Martin Moise REPOM Virtual Power Plant
Martin Moise REPOM Virtual Power Plant
Martin Moise REPOM Virtual Power Plant
editia a 9-a
23 September 2016
6.0
5.0
4.0
3.0
2.0
1.0
0.0
Production
Solar farm 7,5 MW Production:
8.0 10.7 GWh
7.0
Forecast:
6.0
12 GWh
5.0
4.0
3.0
2.0
1.0
0.0
Forecast Production
Solar farm 7,5 MW Production:
8.0 10.7 GWh
7.0
Forecast:
6.0
12 GWh
5.0
4.0 PCCB:
3.0 14.1 GWh
2.0
DAM (+/-):
1.0
11.1 GWh
0.0
Imbalances:
Forecast Production On-Peak 3.2 GWh
Wind farm 10 MW Production:
8.0 20.8 GWh
7.0
6.0
5.0
4.0
3.0
2.0
1.0
0.0
Production
Wind farm 10 MW Production:
8.0 20.8 GWh
7.0
Forecast:
6.0
26.2 GWh
5.0
4.0
3.0
2.0
1.0
0.0
Forecast Production
Wind farm 10 MW Production:
8.0 20.8 GWh
7.0
Forecast:
6.0
26.2 GWh
5.0
4.0 PCCB:
3.0 21.1 GWh
2.0
DAM (+/-):
1.0
18.4 GWh
0.0
Imbalances:
Forecast Production Base 12.1 GWh
Virtual PowerPlant Production:
8.0 31.5 GWh
7.0
Forecast:
6.0
38.2 GWh
5.0
4.0 PCCB:
3.0 30.5 GWh
2.0
DAM (+/-):
1.0
20.7 GWh
0.0
Imbalances:
Forecast Production On-Peak 13.7 GWh
A B A+B Virtual P.P.