Thames Tideway

BIM advancements
in project delivery

11th June 2019


BIM es…
A coordinated set of processes,
supported by technology, that adds value through
creating, managing and sharing
the information about an asset throughout its
lifecycle.

Un conjunto coordinado de procesos,


respaldado por tecnología, que
agrega valor a través de la creación,
administración y uso compartido de la
información sobre un activo a lo
largo de su ciclo de vida.

Mott MacDonald | Smart Infrastructure


Smart
Infrastructure
Controlling Delivery
is
where these two
worlds collide

3
Thames Tideway Tunnel
Abbey Mills
pumping

West Central East


station

Project Cost
£4.2bn

24km, 7.2m dia.


35-65m deep

24 construction sites
Organisation
Chambers
Wharf 3 major JV contractors

100 of different suppliers


Greenwich
connection
tunnel Greenwich
pumping
station
Design
12 disciplines multidisciplinary
teams
4
Thames Tideway Tunnel

The Thames
Tideway Tunnel
will clean up one
of the world’s
iconic rivers and
enable the UK to
meet European
Environmental
Standards

5
Desafíos claves del Proyecto

12 diverse design disciplines interfacing with many


subcontractors – not collocated

Team based at many different locations across Europe

Engagement with a wide variety of stakeholders

Control vast number of deliverables (80,000+)

Shortened design programme (overall 2 years)

6
Smart
Infrastructure
Tideway Video
is
where these two
worlds collide

7
Outcomes – Delivery Efficiencies

Technology Improved
savings Collaboration
80%
Quicker
Instant
Delivery to CVB
40 5.2
Average Client
Information via ProjectWise Revisions of Attendance at BIM
Transfer on workflows. composite models Review Meetings.
delivery. Compared created for
to previous major meetings
project.

6 22.5 1600 4.7


Month reduction Hours saved per Documents shared Days – average time
in design week with informally with the for client approval
programme automated i- client.
enabled via model production.
model based Approx £20k
delivery. saving.
8
Smart
Infrastructure
Back to the start
is
where these two
worlds collide

9
The starting point – foundation

Client Leadership

Common Language Common Data


and standards Environment

Mott MacDonald | Smart Infrastructure 10


Project Lessons and challenges
• Project leadership and management support is a must
Lead • Expert BIM/IM team to lead implementation

• Define, agree and communicate the new ways of working


Plan • Follow through from the project outset

• Everyone is part of the journey


Engage • Engage supply chain

• Big cultural shift needed at all levels


Embed • Perception of BIM as a deliverable not a process

Mott MacDonald | Smart Infrastructure 11


Conclusion and Legacy

1 2 3 4 5 6
Collaborative One CDE Model Based Big Data Improved Industry
Review Delivery Analysis Performance Legacy
Meetings

Improved Decreased Superior project


Resolving and efficiency, programme and management. Improved
identifying control and reduced abortive Quantifiable awareness of
issues earlier assurance work progress metric. project risks.

Improving the health and


wellbeing of Londoners and the
River Thames
12
Thank you