Army Foundation Payment

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

በመከላከያ ስራዊት ፋውንዴሽን አፓርትመንት

ግንባታ ፕሮጀክት

ARMY FOUNDATION
APARTMENT BUILDING
PROJECT
የውል ቁጥር

የስፍር ምስክር ወረቀት 01 የውል የተፈረመበት ቀን


For Measurement Cerificate 01 ቀን፡- 26/07/2015ዓ.ም
የክፍያ ምስክር ወረቀት_ 01 Contract sign Date:- April 4,2023
Certificate of Payment No 01
የገንዘቡ ልክ
Amount
ፕሮጀክት Army foundation apartment project ዋናው ውል
447,694.40
PROJECT : Main Contractor
ቦታ ተጨማሪ ውል 1
Addis Ababa,@ kality
LOCATION : Supplementary Contract 1
አሠሪው መ/ቤት ተጨማሪ ውል 2
EMPLOYER : Supplementary Contract 2
አማካሪው መ/ቤት Army Force foundation ተጨማሪ ውል 3

CONSULTANT Defense Design Enterprise Supplementary Contract 3


ስራ ተቋራጭ Total
CONTRACTOR : Kanaol Construction GC

VAT 15% 67,154.16


ድምር
514,848.56
Total Sum

according to the Report the Consultancy Services Provided by E.C.D.S.W.C.Building and Urban
Design Supervision Work Sector upto date is Ethiopia birr 2,725,099.59 ( TWO MILLION የተከናወነው ሥራ መጠን
SEVEN HUNDRED TWENTY-FIVE THOUSAND NINETY-NINE & 59/100 Birr) without Amount (Birr)
VAT.

አስቀድሞ የተከፈለ በዉሉ መሰረት የተከናወነ የገንዘቡ ልክ


191,180.25
Previous Payment Excuited in contract Amount (Birr)
ተራ ቁ. ቀን የገንዘቡ መጠን ቅናሽ
Item Date Amount (Birr) Rebate (5%)
1 የለዉጥ ስራ ትዛዝ
2 Variation Work
ጠቅላላ
Total
1. አስቀድሞ የተከፈለ
Previous Payment
2.መያዢያ
ድምር Retaintion 5%
0.00
Total 3.መቀጫ
Penality
4.የቅድሚያ ክፍያ ተመላሽ
Advance Repayment
ድምር
0.00
Total
የተጣራ ለአማካሪው የሚከፈለዉ
Net sum payable to the Consultant 191,180.25

ለአማካሪ ድርጅቱ ብር 756,829.86 (ሰባት መቶ ሃምሳ ስድስት ሺህ ስምንት መቶ ሃያ ዘጠኝ ብር 86/100 ብር) ብቻ
ሊከፈለዉ መቻሉን እንመሰክራለን፡፡
we certify that the Consultant is now entitled to the sum of birr 756,829.86 (SEVEN
HUNDRED FIFTY-SIX THOUSAND EIGHT HUNDRED TWENTY-NINE & 86/100
Birr)

ቀን፡-23/10/2013 ዓ.ም
አዲስ አበባ
Addis Ababa
_______________ __________________
በአዲስ አበባ ከተማ አስተዳደር የትላልቅ
ፕሮጀክቶች ግንባታ ጽ/ቤት

CITY GOVERNMENT OF ADDIS


ABABA MEGA PROJECTS
CONSTRUCTION OFFICE የውል ቁጥር
የስፍር ምስክር ወረቀት 01 CERTEFICATE OF VAT S/BD/002/NCB/RFP/2011EFY
For Measurement Cerificate 01 የውል የተፈረመበት ቀን
ቀን፡- 04/06/2012ዓ.ም
የክፍያ ምስክር ወረቀት_ 01 Contract sign Date:- January 6,2020
Certificate of Payment No 01 የገንዘቡ ልክ
Amount
ፕሮጀክት Army foundation apartment project ዋናው ውል
447,694.40
PROJECT : Main Contractor
ቦታ ተጨማሪ ውል 1
ADDIS ABABA
LOCATION : Supplementary Contract 1
አሠሪው መ/ቤት ተጨማሪ ውል 2
EMPLOYER : Supplementary Contract 2
አማካሪው መ/ቤት Army Force foundation ተጨማሪ ውል 3
CONSULTANT Supplementary Contract 3
ስራ ተቋራጭ Defense Design Enterprise የለውጥ ትዕዛዞች ቁጥር 1
CONTRACTOR : Kanaol Construction GC Variation order No 1
ድምር 0.00
Total sum
vat 15% 0.00
Total sum 0.00

አስቀድሞ የተከፈለ የተከናወነው ሥራ መጠን


Previous Payment (VAT) Amount (Birr)
ተራ ቁ. ቀን የገንዘቡ መጠን በዉሉ መሰረት የተከናወነ የገንዘቡ ልክ
Item Date Amount (Birr) Excuited in contract Amount (Birr) 191,180.25
1 ቅናሽ
2 Rebate (5%)
የለዉጥ ስራ ትዛዝ
variation work
ጠቅላላ
Total 191,180.25
Total vat 15% 28,677.04
1. አስቀድሞ የተከፈለ ተ.እ.ታ
0.00
Previous Vat
2.መያዢያ
Retation5%
ድምር 3.መቀጫ
0.00
Total Penality
4.የቅድሚያ ክፍያ ተመላሽ
Advance Repayment
ድምር
Total -

Net vat 28,677.04

የተጣራ ቫት ብር 113,524.48(አንድ መቶ አሥራ ሦስት ሺህ አምስት መቶ ሃያ አራት 48/100 ብር)

Net Vat Birr 113524.48(ONE HUNDRED THIRTEEN THOUSAND FIVE HUNDRED


TWENTY-FOUR & 48/100 Birr)

ቀን፡-23/10/2013 ዓ.ም

አዲስ አበባ
__________________ Addis Ababa ________________
SUMMARY
TOTAL PREVIOUS CURRENT TOTAL
Item No DESCRIPTION
CONTRACT EXCUTED EXCUTED EXCUTED

1.0 External Finishing for 12TH Block 447,694.40 - 191,178.15 191,180.25

Total Birr 447,694.40 - 191,178.15 191,180.25


Vat (15%) Birr 67,154.16 - 28,676.72 28,677.04
Grand Total Birr 514,848.56 - 219,854.87 219,857.29
Contract Executed Quantity Contract Executed Amount
IT. NO DESCRIPTION of item of works UNIT UNIT PRICE
Amount Previous Current Todate Amount Previous Current Todate
External Finishing for 12TH Block
Apply two coats of plaster in cement sand mortar ratio of (1:3) to external HCB wall . Price
includes edge and Grooving (foka)
1 Ø fixing of scaffolding
Ø Supply of Mixer
Cement , eucalyptus and nail supplied by client. Price only labour. M2 2,425.05 1,455.03 1,455.05 105.00 254,630.25 - 152,778.15 152,780.25
Fix 30x3cm Terrazzo window sill bedded and jointed in cement sand mortar (1:3).Price only
2 Ml 316.08 80.00 25,286.40 - - -
labor and cleaning window sill ,which approved by Engineer
3 Apply quartz paint to external wall price only labor . Quartz and primer supplied by client. M2 2,425.05 55.00 133,377.75 - - -
4 Chiseling work for External exposed concrete beam, gutter and column M2
430.00 480.00 480.00 80.00 34,400.00 - 38,400.00 38,400.00

Total Carried To Summary 447,694.40 - 191,178.15 191,180.25