400kV Bus Coupler Bay Relay Setting Calculation

NCC Power Products Ltd

Customer : 2 x 660 MW NCC Power Project, SPSR Nellore


Order Reference : 3100044120
400kV Bus Coupler Bay Relay Setting
Document Description :
Calculation
Drawing Reference : YN1M302135 – CAC
Doc No. : YN1M302135 – ZAC

Description
Reviewed by PAN
400kV Bus Coupler Bay Relay Setting Calculation
Prepared by Order Ref Rev
PRAVEEN.A.N
3100044120 0

Issued by dept. INPS – PSAC


Document. No.
YN1M302135 – ZAC
Date: 07-Aug-15
400kV Bus Coupler Bay Relay Setting Calculation

Contents

Note: ....................................................................................................................................................... 2
Revision Note .......................................................................................................................................... 2
Equipment Details: .................................................................................................................................. 2
Protection Details: ................................................................................................................................... 2
1. Non – Directional Over-current and Earth Fault Protection (51 / 51N) / REF615 ............................... 3
Non – Directional Over– Current Protection:......................................................................................... 3
Non – Directional Earth – Fault Protection: ........................................................................................... 4
2. Breaker Failure Protection (50BF) / REC670 .................................................................................... 5

Note:

1. Instrument transformers ratios shall be verified at site, before setting the analog channels during
Commissioning.
2. The O/C & E/F settings given here are only provisional. Based on the customer practice and/or the
operating time delay adopted in downstream / upstream relays, the settings should be corrected at site
to ensure proper coordination.

Revision Note

Rev # Revision Note Approver Date


0 First Submission PAN 07-Aug-15

Equipment Details:

Side Core Details


3000 – 2000 – 1000 – 500 /1 A, CL PS,
Vk 3000 – 2000 – 1000 – 500 V, RCT =
CT Ratio for 50BF Bay BI2 – Core 3
15/10/5/2.5, Imag = 20/30/60/120 mA @
Vk/2
3000 – 2000 – 1000 – 500 /1 A, CL PS,
Vk 3000 – 2000 – 1000 – 500 V, RCT =
CT Ratio for 51, 51N Bay BI3 – Core 1
15/10/5/2.5, Imag = 20/30/60/120 mA @
Vk/2

Protection Details:

Sr. No Protection Type ANSI Code IED

Description
Reviewed by PAN
400kV Bus Coupler Bay Relay Setting Calculation
Prepared by Order Ref Rev
PRAVEEN.A.N
3100044120 0

Issued by dept. INPS – PSAC


Document. No.
YN1M302135 – ZAC
Date: 07-Aug-15
400kV Bus Coupler Bay Relay Setting Calculation

Back – Up Non - Directional Over – Current and Earth –


1 51 / 51N REF615
Fault Protection
2 Breaker Failure Protection 50BF REC670

1. Non – Directional Over-current and Earth Fault Protection (51 / 51N) / REF615

Non – Directional Over– Current Protection:

The directional over – current protection setting is at set at 120 % of maximum rated CT current, therefore
the pick-up is set for 2400 A.

An IEC normal inverse characteristic is considered and the reset is instantaneous.

Figure 1: IEC Inverse Characteristics Equation

t operating time in seconds


k settable inverse time factor
I measured current value
I> set current value
α index characterizing the algebraic function = 0.02 for Normal Inverse
β constant characterizing the relay = 0.14 for Normal Inverse

Base current, Ibase = 2000 A


Full load current = 2000 A
Pick-up set, 120% of full load current = 2400 A
Operating value in primary = 2400 A
Pickup set, in % of Ibase = 2400 / 2000 = 120 %
TMS1 (k), = 0.21

The description of the parameters in the relay for directional over-current protection is as given below

1
TMS and pickup is set are only provisional in nature. TMS of 0.21 is selected assuming a trip time of 1
second for a fault of 10 kA. Actual TMS and pick-up to be adopted shall be co-ordinated downstream and
upstream relays
Description
Reviewed by PAN
400kV Bus Coupler Bay Relay Setting Calculation
Prepared by Order Ref Rev
PRAVEEN.A.N
3100044120 0

Issued by dept. INPS – PSAC


Document. No.
YN1M302135 – ZAC
Date: 07-Aug-15
400kV Bus Coupler Bay Relay Setting Calculation

Parameter Name : Parameter Description


Operation : Operation Off / On
Num of start phases : Number of phases required for operate activation
Minimum operate time : Minimum operate time for IDMT curves
Reset delay time : Reset delay time
Measurement mode : Selects used measurement mode
Curve parameter A : Parameter A for customer programmable curve
Curve parameter B : Parameter B for customer programmable curve
Curve parameter C : Parameter C for customer programmable curve
Curve parameter D : Parameter D for customer programmable curve
Curve parameter E : Parameter E for customer programmable curve
Start value : Start value
Start value Mult : Multiplier for scaling the start value
Time multiplier : Time multiplier in IEC/ANSI IDMT curves
Operate delay time : Operate delay time
Operating curve type : Selection of time delay curve type
Type of reset curve : Selection of reset curve type

Non – Directional Earth – Fault Protection:

The directional earth fault protection is set to at 20% of rated CT current.

IEC Normal characteristics may to be adopted for the protection with reset being instantaneous.

Base current, Ibase = 2000 A


Full load current = 2000 A
Pick-up set, 20% of full load current = 400 A
Operating value in primary = 400 A
Pickup set, in % of Ibase = 400 / 2000 = 20 % of Ibase
TMS2 (k) = 0.38

The description of the parameters in the relay for directional earth-fault protection (51N) as given below.

Parameter Name : Parameter Description


Operation : Operation Off / On
Minimum operate time : Minimum operate time for IDMT curves
Reset delay time : Reset delay time

2
TMS and pickup is set are only provisional in nature. TMS of 0.38 is selected assuming a trip time of 1
seconds for a fault of 5340 A. Actual TMS and pick-up to be adopted shall be co-ordinated downstream
and upstream relays
Description
Reviewed by PAN
400kV Bus Coupler Bay Relay Setting Calculation
Prepared by Order Ref Rev
PRAVEEN.A.N
3100044120 0

Issued by dept. INPS – PSAC


Document. No.
YN1M302135 – ZAC
Date: 07-Aug-15
400kV Bus Coupler Bay Relay Setting Calculation

Measurement mode : Selects used measurement mode


Curve parameter A : Parameter A for customer programmable curve
Curve parameter B : Parameter B for customer programmable curve
Curve parameter C : Parameter C for customer programmable curve
Curve parameter D : Parameter D for customer programmable curve
Curve parameter E : Parameter E for customer programmable curve
Io signal Sel : Selection for used Io signal
Start value : Start value
Start value Mult : Multiplier for scaling the start value
Time multiplier : Time multiplier in IEC/ANSI IDMT curves
Operate delay time : Operate delay time
Operating curve type : Selection of time delay curve type
Type of reset curve : Selection of reset curve type

2. Breaker Failure Protection (50BF) / REC670

A snap shot showing the sequence of operation for breaker failure protection is provided below. Please
refer to REC670 application manual for detailed explanation

Figure 2: Breaker Failure Protection: Timing Diagram (Informative Only)

The description of the parameters in the relay for the breaker failure protection is as given below.

Description
Reviewed by PAN
400kV Bus Coupler Bay Relay Setting Calculation
Prepared by Order Ref Rev
PRAVEEN.A.N
3100044120 0

Issued by dept. INPS – PSAC


Document. No.
YN1M302135 – ZAC
Date: 07-Aug-15
400kV Bus Coupler Bay Relay Setting Calculation

Parameter Name : Parameter Description


Operation : Operation Off / On
IBase : Base current
FunctionMode : Detection principle for back-up trip
BuTripMode : Back-up trip mode
RetripMode : Operation mode of re-trip logic
IP> : Operate phase current level in % of IBase
I>BlkCont : Current for blocking of CB contact operation in % of IBase
IN> : Operate residual current level in % of IBase
t1 : Time delay of re-trip
t2 : Time delay of back-up trip
t2MPh : Time delay of back-up trip at multi-phase start
t3 : Additional time delay to t2 for a second back-up trip
tCBAlarm : Time delay for CB faulty signal
tPulse : Trip pulse duration

Description
Reviewed by PAN
400kV Bus Coupler Bay Relay Setting Calculation
Prepared by Order Ref Rev
PRAVEEN.A.N
3100044120 0

Issued by dept. INPS – PSAC


Document. No.
YN1M302135 – ZAC
Date: 07-Aug-15
1. Non - Directional Over - Current Protection Settings - 51 - REF615
1. Non - Directional Earth - Fault Protection Settings - 51N - REF615
2. Breaker Failure Protection Settings - 50BF - REC670