The document is a daily activity report for the disassembly and inspection of an engine. It contains 3 entries over 3 days:
1) The first day involved removing many engine components like manifolds, pulleys, the ECM, fuel lines, and the cylinder head cover.
2) On the second day more major components were removed, such as the oil pan, water pump, fuel pump, flywheel, and cylinder head assembly.
3) The third day focused on cleaning the components, inspecting engine parts, and creating a report of replacement parts.
The document is a daily activity report for the disassembly and inspection of an engine. It contains 3 entries over 3 days:
1) The first day involved removing many engine components like manifolds, pulleys, the ECM, fuel lines, and the cylinder head cover.
2) On the second day more major components were removed, such as the oil pan, water pump, fuel pump, flywheel, and cylinder head assembly.
3) The third day focused on cleaning the components, inspecting engine parts, and creating a report of replacement parts.
The document is a daily activity report for the disassembly and inspection of an engine. It contains 3 entries over 3 days:
1) The first day involved removing many engine components like manifolds, pulleys, the ECM, fuel lines, and the cylinder head cover.
2) On the second day more major components were removed, such as the oil pan, water pump, fuel pump, flywheel, and cylinder head assembly.
3) The third day focused on cleaning the components, inspecting engine parts, and creating a report of replacement parts.
3 10-Mar-23 3122E017131 - Inspection Engine Parts 8:00 17:00 8 2. Ardi Wiyanto - List Part and make reporting RPL 3. Adi HAryadi
Prepared by Checked By, Approved by
_________________________ ___________________________________ DAILY ACTIVITY REPORT Customer Name : Name : Site Location : NRP : NO. DATE UNIT NO ACTIVITY START FINISH TOTAL HOURS PIC REMARKS