SN. Description Verified / Confirmed Notes Y N N/A: Safe Corner For Safety Company Allied Contracting Catering

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

SAFE CORNER FOR SAFETY COMPANY ALLIED CONTRACTING CATERING

Inspected By: SAFECO O&M Date: 10/12/2023 Site Name: Document Number : SI/INSRPT/BD-Name
PPM Inspection Type
Fire Alarm System ☐ Wet Fire Fighting System ☐ Access Control System ☒
Public Address System ☐ Building Management System ☐ CCTV System ☐
Potable Fire Extinguishers ☐ Fire Suppression System ☐ Dry Fire Fighting System ☐

Verified / Confirmed NOTES


SN. DESCRIPTION
Y N N/A
1 Visually inspect the ACS Panel. ☐ ☐ ☐
2 Check the temperature and humidity of the environment to ☐ ☐ ☐
ensure optimum conditions for operation.
3 Perform electrical checks to establish the operational state ☐ ☐ ☐
of the equipment.
4 Check that all control and safety interlocks are operating ☐ ☐ ☐
correctly.
5 Ensure setpoints and space conditions are maintained as ☐ ☐ ☐
economically as possible.
6 Check that alarm reporting procedures and systems are ☐ ☐ ☐
operating correctly.
7 Ensure that any emergency power backup systems are ☐ ☐ ☐
operational and will maintain the ACS during power
failure
8 Check that proper access levels are provided ☐ ☐ ☐
9 Check that access codes are provided according to the ☐ ☐ ☐
level of holder
10 Check proper fields are allocated to each cardholder ☐ ☐ ☐
11 Check proper program are allocated to each point of ☐ ☐ ☐
access
12 Check that clear and accurate graphics are updated ☐ ☐ ☐
13 Check the proper operation of the card readers LED and ☐ ☐ ☐
audio tone for authorized and unauthorized entry
14 Check the working period of the UPS supply in case of ☐ ☐ ☐
failure of normal power supply
15 Check the operation of the emergency release and the ☐ ☐ ☐
operation of the door lock
16 Check historical trend and event logs including alarms. ☐ ☐ ☐
Additional Notes:

________________________________________________________________________________________________________

________________________________________________________________________________________________________

COMPANY

SAFETY CONTRACTOR MAIN CONTRACTOR


PERSONAL
SIGNATURE
DATE

You might also like