Construction Planning
Techniques
Construction Planning Techniques
1. Bar Chart
2. Network Analysis
3. Precedence Diagram
4. Line of Balance
Line of Balance
Network Analysis
Bar Chart / Gantt Chart
Features:
Easiest to understand
Most widely form of planning tool
A series of bars plotted against a horizontal time scale
Bar Chart / Gantt Chart
Features (cont’d):
Left hand side – list of activities plotted according to logical
sequence of activities (Taking-Off List)
Right hand side – bars plotted to a time scale
Shows the start and finish time and also the duration of each
activity
Advantages
Easy to understand
Most readily recognised format
Quick & ready to prepare
The start & finish dates & duration of each activity is clearly shown
Disadvantages
Unable to depict in detail the multitude of inter – related shown
dependencies
Unable to ascertain critical activities
Linked Bar Chart
Links are represented by vertical links between the
completion of one activity and the start of another.
Advantages
The merits of bar charts are retained
Shows clear linkage of activities
Provides a more realistic presentation of the coordination
needs of the projects
Indicates the interdependencies of activities and consequently
the effects of localised delay
Disadvantages
The concept of float is missing
The linking of activities may be limited
Linked Bar Chart
NO AKTIVITI TRED KUANTITI JENTERA BURUH ANGKATAP PENGIRAAN TEMPOH (HARI) KOS (RM)
2 Pengorekan Syarikat 45.9M3 Backhoe(1 Unit) 1 4M3/jam 45.9 =12jam 1 1/2 545. 00
4
4 Lapisan tegar Tukang 39.3M3 Jentera Pemadat ( 1 Unit) 2 1.5M3/jam 39.3 = 13jam 1 1/2 1, 422. 25
Konkrit Backhoe(1 Unit) 1.5 x 2
6 Konkrit Alas Tukang 13.1M3 Mesin Pembancuh 2 1.6M3/jam 13.1 = 4jam 1/2 1, 465. 95
Gred 15 Konkrit Konkrit (1Unit) 1.6 x 2
9 Konkrit lantai Tukang 50.7M3 Mesin Pembancuh 4 1.6M3/jam 50.7 = 8jam 1 6, 768. 34
bawah Konkrit Konkrit (1 Unit) 1.6 x 4
Gred 30
10 Menanggalkan Tukang 33M2 - 2 6M2/jam 33 = 3jam 1/2 30. 00
Acuan Kayu 6x2
Method Statement
Method Statement
Method Statement
Compiling a Programme
Resources
Organization and utilization of labour, plant and materials
Activities
Packages of work which consumes resources
Logic
The relationship and interdependence between activities
Example Of Bar Chart / Master Work Program
Refer Short
Term Program
Work Breakdown
Structure (WBS)
Short Term Planning
▪ Quantity of Materials
▪ No. of Manpower /
workforce
▪ Total, type and capacity of
plant & machinery.
PLANNING ACTIVITIES
Setting Out
Removal of Excavation
Formwork
Provide Levels
Pour ACTIVITY
Concrete SEQUENCING
Hardcore
BRC
Lean
DPC
Concrete Formwork
As a source of reference
for work below finish floor
level, as per gridline set in
the plan.
Organized by the
company by erecting
profile boards 50 x 25 mm,
fully supported
underneath, and the
gridlines are marked using
nails.
Preparation for foundation work and floor slab.
Excavated by backhoe.
Over site excavation and foundation works.
To determine the exact
depth / height of the work.
Handled by a supervisor
& a chainman.
Instrument in use: Dumpy
level
Performed by Mason.
Use backhoe & compactor
to level and compact the
hardcore.
NO AKTIVITI TRED KUANTITI JENTERA BURUH ANGKATAP PENGIRAAN TEMPOH (HARI) KOS (RM)
2 Pengorekan Syarikat 45.9M3 Backhoe(1 Unit) 1 4M3/jam 45.9 =12jam 1 1/2 545. 00
4
4 Lapisan tegar Tukang 39.3M3 Jentera Pemadat ( 1 Unit) 2 1.5M3/jam 39.3 = 13jam 1 1/2 1, 422. 25
Konkrit Backhoe(1 Unit) 1.5 x 2
6 Konkrit Alas Tukang 13.1M3 Mesin Pembancuh 2 1.6M3/jam 13.1 = 4jam 1/2 1, 465. 95
Gred 15 Konkrit Konkrit (1Unit) 1.6 x 2
9 Konkrit lantai Tukang 50.7M3 Mesin Pembancuh 4 1.6M3/jam 50.7 = 8jam 1 6, 768. 34
bawah Konkrit Konkrit (1 Unit) 1.6 x 4
Gred 30
10 Menanggalkan Tukang 33M2 - 2 6M2/jam 33 = 3jam 1/2 30. 00
Acuan Kayu 6x2
TAJUK PROJEK : MEMBINA MAKMAL KOMPUTER SEKOLAH
1 Memancang tanda
2 Pengorekan
3 Menyediakan aras
4 Lapisan tegar
5 Acuan
6 Konkrit alas
8 BRC
10 Menanggalkan acuan
If the objectives of the programs are not
met, we should re-assess the sub -
programs from the perspective of :
Attendance of Capacity of
Manpower/labour Machinery