Bill of Materials and Labour
Painting Estimate
Mr.Sekar, Bangalore
Quantity Rate
S.No Particulars Amount(Rs)
(sq.ft) (sq.ft)
Interior
Ceiling and side
1 wall patch putty. 2 11,000 15 1,65,000
coat royal
emulsion
Exterior
Asian paints
ultima protect, 7,000
2 20 1,40,000
lamination paint (Front and Left)
base 1 coat, 2 coat
paint finish
3 coat putty 1 coat
3 primer and 2 coat 1,000 30 30,000
royal emulsion
Grill paint
1 coat satin in 1,200 10 12,000
enamel
Window grills
Stair case grill &
3,000 10 30,000
4 per sole
Two coat satin
enamel, costing 1,000 20 20,000
grills , terrace grill
Exterior crack
15 labour 800 12,000
filling work

Total amount = 4, 09,000.00


Corrected amount = 4, 00,000.00
N.SUNDARAJAN
All Kind Of Painting & Wood Polish Undertaken
28, Vivekananda Street, P.N. Pudur,
Coimbatore – 641041.
Ph: 9842117185 Proprietor
S.Sivaraj
Extra work Bill of Materials and Labour
Painting Estimate
Mr.Sekar, Bangalore
Quantity Rate
S.No Particulars Amount(Rs)
( sq.ft) (sq.ft)
Wall plywood putty
(partition) area, terrace
bathroom, kitchen outside
1 1,500 30 45,000
wall.
3 coat putty, 1 coat
primer, 2 coat paint finish.
Extra 1 coat paint finish
added area. Outer safety
2 5,200 10 52,000
grill, stair case grill,
window grill, balcony grill.
Outer window color
3 change , white 2 coat paint 1,200 20 24,000
finish
Interior
Inner color and side wall
4 15 labour 800 12,000
area, electrical patch work
piece putty
Exterior
Asian paints ultima 5,000
5 protect, lamination paint (Back and 20 1,00,000
base 1 coat, 2 coat paint Right)
finish

Extra work amount = 2, 33,000.00


Old estimation = 4, 00,000.00
Total amount = 6, 33,000.00