecology & Al-Zaid Engineering
136 2015 Saudi Arabia Riyadh Healthcare Ministry of Health HVAC
Pediatric Hospital Consultants (ZEC)
137 Hail General Hospital 2017 Saudi Arabia Hail Healthcare Ministry of Health Saud Consulting Services HVAC
100 Bed General Hospital - Al
138 2018 Saudi Arabia Makkah Healthcare Ministry of Health Hill International HVAC
Jamoum General Hospital
139 300 Bed Al Miqat General Hospital 2018 Saudi Arabia Medina Healthcare Ministry of Health Hill International HVAC
500 Bed Prototype Hospital - Jizan
140 2017 Saudi Arabia Jizan Healthcare Ministry of Health Hill International HVAC
General Hospital
King Abdullah Bin Abdul Aziz Project NKY Architects and
141 2018 Saudi Arabia Various Location Healthcare Ministry of Interior HVAC
(KAP 2) Consultants
NKY Architects and
142 Prince Salman Hospital 2016 Saudi Arabia Riyadh Mid Rise (4 - 14) Ministry of Interior HVAC
Consultants
Al Seif Engineering
143 University Hospital - Tabuk University 2015 Saudi Arabia Tabouk Healthcare Ministry of Health HVAC
Consultants
Al Seif Engineering
144 Najran General Hospital 2011 Saudi Arabia Najran Hotel Ministry of Health HVAC
Consultants

7/9
Office 305 Building A4

Middle East Reference List DWC Dubai, UAE


Tel: +971 4 8844 007
Fax: +971 4 8844 008
(December 20, 2022) www.vironline.com

Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves

Al Seif Engineering
145 Al Kharj General Hospital 2017 Saudi Arabia Al Kharj Healthcare Ministry of Health HVAC
Consultants
146 Al Iman General Hospital 2018 Saudi Arabia Riyadh Healthcare Ministry of Health Specialized Consultants HVAC
147 Sakaka Hospital 2017 Saudi Arabia Sakakah University / College Ministry of Health Saudi Architects HVAC
148 Al Darb General Hospital 2011 Saudi Arabia Jizan University / College Ministry of Health Dar Al Majd Consultant HVAC
Expansion of Zahran Al Janoub
149 2015 Saudi Arabia Asir Region School Ministry of Health Dar Al Majd Consultant HVAC
Hospital
150 Rijal Alma'a Hospital 2017 Saudi Arabia Rijal Alma'a University / College Ministry of Health Dar Al Majd Consultant HVAC
Rehabilitation of Medical Tower - Khatib & Alami Engineering
151 2018 Saudi Arabia Jizan Buildings Ministry of Health HVAC
Jizan General Hospital Consultants
Khatib & Alami Engineering
152 Jeddah Hospital 2018 Saudi Arabia Jeddah Buildings Ministry of Health HVAC
Consultants
Movenpick Hotel Financial District
153 2015 Saudi Arabia Riyadh University / College Movenpick Hotels and Resorts Consolidated Consultants HVAC
Riyadh (Al Ghadeer Hotel)
Al Zaid Engineering
154 Khamees Mushyet Central Hospital 2011 Saudi Arabia Riyadh Healthcare Ministry of Health HVAC
Consultants
Al Zaid Engineering
155 300 Bed Hospital in Jizan 2014 Saudi Arabia Jizan Healthcare Ministry of Health HVAC
Consultants
Trainers Housing of Technical College Technical & Vocational
156 2015 Saudi Arabia Makkah University / College TVTC HVAC
in Mekkah Training Corporation (TVTC)
Tourism College & Trainers Housing
157 2017 Saudi Arabia Khamis Mushait University / College TVTC ERTEGAA Consutants HVAC
in Khamis Mushait
Khatib & Alami Consolidated
158 TBC Schools Project 2016 Saudi Arabia Riyadh Shopping Mall M.O.E HVAC
Engineering Co. Ltd. KSA
Prince Sattam Bin Abdulaziz
159 University in Kharj - Administration 2017 Saudi Arabia Riyadh Shopping Mall MOHE Al Manaber Consultants HVAC
Building
160 33 Buildings of Courts Project 2017 Saudi Arabia Riyadh Healthcare M.O.J Saudi Diyar Consultants HVAC

161 Sheikh Abdullah & Al Rugaib Palace 2017 Saudi Arabia Riyadh Low Rise (1 - 3) AMARCO Abdullah Al Rugaib Co. Ltd HVAC

162 Phase II TAIF Technical College 207 Saudi Arabia Al Taif Buildings TVTC Arab Archtets Consultants HVAC
163 North West Armed Forces Housing 2017 Saudi Arabia Tabouk University / College MODA MODA HVAC
164 Makkah Medical Center 2016 Saudi Arabia Makkah University / College MODA MODA HVAC
165 Dammam Technical College 2014 Saudi Arabia Dammam Buildings TVTC Al Askar Consultants HVAC

166 King Abdul Aziz University 2016 Saudi Arabia Jeddah Buildings MOHE Arabian Flour & Zuhair Fayez HVAC

167 Khaleej Mall in Riyadh 2018 Saudi Arabia Riyadh Healthcare Arabian Centres Fare Construction HVAC

168 DEEM Plaza 2018 Saudi Arabia Riyadh Leisure & Recreation Facilities MASIC Al Memariah HVAC

169 King Salman Hospital 2017 Saudi Arabia Riyadh University / College MOH Specialized Consultants HVAC

8/9
Office 305 Building A4

Middle East Reference List DWC Dubai, UAE


Tel: +971 4 8844 007
Fax: +971 4 8844 008
(December 20, 2022) www.vironline.com

Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves

170 Qortuba Oasis 2015 Saudi Arabia Riyadh Shopping Mall Solidere Saudi Diyar Consultants HVAC

171 KAP-4 2018 Saudi Arabia Various Location Healthcare MOI PROGER Mgmt. Consultants HVAC
Faculty Of Arts - Umm Al Qura
172 2018 Saudi Arabia Mecca Healthcare MOHE SAUD CONSULT HVAC
University
Faculty Of Computer Science - Umm
173 2018 Saudi Arabia Mecca Low Rise (1 - 3) MOHE SAUD CONSULT HVAC
Al Qura
Riyadh-Dammam-
174 Integrated Public Security Operation 2018 Saudi Arabia University / College MOI ARCHEN Engineering HVAC
Madinah

175 Customs Building In KKIA 2018 Saudi Arabia Riyadh University / College GACA MEMAR HVAC

Emergency Tower - Al Iman General


176 2018 Saudi Arabia Riyadh Farm MOH Khatib & Alami HVAC
Hospital

177 Najran Museum 2016 Saudi Arabia Najran School SCTNH Saudi Architects HVAC

Institute Of Entrepreneurship in
178 2015 Saudi Arabia Riyadh University / College TVTC SAUDI ARROW CONSULT HVAC
Riyadh
179 Riwaq Cordoba Mall 2016 Saudi Arabia Riyadh Shopping Mall TVTC JKEL HVAC

180 Suliman Al Habib Hospital - Al Khobar 2018 Saudi Arabia Al Khobar Healthcare ASTOOL Co. SHAKER Consultants HVAC

181 Abha 400 - Beds Hospital 2018 Saudi Arabia Abha Healthcare Suliman Alhabib Dar Al Majd Consultant HVAC

182 Sharma Complex 2019 Saudi Arabia An Narjis Tabouk Low Rise (1 - 3) MOH Saudi Diyar Consultants HVAC

TYPSA Consulting
183 Al Imam Saud University - Riyadh 2016 Saudi Arabia Riyadh University / College Public Investment Fund - KSA HVAC
Engineering
Faculty of Education Majmaah
184 2011 Saudi Arabia Riyadh University / College MOHE Bawardi Consultant HVAC
University
185 Rosa Project - Al Diriyah Farm 2018 Saudi Arabia Riyadh Farm National Guard Saudi Diyar Consultants HVAC

Schools Complex in Imam Saud MOHE/Imam Mohammed Ibn Tecnica Y Proyectos S. A


186 2014 Saudi Arabia Riyadh School HVAC
University Saud Islamic University (TYPSA)

9/9
9. Previous Approvals
UK PAVILION EXPO 2020

Material Approval Submittal


Submission from Contractor to Mace
Issued by : PICO International
Issued to : MACE
CC :
PICO-UKP-TES-MAS-PL-015
MAS Ref. No. Date : 31-Jan-20
Rev. No. 0 Sample tag Ref. No.

Discipline : Arch. Struct. Mech. Elect VT Facade Others……………………………………….

Material Details
Item Description : PLUMBING VALVES BOQ Item No. :

Name of Material : PLUMBING VALVES Reference Spec. Clause: Spec

Location of intended use : AS PER APPROVED SHOP DRAWING Drawing Ref: DRAINAGE IFC DRAWING WRONG REFERENCE

Manufacturer /
VIR Country of Orgin : CHINA, EUROPEAN
Local Supplier :

Reason for Submittal : For Approval For Information Others ( )

Remarks : As per Original Alternative (____________)

Attachments : Drawing Spec. Sample Catalog Others ( Compliance, Country of origin, warranty, test certificates & Previous approval)

Contractor certifies that the attched documents/drawings have been checked, coordinated and found to be in compliance with project specifications.
For Contractor Receipt Acknowledged by

Prepared & Checked


by : ……………………. Signature: …………………………….. Date: …………… Received By : ………………………..
QA/QC
Approved by : ………….…………. Signature: …………………………….. Date: …………… Date : …………………………….
Project Manager
MACE Review & Comments :

Status B
Provide valve details for strainers, double check valve
All valves to be as per FD, local regulations and local water regulation requirements.
Final approval subject to AOR approval

CKR : No objection for the proposed make.


All valves shall be WARS / NSF certification.

This response does not alter the Sub Contract or diminish the Sub Contractor's responsibility to complete the Works in full accordance with the Sub Contract and
does not comprise a variation to the Contract. Should the Sub Contractor require a change in the Sub Contract cost or time, he shall submit an itemized proposal
and obtain the Main Contractor's agreement prior to proceeding with Works.
Returned to Contractor with Status :
A : Approved B: Approved as noted C: Revise / Resubmit D: Information

For MACE Receipt Acknowledged by Contractor

Ajith. B
Signature : ……………………………………………………….. Received by : ……………………………
16.02.2020
Date : ……………………………………………………… Date: ………………………

Distribution : Employer Employer's Representative Cost Management other ( ………………………………………………………..)


16.01.2020

1. Material delivery/Storage/Installation shall be carried out as per the Manufacturer


guidelines and recommendation.
2. Submit MOS prior to proceed with the site execution
3. Follow the ID/Arch (RCP) requirements for the location of valve as per access panels.
4. Follow the approved shop drawings for type of valve and ensue the PN rating are
as per the system requirements.
5. Submit the WRAS certificate along with material delivery

Mohd Irfan 26.01.2020

6. Contractor responsible to ensure that Supplier has all the material required to complete the project as per approved
program
7. Identification shall be carried out as per material approval
8. Contractor shall ensure that all the EXPO / Dubai South requirements are met in the submission
Scanned with CamScanner
ELF-A2Z 1/4/2020

ELF-A2Z 12/4/2020

ELF-A2Z 12/4/2020

Mauro Pirri 11/05/20


SIMMETRICO OPERATIONS
1.No objection for VIR-Italy/China Valves.
2.Thie proposed valves cannot be used for valves used in sump pit lines.
3.Float valves WRAS/NSF to be attached , EAC not accepted.
4.Two way ball valve with actuator shall be based on BMS specialist confirmation on the compatibility with Proposed BMS
system.
5.Provide COO along with delivery.

17-05-21
Doc Type : Document POI : For Submission/Status :Date
B : 27-Jul-2022 12:05 GST
Doc Ref : J364-ME72-MT-MECH-PL-022 Rev : 01/Iss No. : 2 Published By : Ahmed Zaheer, United Masters ElectroMechanical LLC
Doc Title : PLUMBING VALVES

1- Follow the manufacturer recommendations during the installation time .


2- HSE rules to be followed during the installation
3- MIR to be submitted upon delivery .

Project: J364 THE SEVEN Printed by : Ahmed Zaheer,United Masters ElectroMechanical LLC
Folder Path : J364 THE SEVEN\03 MEP CONTRACTOR
Printed-On
UME\03.02
: 28-Jul-2022
UME11:24
SUBMITTALS\03.02.02
GST Material Submittal No. Comments :3
MATERIAL SUBMITTAL FORM
DESIGN & BUILD OF Referenc RD158-LEC-MAT-PLU-000013
THE SHED e No.
Rev. No. 0

RFP 158/RD/21
Originator of Lootah Engineering and Construction DESIGN & BUILD OF THE SHED IN
Submittal LLC Date Sunday, 27 March 2022
RESIDENTIAL DISTRICT DUBAI SOUTH
DUBAI UAE

Item Description Discipline List of Enclosure


(Tick as Applicable)
Specifications Reference
Infrastructure Prequalification Documents

Architectural Trade License


BOQ Reference
Structural Vendor's Technical Literature

Drawing Reference As per drawings Mechanical List of Previous Projects Done

Plumbing Valve Electrical Compliance Statement Sheet (*)


Material Specified
HVAC Method Statement

Plumbing Previous Test Results


Material Proposed Plumbing Valve
Finishes Copy of the Related Specifications

Manufacturer/Supplier VIR ME International External Works Sample with Sample Tag(**)

Address of Manufacturer European union (Italy and Poland ) - China Civil Works Shop Drawings (if applicable)

Contractor Remarks Landscaping Others (specify)- Catalogue

Date Required on Site 10-Apr

Expected Date of Material


Expected Date of Arrival 10/04/2022 Submittal Documents to
of Material on Site:
RE:

*Compliance statement sheet covering each paragraph and subparagraph of the specification and deviations should be
clearly marked.
Advantages/disadvantages betweent the specified and proposed to be mentioned. This statement must be attached to the
relevant submittal form.
**Samples should be presented on a sample board suitably identified with labels. Where it is not possible to present a
Notes:
sample on sample board due to size constraints, sample tag should be attached properly. Photos of samples should be be
included in the submittal.
All document submissions should be include one Original along with a soft copy in PDF Format with this submission.
When a resubmission is made based on The Engineer's comments, the compliance/reply to each comment should be clearly
mentioned point by point. The specified format should be filled in accordinly and attached to the submittal form.

We certify that the material specified herewith has been reviewed in detail and is in compliance with the contract
Contractor Statement
drawings and specifications except as otherwise stated above.

Contractor's Authorized Omar Soliman


Representative Name
Technical Manager
Signature and Stamp

Incoming Ref. No. , if applicable (to be filled by RE)

No objection to proposed Plumbing valves from VALVOINDUSTRIA ING RIZZIO SPA(VIR) (Europian
union-Italy& Poland-China) as per attached material schedule & compliance statement ,subject to
compliance with below mentioned comments:

1]WRAS certificate and valid trade license to be provided with delivery for all valves.
2] Air vent,float valve and non-return valve is missing in schedule.
3] Test certificates,COO certificate shall be provided.
4]Valves shall be compatible with BMS system and connection provisions shall be provided
accordingly.
5]Submit samples ,which can be used for mock up installation.
6]Warranty shall be as per contract documents and shall start from TOC.
7]Final approval subject to compliance with project requirements,successful performance and client's
acceptance.

DM Material Submittal Form (As per Contract) Rev 1 190120


ENGINEER'S APPROVAL STATUS Code 1 Code 2 Code 3 Code 4 For Information Only

RE Technical Team Review


Name and Position

Signature, Date and Stamp

Engineer's Authorized
Representative Name Eng. Sreeranj K
Signature, Date and Stamp

DUBAI SOUTH COMMENTS (To be filled up by DS Development Management Department)

DUBAI SOUTH APPROVAL


Code 1 Code 2 Code 3 Code 4 For Information Only
STATUS

Technical Team
(Development Management)
Reviewer Name and Position

Signature and Date

Design Manager Name

Signature and Date

Project Manager Name

Signature and Date

Outgoing Ref. No., if applicable (to be filled by RE)

CONTRACTOR RECEIVED SIGNATURE

Date Signature and Stamp

DOCUMENT STATUS
Code 1
Code 2
Code 3
Code 4
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the contract requirments
and specfications. This check is only for review of general conformance with the design concept of the project and general compliance with the
information given in the contract documents.
Any amendments to this form should be approved by the Engineer and Dubai South prior to use by the contractor.
DM Material Submittal Form (As per Contract) Rev 1 190120
10. Country Of Origin
SA
M
PL
E
11. Draft Warranty
VIR ME International DWC-LLC
Business Park, Dubai World Central ‫ دبي ورلد سنترال‬,‫مجمع األعمال‬
Building D, Office 305 ٣٠٥ :‫ مكتب‬,‫دي‬:‫مبنى‬
PO Box 282228 ٢٨٢٢٢٨ :‫ب‬.‫ص‬
Dubai - United Arab Emirates ‫ اإلمارات العربية المتحدة‬- ‫دبي‬
Tel : +971 4 88 44 007 +٩٧١-٤-٨٨ ٤٤ ٠٠٧ :‫تليفون‬
Fax : +971 4 88 44 008 +٩٧١-٤-٨٨ ٤٤ ٠٠٨:‫فاكس‬
e-mail: info@virme.ae e-mail: info@virme.ae
web: www.virme.ae web: www.virme.ae

WARRANTY CERTIFICATE

Project : AGMC BMW SHOW ROOM, SHRJAH

Product Supplied : Valves as per Delivery Order No:________

VALVOINDUSTRIA ING. RIZZIO S.p.A. (VIR) stand warranty for all the material
supplied by us on the above reference, for a period of 24 months from TOC, from any
malfunctioning due to proven manufacturing defects or proven bad workmanship.

We agree to this warranty assuming that the material is properly stored, maintained,
and installed. This warranty does not cover rubber/ synthetic / non-metallic parts /
damages or malfunctioning caused due to wrong selection / application and
mishandling, using corrosive media or due to unauthorized repairs, alterations,
modification effected by the user/purchaser, or by misuse, negligence or accidents. We
are responsible only for the products supplied and are not liable for any consequential
losses or damages.

Thanking You.