Plate No.

Redevelopment of Fire Station 1


Coordinates: 8.47918951 N, 124.65156256E

Location: Cogon, Cagayan de Oro City, Misamis Oriental, Philippines

Site Area: ± 3,817.25 m²

Program: Fire Station

Type: Fire Station

A fire station supports the needs of the fire department and the community in which it is
located. It must accommodate extremely diverse functions, including housing, recreation,
administration, training, community education, equipment and vehicle storage, equipment and
vehicle maintenance, and hazardous materials storage. While it is usually only occupied by
trained personnel, the facility may also need to accommodate the general public for community
education or outreach programs. (Mion, 2017) https://www.wbdg.org/building-
types/community-services/fire-station
Site location. Existing Fire station and adjacent commercial buildings.

Simplified solar diagram of Cagayan de Oro City.


Typical distance covered by driving 5 minutes a certain point. In this map, the pinned location is
the existing location of Fire Station 1.

https://app.traveltime.com/search/0-lng=124.65140&0-tt=5&0-mode=driving&0-
title=Cogon%20Fire%20Station%2C%20Captain%20Vicente%20Roa%20Street%2C%20Barangay
%2033%2C%20Poblacion%2C%20Consolacion%2C%20Cagayan%20de%20Oro%2C%20Northern
%20Mindanao%2C%209000%2C%20Philippines&0-lat=8.47921

Design Challenge

Cagayan de Oro City is a developing city and the Gateway of Mindanao. With its new
developments, new buildings and more people coming to urban centers, fire incidents are always
lurking behind. In 2020 alone, the reported fire incident in CDO is 305 with total estimated
damages of Php 66,912,500.00 (BUREAU OF FIRE PROTECTION – R10 CAGAYAN DE ORO CITY
FIRE DISTRICT, file:///C:/Users/acer/Downloads/FIRE%20INCIDENTS%202020-converted.pdf)

As a designer, you are task to redevelop the existing Fire Station 1 with additional space from its
adjacent commercial buildings. The new development will be the face of life safety, discipline,
and readiness of our fire fighters and volunteers.
Supplementary Research Requirements: (100/100)

- Should be in a A4 Bond Paper


- Margins and Guidelines as per Instructors prerogative.
- Sketches and Drawing to further understand the requirements of the building and
developmReent.
- Monochrome or Colored presentation.
- Supplementary Research 100/100
1. Site Analysis (Contextual analysis)
2. Climatic Analysis
3. Space programming and matrix
4. Form evolution
5. Schematic drawings (plans and perspectives, etc)

Drawing Requirements: (100/100) Use A2 Size Paper in Landscape

a. Front Page of Project (10%) (Open Front-Page Design)


- Colored Presentation
- Concept Diagrams, Maps, other important drawings to support your concept
- Provide Student Name, Section and Year (Lower Left Part)
- Provide Instructor’s Name and Subject (Lower Right Part)

b. Site Development Plan (25%)-digital


- (Scale is 1:300m to show the layout of Parking Space and Vicinity Landscape)

c. Floor Plan/s (30%)-digital


- Scale is 1:100m to show the layout of furniture’s and fixtures.
- Label all parts of the Floor Plan.

d. Elevations (15%) (Provide 4 Elevations) -digital


- Scale is 1:100m with complete and proper elevation presentation.

e. Sections (10%) (Provide at least 2 Sectional Drawing w/ complete & proper section
presentation)
- Scale is 1:100m with complete and proper presentation.

f. Exterior Perspective + Interior Perspective (10%)-digital


- Provide One (1) Exterior Perspective
- Provide One (1) Interior Perspective (choose area with elite space)
- Other important details/views you want to show to support your concept

Note:

1. Point deductions will be strictly based on the terms approved by the class during discussion.
2. Schedule of Individual Submissions will be instructed by the concerned Instructor for each class.
TIMELINE/SCHEDULE OF ACTIVITIES

DELIVERABLES DATE OF SUBMISSION

Supplemental Research
10/11/2023; 1:00pm

Schematic Design Phase


12/11/2023; 1:00pm
Macro & Micro Spaces
DESIGN AND DRAWING REQUIREMENTS
Concept Board, Site Dev’t Plan, Floor Plans,
4-Elevations, 2-Sections, Perspectives, and other importants Deadline, January 11, 2024. 5PM
details.

Note:
Please be guided that point deductions will be based on the department’s policy on late submissions.

Main reading resources:

National Fire Protection Association (NFPA)

Republic Act No. 9514

Revised Implementing Rules and Regulations (RIRR) of RA 9514 “The Fire Code of the
Philippines”

PD1096

BP344

Fire Station Design Manual