TECHNICAL SPECIFICATION COVER SHEET REVISED SHEETS

THIS PAGE IS A RECORD OF ALL SPECIFICATION REVISIONS. NORMALLY, REVISED SHEETS ONLY ATTACHED
EACH TIME THE SPECIFICATION IS CHANGED ONLY THE NEW OR REVISED ENTIRE SPECIFICATION RE-ISSUED
PAGES ARE ISSUED. ENTIRE SPECIFICATION REVISED

THE NATURE OF THE REVISION IS BRIEFLY NOTED UNDER REMARKS BUT


ISSUED FOR
THESE REMARKS ARE NOT A PART OF THE SPECIFICATION. THE REVISED
PAGES BECOME PART OF THE ORIGINAL SPECIFICATION AND SHALL BE REVIEW/COMMENTS
COMPLETED WITHIN THEIR ENTIRELY. TENDER/QUOTATION
PURCHASE
CONSTRUCTION X

REV. DATE PREPARED REVIEWED APPROVED PAGES REMARKS


NO. BY BY BY

A Oct. 2021 M.M. C.AMAM C.MYSM 3 ISSUED FOR DETAILED DSIGN

0 Jan. 2022 M.M. C.AMAM C.MYSM 3 ISSUED FOR TENDER

1 Feb. 2022 M.M. C.AMAM C.MYSM 3 ISSUED FOR CONSTRUCTION

SPECIFICATION REV.
ECG ENGINEERING CONSULTANTS GROUP TABLE OF CONTENTS
KSA 000010 - 2970 1

ECG Form No. E409 Rev. 5/03 Sheet 0 of 3


RIYADH SEDRA 2

CONTENTS

VOLUME I

(Not Included)

VOLUME II

METHOD OF MEASUREMENT, BILL OF QUANTITY,


LIST OF MANUFACTURERS

DIVISION 0: INFORMATION

000010 Table of Contents

DIVISION 1: GENERAL REQUIREMENTS

012700 Method of Measurement


012750 Bill of Quantity
012950 List of Manufacturers

VOLUME III
TECHNICAL SPECIFICATIONS – PART A
Divisions 03 Concrete

033000 Cast In Place Concrete


035440 Cement-Based Screeds

Divisions 04 Masonry

042000 Unit Masonry

Divisions 05 Metals

051200 Structural Steel


055000 Metal Fabrications
055213 Pipe And Tube Railings

Division 07 Thermal and Moisture Protection

071340 Polyethylene Sheet


071416 Cold Fluid-Applied Waterproofing
071613 Polymer Modified Cement Waterproofing
071616 Crystalline Waterproofing
075213 Atactic-Polypropylene (APP) Modified Bituminous Membrane Roofing
075216 Styrene-Butadiene-Styrene (SBS) Modified Bituminous Membrane
078413 Penetration Firestopping
079200 Joint Sealants

Table of Contents Section 000010


Riyadh Sedra 2 (Prj. 2970) Page 1 of 3
Divisions 08 Openings

081113 Hollow Metal Doors and Frames


081416 Flush Wood Doors
083323 Overhead Coiling Doors
085113 Aluminum Windows
087100 Door Hardware
088300 Mirrored Glass
089000 Louvers and Vents

Divisions 09 Finishes

092400 Cement Plaster


093000 Tiling
096600 Precast Terrazzo
096723 Resinous Flooring
099100 Painting

Division 10 Specialties

102800 Toilet and Bath Accessories


104416 Fire Extinguishers

Division 13 Special Construction

131500 Reinforced Concrete Water Structures

Division 21 Fire Suppression

212200 Clean-Agent Fire Extinguishing Systems

Division 22 Plumbing

220523 General-Duty Valves for Plumbing Piping


221116 Domestic Water Piping
221123.13 Domestic-Water Packaged Booster Pumps
221319 Sanitary Waste Piping Specialties
221429 Sump Pumps

Division 23 Heating Ventilating and Air Conditioning

230500 Common Work Results for Hvac


230513 Common Motor Requirements for Hvac Equipment
230700 Hvac Insulation
232300 Refrigerant Piping
233113 Metal Ducts
233300 Air Duct Accessories
233423 HVAC Power Ventilators
233713 Diffusers, Registers, and Grilles
237413 Packaged, Outdoor, Roof Top Units
238126 Split-System Air-Conditioners

Table of Contents Section 000010


Riyadh Sedra 2 (Prj. 2970) Page 2 of 3
VOLUME III

TECHNICAL SPECIFICATIONS – PART B

Division 26 Electrical

260513 Medium-Voltage Cables


260519 Low-Voltage Electrical Power Conductors And Cables
260526 Grounding and Bonding for Electrical Systems
260533 Raceway And Boxes for Electrical Systems
260536 Cable Trays for Electrical Systems
261201 Medium-Voltage Oil Transformers
261301 Ring Main Unit
262413 Switchboards
262416 Panelboards
262419 Motor Control Centers
262726 Wiring Devices
263213 Engine Generators
263533 Power Factor Correction Equipment
263600 Transfer Switches
265100 Interior Lighting
265600 Exterior Lighting

Division 28 Electronic Safety and Security

283100 Fire-Alarm System

Division 31 Earthwork

312000 Earth Moving

Division 33 Utilities

331000 Water Supply And Firefighting Networks


333000 Sewage Collection Networks
334100 Storm Water Collection Networks

Division 41 Material Processing And Handling Equipment

412215.10 Overhead Electrical Cranes

Table of Contents Section 000010


Riyadh Sedra 2 (Prj. 2970) Page 3 of 3
TECHNICAL SPECIFICATION COVER SHEET REVISED SHEETS
THIS PAGE IS A RECORD OF ALL SPECIFICATION REVISIONS. NORMALLY, REVISED SHEETS ONLY ATTACHED
EACH TIME THE SPECIFICATION IS CHANGED ONLY THE NEW OR ENTIRE SPECIFICATION RE-ISSUED
REVISED PAGES ARE ISSUED. ENTIRE SPECIFICATION REVISED

THE NATURE OF THE REVISION IS BRIEFLY NOTED UNDER REMARKS BUT


ISSUED FOR
THESE REMARKS ARE NOT A PART OF THE SPECIFICATION. THE REVISED
PAGES BECOME PART OF THE ORIGINAL SPECIFICATION AND SHALL BE REVIEW/COMMENTS
COMPLETED WITHIN THEIR ENTIRELY. TENDER/QUOTATION
PURCHASE
CONSTRUCTION X

X
REV. DATE PREPARED REVIEWED APPROVED PAGES REMARKS x
NO. BY BY BY X

A Oct. 2021 M.M. C.AMAM C.MYSM 27 ISSUED FOR DETAILED DSIGN

0 Jan. 2022 M.M. C.AMAM C.MYSM 46 ISSUED FOR TENDER

1 Feb. 2022 M.M. C.AMAM C.MYSM 44 ISSUED FOR CONSTRUCTION

SPECIFICATION REV.
ECG ENGINEERING CONSULTANTS GROUP METHOD OF MEASUREMENT
KSA 012700 - 2970 1

ECG Form No. E409 Rev. 5/03 Sheet 0 of 44


SECTION 012700

METHOD OF MEASUREMENT

STANDARD NOTES ON MEASUREMENT

1. These notes are intended as a guide only to the method adopted in the preparation of
the Bill of Quantities and the measurement of the Works. Contractors must note that
rates for items must include furnishing and everything necessary for the proper
execution, erection, completion and maintenance of each item and that all auxiliary
work is included unless specifically otherwise stated, measured or excluded in writing by
the Engineer.

2. All items are measured net as fixed in position.

3. Rates must include work at all levels, furnishing, transportation and installation,
materials and goods, scaffolding and testing where applicable. Each item includes also,
unless otherwise specifically stated, all labor in making, materials, goods and all costs in
connection therewith (e.g. conveyance, delivery, unloading, storing, unpacking,
returning packing, handling, hoisting, lowering and the like), fitting, setting and fixing
materials and goods in position, all square raking and curved cutting, waste of and laps
in materials, use of plant, temporary works, patterns, models, templates, samples and
establishment and overhead charges and profit.

4. Quantities are billed to the nearest whole unit. Fractions of a unit less than half are
disregarded and all other fractions are regarded as whole units.

5. All quantities are quoted in metric (S.I.) units of measurement.

6. All rates shall be quoted in Local Currency.

7. Attention is also directed to the Specifications and Drawings, which contain further
notes on all work, required and which are deemed to be included in rates quoted in
attached Bills of Quantities.

8. Rates include supplies, transportation, installation, dismantling and removal of


materials, temporary facilities, and machineries, hand tools, which are provided by the
Contractor at the site.

9. Rates include cost of removal of rubbish and debris from the site.

10. Full payment for any equipment shall not be made until the equipment has successfully
passed acceptance testing. After installation, but prior to successful testing, each
equipment shall be paid for at 80 percent of the unit price stated in the BOQ.

The Engineer shall withhold full payment on any equipment deemed unsatisfactory due
to any defect until such defect has been corrected in accordance with the intent of
Contract Documents.

If within the Defects Liability Period, any equipment, although originally accepted, is
actually not acceptable due to subsequent defect, the Contractor shall repair or replace
the defected equipment at his sole expense, and the Defect Liability Period with respect

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 1 of 44
to that piece or equipment shall be extended accordingly.

Rates for all equipment include for testing at manufacturer's premises and for all spare
parts needed during the Defects Liability Period.

11. Rates for all equipment include testing at manufacturer’s premises and all spare parts
needed during the Defects Liability Period.

12. Rates shall represent full compensation for all plant, materials, transport, labor,
equipment, temporary works, establishment, overhead, profit, and tax charges required
to complete the work described in this sub-section of the specification and/or on the
drawings.

13. Rates shall include all facilities and equipment for testing and inspection by the
Employer's representatives, including transportation.

14 Rates for all equipment including locally testing at manufacturer’s premises and for all
spare parts needed during the Defects Liability Period.

15 Any item that is required for a specific task and does not have a special corresponding
item in the BOQ is considered included in the price of this task.

16 Rates shall include wiring to and from equipment, cables, cable trays, conduits, panels
and all accessories.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 2 of 44
DIVISION 3

CONCRETE

Section Unit Description

033000 Cast-In-Place Concrete


131500 Reinforced Concrete Water Structures

m3/m2 Classified according to concrete grade and thickness of the cast


elements.

Rates shall include the following:

 Furnishing concrete, all equipment necessary for transferring, depositing


and discharging concrete, all types of forms as required complete with all
ties, struts, bracing, scaffolding or staging and accessories, form oils,
tapes, steel reinforcement, steel beams, tying wire, spacers, bolsters,
chairs, spacing blocks, toggles, all types of additives, joint filers, joint
sealants, water-stops, curing compounds and sleeves for embedded
articles.
 Design and erection of formwork, strutting, fixing at various levels, boxing
out, forming construction joints, and the like, chamfering of exposed
corners and edges, fixing sleeves for all embedded articles, fixing of water-
stops, forming holes blocking, boxing, ribs, props, fillets, cleaning and
everything necessary for fixing and removal of forms.
 Making and testing concrete cubes.
 Transferring and casting concrete, compaction, grading, trowelling,
forming channels, grooves, chases, rebates, construction and control
joints and the like, all kinds of grouting, working around obstructions and
curing.
 Curing of different cast elements.
 Testing of all ingredient materials of concrete, and testing of concrete.
 Removal of forms and finishing of concrete surfaces.
 Testing of concrete elements including, but not limited to core testing.
 Steel Reinforcement cutting reinforcing bars and steel mesh to length,
bending, splicing, cleaning, placing in position fixing of all spacers and
accessories and tying of wire.
 No reduction from the measurement shall be made in respect of:
 Any purpose made hole or opening which has an average cross-
section area less than 0.2 m2.
 Volume occupied by any reinforcement, and the like embedded into
concrete.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 3 of 44
Concrete Slabs-on-grade
m2/m3 Classified according to thickness of slab.

Measured in sq m for concrete layers up to 200 mm thick and in cu m for


concrete over 200 mm thick.

Rates shall include the following:

 Items stated above.


 Plain concrete 50 mm thickness beneath R.C slab on grade.
 Furnishing materials, casting, construction of joints and saw-cut joints as
shown in drawing in addition to materials and work described in the
above item.

Plain Concrete

m2/m3 Classified according to thickness of slab.

Measured in sq m for concrete layers up to 200 mm thick and in cu m for


concrete over 200 mm thick.

Rates shall include the following:

 Items stated above.


 Surface preparation and work described in concrete.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 4 of 44
DIVISION 4

MASONRY

Section Unit Description

042000 Unit Masonry

m2 Classified according to type, thickness, and fire rating period.

Measurements shall be for net areas; areas less than 0.25 sq.m will not be
deducted.

Rates shall include the following:

 Furnishing all required materials, horizontal reinforcement, lintels,


anchors, dowels, ties, inserts, metal expansion strips, expanded metals,
mortar, grouting, scaffolding and necessary tools, fire barrier.
 Building-in, cutting, bedding, bonding, plumbing angles, forming reveals,
grooves, chases, holes mortises, making good, and the like.
 Curing and cleaning faces.
 Partition top anchors.
 Through penetration firestop systems.
 Sheet metal flashing and trim
 Concrete beams and posts acting as stiffening elements as required.
 All other necessary accessories to comply with specifications and
performance requirements.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 5 of 44
DIVISION 5

METALS

Section Unit Description

051200 Structural Steel

Ton Classified according to the type of steel sections, measured by weight of


furnishing, installing and erection and fire rating period of structural steel
sections.

Rates shall include the followings:

 Furnishing and installing all materials according to detailed sections


indicated in Drawings and approved shop drawings.
 Bolts, nuts, washers, inserts, base plates and cutting works, bending,
welding, shaping, drilling, riveting, anchors, fixing in place, grouting.
 Hoisting.
 Testing.
 Protective coating and Field finish coating for non-fireproofed steel
elements
 Shop priming and Finishing.
 Protection of completed work.
 Any other required items as per Drawings and Specifications.

055000 Metal Fabrications

No. Ladders safety cage:

Classified according to material and height.

Rates shall include the following:

 Safety hoops as indicated.

m2 Floor Plate and support:

Classified according to material and height.

m Access cover:

Classified according to material and height.

Rates shall include the following:

 Furnishing of approved sections and dimensions materials, frames,


anchors and fasteners, hardware, and accessories.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 6 of 44
 Fabrication process, shop painting and priming, installation and fixation,
field painting, and final finish.
 Required Grout materials.
 All necessary bending, welding, drilling, lugs, strap anchors, base plates
and anchor bolts, bracing, cutting and trimming, embedding into
concrete, pointing, bolting, sleeves, and repair of damaged galvanizing or
coating.

Sundries

Miscellaneous Steel Trim

 Steel Lintels
 Payment for loose steel lintels is included in unit price of concrete
masonry. No separate measurement is made.
055213 Pipe and Tube Railings

m Classified according to material, finish, type, and height.

Rates shall include the following:

 Design according to loads as per specifications.


 Furnishing and installing of required railing & handrails.
 All necessary bending, welding, drilling, lugs, strap anchors, base plates
and anchor bolts, bracing, cutting and trimming, embedding into
concrete, pointing, bolting, sleeves, and repair of damaged coating.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 7 of 44
DIVISION 7

THERNMAL AND MOISTURE PROTECTION

Section Unit Description

071340 Polyethylene Sheet

m2 Classified according to thickness.

Rates shall include the following:

 Furnishing materials including sheets.


 Preparing substrates, spreading and installing sheets, overlaps,
 Protection of completed work.
 Any other required items as per Drawings and Specifications

071416 Cold Fluid-Applied Waterproofing

m2 Classified according to type and thickness.

Rates shall include the following:

 Furnishing waterproofing materials including, protection mat, sealants


and sheet flashing.
 Preparation of substrates.
 Testing.
 Protection, covering and cleaning.
 Any other required items as per Drawings and Specifications.

071613 Polymer Modified Cement Waterproofing

m2 Rates shall include the following:

 Furnishing of waterproofing materials and additives.


 Preparation, cleaning and wetting the substrates.
 Applying, smoothing, making good and curing.
 Testing.
 Any other required items as per Drawings and Specifications

071616 Crystalline Waterproofing

m2 Rates shall include the following:

 Furnishing of waterproofing materials and additives.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 8 of 44
 Preparation, cleaning and wetting the substrates
 Applying, smoothing, making good and curing.
 Testing.
 Protection, covering and cleaning.
 Any other required items as per Drawings and Specifications.

075213 Atactic-Polypropylene (APP) Modified Bituminous Membrane Roofing

m2 Rates shall include the following:

 Furnishing waterproofing materials including, protection mat, sealants


and sheet flashing.
 Preparation of substrates.
 Cutting, rounding, intersections, prime coat, and side overlapping to
vertical surfaces, reglets and bending free edge in grooving.
 Testing.
 Replacing of damaged membrane.
 Protection, covering and cleaning.
 Any other required items as per Drawings and Specifications.

075216 Styrene-Butadiene-Styrene (SBS) Modified Bituminous Membrane

m2 Classified according to type and thickness.

Rates shall include the following:

 Furnishing waterproofing materials including, protection mat, sealants


and sheet flashing.
 Preparation of substrates.
 Cutting, rounding, intersections, prime coat, and side overlapping to
vertical surfaces, reglets and bending free edge in grooving.
 Testing.
 Replacing of damaged membrane.
 Protection, covering and cleaning.
 Any other required items as per Drawings and Specifications
078413 Penetration Fire stopping

 Through-penetration fire stop systems and related accessories shall not


be measured separately for payment and shall be paid as part of the
Contract unit price for the associated work requiring through-penetration
fire stop systems.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 9 of 44
079200 Joint Sealants

 Joint sealant systems and related accessories shall not be measured


separately for payment and shall be paid as part of the Contract unit
price for the associated work requiring through joint sealant systems.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 10 of 44
DIVISION 8

OPENINGS

Section Unit Description

081113 Hollow Metal Doors and Frames

No. Classified according to type, finish, and size, as per Drawings & Door
Schedules.

Rates shall include the following:

 Frames and architrave.


 Accessories, fasteners, inserts, anchors, weather stripping, sealants, and
gaskets.
 Hardware.
 Mullions and transom bars.
 Cutting, fabrication, and welding.
 Hardware reinforcement in doors and frames.
 Louvers.
 Finishing, and repairing.
 Testing, adjusting and cleaning.
 Furnishing and installing materials.
 Any other required items as per Drawings and Specifications.

081416 Flush Wood Doors

No. Classified according to type, size, finish, frame type, as per Drawings & Door
Schedules.

Rates shall include the followings:

 Furnishing and installation of doors frame, sub frame, and architrave.


 Hardware according to hardware schedule.
 Accessories, fasteners, inserts, anchors, weather stripping, and sealants.
 Testing, adjusting and cleaning.
 Painting, veneers, or staining.
 Transom and side panels.
 Repairing, and protection.
 Any other required items as per Drawings and Specifications.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 11 of 44
083323 Overhead Coiling Doors

No. Classified according to material, finish, type, size, operation, and fire rating
period as per Drawings & Door Schedules.

Rates shall include the following:

 Furnishing & installing materials.


 Vision window, and wicked door (If any).
 Curtain jamb guides, bottom bar.
 Counterbalance, and hood.
 Fasteners, anchors, clips, accessories, sealants, and seals.
 Hardware.
 Plugging, screwing, cutting, seals.
 Finishing, and repairing.
 Activity and safety devices.
 Demonstration.
 Testing, adjusting and cleaning.
 Any other required items as per Drawings and Specifications.

085113 Aluminum Windows

No. Classified according to type, finish and size as per Drawings & windows
Schedules.

Rates Shall Include the Following:

 Furnishing & installing materials.


 Glazing.
 Insect screen.
 Sealants.
 Weathers tripping.
 Finishing, and repairing.
 Hardware.
 Adjusting, cleaning, and protection.
 Any other required items as per Drawings and Specifications.

087100 Door Hardware

No. Classified according to hardware set as per Door hardware set Schedule.

Rates Shall Include the Following:

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 12 of 44
 Components of hardware sets as indicated Door hardware set Schedule
 Furnishing & installing materials.
 Adjusting, cleaning, and protection.
 Any other required items as per Drawings and Specifications.

088300 Mirrors

No. Classified according to size and type.

Rates shall include the following:

 Furnishing & installing materials.


 Clips and installing wood furring, nails, screws, sealant and all necessary
items for fixing wood furring and mirror.
 Cutting, edging.
 Any other required items as per Drawings and Specifications.

089000 Louvers and Vents

No. Classified according to type, height and finish.

Rates shall include the followings:

 Fixing in position, adjusting, plugging and screwing.


 All accessories and fittings required.
 Grouting, finishing, and cleaning.
 Framing and sub-framing.
 Screen.
 Adjusting, cleaning, and protection.
 Any other required items as per Drawings and Specifications.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 13 of 44
DIVISION 9

FINISHES

Section Unit Description

092400 Portland Cement Plastering

m2 Classified according to the type, thickness and location.

Rates shall include the followings:

 Furnishing and installing materials.


 Scaffolding where required, spatter dash, forming key, floating, dubbing
out, arises.
 Plaster accessories as per Specifications.
 Sealants.
 Cleaning.
 Suspension system for metal lath suspended ceiling.
 Finishing to the required texture and repairing of damaged plaster coat.
 Any other required items as per drawings and specifications.

093000 Tiling

Floor& wall Tiling

m2 Classified according to type and size.

Rates shall include the followings:

 Furnishing and installing materials.


 Setting materials, grouting and sealants.
 Thresholds, trim units, and special tiles and fittings.
 Replacing of damaged tiles.
 Protection covering and cleaning.
 Any other required items as per Drawings and Specifications.

Ceramic Skirting

m Classified according to type and height.

Rate shall include the followings:

 Furnishing and setting tiles.


 Setting materials, grouting and sealants.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 14 of 44
 Replacing of damaged parts.
 Protection covering and cleaning.
 Any other required items as per Drawings and Specifications.

096600 Terrazzo Flooring

m2 Classified according to size and thickness.

Rates shall include the followings:

 Furnishing and setting tiles.


 Mortar, grouting and sealants.
 Replacing of damaged tiles.
 Cutting.
 Protection covering and cleaning.
 Any other required items as per Drawings and Specifications.

Terrazzo base

m Classified according to height and thickness.

Rates shall include the followings:

 Furnishing and setting tiles.


 Mortar, grouting and sealants.
 Repairing of damaged tiles.
 Cutting.
 Protection covering and cleaning.
 Any other required items as per Drawings and Specifications.

096723 Resinous Flooring

m2 Classified according to material, system, location and thickness.

Rates shall include the followings:

 Furnishing and installing materials.


 Coating system including primer, intermediate, top coats and aggregate.
 Substrate preparation.
 Patching and fill material.
 Sealants.
 Replacing of damaged flooring.
 Protection and cleaning.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 15 of 44
 Any other required items as per Drawings and Specifications.

099100 Painting

m2 Painting is classified according to type, location and substrates.

Rates shall include the followings:

 Furnishing and applying the paint system including primer, intermediate,


top coats, preparing surfaces, rubbing down between each coat, stopping,
knotting.
 Covering of floors, with sheets while painting is being executed, removing
paint splashes, spots, and stains and completion of work to perfection.
 Painting on other items such as metal and wood shall not be measured
separately for payment and shall be paid as part of the item.
 Repairing of damaged parts.
 Cleaning.
 Any other required items as per Drawings and Specifications.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 16 of 44
DIVISION 10

SPECIALTIES

Section Unit Description

102800 Toilet, Bath and Laundry Accessories

No. Classified according to type and finish.

Rates shall include the following:

 Supplying accessories complete with all necessary fasteners.


 Fixing in position, and other necessary works.

104416 Fire Extinguishers

No. Fire Extinguishers

Classified according to type.

Rates shall include the following:

 Furnishing and installation.


 Extinguishers complete with charge, pressure gauge and brackets .

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 17 of 44
DIVISION 21

FIRE SUPPRESSION

Section Unit Description

212200 Clean Agent Fire Extinguishing Systems - NOVEC

L.S Clean Agent Cylinders Sets

Rates shall include the following:

 Furnishing and installation.


 Cylinders, manifolds, hose connections, cylinder valves, pressure release
flaps, pressure switches, solenoid actuators, pressure gauges, supports,
painting, wiring to control panels and accessories as specified and
required for operation.
 Initial gas fills.
 Testing and commissioning.

Control Panels

Classified according to No. of extinguishing areas.

Rates shall include the following:

 Furnishing and installation.


 Factory assembled control panel and hook up site wiring, touch up
painting, and identification.
 Testing and commissioning.

Horn/Strobe Units

Rates shall include the following:

 Furnishing and installation.


 Wiring between unit and control panel.
 Testing and commissioning.

Alarm Bells

Rates shall include the following:

 Furnishing and installation


 Wiring between unit and control panel
 Testing and commissioning.

Strobe lights

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 18 of 44
Rates shall include the following:

 Furnishing and installation


 Wiring between unit and control panel.
 Testing and commissioning.

Manual release stations

Rates shall include the following:

 Furnishing and installation.


 Wiring between unit and control panel.
 Testing and commissioning.

Abort switches

Rates shall include the following:

 Furnishing and installation.


 Wiring between unit and control panel.
 Testing and commissioning.

Discharge Nozzles

Rates shall include the following:

 Furnishing of nozzles and connections to piping.

Optical Smoke Detectors

Rates shall include the following:

 Furnishing and installation.


 Wiring to control panel.
 Testing and commissioning.

Warning signs

Rates shall include the following:

 Furnishing and installing.

Piping Network

Classified by size.

Rates shall include the following:

 Furnishing and installation.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 19 of 44
 Pipes, fittings, accessories, flexible couplings, flange adaptors, flexible
connections, joints, jointing materials, welding materials, expansion joints,
sleeves, mechanical coupling, hangers, supports, identification, earthing
of network, painting and all other accessory and fittings necessary for
complete installation of piping system.
 Equipment, instruments and personnel necessary for installation of piping
system.
 Testing and commissioning.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 20 of 44
DIVISION 22

PLUMBING

Section Unit Description

Piping

This method of measurements is applicable for all types of piping, unless


otherwise indicated

m Classified by material and diameter.

Rates shall include the following:

 Furnishing and installing of pipes, fittings, accessories, flexible couplings


and flange adaptors, joints and jointing materials, welding materials,
expansion joints, sleeves, wall cleanout, rocker pipes.
 Mechanical coupling, hangers, supports and braces.
 Mechanical insulation and wrapping.
 Painting and coatings, Identification.
 All other accessories and fittings necessary for complete installation of
piping systems.
 Excavation, shoring, bracing, dewatering and backfilling, furnishing all
material, thrust blocks and tie rods, equipment, instruments
 Labors necessary for installation of piping system.
 Flushing of systems and disinfection of water pipe systems.
 Testing on site.

Valves

This method is applicable for all types of valves, unless otherwise indicated

No Classified according to type, material and size.

Rates shall include the following:

 Furnishing and installing of valves, flanges, tie-rods, supporting, bolts,


operating lever, handle and gears.
 Testing on site.
221123 Domestic Water Pumps

No. Electrically Driven Pumps

Classified according to type and capacity.

Rates shall include the following:

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 21 of 44
 Supply of pump sets complete with electric control panels, all accessories,
strainers, pressure switches, fittings, fasteners, supports, bracing, gaskets,
and bolts
 All necessary wiring, power cables, vibration isolators prefabricated
bedplates, connecting flanges complete with tapping, motors, casings,
impellers, couplings, bearings and seals, casing, air release valves,
pressure regulators, pressure gauges, pressure switches, glands, starters,
control and remote devices, control cables, control valves.
 Pressure vessels and accessories.

 Variable speed drives with its attachments, monitoring and control


devices and connections

 Foundation blocks, spare parts, Installation.


 Connection to piping.
 Testing on site.
 Commissioning and putting into service.

221319 Sanitary Waste Piping Specialties

No. Classified according to type and material.

Rates shall include the following:

 Furnishing specialties complete with accessories and materials required


for specified installation.
 Civil works, installation, identification and connections.
 Testing, putting into services.
 Finishing of surfaces.

 Installation, fixation, and leveling.

No. Trench Grates

Classified according to type, width and material.

Rates shall include the following:

 Furnishing, trench grate, frame and coating.


 Installation, fixation, and leveling.
 Commissioning.
 Installation, leveling, and fixation.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 22 of 44
221329 Sanitary Sewage Pumps
&
221429 Sump Pumps

No. Electrically Driven Pumps

Classified according to type and capacity.

Rates shall include the following:

 Supply of pump sets complete with electric control panels, all accessories,
strainers, pressure switches, fittings, fasteners, supports, bracing, gaskets,
and bolts.
 All necessary wiring, power cables, vibration isolators prefabricated
bedplates, connecting flanges complete with tapping, motors, casings,
impellers, couplings, bearings and seals, casing, air release valves,
pressure regulators, pressure gauges, pressure switches, glands, starters,
control and remote devices, control cables, control valves.
 Seals, bearings, delivery, bends, guide rails, float switches, lifting chains
with identification tags.
 All special pieces for installation and operation.

 Foundation blocks, spare parts, Installation.


 Connection to piping.
 Testing on site.
 Commissioning and putting into service.

No. Sump & Sewage Pits

Classified according to type and dimensions.

Rates shall include the following:

 Furnishing materials and necessary equipment, tools, and labors,


excavation, dewatering, shoring, backfilling, reinforced and plain concrete
and concrete inserts.
 Exterior and interior damp-proofing, plastering, connection of
surrounding pipes, covers and frames.
 Pipes sleeves, inlet control cables rod, steps.
 Loading and unloading fixed parts, puddle flanges, adjacent valve
chamber of indicated sump and sewage pump sets.
 All accessories required for installation, testing, putting in service.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 23 of 44
DIVISION 23

HEATING VENTILATING AND AIR CONDITIONING

Section Unit Description

232113 HVAC
To
238400 General

Work is measured net as fixed in position.

Contractors must note that rates of items include everything necessary for
the proper supply, installation, execution, completion, start-up and
maintenance of each item that all auxiliary work is included unless specifically
otherwise stated, measured or excluded in writing by the Engineer.

Rates shall be fully inclusive of all that is necessary to fulfill the liability and
obligations and shall include:

 Labor and all associated costs.


 Materials, goods and all associated costs.
 Temporary works.
 Coordination with other installations.
 Identification, which shall include plates, discs, labels, charts and color
coding.
 Cutting or forming holes, chases, mortises or the like and building in
brackets, supports or the like including making good finishing.
 Protective and decorative painting.
 All required testing, commissioning, balancing, handing over and
maintenance as specified and shall include provision of fuel and power.
 Tools and spare parts, which shall include loose keys and consumable
items.
 Documents, which shall include: shop working and as-built drawings,
operating instructions and maintenance manuals and other submittals
required in the specifications such as materials approvals, samples and
samples of work.
 Al builders work necessary for HVAC works.
 All civil works, including excavation, backfilling, etc.
 Establishment charges, overheads and profit.
 Miscellaneous items to complete the work as per specifications and
Drawings.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 24 of 44
Sheet Metal Duct Work

Rates shall include the following:

 Insulation (as specified), sheet metal cladding (as specified), plenums,


joints, fittings, bends, elbows, flexible connections, connections, sleeves,
stiffeners, access and inspection doors
 Wrapping with dense tap, measuring points or the like.
 Air Duct Accessories such as Fire/smoke dampers, manual volume control
dampers and sound Attenuators or the like .
Ducts shall be classified as follows:

Ton Rectangular ductwork is measured by weight (based on the area and


calculated as the length along the center line over all fittings, times the
nominal net width). No deductions shall be made for intersections or
openings and no additions shall be made for the extra weight of seams,
stiffeners, fixings or the like. Ductwork shall be as indicated on the drawings.
The rates shall also include metal cladding as specified.

No. Air Outlets, etc.

Motorized Dampers, registers, grilles, diffusers, louvers or the like are


classified according to type and size. Linear diffusers shall be measured in
linear meters.

Rates shall include the following:

 Frames, plenums, fixing devices, paint, supports or the like

 Fitting and making good around wall and ceiling finishes.


No. Equipment

Package roof top unit , split unit , fans or the like are classified according to
type.

Rates shall include the following:

 Pipes , Valves, fittings, bases, control works , vibration isolators, sound


lining, all required joints, accessories, and the like.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 25 of 44
DIVISION 26
ELECTRICAL

Section Unit Description

260513 Medium Voltage Cables

M Classified according to type, voltage, number of cores and size.

Rates include the following:


 Material supply complete with fittings and cable termination accessories,
installation and testing.
 Supply and installation of necessary joints, lugs, terminals, and
accessories, cable ducts, cable trenches, either indoor or outdoor.
 Manholes, sleeves, complete with all necessary grounding taps, as well as
layout shop drawings and as-built drawings with full data/feeder
schedule, as specified and shown on drawings.
 And all necessary accessories to complete the work according to the
technical specifications and the other contract documents.

260519 Low Voltage Electrical Power Conductors and Cables


260536 Cable Tray

M Classified according to type, voltage, number of cores and size.

Rates include the following:

 Material supply, complete with fittings and cable termination accessories,


installation in raceways, and testing.
 Supply and installation of necessary joints, lugs, cable tray, cable tray
cover, cable tray accessories, terminals and accessories, conduits, cable
ducts, either indoor or outdoor.
 Manholes, sleeves, pull and junction boxes complete with all necessary
grounding taps.
 And all necessary accessories to complete the work according to the
technical specifications and the other contract documents.

260519 Low Voltage Electrical Power Conductors and Cables


260533 Raceways and Boxes
262726 Wiring Devices

Wiring for Lighting, Convenience and Power Socket Outlets

No. Classified according to number of outlets.

Rates include the following:

 Material supply, installation, testing, connection, grounding taps and

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 26 of 44
testing of wires, conduits with all accessories, outlets boxes, necessary
pull and junction boxes.
 All other materials necessary for a complete wiring system from outlet
termination up to panel boards.

Outlets Fittings

No. Classified according to type, number of poles and ampere rating.

Rates include the following:

- Cover fittings as “isolators, load-break switches, lighting switches and all


types of socket outlets”.
- Supply, installation, covers plates, supports, screws and all other
associated accessories.
- Assembly, connection, grounding tapes.
- Testing of the complete system.

260526 Grounding and Bonding

L.S Classified according to requirements to achieve the specified earth resistance.

Rates include the following:

 Material supply, fabrication, supply, installation, connections and testing


of the complete system.
 Grounding pits, electrodes, equi-potential bars, main and branch
grounding conductor, test links, grounding taps to mechanical equipment
and motors, and thermo welds.
 All other necessary fittings to achieve complete grounding for all
necessary and indicated equipment.
 Associated civil works relevant to fixation and installation.
 And all necessary accessories to complete the work according to the
technical specifications and the other contract documents.

261201 Distribution Transformers - Oil Type

No. Classified according to type, voltage and rating.


Rates include the following:

 Supply, install, testing and commissioning of MV oil transformer include


the following:
 Detailing, fabrication, assembly, delivery, termination for M.V. and L.V.
 Installation, connection, grounding tapes.
 Testing and commissioning.
 Associated civil work relevant to fixation and installation, catalogues.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 27 of 44
 All requirements needed from Saudi electrical distribution company
261301 Ring Main Unit

No. Classified according to type, voltage, no. of cell, rating.

Rates include the following:

 Supply, Install, testing and commissioning of ring main unit include


Detailing, fabrication, assembly, bushings, terminations, glands, grounding
taps/links.
 Factory testing, delivery, and installation.
 Testing before connection, and testing of the entire system.
 Spare parts.
 Associated civil work relevant to fixation and installation.
 And all necessary accessories to complete the work according to the
technical specifications and the other contract documents.
 All requirements needed from Saudi electrical distribution company

262413 Switchboards
263533 Power Factor Correction Capacitors
No. Classified according to type, voltage, form of separation and ratings.

Rates include the following:

 Supply, install, testing and Detailing, fabrication, assembly, bushings,


terminations, glands, digital power meter, surge protection devices,
power factor correction and grounding taps/links.
 Factory testing, delivery and installation.
 Testing before connection, testing of the entire system, and any And all
necessary accessories to complete the work according to the technical
specifications and the other contract documents.

262416 Panel boards


No. Classified according to type, voltage, and ratings.

Rates include the following:

 Supply, install and Detailing, fabrication, assembly, bushings,


terminations, glands, Surge protection device (SPD) and grounding
taps/links.
 Factory testing, delivery and installation.
 Testing before connection, testing of the entire system, and any And all
necessary accessories to complete the work according to the technical
specifications and the other contract documents.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 28 of 44
262419 Motor Control Centers

No. Classified according to type, voltage, form of separation and ratings.

Rates include the following:

 Supply, install and Detailing, fabrication, assembly, bushings,


terminations, glands, grounding taps/links and connections to BMS or Fire
Alarm control panel as indicating in the drawings.
 Factory testing, delivery and installation.
 Testing before connection, testing of the entire system, and any And all
necessary accessories to complete the work according to the technical
specifications and the other contract documents.
262726 Wiring Devices
Outlets Fittings

No. Classified according to type, number of poles and ampere rating.

Rates include the following:

 Cover fittings as “isolators, load-break switches, lighting switches and all


types of socket outlets”.
 Supply, installation, cover plates, supports, screws and all other
associated accessories.
 Assembly, connection, grounding tapes.

263213 Generators

No. Classified according to type, rating and voltage.

Rates include the following:

- Supply, installation, testing and commissioning of the unit with control panel,
fuel system, battery set, battery charger, Sound Attenuation and fuel tanks.
- Provision of connections between fuel storage tank and daily tank and
solenoid valve required, cooling, set of pumps, exhaust system, lubrication
system, grounding tapes, noise suppressors silencer, vibration suppressors,
ventilation works, concrete base and louvers.
- Transportation to the project
- Spare Parts as indicated in the specifications.
- All associated civil work relevant to fixation and installation.
- Detailing, fabrication, delivery, assembly, installation of all accessories.
- Testing before shipping in the factory on load bank and on testing on site
after installation on the actual loads of the complete system, spare parts,
catalogues and manuals.
- And all necessary accessories to complete the work according to the

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 29 of 44
technical specifications and the other contract documents.

265100 Interior Lighting


265600 Exterior Lighting

No. Classified according to type designation.

Rates include the following:

 Material supply, installation, testing, complete with control gear, Driver,


and power factor corrector (wherever necessary), lamps, internal wiring
including battery charging wires from panel to lighting fixtures, mounting
brackets, foundation and accessories, complete assembly, installation,
grounding taps connection to lighting outlets and testing.
 And all necessary accessories to complete the work according to the
technical specifications and the other contract documents.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 30 of 44
DIVISION 28

ELECTRONIC SAFETY AND SECURITY

Section Unit Description

283100 Fire Alarm System

Rates shall include the following:

 Furnishing, installation and testing all equipment, software, materials of


equipment.
 All necessary equipment and material required for installation and
erection, and all other components and devices, adjusting and acceptance
and operation.

L.S. Addressable Fire Alarm Control Panels

Rates shall include the following:

 Supply, install, programming, connection software and hardware and all


interfaces required.
 Testing, commission, start-up and hand-over.
 Emergency Power Supply (EPS), batteries, charger, conduits, boxes,
raceways, cables, communication cables with other fire alarm control
panels including, terminations, connection with earthing, and labeling.
 All necessary accessories required to complete the work.

No. Initiating Devices (Intelligent addressable multi detector, Manual Station, etc)

Rates shall include the following:

 Supply, install, test, commission, programming, start-up and hand-over.


 Conduits, boxes, mounting base, raceways, fire resistances cables,
terminations, labeling.
 All necessary accessories required to complete the work.

No. Notification Appliances (Alarm sirens, Strobe lights, ,…etc)

Rates shall include the following:

 Supply, install, test, commission, programming, start-up and hand-over.


 Conduits, boxes, raceways, fire resistances cables, terminations, labeling.
 All necessary accessories required to complete the work.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 31 of 44
No. Interfacing Devices (Control modules, Monitor modules, …etc)

Rates shall include the following:

 Supply, install, test, commission, programming, start-up and hand-over.


 Conduits, boxes, raceways, fire resistances cables, terminations, labeling.
 All necessary accessories required to complete the work.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 32 of 44
DIVISION 31

EARTHWORK

Section Unit Description

312000 Earth Moving

Excavation m3

Excavation shall be measured geometrically from the actual surface of


existing soil to the required excavation levels shown on Drawings

Rates shall include the Following:

 Survey works, surfaces trimming, including taking corrective works to


reach bottom level, as approved by the Engineer.
 Excavation in any material likely to be encountered including boulders,
paved areas, old foundations (if any), etc.
 Selecting, setting aside and preserving any material suitable for backfilling.
 Transporting of excavated materials within the site and disposal of
unsuitable material off the site to public dumping areas as instructed by
the Engineer.
 All labor, equipment, temporary works, and all other works required to
complete the work as per project specification.

Backfilling m3

Classified according to the type of backfilling. Filling shall be measured


geometrically to net compacted volume.

Rates shall Include the Following:

 Survey works, compaction, and testing, as approved by the Engineer


 All materials, transportation, labor, equipment, temporary works,
dewateing, shoring and all other works required to complete the work as
per project specification

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 33 of 44
DIVISION 33

UTILITIES

Section Unit Description

Pipes

331000 Unplasticized PVC Pipes (Upvc), High Density Polyethylene (HDPE), Ductile
Iron Pipes and Fittings, (DI) Ductile iron pipe and fittings
&
333000 Extra Strength Vitrified Clay (ESVC),
&
334000 Unplasticized PVC Pipes (Upvc), Reinforced Concrete Pipes (RC)

lm Classified according to material, diameter, and depth indicated on drawings.

Rates shall include the following:

- Required submittal and drawings


- Transporting, Supplying and Storing pipes and fittings.
- (Gravity) Transporting, Supplying fittings, Rocker pipes, accessories, geo
textile fabric membrane, jointing necessary materials, furnishing labor,
equipment and tools
- (Pressure) Transporting, Supplying and Storing bends, tees, reducers,
special pieces, flexible joints, restrained joints (Stepped coupling) ,
protection polyethylene sleeves sheets, push on fittings, saddle strap,
Ferrules, end plug, all special fittings for building connections, all jointing
necessary materials, gaskets, lubricant, flanges, bolts, nuts, furnishing
labor, equipment and tools and all accessories, fittings, material required
for complete installation of pipes according to drawings and
specifications.
- Excavation of pipe trenches to the below grade shown on drawings,
dewatering, bracing, shoring, sheeting, grading and leveling of excavation
bottom below the pipe, transporting the excavation material outside the
project area, placing plain concrete base along the RC pipe routing.
Furnishing labor, equipment and tools. All material required for complete
excavation of pipes trenches according to drawings and specifications.
- Lowering pipes into trench, laying out; aligning, jointing pipe, installing
rocker pipes, placing support, placing RC/PC concrete encasement, placing
plain concrete base under RC pipes, covering pipe trench with geo textile
membrane. Furnishing labor, equipment, and flushing, cleaning, testing of
the installed work. All fittings, materials, accessories required for
complete installation of pipes, according to drawings and specifications.
- Lowering pipes into trench, laying out; aligning, jointing pipe, placing
concrete support, installing fittings, elbows, tees, restrained joints, flexible

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 34 of 44
joints, end plugs, installing fiber board, wrapping DI pipes with
polyethylene sleeve, , fitting, special fitting when contacted to soils with
polyethylene sleeves, placing thrusts blocks, RC concrete encasement,
concrete blocks . Furnishing labor, equipment, and flushing, cleaning,
disinfecting testing of the installed work. All fittings, materials, accessories
required for complete installation of pipes, according to drawings and
specifications.
- Service Lateral Connection for water, lowering Upvc pipe, installing saddle
strap/or tee connections on main line, installing ferrule, end plugs, pipe
sleeve, installing special fitting for building connection different pipes,
constructing concrete block, constructing concrete encasement,
Furnishing labor, equipment, and flushing, cleaning, disinfecting testing of
the installed work. All fittings, materials, accessories required for
complete installation of pipes, according to drawings and specifications.
- Backfilling to existing ground with selective fine compressive material,
backfilling shall be in layers each layer shall be compacted by hand and
pneumatic tampers, warping the pipe trench with geo textile filter fabric,
and all material required for complete back filling according to drawings
and specifications.

- Fittings shall be measured in center line as a pipe length.

333000
& Chambers
334000 Wastewater and Storm Drainage Structures

No. Manholes

Classified according to type, diameter or dimension and depth from ground


level to bottom elevation of the structure.

Rates shall include the following:

- Required submittals and drawings.


- Required structural calculation for each type of manhole
- Transporting, Supplying and Storing pipes, Ramp drop fittings, Vertical
drop fittings, Rocker pipes, short pieces, fittings (elbows, short piece)
plugs, chains, hollow block wall brick, and all fittings, and accessories
required for drop manhole installation according to drawings and
specifications.
- Transporting, Supplying and Storing DI solid covers, DI Grating Cover, CI
flap, GRP Ladder, GRP sheet liner, cast iron step irons, tanking membrane,
grout, GRP fittings all accessories, fittings, material required for
installation the covers, Ladders, step irons and manhole isolation
according to drawings and specifications.
- Furnishing materials and necessary equipment, tools, and labor,
excavation, dewatering, shoring, bracing, sheeting, grading and leveling of

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 35 of 44
excavation bottom below the base, transporting the excavation material
outside the project area, back filling to the base bottom grade with
selective fine compressive material and placing polyethylene sheets below
the base, placing blinding concrete, constructing reinforced/Plain
concrete base, constructing reinforced/plain concrete walls, constructing
reinforced concrete cover slab, constructing plain concrete benching with
epoxy mortar, plastering, installing rocker pipe, constructing plain
concrete below above rocker pipe, install Y drop fittings, install vertical
drop fittings and, accessories, constructing plain concrete surrounding the
drop manhole fittings, Install approved resilient connectors at each pipe
entering and exiting manholes, install inside GRP liner, apply outside
tanking membrane/or apply inside coal tar epoxy paint and outside
bituminous paint , install GRP ladders/or step iron, installing brick work on
cement mortar for adjusting levels , install DI covers, backfilling to existing
ground with selective fine compressive material, backfilling shall be in
layers each layer shall be compacted by hand and pneumatic tampers as
shown on drawing, testing of the structure, and all materials, accessories,
fittings required for installation according to drawings and specifications.
No. Inspection Chamber

Rates shall include the following:

- Required submittals and drawings.


- Required structural calculation for each type of manhole
- Furnishing materials and necessary equipment, tools, and labour,
excavation, dewatering, shoring, bracing, sheeting, grading and leveling of
excavation bottom below the base, transporting the excavation material
outside the project area, back filling to the base bottom grade with
selective fine compressive material and placing polyethylene sheets below
the base, placing blinding concrete, constructing plain concrete base,
constructing plain concrete walls, constructing reinforced concrete cover
slab, constructing plain concrete benching with epoxy mortar, plastering,
install resilient connectors at each pipe entering and exiting manholes,
install inside GRP liner, install outside tanking membrane/or apply inside
coal tar epoxy paint and outside bituminous paint, install cast iron step
irons/or GRP ladder, installing brick work on cement mortar for adjusting
levels , install DI covers, backfilling to existing ground with selective fine
compressive material, backfilling shall be in layers each layer shall be
compacted by hand and pneumatic tampers as shown on drawing, testing
of the structure, and all materials required for installation according to
drawings and specifications.
- Transporting, Supplying and Storing short pieces, WYE branch, Riser pipe,
WYE Poles, accessories, jointing necessary materials, furnishing labor,
equipment and tools for service connection between inspection chamber
and main sewer.
- Excavation of pipe trenches to the below grade shown on drawings,
dewatering, bracing, shoring, sheeting, grading and leveling of excavation
bottom below the pipe, transporting the excavation material outside the

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 36 of 44
project area,
- Lowering pipe, installing WYE branch, Riser pipe, closure, WYE Poles
constructing concrete encasement, testing installed works, installing fiber
board. Furnishing labor, equipment, and flushing, cleaning, testing of the
installed work. All fittings, materials, accessories required for complete
installation of pipes, according to drawings and specifications.
- Backfilling to existing ground with selective fine compressive material,
backfilling shall be in layers each layer shall be compacted by hand and
pneumatic tampers, warping the pipe trench with geo textile filter fabric,
and all material required for complete back filling according to drawings
and specifications.
No. Catch Basin and Intermediate Catch Basin

Rates shall include the following:

- Required submittals and drawings.


- Required structural calculation for each type of Chamber
- Furnishing materials and necessary equipment, tools, and labour,
excavation, dewatering, shoring, bracing, sheeting, grading and leveling of
excavation bottom below the base, transporting the excavation material
outside the project area, back filling to the base bottom grade with
selective fine compressive material and placing polyethylene sheets below
the base, placing blinding concrete, constructing plain concrete base,
constructing plain concrete walls, constructing reinforced concrete cover
slab, plastering, install Rocker pipe, constructing plain concrete surround
rocker pipe, Install approved resilient connectors at each pipe entering
and exiting manholes, installing cast iron flab, apply inside coal tar epoxy
paint and outside bituminous paint, installing brick work on cement
mortar for adjusting levels , install DI grating covers, install cast iron step
irons/or GRP ladder, installing brick work on cement mortar for adjusting
levels ,backfilling to existing ground with selective fine compressive
material, backfilling shall be in layers each layer shall be compacted by
hand and pneumatic tampers, testing of the structure, and all materials
required for installation according to drawings and specifications.
- Transporting, Supplying and Storing short pieces, WYE branch, Riser pipe,
WYE Poles, accessories, jointing necessary materials, furnishing labor,
equipment and tools for service connection between catch basin and
main sewer.
- Excavation of pipe trenches to the below grade shown on drawings,
dewatering, bracing, shoring, sheeting, grading and leveling of excavation
bottom below the pipe, transporting the excavation material outside the
project area,
- Lowering pipe, installing WYE branch, Riser pipe, closure, WYE Poles
constructing concrete encasement, testing installed works, installing fiber
board. Furnishing labor, equipment, and flushing, cleaning, testing of the
installed work. All fittings, materials, accessories required for complete
installation of pipes, according to drawings and specifications.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 37 of 44
- Backfilling to existing ground with selective fine compressive material,
backfilling shall be in layers each layer shall be compacted by hand and
pneumatic tampers, warping the pipe trench with geo textile filter fabric,
and all material required for complete back filling according to drawings
and specifications
m2. Riprap

Rates shall include the following:

- Required submittals and drawings.


- Transporting, Supplying and Storing pipes, Rocker pipes, Pitching-stone,
polyethylene geo membrane, grout, cement mortar, and all material
required for complete installation the rip rap according to drawings and
specifications.
- Furnishing materials and necessary equipment, tools, and labor,
regarding, transporting the excavation material outside the project area,
regarding the ditches area, place placing structural fill layer/crushed
aggregate base course, placing lain concrete, place graded stone bedding,
place cement mortar, place loose rip rap, placing grout, installing Rocker
pipe, placing concrete surrounding the rocker pipe, placing grout and all
materials required for installation according to drawings and
specifications.
LS Connection to Existing

- Furnishing materials and necessary equipment, tools, excavation,


penetrating inside the manhole, installing the pipe, placing grout, sealing
the pipe location, restoring everything as it is, testing the manhole for
water tightens, backfilling to existing ground with selective fine
compressive material, backfilling shall be in layers backfilling to existing
ground with selective fine compressive material, backfilling shall be in
layers each layer shall be compacted by hand and pneumatic tampers,
testing of the structure, and all materials, accessories, fittings required for
installation according to drawings and specifications
- Furnishing materials and necessary equipment, tools, excavation,
penetrating inside the concrete channel, installing the pipe, placing grout,
sealing the pipe location, restoring everything as it is, testing the manhole
for water tightens, backfilling shall be in layers each layer shall be
compacted by hand and pneumatic tampers, testing of the structure, and
all materials, accessories, fittings required for installation according to
drawings and specifications
- Furnishing materials and necessary equipment, tools, excavation,
regarding the surrounding area towards the ditch, installing head wall in
the in the existing concert ditch, installing rocker pipe, placing plain
concrete under the pipe, placing grout, sealing the pipe location, apply
inside coal tar epoxy paint and outside bituminous paint, restoring
everything as it is, testing the water structure for water tightens,
backfilling to existing ground with selective fine compressive material,
backfilling shall be in layers each layer shall be compacted by hand and

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 38 of 44
pneumatic tampers, testing of the structure, and all materials,
accessories, fittings required for installation according to drawings and
specifications
331000 Infrastructure Valves
Valve Chamber Construction
Reinforced Concrete Valve Chamber

No. Classified according to type, width, length and depth from ground level to
bottom elevation of the chamber.

Rates shall include the following:

- Required submittals and drawings.


- Transporting, Supplying and Storing pipes, DI flanged butter fly valve, DI
buried gate valve, DI air valve, , DI elbow, DI dismantling pieces, DI
connection piece, DI puddle flange, bolts, nuts, gasket, restrained joint
between different type of pipes, flexible coupling, blind flange, and all
accessories required for complete installation according to drawings and
specifications.
- Transporting, Supplying and Storing DI solid top frame and covers, GRP
ladder, step iron, polyethylene sleeve and all accessories required for
installation the chamber.
Furnishing materials and necessary equipment, tools, and labour, excavation,
dewatering, shoring, bracing, sheeting, grading and leveling of excavation
bottom below the chamber , transporting the excavation material outside
the project area, back filling to the base bottom grade with selective fine
compressive material, placing polyethylene sheets below the base, placing
blinding concrete, constructing RC base, constructing RC walls, installing pipe,
installing pipe fittings, installing puddle flange, installing flexible coupling,
installing connection piece, installing butter fly valve, installing gate valves,
installing elbows, installing dismantling piece, installing connection piece,
installing fittings, constructing concrete support under valve, constructing RC
slab, installing DI cover for the chamber, installing GRP ladder or step irons,
installing polyethylene sleeve surrounding the DI external works, backfilling
to existing ground with selective fine compressive material, backfilling shall
be in layers each layer shall be compacted by hand and pneumatic tampers,
and all required accessories and for complete installation

Reinforced Concrete Water Meter Chamber

No. Classified according to type, width, length and depth from ground level to
bottom elevation of the chamber.

Rates shall include the following:

- Required submittals and drawings.


- Required structural calculation for each type

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 39 of 44
- Transporting, Supplying and Storing pipes, DI flanged gate valves,
dismantling pieces, DI flow meter, DI Y strainer, DI connection piece, DI
elbows, DI Tee, DI puddle flange, bolts, nuts, gasket, restrained joint
between different pipes, flexible coupling, and all accessories required for
complete installation according to drawings and specifications.
- Transporting, Supplying and Storing DI solid top frame and covers, GRP
ladder, polyethylene sleeve and all accessories required for installation
the chamber.
- Furnishing materials and necessary equipment, tools, and lab our,
excavation, dewatering, shoring, bracing, sheeting, grading and leveling of
excavation bottom below the chamber , transporting the excavation
material outside the project area, back filling to the base bottom grade
with selective fine compressive material, placing polyethylene sheets
below the base, placing blinding concrete, constructing RC base,
constructing RC walls, installing pipe, installing pipe fittings, installing
puddle flange, installing flexible coupling, installing connection piece,
installing Strainer, installing flow meter, installing gate valves, installing
fittings, installing dismantle piece, constructing concrete support under
valves, constructing RC slab, installing DI cover for the chamber, installing
GRP ladder/or Step iron on, wrapping the external pipes, fittings with
polyethylene sleeve, backfilling to existing ground with selective fine
compressive material, backfilling shall be in layers each layer shall be
compacted by hand and pneumatic tampers, and all required accessories
and for complete installation.
Control valve

No. Classified according to type, diameters, and depth from ground level to bottom
elevation of the main pipe invert level.

Rates shall include the following:

- Required submittals and drawings.


- Transporting, Supplying and Storing flanged gate valves, fittings,
dismantling pieces, connection pieces, restrained joint, bolts, nuts, gasket,
polyethylene sleeve, and all accessories required for buried gate valves
installation according to drawings and specifications.
- Transporting, Supplying and Storing surface box, extension spindle, UPVC
tube, protection cap, operation cap, key and all accessories required for
installation the control valves.
- Furnishing materials and necessary equipment, tools, and labour,
excavation, dewatering, shoring, bracing, sheeting, grading and leveling of
excavation bottom below the base, transporting the excavation material
outside the project area, back filling to the base bottom grade with
selective fine compressive material and constructing plain concrete
support for valve, installing dismantling piece, valve, installing restrained
joints, covering the valve and the fitting with polyethylene sleeve,
installing caps and spindle, installing protection tube, installing surface
box on reinforced concrete base, backfilling to existing ground with

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 40 of 44
selective fine compressive material, backfilling shall be in layers each layer
shall be compacted by hand and pneumatic tampers as shown on
drawing, and all required accessories and for complete installation.

Flow Control Valve

No. Classified according to type, diameters, and depth from ground level to
bottom elevation of the main pipe invert level.

Rates shall include the following:

- Required submittals and drawings.


- Transporting, Supplying and Storing flanged gate valves, fittings,
dismantling pieces, connection pieces, restrained joint, bolts, nuts, gasket,
polyethylene sleeve, and all accessories required for buried gate valves
installation according to drawings and specifications.
- Transporting, Supplying and Storing surface box, extension spindle, UPVC
tube, protection cap, operation cap, key and all accessories required for
installation the flow control valves.
- Furnishing materials and necessary equipment, tools, and labour,
excavation, dewatering, shoring, bracing, sheeting, grading and leveling of
excavation bottom below the base, transporting the excavation material
outside the project area, back filling to the base bottom grade with
selective fine compressive material and constructing plain concrete
support for valve, installing dismantling piece, valve, installing restrained
joints, covering the valve and the fitting with polyethylene sleeve,
installing caps and spindle, installing protection tube, installing surface
box on reinforced concrete base, backfilling to existing ground with
selective fine compressive material, backfilling shall be in layers each layer
shall be compacted by hand and pneumatic tampers as shown on
drawing, and all required accessories and for complete installation.

Buried Gate valve

No. Classified according to type, diameters, and depth from ground level to
bottom elevation of the main pipe invert level.

Rates shall include the following:

- Required submittals and drawings.


- Transporting, Supplying and Storing flanged gate valves, fittings,
dismantling pieces, connection pieces, restrained joint, bolts, nuts, gasket,
polyethylene sleeve, and all accessories required for buried gate valves
installation according to drawings and specifications.
- Transporting, Supplying and Storing surface box, extension spindle, Upvc
tube, protection cap, operation cap, key and all accessories required for
installation the buried gate valve.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 41 of 44
- Furnishing materials and necessary equipment, tools, and labour,
excavation, dewatering, shoring, bracing, sheeting, grading and leveling of
excavation bottom below the base, transporting the excavation material
outside the project area, back filling to the base bottom grade with
selective fine compressive material and constructing plain concrete
support for valve, installing dismantling piece, valve, installing restrained
joints, covering the valve and the fitting with polyethylene sleeve,
installing caps and spindle, installing protection tube, installing surface
box on reinforced concrete base, backfilling to existing ground with
selective fine compressive material, backfilling shall be in layers each layer
shall be compacted by hand and pneumatic tampers, and all required
accessories and for complete installation.

Post Fire Hydrant

No. Classified according to type and diameters

Rates shall include the following:

- Required submittals and drawings.


- Transporting, Supplying and Storing buried gate valve, traffic type fire
hydrant, DI upper barrel, DI lower barrel, duct foot, breakable flange,
restrained joint, bolts, nuts, gasket, dismantling piece, tees, polyethylene
sleeve, surface box, extension spindle, Upvc tube, protection cap,
operation cap, key, traffic protection pipe and all accessories required for
installation the buried gate valve and fire hydrant.
- Furnishing materials and necessary equipment, tools, and labour,
excavation, dewatering, shoring, bracing, sheeting, grading and leveling of
excavation bottom below the pipe, buried gate valve, and fire hydrant
transporting the excavation material outside the project area, back filling
to the base bottom grade with selective fine compressive material,
installing pipe tee, installing restrained joint, installing pipe, installing the
valve, installing dismantling piece, installing fire hydrant lower barrel,
installing duct foot, constructing plain concrete support under the valve,
constructing plain concrete surrounding the duct foot, wrapping the pipe
with polyethylene sleeve, installing extension spindle, installing protection
tube, installing surface box on plain concrete support, installing upper
barrel and fire hydrant through breakable flange supported on plain
concrete support, installing protection pipe hot dip galvanized pipe to
filled with concrete, backfilling to existing ground with selective fine
compressive material, backfilling shall be in layers each layer shall be
compacted by hand and pneumatic tampers, and all required accessories
and for valve and hydrant complete installation complete installation.

Service Connection

No. Rates shall include the following:

- Required submittals and drawings.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 42 of 44
- Transporting, Supplying and Storing gate valve, Saddle strap gunmetal
type, polyethylene service pipe MDPE SDR 11, compressed fitting, ferrule,
meter, connection piece, DI cover, precast slab, warning tape e and all
accessories required for installation the of service connection.
- Furnishing materials and necessary equipment, tools, and labour,
excavation, dewatering, shoring, bracing, sheeting, grading and leveling of
excavation bottom below the pipe, and chamber transporting the
excavation material outside the project area, back filling to the base
bottom grade with selective fine compressive material, install Saddle strap
gunmetal type, install pipe, install ferrule, placing polyethylene sheets
below the chamber base, placing blinding concrete, constructing PC base,
construct PC wall, install gate valve, install meter, install connection piece,
construct PC support under the valve, construct RC precast slab, install DI
covers , precast slab, install end plug, backfilling to existing ground with
selective fine compressive material, backfilling shall be in layers each layer
shall be compacted by hand and pneumatic tampers as shown on
drawing, installing warning tapes, and all required accessories and for
complete installation.
No. Controllers

Rates shall include the following:

 All accessories, power supply cables, grounding rods, stainless steel


pedestal (if any), concrete foundation (if any), all wiring from automatic
controller to solenoid valve and all equipment necessary for proper
installation and operation according to specifications.

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 43 of 44
DIVISION 41

CRANES AND HOISTS

Section Unit Description

412213.10 Overhead Traveling Crane System

No. Cranes

Are classsified according to lifting capacity. Rates shall include supply and
installation of all necessary girders, traveling rails and beams, wheels, and
carriage limit switches, control panel of control devices safety devices,
cables, festoon, steel fabrication fasteners, crane trolley, chains and all
accessories required for proper operation testing and putting into services.

END OF SECTION 012700

Method of Measurement Section 012700


Riyadh Sedra 2 (Prj. 2970) Page 44 of 44
TECHNICAL SPECIFICATION COVER SHEET REVISED SHEETS
THIS PAGE IS A RECORD OF ALL SPECIFICATION REVISIONS. NORMALLY, REVISED SHEETS ONLY ATTACHED
EACH TIME THE SPECIFICATION IS CHANGED ONLY THE NEW OR ENTIRE SPECIFICATION RE-ISSUED
REVISED PAGES ARE ISSUED. ENTIRE SPECIFICATION REVISED

THE NATURE OF THE REVISION IS BRIEFLY NOTED UNDER REMARKS BUT


ISSUED FOR
THESE REMARKS ARE NOT A PART OF THE SPECIFICATION. THE REVISED
PAGES BECOME PART OF THE ORIGINAL SPECIFICATION AND SHALL BE REVIEW/COMMENTS
COMPLETED WITHIN THEIR ENTIRELY. TENDER/QUOTATION
PURCHASE
CONSTRUCTION X

REV. DATE PREPARED REVIEWED APPROVED PAGES REMARKS


NO. BY BY BY

A Oct. 2021 C.AMAM C.MYSM ISSUED FOR DETAILED DSIGN

0 Jan. 2022 C.AMAM C.MYSM ISSUED FOR TENDER

1 Feb. 2022 C.AMAM C.MYSM ISSUED FOR CONSTRUCTION

SPECIFICATION REV.
ECG ENGINEERING CONSULTANTS GROUP
BILL OF QUANTITIES
KSA 012750 – 2970 1

ECG Form No. E409 Rev. 5/03 Sheet 0 of


TECHNICAL SPECIFICATION COVER SHEET REVISED SHEETS
THIS PAGE IS A RECORD OF ALL SPECIFICATION REVISIONS. NORMALLY, REVISED SHEETS ONLY ATTACHED
EACH TIME THE SPECIFICATION IS CHANGED ONLY THE NEW OR ENTIRE SPECIFICATION RE-ISSUED
REVISED PAGES ARE ISSUED. ENTIRE SPECIFICATION REVISED

THE NATURE OF THE REVISION IS BRIEFLY NOTED UNDER REMARKS BUT


ISSUED FOR
THESE REMARKS ARE NOT A PART OF THE SPECIFICATION. THE REVISED
PAGES BECOME PART OF THE ORIGINAL SPECIFICATION AND SHALL BE REVIEW/COMMENTS
COMPLETED WITHIN THEIR ENTIRELY. TENDER/QUOTATION
PURCHASE
CONSTRUCTION X

REV. DATE PREPARED REVIEWED APPROVED PAGES REMARKS


NO. BY BY BY

A Oct. 2021 M.M. C.AMAM C.MYSM 4 ISSUED FOR DETAILED DSIGN

0 Jan. 2022 M.M. C.AMAM C.MYSM 6 ISSUED FOR TENDER

1 Feb. 2022 M.M. C.AMAM C.MYSM 6 ISSUED FOR CONSTRUCTION

SPECIFICATION REV.
ECG ENGINEERING CONSULTANTS GROUP LIST OF MANUFACTURES
KSA 012950 - 2970 1

ECG Form No. E409 Rev. 5/0 Sheet 0 of 6


LIST OF MANUFACTURERS

1. Contractor should abide by the manufacturers listed below OR equal approved by the
Engineer, comply with the Project Specifications, obtain accredited Test Reports
along with approved record of similar successful interventions in projects.

2. Contractor shall submit the following:

a. A letter from the Mother Company listed in the LOM certifying that the
submitted product is manufactured in that factory in such location under the
Company quality control protocol and supervision, and stating that the factory
is one of the Company’s accredited factories.
b. In case of any deviation from Specifications and specified performance
requirements, Engineer has the right to request further testing in an approved
independent laboratory accepted by the Engineer on Contractor's Expense to
demonstrate compliance of the product with the Project specifications.

SECTION PRODUCT MANUFACTURER


No.
033000 Steel Reinforcement Bahra
Rajhi
Sabic
Bawan
Cast in Place Concrete Arki
ETE Ready Mix
El-Tawi
Ready Mix Beton
Bin Laden
Saudi Ready mix
Bina Ready mix
035440 Cement Based Screed BASF
Sika
Henkel
Fosroc
042000 Concrete Unit Masonry T.Nagadi Concrete Group
Mastour
Al Bustan
Unitec
051200 Steel Structure Zamil Structural Steel Co. Ltd.
Batler
Kirby
055000 & Metal Fabrications & Decorative Metal Guardian
057300 Railings Rezayat
Baghlaf Al Zafer
Bawan
Al Bayan
071340 Polyethylene Sheet Waterproofing Arnon
Sabek
Indeveco
071416 Cold Fluid-applied Waterproofing BASF
Sika
Henkel
071613 Polymer Modified Cement Waterproofing BASF
Sika

List of Manufacturers
Riyadh Sedra 2 (Prj. 2970) Section 012950
Page 1 of 6
SECTION PRODUCT MANUFACTURER
No.
Henkel
071616 Crystalline Waterproofing Velosite
Xypex
Vandex
BASF
075216 Styrene-Butadiene-Styrene (SBS) Modified Bitumat
Bituminous Membrane Awazel
Henkel
075123 & Atactic- Polypropylene (APP) Modified Dermabit
075216 Bituminous Membrane Roofing Awazel
Bitumat
078413 Penetrating fire stop Tremco
Hilti
Flame guard
Passive
079200 Joint Sealants Sika
Henkel
Fosroc
081113 Steel Doors And Frames Al Kuhaimi
Al-Muhaidib
Metalco
Al Moosa
Al Manashy
Wood Master
083323 Overhead Coiling Doors Hormann
Novoferm
Ascot
Braselmann
085113 & Aluminum Windows Heuck
089000 & Louvers Al Wakeel
Reynaers
Shucco
Alumil
087100 Door Hardware Cisa
Tesa
Dorma
JNF
Amig
093000 Tiling Saudi Ceramic
Al Fanar
Al Khazaf Al Saudi
RAK
096600 Precast Terrazzo ARTIC
SACEP
096723 Resinous Flooring BASF
Sika
Fosroc
099100 Painting Jotun
Al Jazira
Sigma
Sherwin- Williams
internatinal
102800 Toilet and path accessories Aquis Sanitär AG

List of Manufacturers
Riyadh Sedra 2 (Prj. 2970) Section 012950
Page 2 of 6
SECTION PRODUCT MANUFACTURER
No.
BOBRICK
104416 Fire Extinguishers Naffco
Bristol
Sffeco
212200 Novec system ; Cylinders, Nozzles, Fike
Manifolds, Hoses, Actuators Kidde
Ansul
Detectors, Control Panels, Alarm Simplex grinnell
Devices, Manual Release Devices. System Sensor
Siemens
Notifire
Fenwal
Potter
Tyco
220523 General-Duty Valves Milwaukee Valve Company
for Plumbing Piping NIBCO INC.
Crane Co.; Crane Valve Group; Crane
Valves.
Hattersley Newman
Kitz Corporation
Tecofi
221116 Domestic Water Piping Pont-a-Mousson
“Ductile iron pipes” Mcwane
Ductile Iron
Amrican Cast Iron
SADIP
221123 Domestic-Water Packaged Pumps Aurora Pump.
KSB
Wilo
Peerless
Grundfos
Armstrong
221319 Sanitary Waste Piping Specialties Zurn
Wavin
Geberit
Sadip
MMP
Watts Drainage Products Inc.
Josam Company; Josam Div.
Saudi cast
221329 Sanitary Sewerage ABS /Sulzer
Pumps Homa
Grundfos
Flygt AB
KSB
Salmson
230700 HVAC Insulation Saudi Rockwoool
Kimmco
Arabian Fiberglass Insulation Co. Ltd.
(Afico)
Armacell
K FLEX
Adhesive Foster
Fevicol

List of Manufacturers
Riyadh Sedra 2 (Prj. 2970) Section 012950
Page 3 of 6
SECTION PRODUCT MANUFACTURER
No.
232300 Refrigerant Piping Yorkshire
Kembila
Flowflex
Crane
MKM
233113 Metal Ducts Safid
Arabian thermal air industries
Saudi duct factory
233300 Air Duct Accessories Ruskin Company.
BETEC CAD
BCI
Trox
Safid
Saudi duct factory
233423 HVAC Power Ventilators Greenheck.
Helios
TLT
Prollrichdlk
Fabresse
S&P
Woods
Casals
SODECA
Ferrari
System Air
Nicotra
Rosenberg
233713 Diffusers, Registers, And Grilles BCI.
Gulf grills
Saudi Euro register
Titus
Flowtech
237413 Package, Outdoor, Roof Top Units Carrier
Trane
York
Daikin
Petra
Zamil
238126 Split-System Air-Conditioners York
SKM
LG
Zamil
260513 Medium Voltage Electrical Power Cables Jeddah cables
Saudi cables
Riyadh cables
Bahra Cable
ALFANAR (Elecra Cables)
260519 LV electrical power Conductors and Cables Jeddah cables
Saudi cables
Riyadh cables
Bahra Cable
ALFANAR (Elecra Cables)
260526 Grounding and Bonding for electrical system Furse
Kingsmill
Wallis
Erico
260533 Raceways and Boxes for electrical systems Ega tube
(UPVC Conduits, Boxes and Wall) ALFANAR

List of Manufacturers
Riyadh Sedra 2 (Prj. 2970) Section 012950
Page 4 of 6
SECTION PRODUCT MANUFACTURER
No.
Decoduct
Clipsal
Galvanized Steel Conduits and Boxes Allied
Wheatland
Burn
Smart tube
Panasonic
ABB (Steel city (for steel box))
ABB (Thomas and Betts (for Steel Boxes))
Flexible Conduits Flexicon
Kopex
Dielectrix
260536 Cable trays Saudi Electric Industries
Decoduct
Al-Misbah Fabricators Co.
261201 Transformer ABB
Al Fanar
Saudi Transformer company (STC)
261301 Ring Main Unit Schneider Elec.
ABB
Siemens
Al Fanar
Eaton
262726 Wiring Devices ABB
Switches and Sockets Siemens
ALFANAR
(As per Architect & ID Selection) MK Electric Limited
ALF
Industrial Sockets Clipsal
Legrand
Eaton
Gewiss
Schneider
ABB
Load break switches ABB (GE)
Socomec
Schneider
ABB
Katko
Gewiss
Bticino
Eaton
262413 & Switchboard & Schneider Elec.
262416 & Panelboards & ABB
263533 & Power Factor Correction & Siemens
262419 MCC ALFANAR
Variable Speed Drive (VSD) ABB
Schneider Electric
Siemens
GE
263213 Stand by Generator Caterpillar
Cummins
MTU
FG Wilson
Mitsubishi Electric Saudi Ltd.

List of Manufacturers
Riyadh Sedra 2 (Prj. 2970) Section 012950
Page 5 of 6
SECTION PRODUCT MANUFACTURER
No.
SDMO
263600 Automatic Transfer Switches (ATS) ASCO
(Double throw technology) GE -zenith
265100 & Interior lighting & Saudi lighting
265600 Exterior Lighting Inara
(According to lighting fixture schedule and Philips
ID selection ) Schreder
283100 Fire Alarm System Edwards Systems Technology
Notifier by Honeywell
Siemens
Fire alarm Cables MESC
EL-Sewedy
ITALCOND
331000 Water Supply Networks Fusion Equipment ISCO Industries
HDPE Pipes and Fittings Arkan Development Company
Saudi Pipe System SPS
Cosmoplast HDPE
Ductile Iron Pipes and Fittings Sertopi
Saudi Arabian Ductile Iron Pipes SADIP
AMIANTIT
Saudi Pipe System SPS
Infrastructure valves VAG
Crane Co. Valves and Fittings
Kennedy Valve
Div of ITT
Viking Johnson
Bimex Somepal
Master Meter
Saudi Pipe System SPS
Mega Coupling
Saint Gobain
AVK
Sitrans Flow meters
Bristol
Pratt
Valve chambers and Covers Saint Gobain
Saudi Pipe System SPS
RVK
412215 Overhead Crane Yale
Dresser
Hadef
Kuhnezug
Stahl

END OF SECTION 012950

List of Manufacturers
Riyadh Sedra 2 (Prj. 2970) Section 012950
Page 6 of 6