The inspection report noted several maintenance and installation issues across multiple buildings. Building 02 required outdoor unit connections and switches as well as piping insulation. Several rooms in Building 9 and 04 needed electrical connections for new window and split units along with proper unit fixing and insulation. Piping and valve work was in progress for new chillers in Building E-01. Room 703 in Building 1 required electrical connection and drainage for a new window unit. Water filling was underway in the repaired tank of Building T-01.
Refurbish Antique Telephones for Fun and Hobby: Step by Step Instructions to Take an Old Telephone and Return It to Its Original Working Order. No Electronics or Telephone Knowledge Needed.
77th Conference on Glass Problems: A Collection of Papers Presented at the 77th Conference on Glass Problems, Greater Columbus Convention Center, Columbus, OH, November 7-9, 2016
The inspection report noted several maintenance and installation issues across multiple buildings. Building 02 required outdoor unit connections and switches as well as piping insulation. Several rooms in Building 9 and 04 needed electrical connections for new window and split units along with proper unit fixing and insulation. Piping and valve work was in progress for new chillers in Building E-01. Room 703 in Building 1 required electrical connection and drainage for a new window unit. Water filling was underway in the repaired tank of Building T-01.
The inspection report noted several maintenance and installation issues across multiple buildings. Building 02 required outdoor unit connections and switches as well as piping insulation. Several rooms in Building 9 and 04 needed electrical connections for new window and split units along with proper unit fixing and insulation. Piping and valve work was in progress for new chillers in Building E-01. Room 703 in Building 1 required electrical connection and drainage for a new window unit. Water filling was underway in the repaired tank of Building T-01.
The inspection report noted several maintenance and installation issues across multiple buildings. Building 02 required outdoor unit connections and switches as well as piping insulation. Several rooms in Building 9 and 04 needed electrical connections for new window and split units along with proper unit fixing and insulation. Piping and valve work was in progress for new chillers in Building E-01. Room 703 in Building 1 required electrical connection and drainage for a new window unit. Water filling was underway in the repaired tank of Building T-01.
Today following observations were recorded during Inspections.
1. Building # 02 Family (for 6 Units)
a. Connections Required for Outdoor Units. b. Selector Switch Required for Outdoor Units c. Proper Insulation Required to cover the Copper Piping 2. Building# 9 (Windows Units) a. Room# 628, Window Unit Installed, Electrical Connection Required b. Room# 627 & 621, Window Unit Installed, Electrical Connection Required c. Proper Fixing required for the Units 3. Building# 04 (L5, Technical Room) a. Room# 502, Two New Split Unit Installed, Electrical Connection Required b. Civil Work required & Drain Line Not Installed c. Proper Insulation Required for Copper Pipe (Outdoor Unit) 4. Building# E-01 a. Piping Network is in Progress for both New PETRA Chillers b. Ball Valves, Gate Valves and Secondary Pump Connections are in Process 5. Building#1 Lift Machine Room a. Room# 703, New Window Unit Installed, Electrical Connection Required b. Proper Drain Line Required 6. Building#T-01 a. After Repairing Water Tank, Water Filling in the Tank is in Process.