Professional Documents
Culture Documents
Assets Without PM WO Updated 21st August 2023
Assets Without PM WO Updated 21st August 2023
Assets Without PM WO Updated 21st August 2023
All Assets
need to be
SA-Side Maintoll gate logged into
2 Control Panel No any PM for irrigation pumps control panel. Electrical
old bldg, Maximo for
performing
the PM
All Assets
need to be
SA- Side branch toll logged into
3 Control Panel No any PM for booster pumps control panel Electrical
gate Maximo for
performing
the PM
All Assets
need to be
SA- Side branch toll logged into
4 Control Panel No any PM for irrigation pumps control panel. Electrical
gate Maximo for
performing
the PM
All Assets
need to be
logged into
5 Control Panel No any PM for booster pumps control panel Electrical SA7A
Maximo for
performing
the PM
All Assets
need to be
Diesel logged into
6 PM for Diesel Generator Electrical BA-TG
Generator Maximo for
performing
the PM