Today following observations were recorded during Inspections.

1. Building # 02 Family (for 6 Units)


a. Connections Required for Outdoor Units.
b. Selector Switch Required for Outdoor Units
c. Proper Insulation Required to cover the Copper Piping
2. Building# 9 (Windows Units)
a. Room# 628, Window Unit Installed, Electrical Connection Required
b. Room# 627 & 621, Window Unit Installed, Electrical Connection Required
c. Proper Fixing required for the Units
3. Building# 04 (L5, Technical Room)
a. Room# 502, Two New Split Unit Installed, Electrical Connection Required
b. Civil Work required & Drain Line Not Installed
c. Proper Insulation Required for Copper Pipe (Outdoor Unit)
4. Building# E-01
a. Piping Network is in Progress for both New PETRA Chillers
b. Ball Valves, Gate Valves and Secondary Pump Connections are in Process
5. Building#1 Lift Machine Room
a. Room# 703, New Window Unit Installed, Electrical Connection Required
b. Proper Drain Line Required
6. Building#T-01
a. After Repairing Water Tank, Water Filling in the Tank is in Process.

Regards

Yasir Liaquat

FM Engineer