Pow - Maereni-Pangani Primary School
Pow - Maereni-Pangani Primary School
Pow - Maereni-Pangani Primary School
concrete vibrators
Skilled Labourer
concrete mixers
Concrete Mixer
wheelbarrrows
Water Bowser
Tipper /Truck
EQUIPMENTS PERSONEL
Drum Roller
CONTRACT PERIOD:4 MONTHS
scaffolding
Site Agent
exacators
Surveyor
Foreman
QUANTITY UNIT BID ACTIVITY
Stripper
backhoe
Trowels
Casuals
Pickup
shovel
UNIT M1 M2 M3 M4 M12
picks
IN BOQ RATE (Ksh) (MONTHs)
ACTIVITY
BILL NO 0.2
MOBILIZATION
DEMOBILIZATION 0.2
CASH FLOW STATEMENT
MONTHLY CASH FLOW PROJECTION (16 % VAT INCLUSIVE) 833,460.00 833,460.00 833,460.00 833,460.00###
MONTHLY CASH FLOW (KSH IN MILLIONS) 0.83 0.83 0.83 0.83###
CUMULATIVE CASH FLOW
833,460.00 1,666,920.00 2,500,380.00 3,333,840.00###
CUMULATIVE CASH FLOW (KSH IN MILLIONS)
0.83 1.67 2.50 3.33###
NOTES
VALUE OF INTERIM PAYEMENT CERTIFICATES (16 % VAT IPC 1 IPC 2 IPC 4 contigency sum will be utilised when and where
INCLUSIVE )
2,500,380.00 #VALUE! ###instructed by the Engineer within the contract period
to achieve 100% progress
LESS 5% RETENTION MONEY (KSH) 125,019.00 #VALUE! ###
NET PAYMENT (Ksh) 2,375,361.00 #VALUE! ###
12.00
10.00
8.00
6.00
4.00 3.33
2.50
2.00 1.67
0.83
0.83
0.83
0.83
0.00
---
-
0 5 TIME (MONTHS
10 15 20 25 30