Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

Building

Podium
Footprint
Proposed Plot Plot Area Basement Floor No. of
Plot Area (Ha) as per
Land Use No./ID (Sqm) Area (Sqm.) Plate Podium
G.Cov.
(Sqm)
(Sqm)

Healthcare HC1.A 18005.81 1.80 12464.48 9002.91 7157.26 3


Zone HC1.B 17743.14 1.77 12653.74 8871.57 8605.29 3
HO1.A 24388.17 2.44 16504.33 4877.63 5329.00 7
HO1.B 16175.21 1.62 9811.72 7278.84 5329.00 3

HO 1.C 17719.99 1.77 11340.70 7973.99 6089.63 3

HO 1.D 15370.80 1.54 9719.93 6916.86 5170.65 3

HO2.C 8180.62 0.82 4534.37 3681.28 3512.38 3


HO 2.A 8141.19 0.81 4752.64 3663.54 3592.08 3
Hospitality, HO 2.B 9888.40 0.99 5914.29 4449.78 3185.53 3
ECC & HO 2.C 8180.62 0.82 4534.37 3681.28 3512.38 3
Cultural

HO 3.A 19576.13 1.96 12394.33 8809.26 7852.65 3

HO 3.B 8531.43 0.85 4049.79 3839.14 2999.93 3

Building
Podium
Footprint
Proposed Plot Plot Area Basement Floor No. of
Plot Area (Ha) as per
Land Use No./ID (Sqm) Area (Sqm.) Plate Podium
G.Cov.
(Sqm)
(Sqm)

RL 1 28242.33 2.82 17048.18 12709.05 4885.15 2


RL 2 33727.42 3.37 21367.80 15177.34 0
Residential-
RL 3 24799.30 2.48 13984.64 11159.68 1789.71 2
Luxury
RL 4 24677.03 2.47 14170.97 11104.66 11823.86 4
RL 5 20860.77 2.09 12093.37 9387.35 3898.28 2
RA1 24857.72 2.49 15726.96 11185.97 5403.81 2

RA2 17145.51 1.71 7943.89 7715.48

RA3 13690.49 1.37 6973.11 6160.72

RA4 31794.32 3.18 20221.06 14307.44 3655.38 2

Residential -
Affordable
RA5 13831.46 1.38 6994.41 6224.16 2303.17 2
Residential -
Affordable
RA6 15269.74 1.53 9352.71 6871.38

RA7 15268.74 2.40 14906.29 10788.64 2978.85 2


RA8 11556.60 1.16 5506.91 5200.47
RA9 40101.09 4.01 25531.49 18045.49
RA10 12427.11 1.24 7246.25 5592.20
RA11 25496.91 2.55 15028.46 11473.61
RA12 10672.75 1.07 5967.93 4802.74

RM1 15955.77 1.60 8545.76 7180.10 3380.42 2


RM2 22301.10 2.23 12803.90 10035.50 2783.90 2
RM 3 44009.97 4.40 29986.62 19804.49 5596.50 2
RM4
RM5 30103.97 3.01 18268.65 13546.79 5077.37 2
RM6 21124.25 2.11 1163.17 9505.91 3260.65 2
RM7 25868.82 2.59 15361.35 11640.97 2518.38 2
RM8 45990.52 4.60 29715.27 20695.73 2527.42 2
Residential-
RM9 21482.56 2.15 13283.87 9667.15 3249.59 2
MID
RM10 29363.84 2.94 17035.87 13213.73 2527.40 2
RM11 37416.95 3.74 22355.64 16837.63 4612.50 2
RM12 41475.35 4.15 27553.58 18663.91 4706.18 2
RM13 33735.21 3.37 20301.10 15180.84 1575.95 2
RM14 36121.05 3.61 22819.81 16254.47 8787.56 2
RM15 33848.68 3.38 21685.76 15231.91 1425.53 2
RM16 35094.26 3.51 22892.97 15792.42 2874.01 2
RM17 18243.62 1.82 10679.09 8209.63 3563.17 2

Building
Tower
Footprint
Proposed Plot Plot Area Basement Floor No. of
Plot Area (Ha) as per
Land Use No./ID (Sqm) Area (Sqm.) Plate Floors
G.Cov.
(Sqm)
(Sqm)
CR1 22627.80 2.26 15733.55 11503.25 9400.79 5

CR2A 10544.38 1.05 5482.50 3192.09 3192.99 5

CR2B 7489.14 0.75 4065.04 2228.45 2226.87 5

CR3 8125.70 0.81 3812.78 2903.75 2903.75 5

Retail-
CR4 10227.47 1.02 4960.16 3432.06 3432.05 5
Dedicated

CR5 14709.68 1.47 9846.16 6108.77 6105.32 5

CR6 8859.79 0.89 6461.85 3510.63 3686.01 7


Dedicated

CR7 5992.60 0.6 4023.14 1900.28 1900.28 7

CR8 10351.36 1.04 5458.67 139.60 1396.60 7

Building
Proposed Plot Plot Area Basement Total BUA Setbacks
Plot Area (Ha) Footprint
Land Use No./ID (Sqm) Area (Sqm (Sqm) Front/Rear/Sides (m)
(Sqm)
PSP 1.A PSP Removed
PSP 1 B 19651.41 1.97 13170.30 6380.23 29352.47 10,15,10,15
PSP 1C 13009.69 1.30 8069.51 3887.69 19389.56 10,15,10,10
PSP 1D 14882.04 1.49 9244.77 3891.07 23796.48 10,15,10,10
PSP 1E 14345.65 1.43 9049.65 2110.40 27251.22 10,10,10,10
School
PSP 1F PSP Removed
PSP 1 G 18430.68 1.84 12938.52 5532.00 27561.80 10,10,15,10
PSP 1H 16133.75 1.61 9842.92 2706.72 24849.33 10,15,15,10
PSP 1I 27667.61 2.77 21090.43 6353.69 36381.35 10,10,10,10
PSP 1J 29879.90 2.99 20925.28 8446.17 44567.25 15,15,15,10
PSP 2B 7461.35 0.75
Plaza
PSP 2A 14315.73 1.43

No. of
Proposed Plot No./ Plot area Plot area
G.Cov(%) Floors
Land Use ID (Sqm) (Ha)

Transit Hub
### 5.98 25 4
Mall

Podium FC,
MTO, IIC,
Mixed Use 271565.68 27.16 75 1
(Including
high Street)

Residential
Amenities
Tower
Total BUA Total BUA Total BUA Setbacks
Tower Floor No. of
Podium Tower with G.Cov(%) Front/Rear/Sides(
No./ID Plate Floors
(Sqm) (Sqm) Podium m)
(Sqm)

21471.77 T-01 5581.58 20 111631.57 133103.35 50 10,10,15,10


20415.88 T-01 6067.88 20 121357.51 14177.39 50 10,10,10,10
37303.00 T-01 4225.00 8 33800.01 71103.01 20 20,10,10,10
15987.00 T-01 4225.01 10 4225.05 58237.05 45 20,20,10,10,10
T-01 1071.17 20 21423.47
18268.89 50530.47 45 20, 10, 10, 10
T-02 1083.81 10 10838.10
T-01 1059.41 12 12712.87
15511.94 50005.76 45 20, 10, 10, 10
T-02 1089.05 20 21780.95
10537.13 T-01 2988.07 8 23904.55 34441.68 45 10,15,10,10
10776.24 T-01 2911.87 10 29118.65 39894.89 45 10,10,10,10
9556.59 T-01 2283.69 15 34255.29 43811.89 45 10,10,15,10
10537.13 T-01 2988.07 8 23904.55 34441.68 45 10,15,10,10
T-01 1155.67 8 9245
T-02 1000.35 15 15005.36
T-03 1000.36 15 15005.31
23557.94 84797.48 45 10,15,10,15
T-04 966.84 8 7734.71
T-05 506.92 8 4055.35
T-06 679.56 15 10193.46
T-01 1047.90 16 16766.39
8999.79 T-02 713.97 9 6425.75 35786.60 45 10,15,10,10
T-03 399.41 9 3594.69

Total BUA
Tower No. of with
Total BUA Total BUA
Floor Floors Podium
Podium Tower G.Cov(%) Setbacks Front/Rear/Sides(m)
Plate (Tower (incl. High
(Sqm) (Sqm)
(Sqm) Type-1-6) Street)
(Sqm)

9770.30 5549.17 28 155376.68 165146.98 45 18,18,14,21


0.00 6301.80 30 189053.97 189053.97 45 18,18,14,18,10

3579.42 4201.20 20 84024.07 87603.49 45 18,18,18,18

47295.44 1568.00 50 78400.00 125695.44 45 21,21,21,21,14


7796.56 3060.49 32 97935.55 105732.11 45 18,18,18,14
10807.62 5478.89 23 126014.54 136822.16 45 18,14,18,12

3612.76 8 28902.11 28902.11 45 18,14,18,18

2424.21 20 48484.21 48484.21 45 18,14,18,18

7310.76 6464.56 18 116362.04 123672.80 45 18,18,14,21


4606.34 2641.60 20 52832.07 57438.41 45 18,18,10,21

3232.28 18 58181.11 58181.11 45 18,18,10,10

5957.70 4381.12 18 78860.08 84817.78 45 18,14,21,14


1847.02 9 16623.16 16623.16 45 18,14,14,14
6924.47 8 55395.73 55395.73 45 18,16,6,6
2402.99 20 48059.90 48059.90 45 18,18,6,12
5419.14 8 43353.16 43353.16 45 18,18,12,12
2286.42 5 11432.09 11432.09 45 6,12,12,12

6760.84 4212.04 30 126361.15 133121.99 45 18,14,18,18


5567.80 4329.07 30 129872.01 135439.81 45 18,18,21,15
11193.00 8658.14 30 259744.35 270937.35 45 18,18,21,15,10

10154.74 5444.00 28 152432.07 162586.81 45 18,18,18,21


6521.30 3435.41 30 103062.21 109583.51 45 18,18,10,21
5036.76 4735.37 28 132590.28 137627.04 45 18,18,18,21
5054.84 7213.75 30 216412.61 221467.45 45 18,18,18,21
6499.18 3326.50 30 99795.12 106294.30 45 18,6,14,21,14
5054.80 4755.29 35 166434.98 171489.78 45 18,18,18,21
9225.00 5686.53 28 159222.79 168447.79 45 18,18,18,21
9412.36 7220.23 35 252707.99 262120.35 45 18,18,21,10,10
315.90 7128.21 30 213846.22 216998.12 45 18,18,18,12
17575.12 6257.19 27 168944.13 186519.25 45 18,18,21,21
2851.06 5719.35 30 171580.47 174431.53 45 18,18,14,21
5748.02 7355.23 30 220656.96 226404.98 45 18,18,10,21
7126.34 4088.91 28 114489.40 121615.74 45 18,18,18,6

Total BUA
Setbacks
Tower G.Cov(%)
Front/Rear/Sides(m)
(Sqm)
47003.95 45 10,15,10,15

15964.93 45 10,15,15,10

11134.36 45 10,15,10,10

14518.77 45 15,15,10,15

17160.27 45 10,10,15

30526.58 45 10,15,10,10

25802.04 45 6,6,6,10
13301.95 45 6,6,6,6

9776.17 45 10,10,15

Setbacks
Front/Rear/Sides (m)

PSP Removed
10,15,10,15
10,15,10,10
10,15,10,10
10,10,10,10
PSP Removed
10,10,15,10
10,15,15,10
10,10,10,10
15,15,15,10

You might also like