Professional Documents
Culture Documents
Plumbing Submittal - VIR - BMW SHOWROOM Valves
Plumbing Submittal - VIR - BMW SHOWROOM Valves
(VIR)
MATERIAL SUBMITTAL
VIR ME International
Business Park, Dubai World Central
Dubai, United Arab Emirates
INDEX
1. Material Schedule
2. Project Specification
3. Compliance Statement
4. Catalogue
5. Authorization/ Dealership Letter
6. Test Certificates/ Authority Approvals
7. Company Profile & Trade License
8. Project References
9. Previous Approvals
10. Country Of Origin
11. Draft Warranty
1. Material Schedule
SCHEDULE OF MATERIALS (PLUMBING VALVES)
MATERIALS MODEL DESCRIPTION SIZE (MM) ORIGIN CATALOGUE
REF.
ISOLATION-GATE VALVE 90 BRONZE GATE VALVES, NON RISING STEM, THREADED 15MM-50MM ITALY
TO BS21, PN16
ISOLATION- BUTERFLY VALVE 4025L DUCTILE IRON BUTTERFLY VALVE, SEMI LUG TYPE, 65MM CHINA
STAINLESS STEEL DISC AND STEM, EPDM LINED, LEVER
OPERATED, PN16
CHECK VALVE 765K SPRING-LOADED BRASS CHECK VALVE, THREADED F/F 15MM - 50MM CHINA
(ISO 7/1 RP), PN25
ISOLATION- BALL VALVE 33FF NICKEL PLATED BRASS BALL VALVE, FULL BORE, 15MM-50MM ITALY
THREADED TO BS21,PN32
AIR VENT 9390 BRASS AUTOMATIC AIR VENT, THREADED TO BS21, PN10 15MM CHINA
FOOT VALVE 765K+STRAINER SPRING-LOADED BRASS CHECK VALVE, THREADED F/F 15MM-50MM CHINA
(ISO 7/1 RP), PN25 WITH SS MESH
FLOAT VALVE FV-C BRASS FLOAT VALVE, THREADED END WITH COPPER 15MM-50MM ITALY
FLOAT
BIB TAP 293LK BRASS BIBCOCK WITH LOCKSHIELD AND KEY, THREADED 15MM CHINA
WITH HOSE UNION, PN16
2. Poject Specification
3. Compliance Statement
Not part of the submittal
Proposed Model 4025L for isolation Proposed Model 90 Bronze gate valves for Isolation upto 2"
valves above 2" Comply with equivalent EN standards
Ductile Iron Body , SS disc & stem, Comply with PN 16
PN16, Semi Lugged, WRAS Comply with Iso7/1 Rp female thread
Comply
approved Comply with threaded ends
Not applicable
Working conditions
● Suitable for: water, -10°C to +170°C
below 0°C only for water with added antifreeze fluids
● Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/EU)
Fig. 90
Fig. 90LK
PARTLIST 11
10
N. Part Material Norm
1 Body Bronze EN1982 CB491K 9
2 Wedge DZR Brass EN12164 CW602N 8
3 Ring Brass EN12164 CW617N
7
4 Stem DZR Brass EN12164 CW602N
5 Gasket PTFE - 6
6 Bonnet Bronze EN1982 CB491K 5
7 Packing ring Graphite -
8 Packing nut Brass EN12164 CW617N 4
9 Handwheel Aluminum - 3
10 Disc Aluminum -
2
11 Nut Steel EN10025 Fe42
1
DIMENSIONS ØV
ØD
L C P H1 ØV ØD-□Q Kv Weight1 □Q
DN T
[mm] [mm] [mm] [mm] [mm] [mm] [m3/h] [g]
015 ½" 49 15,5 13 66/68 60 13,5-□6 9 240/230
020 ¾" 52 16,5 19 77/77 60 13,5-□7 20 320/310 H
025 1" 61 19,5 25 89/85 70 13,5-□7 35 485/465
032 1¼" 70 21,5 32 111/104 85 16,0-□7 62 760/730 Fig. 90LK
040 1½" 72 21,5 38 124/115 85 18,8-□8 104 1120/1080
050 2" 84 26 49 143/134 100 18,8-□8 169 1615/1565 T P
1
Fig. 90 / Fig. 90LK
C
L
200408
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®
PN16
Max differential pressure 10bar for DN≥350
(versions for Max differential pressure 16bar available)
Free of CE marking for DN≤300 (cat. according to Art. 4.3 Dir. 2014/68/EU)
Working conditions
● Suitable for: water, -10°C to +110°C (max 85°C for WRAS)
below 0°C only for water with added antifreeze fluids
● Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/EU)
PARTLIST
402W series 4025 series
N. Part
Material Norm Material Norm
1 Body D.I. + epoxy GGG40 D.I. + epoxy GGG40
2 Disc D.I. + epoxy GGG40 Stainless steel SS316
3 Stem Stainless steel SS416 Stainless steel SS416
4 Taper pin Stainless steel - Stainless steel -
5 Seat EPDM - EPDM -
6 Seat support Plastic - Plastic -
7 Bushing PTFE - PTFE -
8 O-ring EPDM - EPDM -
9a Lever Cast iron - Cast iron -
9b Manual gear Cast iron - Cast iron -
A Section A-A
8
1
A
200706
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
DIMENSIONS WITH LEVER OR GEAR
GA GB GC
L HL GA GB GC HG ØG Weight1
DN
[mm] [mm] [mm] [mm] [mm] [mm] [mm] [kg]
032 267 152 153 53 125 229 146 2,8 / 6,9 ØG
040 267 152 153 53 125 229 146 3,1 / 7,2 HG
050 267 194 153 53 125 271 146 3,8 / 7,9
065 267 207 153 53 125 284 146 4,5 / 8,6
080 267 213 153 53 125 290 146 5,0 / 9,1
100 267 232 153 53 125 309 146 6,6 / 10,7
125 267 245 153 53 125 322 146 7,9 / 12,0
150 267 257 153 53 125 334 146 9,3 / 13,4
200 359 296 236 73 216 442 289 14,7 / 25,7
L
250 359 328 236 73 216 474 289 21,2 / 32,2
300 359 373 231 80 237 521 289 33,0 / 46,0
350 - - 231 80 237 552 289 - / 58,8
400 - - 243 111 319 680 290 - / 101,2 HL
450 - - 243 111 319 702 290 - / 117,7
500 - - 243 111 319 759 290 - / 160,1
600 - - 296 133 385 902 375 - / 257,5
1
Weight for version with lever / weight for version with gear
OTHER DIMENSIONS
HA HB HC NxØP ØK L ØF S MxØB ØC ISO-□Q Torque Kv Wgt
DN
[mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [Nm] [m3/h] [kg]
032 65 120 32 4x19 100 33 90 11 4x9 70 F07 - □9 10 40 1,9
040 75 120 32 4x19 110 33 90 11 4x9 70 F07 - □9 12 50 2,2
050 76 162 32 4x19 125 43 90 13 4x9 70 F07 - □9 14 99 2,9
065 89 175 32 4x19 145 46 90 13 4x9 70 F07 - □9 20 170 3,6
080 95 181 32 8x191 160 46 90 13 4x9 70 F07 - □9 27 261 4,1
100 114 200 32 4x19 180 52 90 13 4x9 70 F07 - □11 49 519 5,7
125 127 213 32 4x19 210 56 90 13 4x9 70 F07 - □14 80 884 7,0
150 140 225 32 4x23 240 56 90 13 4x9 70 F07 - □14 119 1366 8,4
200 173 260 36 4x23 295 60 125 14 4x11 102 F10 - □17 229 2713 12,7
250 203 292 36 4x28 355 68 125 14 4x11 102 F10 - □22 380 4697 19,2
300 242 337 36 4x28 410 78 150 20 4x14 125 F12 - □22 552 7136 31,0
350 267 368 45 4x28 470 78 150 20 4x14 125 F12 - □24 650 10308 43,8
400 298/3092 400 51 4x31 525 102 210 20 4x22 165 F16 - □27 922 14175 61,2
450 318/3282 422 51 4x31 585 114 210 20 4x22 165 F16 - □27 1194 18774 77,7
500 349/3612 479 64 4x34 650 127 210 22 4x22 165 F16 - □32 1706 24140 105,1
600 410/4592 562 70 4x37 770 154 210 22 4x22 165 F16 - □36 3080 37294 195,5
1
Additional holes for compatibility with PN10 flanges with four holes
2
Version for Max differential pressure 10bar / version for Max differential pressure 16bar
ØF
HC
S
ISO 5211
connection ØK HB
MxØB NxØP ®
ØC
□Q HA
Via Circonvallazione, 10
13018 Valduggia (VC), Italy
L Tel: +39 0163 47891
Fax: +39 0163 47895
www.vironline.com
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
FITTING VIR ACTUATORS
Cutter-AQ electric actuators Jackup electric actuators1 Hovercraft pneumatic act.2
DN
230VAC 24VDC 230VAC 24VAC Double eff. Spring ret.
032 KACUTAQ00.800 KACUTAQ00.800 KAJACKP00/07.800 KAJACKP14/21.800 KAHOVER15.801 KAHOVER29.801
040 KACUTAQ00.800 KACUTAQ00.800 KAJACKP00/07.800 KAJACKP14/21.800 KAHOVER15.801 KAHOVER29.801
050 KACUTAQ01.800 KACUTAQ01.800 KAJACKP00/07.800 KAJACKP14/21.800 KAHOVER15.801 KAHOVER29.801
065 KACUTAQ01.800 KACUTAQ01.800 KAJACKP00/07.800 KAJACKP14/21.800 KAHOVER15.801 KAHOVER30.801
080 KACUTAQ01.800 KACUTAQ01.800 KAJACKP00/07.800 KAJACKP14/21.800 KAHOVER15.801 KAHOVER31.801
100 KACUTAQ02.800 KACUTAQ02.800 KAJACKP01/08.800 KAJACKP15/22.800 KAHOVER17.801 KAHOVER32.801
125 KACUTAQ03.800 KACUTAQ08.800 KAJACKP02/09.800 KAJACKP16/23.800 KAHOVER18.801 KAHOVER34.801
150 KACUTAQ04.800 KACUTAQ09.800 KAJACKP02/09.800 KAJACKP16/23.800 KAHOVER19.801 KAHOVER35.801
200 KACUTAQ06.800 KACUTAQ10.800 KAJACKP03/10.800 KAJACKP17/24.800 KAHOVER21.801 KAHOVER36.801
250 KACUTAQ07.800 on request KAJACKP03/10.800 KAJACKP17/24.800 KAHOVER23.801 KAHOVER38.801
300 KACUTAQ11.800 on request KAJACKP04/11.800 KAJACKP18/25.800 KAHOVER24.801 KAHOVER39.801
350 KACUTAQ11.800 on request KAJACKP04/11.800 KAJACKP18/25.800 KAHOVER24.801 KAHOVER40.801
400 KACUTAQ12.800 on request KAJACKP05/12.800 KAJACKP19/26.800 KAHOVER25.8013 KAHOVER40.801
450 KACUTAQ12.800 on request KAJACKP05/12.800 KAJACKP19/26.800 KAHOVER26.8013 on request
500 KACUTAQ13.800 on request KAJACKP06/13.800 KAJACKP20/27.800 KAHOVER27.801 on request
600 KACUTAQ13.800 on request KAJACKP06/13.800 KAJACKP20/27.800 on request on request
1
3 points control versions / 0-10V control versions
2
Pneumatic actuators sized on 6bar air supply
3
Flange adaptors required
Mounting of proposed actuators may require specific square connection adaptors
Technical description and dimensions of actuators as reported in their specific technical sheets
Via Circonvallazione, 10
13018 Valduggia (VC), Italy
Tel: +39 0163 47891
Fax: +39 0163 47895
www.vironline.com
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®
Brass sillcock
Threaded M (ISO 228/1) with hose union
With lockshield and key
Design according to BS1010-2
PN16
Free of CE marking (cat. according to Art. 4.3 Dir. 2014/68/EU)
Working conditions
● Suitable for: water, 0°C to +100°C
● Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/EU)
13
PARTLIST 12
DIMENSIONS
L
D E AA AB HA HB L Weight
DN T
[mm] [mm] [mm] [mm] [mm] [mm] [mm] [g]
015 ½" 12 15,5 28 65 33 95 50 255
HB
D HA
E
AA AB
220831
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®
PN25
Free of CE marking (cat. according to Art. 4.3 Dir. 2014/68/EU)
Working conditions
● Suitable for: water, 0°C to +100°C
● Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/UE)
PARTLIST 7
DIMENSIONS
D L Val. wgt
DN G
[mm] [mm] [g] D
015 ½" 30,4 54,5 123 G
020 ¾" 37,2 59,3 192
025 1" 45,2 68,5 299
032 1¼" 56,8 76,9 481
040 1½" 65,2 81,8 627
050 2" 81,9 97,5 999
221123
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®
PN25
Free of CE marking (cat. according to Art. 4.3 Dir. 2014/68/EU)
Working conditions
Suitable for: water, 0°C to +100°C
Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/UE)
DIMENSIONS
D L Val. wgt
DN G D
[mm] [mm] [g]
015 ½" 30,4 54,5 123 G
020 ¾" 37,2 59,3 192
025 1" 45,2 68,5 299
032 1¼" 56,8 76,9 481
040 1½" 65,2 81,8 627
050 2" 81,9 97,5 999
170217
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®
PN10
Free of CE marking (cat. according to Art. 4.3 Dir. 2014/68/EU)
Working conditions
● Suitable for: water, 0°C to +110°C
over 100°C only for water with added anti-boiling fluids
● Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/UE)
11
PARTLIST 10
9
N. Part Material Norm 8
1 Body Brass EN12165 CW617N
7
2 Floating Polypropylene1 -
3 Cursor Plastic - 6
4 Spring Stainless steel AISI 304
5
5 Shutter Plastic -
6 Shutter gasket EPDM Perox - 4
7 Vent Brass EN12164 CW617N 3
8 Cursor mount Stainless steel AISI 304
9 O-ring EPDM Perox - 2
10 Plug Brass EN12165 CW617N 1
11 Vent plug Polypropylene1 - 15
12 O-ring2 EPDM Perox -
13 Check valve body2 Brass EN12164 CW617N For Fig. 14
14 Check valve spring2 Stainless steel AISI 302 9393
13
15 Shutter2 Brass EN12164 CW617N
1
for high temperature
2
12
Check valve Fig.9393 components
DIMENSIONS
D H P1 E1 L1 Weight2
DN G
[mm] [mm] [mm] [mm] [mm] [g] H
010 ⅜" 10,5 60 - - - 156
015 ½" 10,5 60 15,5 20,8 35,3 165 / 213 D L
1
only for Fig. 9393 E
2
Fig. 9390 / Fig. 9393
P D
G G
230626
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®
13018 Valduggia (VC), Italy
Tel: +39 0163 47891
Fax: +39 0163 47895
www.vironline.com
Working conditions
Suitable for: water, 0°C to +130°C
Suitable for: air, -10°C to +130°C
Not suitable for: gases and liquids group 1 (Dir. 2014/68/EU)
9
N. Part Material Norm 8
1 Fixed end Nickel plated brass1 EN12165 CW617N
2 Seat PTFE - 7
3 Ball Chromium pl. brass EN12164 CW617N 6
4 Body Nickel plated brass1 EN12165 CW617N
5
5 Stem Brass EN12164 CW617N
6 O-ring NBR 70SH - 4
7 O-ring FKM -
3
8 Handle Dacromet steel2 EN10111 Fe P11
9 Screw Zinc plated steel EN10025 Fe42 2
1
Threads and internal parts not plated
2
With red PVC cover
1
A C P HL L Weight
DN T
[mm] [mm] [mm] [mm] [mm] [g]
L
010 40,7 10,0 8,5 32 81,0 85
015 ½" 47,6 11,5 12,7 44 91,5 165
020 ¾" 53,7 12,0 18,5 47 91,5 230
025 1" 65,0 14,5 24,0 51 126,5 390 HL
032 1¼" 77,8 16,0 31,0 57 126,5 560
040 1½" 85,0 17,0 37,0 69 141,5 830
050 2" 103,0 19,0 49,5 78 141,5 1310 T P
C
A
190225
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
Via Circonvallazione, 10 ®
PN5
Free of CE marking (cat. according to Art. 4.3 Dir. 2014/68/EU)
Working conditions
● Suitable for: water, 0°C to +100°C
● Not suitable for: gases group 1 & 2, liquids group 1 (Dir. 2014/68/EU)
PARTLIST
N. Part Material Norm
1 Rod Brass CW617N 10 11
8 9
2 Joint Tin alloy - 7
3 Floater Copper2 - 5
4
3
4 Floater lock Brass - 1
2
5 Levers Brass1 CW617N
6 Cotter-pin Brass CW508L
7 Lever Brass1 CW617N
8 Shutter Brass1 CW617N 6
9 Gasket NBR -
10 Body Brass1 CB 7535
11 Lock-nut Brass1 CW614N
1
CC491K bronze for DN≥65
2
Available also with plastic HDPE-BL3 floater
DIMENSIONS
C A L ØG1 Weight1 A C
DN T
[mm] [mm] [mm] [mm] [g]
015 ½" 30 41 215 100/ - 289/ - T
020 ¾" 30 51 270 120/120 444/416 L
025 1" 35 54 320 150/150 686/593
032 1¼" 44 80 430 180/180 1351/1257
040 1½" 56 85 480 200/220 1823/1663
050 2" 62 101 525 220/220 2393/2141
065 2½" 73 113 750 250/300 4535/4210
080 3" 73 120 750 300/300 6240/5901
100 4" 81 156 750 300/300 9240/8901 ØG
1
Copper floater version / plastic floater version
230216
Drawings, photos and data contained in this card are provided for information only. VIR reserves the right to change them without notice.
5. Authorization/ Dealership
Letter
Not Applicable
6. Test Certificates/ Authority
Approvals
This certifies that
The certificate by itself is not evidence of a valid WRAS Approval. Confirmation of the current
status of an approval must be obtained from the WRAS Directory (www.wras.co.uk/directory)
November 2023
1811304
Certificate No.
June 2017
This certifies that
The certificate by itself is not evidence of a valid WRAS Approval. Confirmation of the current
status of an approval must be obtained from the WRAS Directory (www.wras.co.uk/directory)
January 2024
1901359
Certificate No.
June 2017
This certifies that
4025L, 4025G, 402WL, 402WG, 4325L, 4325G, 432WL & 432WG BUTTERFLY
VALVES
The certificate by itself is not evidence of a valid WRAS Approval. Confirmation of the current
status of an approval must be obtained from the WRAS Directory (www.wras.co.uk/directory)
November 2024
1911319
Certificate No.
June 2017
REPORT ON WATER POTABILITY OF 1/2" Brass Bib tap (Lock shield)
Page 01 of 04
Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 24 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 30/12/2021
Continued P/2
Page 02 of 04
Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 24 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 30/12/2021
Test Result
Test
Test Method Specification
Parameter
Blank* Final Extract#
Colour BS 6920-Part 2 - Clause 2.3 <5 Pt.Co <5 Pt.Co Max. 5 Pt.Co
Turbidity BS 6920-Part 2 - Clause 2.3 <0.5 NTU <0.5 NTU Max 0.5 NTU
Continued P/3
Page 03 of 04
Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 168 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 05/01/2022
Test Method : BS 6920 Part 2:2014 section 2.6.
Results
BS 6920: Part 1 2014 Spec.
Parameter Unit
Limits (Max.) Blank* Final Extract#
Continued P/4
Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 168 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 05/01/2022
Test Method : BS 6920 Part 2:2014 section 2.5.
Remarks : The microbiological status of the above sample are within the limits of Specifications.
Note : As per the test report, the water in contact with sample was found to be non-toxic and suitable for
drinking purpose.
CFU-Colony forming unit
APHA (American Public Health Association) Standard method for the examination of water and waste
water 22nd Edition:2012
*Specification Reference: Guidelines for the control of legionella in water system public health & safety
department, Public safety section, Dubai Municipality (Guidelines value for TBC is not available in GSO
149/2014 specification)
Authorized Signatory
Page 01 of 04
Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 24 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 30/12/2021
Continued P/2
Page 02 of 04
Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 24 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 30/12/2021
Test Result
Test
Test Method Specification
Parameter
Blank* Final Extract#
Colour BS 6920-Part 2 - Clause 2.3 <5 Pt.Co <5 Pt.Co Max. 5 Pt.Co
Turbidity BS 6920-Part 2 - Clause 2.3 <0.5 NTU <0.5 NTU Max 0.5 NTU
Continued P/3
Page 03 of 04
Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 168 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 05/01/2022
Test Method : BS 6920 Part 2:2014 section 2.6.
Results
BS 6920: Part 1 2014 Spec.
Parameter Unit
Limits (Max.) Blank* Final Extract#
Continued P/4
Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 168 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 05/01/2022
Test Method : BS 6920 Part 2:2014 section 2.5.
Remarks : The microbiological status of the above sample are within the limits of Specifications.
Note : As per the test report, the water in contact with sample was found to be non-toxic and suitable for
drinking purpose.
CFU-Colony forming unit
APHA (American Public Health Association) Standard method for the examination of water and waste
water 22nd Edition:2012
*Specification Reference: Guidelines for the control of legionella in water system public health & safety
department, Public safety section, Dubai Municipality (Guidelines value for TBC is not available in GSO
149/2014 specification)
Authorized Signatory
Page 01 of 04
Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 24 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 30/12/2021
Continued P/2
Page 02 of 04
Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 24 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 30/12/2021
Test Result
Test
Test Method Specification
Parameter
Blank* Final Extract#
Colour BS 6920-Part 2 - Clause 2.3 <5 Pt.Co <5 Pt.Co Max. 5 Pt.Co
Turbidity BS 6920-Part 2 - Clause 2.3 <0.5 NTU <0.5 NTU Max 0.5 NTU
Continued P/3
Page 03 of 04
Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 168 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 05/01/2022
Test Method : BS 6920 Part 2:2014 section 2.6.
Results
BS 6920: Part 1 2014 Spec.
Parameter Unit
Limits (Max.) Blank* Final Extract#
Continued P/4
Test Data:
Extraction Condition : 60±2°C
Extraction Duration : 168 Hours
Extraction Started on : 29/12/2021
Extraction Finished on : 05/01/2022
Test Method : BS 6920 Part 2:2014 section 2.5.
Remarks : The microbiological status of the above sample are within the limits of Specifications.
Note : As per the test report, the water in contact with sample was found to be non-toxic and suitable for
drinking purpose.
CFU-Colony forming unit
APHA (American Public Health Association) Standard method for the examination of water and waste
water 22nd Edition:2012
*Specification Reference: Guidelines for the control of legionella in water system public health & safety
department, Public safety section, Dubai Municipality (Guidelines value for TBC is not available in GSO
149/2014 specification)
Authorized Signatory
Model Numbers
The cer)ficate by itself is not evidence of a valid WRAS Approval. Confirma)on of the current
status of an approval must be obtained from the WRAS Approvals Directory (www.wras.co.uk/
directory)
May 2028
Cer)ficate No.
2305328
Ian Hughes,
WRAS Approvals Manager
7. Company Profile &
Trade License
Valvoindustria Ing. Rizzio S.p.A.
PAG-1
TAPPE DI UNA STORIA MILESTONES
PAG-2
LA FONDAZIONE THE BEGINNING
Corre l’anno 1971 quando a Valduggia nasce VIR S.p.A. Perché VIR?
Il nome scelto è un acronimo di Valvoindustria Ing. Rizzio, dal fondatore, Ing. Savino
Rizzio. In oltre 40 anni di attività VIR S.p.A. è divenuta leader internazionale nella
produzione di valvole, con oltre 10 milioni di pezzi prodotti all’anno.
VIR S.p.A. was established in Valduggia in 1971. Why VIR?
The name chosen is an acronym of Valvoindustria Ing. Rizzio, from the founder, Ing. Savino
Rizzio. In more than 40 years of activity, VIR S.p.A. has become an international leader in
the production of valves, with an annual production of over 10 million pieces.
PAG-3
QUALCOSA IN PIU’ SOMETHING MORE
PAG-4
PAG-5
OLTRE LA PRODUZIONE BEYOND PRODUCTION
PAG-6
DARE FORMA ALLE IDEE GIVING SHAPE TO IDEAS
Grazie ad un competente ufficio tecnico interno, studiamo progetti cercando di anticipare le
esigenze del mercato e troviamo nuove soluzioni alle necessità dei nostri clienti.
Thanks to a highly competent in-house technical office, VIR studies projects aimed at anticipa-
ting the needs of the market and finding new solutions for the customers’ requirements.
PAG-7
VALVOLE A SFERA BALL VALVES
MATERIALI MATERIALS
Le Valvole a sfera VIR sono disponibili in differenti tipologie di materiali: Bronzo, Ottone, Ottone
DZR, Ottone a basso livello di piombo, PP, PP-R80 e ghisa.
VIR ball valves are available in different types of materials: bronze, brass, DZR brass, low-lead
brass, PP, PP-R80 and cast-iron.
COLORE COLOUR
La personalizzazione dei nostri prodotti passa anche attraverso il colore. I modelli in plastica,
infatti, possono essere realizzati in una vasta gamma di cromie differenti.
The personalisation of our products is also obtained by means of colour. The items made in
plastic can, in fact, be realised in a vast range of different shades.
ESPERIENZA EXPERIENCE
L’alta qualità delle nostre valvole a sfera nasce da una esperienza produttiva quaran-
tacinquennale.
The high quality of our ball valves stems from over forty-five years’ production experience in
this field.
PAG-8
PAG-9
VALVOLE DI BILANCIAMENTO BALANCING VALVES
PAG-10
MATERIALI MATERIALS
Le valvole di bilanciamento VIR sono realizzate nei materiali della tradizione che più resistono
alla corrosione dei fluidi utilizzati negli impianti di riscaldamento: ottone DZR e bronzo.
The VIR balancing valves are made of the materials that traditionally have a higher resistance
to the corrosive action of heating system fluids : DZR brass and bronze.
MISURA MEASUREMENT
Per effettuare una corretta messa in opera dei nostri prodotti, è importante eseguire le corrette
misurazioni. A tale scopo mettiamo a disposizione strumenti e accessori per la misurazione,
anche attraverso smartphone.
In order to obtain an optimal commissioning of our products, it is imperative to obtain the
correct measurements. For that reason, we ensure that our customers have at their disposal
the necessary instruments and accessories for measuring, some of which work even via
smartphone.
ESPERIENZA EXPERIENCE
Realizziamo valvole di bilanciamento dal 1988 e possiamo quindi vantare un’esperi-
enza produttiva ultratrentennale nel settore.
VIR has been producing balancing valves since 1988 and can, therefore, boast an over
thirty-year production experience in the sector.
PAG-11
COMPLEMENTI PER L’HVAC ACCESSORIES FOR HVAC
GAMMA RANGE
Mettiamo a disposizione una gamma completa non solo di valvole, ma anche di accessori per
l’HVAC quali, ad esempio, filtri e giunti flessibili in un vasto assortimento di materiali e
tipologie.
VIR has a complete range not only of valves, but also accessories for HVAC such as, for
example, filters and flexible joints, in a vast assortment of materials and types.
MISURE SIZES
Per soddisfare ogni tipo di esigenza, forniamo una gamma di misure da ¼” a 24” ; da 8mm a
600 mm.
To satisfy every type of necessity, we supply a range of sizes from ¼” to 24”; from 8mm to
600mm.
MOTORI MOTORS
VIR strizza l’occhio all’automazione e propone una serie di valvole motorizzate elettricamente,
pneumaticamente e relativi accessori.
VIR walks hand-in-hand with automation and proposes a series of electrically and pneumatical-
ly motorized valves, as well as their relative accessories.
INSTALLAZIONE INSTALLATION
VIR produce anche un innovativo kit per l’installazione su unità terminali, che permette in
cantiere un'installazione rapida e ordinata.
VIR also produces an innovative kit to be fitted onto terminal units, thus allowing a rapid and
clean on-site installation.
PAG-12
PAG-13
ICONIC REFERENCE LIST
PAG-14
5 13
15
14
17
16 22
26
20
23 8
18
19
PAG-15
CERTIFICAZIONI CERTIFICATIONS
UNI EN
331
EN331- Europe
STF - Finland
ACS - France
IAPMO - USA
VA - Denmark
UL-FM - USA
NSF 61 - USA
WRAS - UK
PAG-16
Per ogni informazione sui punti vendita dei prodotti VIR in Italia e
nel mondo contattateci ai seguenti riferimenti:
For information about VIR’s products and points of sale, in Italy and
in the world, please contact us at:
sales@vironline.com
Ordini, trattative e informazioni commerciali
Orders and commercial information
tcnsales@vironline.com
Informazioni di carattere tecnico
Technical information
www.vironline.com
Per scaricare cataloghi e brochure
To download catalogues and brochures
PAG-17
8. Project References
Office 305 Building A4
Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves
Commercial Building Mr. Saif Alsayed Mr. Saif Alsayed Saleh Ahmed Hannover Consulting
7 2022 UAE Abu Dhabi Mid Rise (4 - 14) HVAC
Saleh Ahmed Alsayed Ashkar Alsayed Ashkar Engineers
Commercial Building Mr. Ali Khadim Mr. Ali Khadim Salem Al Hannover Consulting
8 2022 UAE Abu Dhabi Low Rise (1 - 3) HVAC
Salem Al Mansoori Mansoori Engineers
Residential Building Mr. Saif Bader
9 2022 UAE Abu Dhabi Low Rise (1 - 3) Mr. Saif Bader Haji Sultan Zein Design Consultant HVAC
Haji Sultan
Commercial Building of H.E. Faris Mr. H.E. Faris Khalafan Hannover Consulting
10 2022 UAE Abu Dhabi Mid Rise (4 - 14) HVAC
Khalafan Buhumaid Almazrouei Buhumaid Almazrouei Engineers
Commercial Building of Mr. Ghanem Mr. Ghanem Salem Omair Golden Planners Consultants
11 2022 UAE Abu Dhabi Mid Rise (4 - 14) HVAC
Salem Omair Almansoori Almansoori LLC
Sports Facilities Building for Muay Hannover Consulting
12 2022 UAE Abu Dhabi Low Rise (1 - 3) Ministry of Presidential Affairs HVAC
Thai & Kickboxing Federation Engineers
Vocational Center Building for Al Bayan Engineering
13 2022 UAE Abu Dhabi Low Rise (1 - 3) Ministry of Presidential Affairs HVAC
Emirates National School Consultant
Consistent Engineering
14 Lulu Hypermarket at Dubai South 2022 UAE Dubai Low Rise (1 - 3) Lulu Hypermarket LLC HVAC
Consultants
Shed in Residential District Dubai
15 2022 UAE Dubai Low Rise (1 - 3) Dubai South Al Wasl Al Jadeed Consultant HVAC, PLUMBING
South
Mirage Leisure and
16 Grand Bleu 2022 UAE Dubai High Rise (15+) Emaar Properties PJSC HVAC
Developments LLC
Nshama Reem Community - 364
17 2021 UAE Dubai Low Rise (1 - 3) Nshama AWAJ Consultant PLUMBING
Townhouses
Al Hamah Janoob Real Estate Itqan Architectural Design
18 Eastern Residence Villas - Falcon City 2021 UAE Dubai Low Rise (1 - 3) PLUMBING
Development LLC Consultancy
19 Creek Edge - Dubai Creek Harbour 2021 UAE Dubai High Rise (15+) Emaar Properties PJSC U+A Design & Consultancy HVAC, PLUMBING
The Midtown - Zone - 5 (Mesk) Deyaar (Global Real Estate
20 2021 UAE Dubai Mid Rise (4 - 14) Ramboll Middle East Ltd HVAC, PLUMBING
International Media Production Zone Devt. Co.)
O.R. Mess At Royal Guard of Oman
21 2021 Oman Seeb Low Rise (1 - 3) Royal Guard of Oman Royal Guard of Oman HVAC
HQ Camp, Seeb
1/9
Office 305 Building A4
Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves
37 Holiday Inn & Kingston Residences 2020 UAE Dubai High Rise (15+) Kingston Holdings FZC Seed Engineering Consultants HVAC, PLUMBING
Khodr Mohamad Mahmood
38 Bahia Residence Wadi Al Shafa 2 2020 UAE Dubai Mid Rise (4 - 14) Al Wasl Al Jadeed Consultant PLUMBING
Aldah
39 Sobha Creek Vista Reserve 2020 UAE Dubai High Rise (15+) PNC Investments PNC Architects HVAC, PLUMBING
Expo 2017 Astana Future
40 Kazakhstan Pavilion - Expo 2020 2020 UAE Dubai Low Rise (1 - 3) Buro Kling, HME PLUMBING
Energy
41 Barraquer Eye Hospital 2020 UAE Dubai Healthcare Barraquer APG Engineering HVAC
42 IMPZ District Cooling Plant 2020 UAE Dubai Low Rise (1 - 3) Empower Dar-al-Handasah Consultants HVAC, PLUMBING
43 G+4- Dubai South HQ 2020 UAE Dubai Low Rise (1 - 3) Instant Access Prime Engineering Consultants HVAC
Commercial Building, Mr. Saif Al Hannover Consulting
44 2020 UAE Abu Dhabi Mid Rise (4 - 14) Mr.Saif al Sayed HVAC, PLUMBING
Sayed Engineers
2B+G+6 Floors Buiilding on Plot
45 2020 UAE Dubai Mid Rise (4 - 14) Ahmed Butti Ahmed AL Buhairi Ian Ban Ham Associates HVAC, PLUMBING
No.3190132, Oud Metha, Dubai
46 Rove City Walk 2020 UAE Dubai Mid Rise (4 - 14) EMAAR Arch Group PLUMBING
2/9
Office 305 Building A4
Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves
47 Sobha Creek Vistas 2020 UAE Dubai High Rise (15+) PNC Investments PNC Architects HVAC, PLUMBING
Carrefour Hypermarket, AL Zahia City
48 2020 UAE Dubai Low Rise (1 - 3) Majid Al Futtaim Nottingham Consultants HVAC
Centre Sharjah
49 One Park Avenue 2020 UAE Dubai High Rise (15+) PNC Investments PNC Architects HVAC, PLUMBING
Dubai Creek Harbour Development - SSH International Engineering
50 2020 UAE Dubai High Rise (15+) EMAAR HVAC, PLUMBING
Dubai Creek Beach Phase 1 Consultant
Residential Building for Mr.Saif Bader
51 2020 UAE Abu Dhabi Mid Rise (4 - 14) Mr. Saif Bader Zein Design Consultant HVAC, PLUMBING
Haji Sultan
Department of International
52 UK Pavillion - Expo 2020 2020 UAE Dubai Low Rise (1 - 3) CKR Consulting Engineers HVAC
Trade
53 Reem Mall 2020 UAE Abu Dhabi Low Rise (1 - 3) Reem Mall Dewan Arhitects HVAC, PLUMBING
Mall Extension - Bin Al Jesrain Co- Bin Al Jesrain Co-operative Hannover Consulting
54 2020 UAE Abu Dhabi Low Rise (1 - 3) HVAC, PLUMBING
operative Society Society Engineers
Dubai Creek Harbour Development
55 2019 UAE Dubai High Rise (15+) Emaar Properties PJSC WME Consultants HVAC, PLUMBING
Icon Bay
Mario Associates Mechanical &
56 Mulberry Park Heights 2019 UAE Dubai Mid Rise (4 - 14) Emaar Properties PJSC Electrical Engineering HVAC
Consultants
Expo 2020 Bureau /
57 Australian Pavilion - Expo 2020 2019 UAE Dubai Low Rise (1 - 3) Department of Foreign Affairs Turner & Townsend PLUMBING
& Trade
HSBC Holdings plc (UK) /
Shankland Cox Ltd./Mace
58 UK Pavilion - Expo 2020 2019 UAE Dubai Low Rise (1 - 3) Department of Trade and PLUMBING
International
Industry
Expo 2020 Bureau / Ministry of
Wanders Werner Falasi
59 Ukraine Pavilion - Expo 2020 2019 UAE Dubai Low Rise (1 - 3) Economic Development & PLUMBING
Architect
Trade
T-018-18 Deira Waterfront Deira Waterfront Development
60 2019 UAE Dubai High Rise (15+) DAR Consultant HVAC
Development Plot 9 LLC
T-018-18 Deira Waterfront Deira Waterfront Development
61 2019 UAE Dubai High Rise (15+) DAR Consultant HVAC
Development Plot 10 LLC
(B+G+4F+R) Labour Accomodation
Farnek Total Facilities
62 Development 599-7499 Jebel Ali 2019 UAE Dubai Mid Rise (4 - 14) Arif & Bintoak PLUMBING
Management
(Farnek)
3B+G+2P+17+R Residential Deyaar (Global Real Estate Kling Consult GMBH/ Conin
63 2018 UAE Dubai High Rise (15+) HVAC
Building (BELLAROSE) Devt. Co.) Consultant
The Heart of Europe Real
St. Petersburg Island - The Heart of Sigma Art Engineering
64 2018 UAE Dubai Mega Urban Development Estate Development - PLUMBING
Europe Consultants
Kleindienst & Partners
The Heart of Europe Real
Sigma Art Engineering
65 Germany Island - The Heart of Europe 2018 UAE Dubai Mega Urban Development Estate Development - PLUMBING
Consultants
Kleindienst & Partners
3/9
Office 305 Building A4
Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves
Commercial/Residential Building,
JVC004 Holdings Al Khawajah Engineering
76 G+3P+17 at Plot No. JVC18TCPO10A 2015 UAE Dubai High Rise (15+) HVAC
Limited/Nakheel Co. LLC Consultants
- Jumeirah Village Circle
Residential Building (G+3) at Wadi Al Mr. Ghulam Ali Abdul Rahman Abdul Rahman Architectural
77 2016 UAE Dubai Mid Rise (4 - 14) HVAC
Safa - 5 Esfandnia Consultants
2B+G+17+Roof Residential & Vezul Real Estate
78 2016 UAE Dubai High Rise (15+) National Engineering Bureau HVAC
Commercial Building - Vezul Tower Development LLC
Viceroy Dubai Jumeirah Village
Atkins Engineering
79 (Suites in the SKAI - Jumeirah Village 2014 UAE Dubai Hotel Five Holdings HVAC
Consultants
Circle )
Residential Building, G+4P+18 at Plot
Al Khawajah Engineering
80 No. JVC13AHRG001B - Jumeirah 2017 UAE Dubai High Rise (15+) Orient Gate HVAC
Consultants
Village Circle
Fairmont Hotels & Serviced Khatib and Alami Consolidated
81 2015 UAE Dubai Hotel Apartments Fairmont Hotels & Resorts HVAC
Apartments - Package 2 Engineering Co.
82 Kingston Tower 01 - City Center 2017 UAE Dubai High Rise (15+) Kingston Holdings FZC Canadian Consultant HVAC
Real Estate Investment
83 Ajman Corniche Residences 2007 UAE Ajman High Rise (15+) WSP Middle East HVAC
Establishment
4/9
Office 305 Building A4
Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves
98 Hyatt Regency - Arusha 2017 Tanzania Arusha Hotel ASB Tanzania Ltd Seed Engineering Consultants HVAC
CA du Toit Consulting
99 Melia Lodges - Serengeti, Tanzania 2017 Tanzania Serengeti Hotel ASB Tanzania Ltd HVAC
Engineering
Proposed 5 Star Hotel & Office Tower
100 2018 Tanzania Tanzania Hotel Rotana Group of Hotels Seed Engineering Consultants HVAC
Project in Tanzania
101 Emiral Project 2013 Algeria Algeria Buildings Emiral Emiral HVAC
5/9
Office 305 Building A4
Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves
6/9
Office 305 Building A4
Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves
Mohammad Salahuddin
123 Movenpick Hotel Refurbishment 2017 Bahrain Manama Hotel KONTRA Consulting Engineering Bureau HVAC
(MSCEB)
Mohammad Salahuddin
Avenue Mall (Grand Avenue and The
124 2014 Bahrain Manama Shopping Mall Majid Al Futtaim Consulting Engineering Bureau HVAC
Harbour) (MSCEB)
Upgradation of Sabiya Power & Ministry of Electricity & Water Ministry of Electricity & Water
125 2018 Kuwait Subiyah Power Plant HVAC
Distillation Plant Stage-1 Kuwait Kuwait
Upgradation of Sabiya Power & Ministry of Electricity & Water Ministry of Electricity & Water
126 2018 Kuwait Subiyah Power Plant HVAC
Distillation Plant Stage-3 Kuwait Kuwait
127 King Salaman Hospital 2018 Saudi Arabia Riyadh Healthcare Ministry of Interior Specialized Consultants HVAC
Medial Services Directorate,
Makkah Al Mukarramah Medical
128 2018 Saudi Arabia Makkah Healthcare Ministry of Defense Engineering Works HVAC
Centre Department
King Abdullah Bin Abdul aziz Project
129 2018 Saudi Arabia Various Location Buildings Ministry of Interior JV Gesbau-Italconsult Co HVAC
(KAP 5)
King Abdullah Bin Abdul aziz Project
130 2018 Saudi Arabia Various Location Buildings Ministry of Interior JV Gesbau-Italconsult Co HVAC
(KAP 4)
Obstetrics Gynecology & Pediatric
131 2018 Saudi Arabia - Healthcare Ministry of Health Supervision Consultant HVAC
Hospital
132 Qortuba Oasis Project 2015 Saudi Arabia Riyadh Low Rise (1 - 3) Solidere Qortuba Saudi Diyar Consultants HVAC
Sweidi Hospital (Dr. Sulaiman Al Dr. Sulaiman Al Habib Medical Dr. Sulaiman Al-Habib Medical
133 2015 Saudi Arabia Al Khobar Healthcare HVAC
Habib Group) Group Group
134 King Abdullah Economic City 2019 Saudi Arabia Rabigh-Jeddah Buildings King Abdullah Economic City EHAF Consulting Engineers HVAC
135 Al Talah Gardens 1, Phase 3 2015 Saudi Arabia Riyadh Healthcare King Abdullah Economic City EHAF Consulting Engineers HVAC
300 Bed Obstetrics Gynecology & Al-Zaid Engineering
136 2015 Saudi Arabia Riyadh Healthcare Ministry of Health HVAC
Pediatric Hospital Consultants (ZEC)
137 Hail General Hospital 2017 Saudi Arabia Hail Healthcare Ministry of Health Saud Consulting Services HVAC
100 Bed General Hospital - Al
138 2018 Saudi Arabia Makkah Healthcare Ministry of Health Hill International HVAC
Jamoum General Hospital
139 300 Bed Al Miqat General Hospital 2018 Saudi Arabia Medina Healthcare Ministry of Health Hill International HVAC
500 Bed Prototype Hospital - Jizan
140 2017 Saudi Arabia Jizan Healthcare Ministry of Health Hill International HVAC
General Hospital
King Abdullah Bin Abdul Aziz Project NKY Architects and
141 2018 Saudi Arabia Various Location Healthcare Ministry of Interior HVAC
(KAP 2) Consultants
NKY Architects and
142 Prince Salman Hospital 2016 Saudi Arabia Riyadh Mid Rise (4 - 14) Ministry of Interior HVAC
Consultants
Al Seif Engineering
143 University Hospital - Tabuk University 2015 Saudi Arabia Tabouk Healthcare Ministry of Health HVAC
Consultants
Al Seif Engineering
144 Najran General Hospital 2011 Saudi Arabia Najran Hotel Ministry of Health HVAC
Consultants
7/9
Office 305 Building A4
Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves
Al Seif Engineering
145 Al Kharj General Hospital 2017 Saudi Arabia Al Kharj Healthcare Ministry of Health HVAC
Consultants
146 Al Iman General Hospital 2018 Saudi Arabia Riyadh Healthcare Ministry of Health Specialized Consultants HVAC
147 Sakaka Hospital 2017 Saudi Arabia Sakakah University / College Ministry of Health Saudi Architects HVAC
148 Al Darb General Hospital 2011 Saudi Arabia Jizan University / College Ministry of Health Dar Al Majd Consultant HVAC
Expansion of Zahran Al Janoub
149 2015 Saudi Arabia Asir Region School Ministry of Health Dar Al Majd Consultant HVAC
Hospital
150 Rijal Alma'a Hospital 2017 Saudi Arabia Rijal Alma'a University / College Ministry of Health Dar Al Majd Consultant HVAC
Rehabilitation of Medical Tower - Khatib & Alami Engineering
151 2018 Saudi Arabia Jizan Buildings Ministry of Health HVAC
Jizan General Hospital Consultants
Khatib & Alami Engineering
152 Jeddah Hospital 2018 Saudi Arabia Jeddah Buildings Ministry of Health HVAC
Consultants
Movenpick Hotel Financial District
153 2015 Saudi Arabia Riyadh University / College Movenpick Hotels and Resorts Consolidated Consultants HVAC
Riyadh (Al Ghadeer Hotel)
Al Zaid Engineering
154 Khamees Mushyet Central Hospital 2011 Saudi Arabia Riyadh Healthcare Ministry of Health HVAC
Consultants
Al Zaid Engineering
155 300 Bed Hospital in Jizan 2014 Saudi Arabia Jizan Healthcare Ministry of Health HVAC
Consultants
Trainers Housing of Technical College Technical & Vocational
156 2015 Saudi Arabia Makkah University / College TVTC HVAC
in Mekkah Training Corporation (TVTC)
Tourism College & Trainers Housing
157 2017 Saudi Arabia Khamis Mushait University / College TVTC ERTEGAA Consutants HVAC
in Khamis Mushait
Khatib & Alami Consolidated
158 TBC Schools Project 2016 Saudi Arabia Riyadh Shopping Mall M.O.E HVAC
Engineering Co. Ltd. KSA
Prince Sattam Bin Abdulaziz
159 University in Kharj - Administration 2017 Saudi Arabia Riyadh Shopping Mall MOHE Al Manaber Consultants HVAC
Building
160 33 Buildings of Courts Project 2017 Saudi Arabia Riyadh Healthcare M.O.J Saudi Diyar Consultants HVAC
161 Sheikh Abdullah & Al Rugaib Palace 2017 Saudi Arabia Riyadh Low Rise (1 - 3) AMARCO Abdullah Al Rugaib Co. Ltd HVAC
162 Phase II TAIF Technical College 207 Saudi Arabia Al Taif Buildings TVTC Arab Archtets Consultants HVAC
163 North West Armed Forces Housing 2017 Saudi Arabia Tabouk University / College MODA MODA HVAC
164 Makkah Medical Center 2016 Saudi Arabia Makkah University / College MODA MODA HVAC
165 Dammam Technical College 2014 Saudi Arabia Dammam Buildings TVTC Al Askar Consultants HVAC
166 King Abdul Aziz University 2016 Saudi Arabia Jeddah Buildings MOHE Arabian Flour & Zuhair Fayez HVAC
167 Khaleej Mall in Riyadh 2018 Saudi Arabia Riyadh Healthcare Arabian Centres Fare Construction HVAC
168 DEEM Plaza 2018 Saudi Arabia Riyadh Leisure & Recreation Facilities MASIC Al Memariah HVAC
169 King Salman Hospital 2017 Saudi Arabia Riyadh University / College MOH Specialized Consultants HVAC
8/9
Office 305 Building A4
Project name Anno Country City Project Type Client / End User Consultant Systems with VIR valves
170 Qortuba Oasis 2015 Saudi Arabia Riyadh Shopping Mall Solidere Saudi Diyar Consultants HVAC
171 KAP-4 2018 Saudi Arabia Various Location Healthcare MOI PROGER Mgmt. Consultants HVAC
Faculty Of Arts - Umm Al Qura
172 2018 Saudi Arabia Mecca Healthcare MOHE SAUD CONSULT HVAC
University
Faculty Of Computer Science - Umm
173 2018 Saudi Arabia Mecca Low Rise (1 - 3) MOHE SAUD CONSULT HVAC
Al Qura
Riyadh-Dammam-
174 Integrated Public Security Operation 2018 Saudi Arabia University / College MOI ARCHEN Engineering HVAC
Madinah
175 Customs Building In KKIA 2018 Saudi Arabia Riyadh University / College GACA MEMAR HVAC
177 Najran Museum 2016 Saudi Arabia Najran School SCTNH Saudi Architects HVAC
Institute Of Entrepreneurship in
178 2015 Saudi Arabia Riyadh University / College TVTC SAUDI ARROW CONSULT HVAC
Riyadh
179 Riwaq Cordoba Mall 2016 Saudi Arabia Riyadh Shopping Mall TVTC JKEL HVAC
180 Suliman Al Habib Hospital - Al Khobar 2018 Saudi Arabia Al Khobar Healthcare ASTOOL Co. SHAKER Consultants HVAC
181 Abha 400 - Beds Hospital 2018 Saudi Arabia Abha Healthcare Suliman Alhabib Dar Al Majd Consultant HVAC
182 Sharma Complex 2019 Saudi Arabia An Narjis Tabouk Low Rise (1 - 3) MOH Saudi Diyar Consultants HVAC
TYPSA Consulting
183 Al Imam Saud University - Riyadh 2016 Saudi Arabia Riyadh University / College Public Investment Fund - KSA HVAC
Engineering
Faculty of Education Majmaah
184 2011 Saudi Arabia Riyadh University / College MOHE Bawardi Consultant HVAC
University
185 Rosa Project - Al Diriyah Farm 2018 Saudi Arabia Riyadh Farm National Guard Saudi Diyar Consultants HVAC
9/9
9. Previous Approvals
UK PAVILION EXPO 2020
Material Details
Item Description : PLUMBING VALVES BOQ Item No. :
Location of intended use : AS PER APPROVED SHOP DRAWING Drawing Ref: DRAINAGE IFC DRAWING WRONG REFERENCE
Manufacturer /
VIR Country of Orgin : CHINA, EUROPEAN
Local Supplier :
Attachments : Drawing Spec. Sample Catalog Others ( Compliance, Country of origin, warranty, test certificates & Previous approval)
Contractor certifies that the attched documents/drawings have been checked, coordinated and found to be in compliance with project specifications.
For Contractor Receipt Acknowledged by
Status B
Provide valve details for strainers, double check valve
All valves to be as per FD, local regulations and local water regulation requirements.
Final approval subject to AOR approval
This response does not alter the Sub Contract or diminish the Sub Contractor's responsibility to complete the Works in full accordance with the Sub Contract and
does not comprise a variation to the Contract. Should the Sub Contractor require a change in the Sub Contract cost or time, he shall submit an itemized proposal
and obtain the Main Contractor's agreement prior to proceeding with Works.
Returned to Contractor with Status :
A : Approved B: Approved as noted C: Revise / Resubmit D: Information
Ajith. B
Signature : ……………………………………………………….. Received by : ……………………………
16.02.2020
Date : ……………………………………………………… Date: ………………………
6. Contractor responsible to ensure that Supplier has all the material required to complete the project as per approved
program
7. Identification shall be carried out as per material approval
8. Contractor shall ensure that all the EXPO / Dubai South requirements are met in the submission
Scanned with CamScanner
ELF-A2Z 1/4/2020
ELF-A2Z 12/4/2020
ELF-A2Z 12/4/2020
17-05-21
Doc Type : Document POI : For Submission/Status :Date
B : 27-Jul-2022 12:05 GST
Doc Ref : J364-ME72-MT-MECH-PL-022 Rev : 01/Iss No. : 2 Published By : Ahmed Zaheer, United Masters ElectroMechanical LLC
Doc Title : PLUMBING VALVES
Project: J364 THE SEVEN Printed by : Ahmed Zaheer,United Masters ElectroMechanical LLC
Folder Path : J364 THE SEVEN\03 MEP CONTRACTOR
Printed-On
UME\03.02
: 28-Jul-2022
UME11:24
SUBMITTALS\03.02.02
GST Material Submittal No. Comments :3
MATERIAL SUBMITTAL FORM
DESIGN & BUILD OF Referenc RD158-LEC-MAT-PLU-000013
THE SHED e No.
Rev. No. 0
RFP 158/RD/21
Originator of Lootah Engineering and Construction DESIGN & BUILD OF THE SHED IN
Submittal LLC Date Sunday, 27 March 2022
RESIDENTIAL DISTRICT DUBAI SOUTH
DUBAI UAE
Address of Manufacturer European union (Italy and Poland ) - China Civil Works Shop Drawings (if applicable)
*Compliance statement sheet covering each paragraph and subparagraph of the specification and deviations should be
clearly marked.
Advantages/disadvantages betweent the specified and proposed to be mentioned. This statement must be attached to the
relevant submittal form.
**Samples should be presented on a sample board suitably identified with labels. Where it is not possible to present a
Notes:
sample on sample board due to size constraints, sample tag should be attached properly. Photos of samples should be be
included in the submittal.
All document submissions should be include one Original along with a soft copy in PDF Format with this submission.
When a resubmission is made based on The Engineer's comments, the compliance/reply to each comment should be clearly
mentioned point by point. The specified format should be filled in accordinly and attached to the submittal form.
We certify that the material specified herewith has been reviewed in detail and is in compliance with the contract
Contractor Statement
drawings and specifications except as otherwise stated above.
No objection to proposed Plumbing valves from VALVOINDUSTRIA ING RIZZIO SPA(VIR) (Europian
union-Italy& Poland-China) as per attached material schedule & compliance statement ,subject to
compliance with below mentioned comments:
1]WRAS certificate and valid trade license to be provided with delivery for all valves.
2] Air vent,float valve and non-return valve is missing in schedule.
3] Test certificates,COO certificate shall be provided.
4]Valves shall be compatible with BMS system and connection provisions shall be provided
accordingly.
5]Submit samples ,which can be used for mock up installation.
6]Warranty shall be as per contract documents and shall start from TOC.
7]Final approval subject to compliance with project requirements,successful performance and client's
acceptance.
Engineer's Authorized
Representative Name Eng. Sreeranj K
Signature, Date and Stamp
Technical Team
(Development Management)
Reviewer Name and Position
DOCUMENT STATUS
Code 1
Code 2
Code 3
Code 4
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the contract requirments
and specfications. This check is only for review of general conformance with the design concept of the project and general compliance with the
information given in the contract documents.
Any amendments to this form should be approved by the Engineer and Dubai South prior to use by the contractor.
DM Material Submittal Form (As per Contract) Rev 1 190120
10. Country Of Origin
SA
M
PL
E
11. Draft Warranty
VIR ME International DWC-LLC
Business Park, Dubai World Central دبي ورلد سنترال,مجمع األعمال
Building D, Office 305 ٣٠٥ : مكتب,دي:مبنى
PO Box 282228 ٢٨٢٢٢٨ :ب.ص
Dubai - United Arab Emirates اإلمارات العربية المتحدة- دبي
Tel : +971 4 88 44 007 +٩٧١-٤-٨٨ ٤٤ ٠٠٧ :تليفون
Fax : +971 4 88 44 008 +٩٧١-٤-٨٨ ٤٤ ٠٠٨:فاكس
e-mail: info@virme.ae e-mail: info@virme.ae
web: www.virme.ae web: www.virme.ae
WARRANTY CERTIFICATE
VALVOINDUSTRIA ING. RIZZIO S.p.A. (VIR) stand warranty for all the material
supplied by us on the above reference, for a period of 24 months from TOC, from any
malfunctioning due to proven manufacturing defects or proven bad workmanship.
We agree to this warranty assuming that the material is properly stored, maintained,
and installed. This warranty does not cover rubber/ synthetic / non-metallic parts /
damages or malfunctioning caused due to wrong selection / application and
mishandling, using corrosive media or due to unauthorized repairs, alterations,
modification effected by the user/purchaser, or by misuse, negligence or accidents. We
are responsible only for the products supplied and are not liable for any consequential
losses or damages.
Thanking You.