Quarry Materials

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

FROM

3 2 1 SL No 1st. Km 1
|Quarry
|Other
|ThelamaraRoad Road QUARRY ConstructionName
Rowta
ANALYSIS
2
of
43.00 3
Tiniali TO Work:
Name
Road of Poly/2022/7) of
Total 4
SITE 5.00
workshop
Upgradation OF
to RATES
wor OF
38.00
site WORK 5
(Govt. and FOR
2.00 6Km
of
Tech-
Government
Industrial DIFFERENT
0.00 7Rs.
Km
Lab Assume
Katcha at
2.00| 0.00 0.00 2.00 8 Training
88eg Road (km) Haulage
Cost of 61
PolytechnicQUARRY-
olololo Unsurfaced Rs nos. 1.00
0.00 0.000.00| 0.00
39.00|
39.00
8883 Road (km) 9
Institute, Of Cum
Km
40.00| 1.00A 0.00 Surfaced 10 ITIUPolytechnicsMATERIALS
lel:8 Road (km) 38.00 Institute
(Compacted)
43.00 Rs. Tezpur
1.00 2.00 11
88|8 Total(km) 566 20 and
and ITI AS
12 of
566.20
Assam) in PER
Sonitpur Assam
13
1467.50 SOR
(Part-B)(Package
Polytechnic)
GSB as
14 2020-21
724. 74 Materials
Costof Centre
15
2758.44 (Analysis
of
1100.00 16
Excellence
Stone/Boulder
No.
17
736.06 I)
IT
18
(
1836.06

You might also like