Process Specification

Installation of Bearings/Bushes by Bonding 80–T–34–9020


Issue: 09/98
Page 1 / 5

Contents All directives are originally compiled, checked and


approved in the German language.
In case of discrepancies which could result from
1 Scope and Application possible translation errors or wrong interpretation of
the English text, the German version of these directi-
2 Related Documents ves shall always be binding.
3 Prerequisites
4 Materials and Equipment
5 Process
6 Quality Assurance
7 Safety and Health
8 Process Flow Chart

Data Sheet 1: Metallon E 2082


Data Sheet 2: EA 934 NA
Data Sheet 3: Loctite 675
Data Sheet 4: Loctite 601
Data Sheet 5: Loctite 638
Data Sheet 6: Loctite 648
Data Sheet 7: Not applicable
Data Sheet 8: AIRBUS Program
Data Sheet 9: Loctite 603

This process specification was editorially updated by EVT due to a change from paper to online distribution.
The technical content of this specification has not been modified.

Earlier issue: 02/94


Copying of this document, and giving it to others and the use or communication of the contents thereof, are forbidden without express authority. Offen-
ders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
Page 2 80–T–34–9020 (09/98)

1 SCOPE AND APPLICATION


This process specification contains the requirements which must be observed when bonding bearings
and bushes.
The bonding process described in this specification is carried out with bonding agents of a liquid
to pasty consistency. Refer to the appropriate data sheets for the process conditions for the individ–
ual bonding agents.

2 RELATED DOCUMENTS
QVA–Z02–22–00 Inspection stamps
QVA–Z10–12–00 Incoming and prolongation inspection for non–structural adhesives
80–T–34–9032 Bonding of non–structural connections
80–T–34–9600 Application of sealing compounds
80–T–35–0014 Cleaning with organic solvents (Cold cleaning agents)
80–T–35–2100 Chromic acid anodizing
80–T–35–5218 Application of elastic protective coatings

3 PREREQUISITES
3.1 Personnel
The bonding of bearings and bushes according to this process specification shall only be performed
by personnel trained for this purpose.
Only the appointed personnel shall be permitted to apply the stamp identifying him on the job card
after due performance of the appropriate operation (see QVA–Z02–22–00).

3.2 Manufacturing documents


The following information must be given in the manufacturing documents:
a) bonding agent,
b) axial test load (if required) together with details of the scope of the test.
The following statement is to be made in the manufacturing documents:
”Installation of bearings/bushes by bonding per 80–T–34–9020”.

4 MATERIALS AND EQUIPMENT


4.1 Equipment
See 80–T–34–9032 for equipment requirements.

4.2 Parts to be bonded


Only such parts (bearings/bushes/components) may be used, which have been approved by the
Quality Assurance Department for bonding.
The bonding surfaces may not be coated with any materials apart from a cured bonding primer.
If a coat is applied before bonding, the bonding surfaces are to be masked.
Page 3 80–T–34–9020 (09/98)

4.3 Bonding agents and activators


Only those bonding agents or bonding systems (bonding agents and activators) specified in the
manufacturing documents and approved by the Incoming Goods Department may be used for bond-
ing bearings and bushes.
The bonding agents and activators must be stored in properly sealed original containers according
to the details in the data sheets.
No products may be used which have exceeded the specified storage life.

5 PROCESS
5.1 Pretreatment
The following pretreatment processes must be carried out immediately before bonding.
Contamination of the bonding surfaces after pretreatment e.g. by touching with bare hands or tools,
must be prevented.

5.1.1 Bore or bush


The bonding surfaces must be pretreated by roughening with Scotch–Brite Type S/004 or with
abrasive sheets with a grain size finer than 120, followed by cleaning per 80–T–35–0014. The fits
specified in the manufacturing documents must be observed.
Bonding surfaces anodized with chromic acid (per 80–T–35–2100) and/or coated with bonding
primer are only to be cleaned per 80–T–35–0014.

5.1.2 Bearings
The bonding surfaces must be slightly roughened with Scotch–Brite Type S/004 and subsequently
cleaned per 80–T–35–0014.
Note: In the case of bearings with movable parts, care must be taken to prevent abraded particles
or solvents entering the bearing, e.g. by caps.

5.2 Mixing the bonding agents


If two–component products are used, these are to be mixed per 80–T–34–9032.

5.3 Application of the activator


When the bonding system includes an activator (see product data sheets), the activator is applied
thinly to the cleaned bonding surfaces and dried for at least 2 minutes.

5.4 Application of the bonding agent and insertion of the bearing


Before application of the bonding agent, ensure that the bonding surfaces are dry and have been
brought to room temperature (at least 17 C).
Immediately after pretreatment, both bonding surfaces must be coated thinly and evenly with the
bonding agent and then joined. After inserting the bearing or bush (check that the position is
correct), the part must be fixed in the required position and any excess bonding agent removed
with a clean, light, lint–free cloth or paper towel (without solvent).

5.5 Additional mechanical securing


If the manufacturing documents require additional mechanical securing, this must be carried out
immediately after the bonding process.
Page 4 80–T–34–9020 (09/98)

5.6 Curing
For curing conditions see product data sheets.
The bearings and bushes must remain in their fixed positions during the entire curing period.

5.7 Post–treatment
It may be necessary to apply the activator as per the relevant data sheet in order to fill completely
the circumferential gap. If required in the manufacturing documents, a sealing agent per
80–T–34–9600 and/or protective varnish per 80–T–35–5218 is applied to the joint between bearing
or bush and component, depending on the type.

6 QUALITY ASSURANCE
Unless specified otherwise in process– or component–specific design, manufacturing or QA docu-
ments, the competent segment has to ensure that the following measures are taken.

6.1 Pretreatment
The pretreatment per 5.1 is to be checked as follows:
S Roughening of the bonding surfaces.
S Uniform and clean appearance of the bonding surfaces.
S Residues of contamination or solvents in the case of bearings with movable parts.
S Ambient conditions for application of bonding agent (see data sheets).

6.2 Bonding agent application


The application of bonding agents per 5.2, 5.3, 5.4 and 5.6 is to be checked as follows:
S Mixture proportions of the bonding agent per data sheets.
S Smear–free and homogenous appearance in case of mixed bonding agents.
S Application of the activator to the bonding surfaces.
S Thin, uniform film of bonding agent applied to both bonding surfaces.
S Curing time per data sheets.
S Expiry date of the bonding components.

6.3 Components
The components must be checked as follows:
S Installation length.
S Uniform emergence of bonding agent.
S Clearance of bearing.
If required in the manufacturing documents, the shear strength (bonding strength) is to be checked
by tests with the loads specified in the manufacturing documents. The test can be performed on
a test sample which has been manufactured together with the production batch. The test sample
must be identical with the series–produced component with regard to fit and material.

6.4 Bonding agents


Incoming Goods Inspection must be performed per QVA–Z10–12–00.
Until the Quality Assurance instructions have been published, the following aspects of the bonding
agent must be checked: processing time, strength etc, according to the details of the material data
sheets.
Page 5 80–T–34–9020 (09/98)

7 SAFETY AND HEALTH


Apply the local safety regulations.
It is the responsibility of the user of this standard to apply appropriate safety and health practices
and determine the applicability of regulatory limitations prior to use.

8 PROCESS FLOW CHART

Bonding agent Component / bush Bearing

Bonding agent check Pretreatment Pretreatment


per 6.4 per 5.1.1 per 5.1.2

Pretreatment check
per 6.1

Mix Application of activator


per 5.2 per 5.3

Application of bonding agent


per 5.4
with check
per 6.2

Additonal mechanical
securing per 5.5

Curing per 5.6

Check per 6.2, 6.3

Post–treament
per 5.7
Process Specification

Installation of Bearings/Bushes by Bonding 80–T–34–9020


Data Sheet 1
– Metallon E 2082 – Issue: 09/98
Page 1 / 1

Product Metallon E 2082


Manufacturer Henkel & Cie.
Material data sheet —
Selection list VFN 12511 ident.–no. 01
Basis epoxy resin
Accelerator amine resin
Mixture proportions Basis Accelerator
parts by weight 100 50
parts by volume — —
Storage life [a] 0,5 0,5
Storage temp. [C] RT RT
Parameters and condition of the mixed product
Consistency sticky paste
Color gray
Gap [mm] (D–d)/2 0,05–0,15
Activator —
Application time [min] 90 / for 100 g prepared quantity
Airing time [min] —
Curing temp. [C] RT 1)

Curing time 24 h
Humidity [%] max. 75
Bonding strength [N/mm2]  10

(Units of time: s = second, min = minute, h = hour, d = day, a = year)


1) not less than 17 C

Earlier issue: 06/86


Copying of this document, and giving it to others and the use or communication of the contents thereof, are forbidden without express authority. Offen-
ders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
Process Specification

Installation of Bearings/Bushes by Bonding 80–T–34–9020


Data Sheet 2
– EA 934 NA – Issue: 09/98
Page 1 / 1

Product EA 934 NA
Manufacturer Dexter Corporation
Material data sheet DA 4–653–3
Selection list VFN 12511 ident.–no. 04 NT 00//A–007.10054
Basis epoxy resin
Accelerator amine resin
Mixture proportions Basis Accelerator
parts by weight 100 33
parts by volume — —
Storage life [a] 3 months 1 1
Storage temp. [C] RT +4 RT
Parameters and condition of the mixed product
Consistency sticky paste
Color gray
Gap [mm] (D–d)/2 0,05–0,14
Activator —
Application time [min] 40 / for 100 g prepared quantity
Airing time [min] —
Curing temp. [C] RT 1) 65 " 5 95 " 5
Curing time 24 h 2h 1h
Humidity [%] max. 75
Bonding strength [N/mm2] [ 13

(Units of time: s = second, min = minute, h = hour, d = day, a = year)


Remarks: 1) not less than 17 C

Earlier issue: 06/86


Copying of this document, and giving it to others and the use or communication of the contents thereof, are forbidden without express authority. Offen-
ders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
Process Specification

Installation of Bearings/Bushes by Bonding 80–T–34–9020


Data Sheet 3
– Loctite 675 – Issue: 09/98
Page 1 / 1

Product Loctite 675


Manufacturer Loctite GmbH, Germany
Material data sheet —
Selection list VFN 12511 ident.–no. 06 NT 00//A–007.10053
Basis Methacrylate
Storage life [a] 1 1)

Storage temp. [C] RT


Parameters and condition of the product
Consistency liquid
Color green
Gap [mm] (D–d)/2 0.03–0.07
Activator Locquic T
Application time [min] —
Airing time [min] —
Curing temp. [C] RT 2) 90 " 5 50 " 5
Curing time [h] 4–8 1 4
Humidity [%] not less than 30
Bonding strength [N/mm2] [ 10
Remarks

(Units of time: s = second, min = minute, h = hour, d = day, a = year)


1) In original containers with specified level.
2) At least 17 C, curing time for bonding test not less than 24 h.
3) Temperature curing to be used when high dynamic strength required, e.g. wing–fuselage fittings.

Earlier issue: 02/94


Copying of this document, and giving it to others and the use or communication of the contents thereof, are forbidden without express authority. Offen-
ders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
Process Specification

Installation of Bearings/Bushes by Bonding 80–T–34–9020


Data Sheet 4
– Loctite 601 – Issue: 09/98
Page 1 / 1

Product Loctite 601


Manufacturer Loctite Technik
Material data sheet —
Selection list VFN 12511 ident.–no. 07
Basis methacrylic resin
Accelerator —
Mixture proportions —
parts by weight —
parts by volume —
Storage life [a] 1 1)

Storage temp. [C] RT


Parameters and condition of the mixed product
Consistency liquid
Color green
Gap [mm] (D–d)/2 0.03–0.07
Activator Locquic T
Application time [min] —
Airing time [min] —
Curing temp. [C] RT 2)

Curing time 3 h 3)
Humidity [%] not less than 30
Bonding strength [N/mm2]  10

(Units of time: s = second, min = minute, h = hour, d = day, a = year)


1) In original containers with specified contents.
2) Not less than 17 C
3) Curing time for bonding test not less than 16 h.

Earlier issue: 06/86


Copying of this document, and giving it to others and the use or communication of the contents thereof, are forbidden without express authority. Offen-
ders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
Process Specification

Installation of Bearings/Bushes by Bonding 80–T–34–9020


Data Sheet 5
– Loctite 638 – Issue: 09/98
Page 1 / 1

Product Loctite 638


Manufacturer Loctite Technik
Material data sheet —
Selection list VFN 12511 ident–no. 08
Basis dimethacrylic ester
Accelerator —
Mixture proportions —
parts by weight —
parts by volume —
Storage life [a] 1 1)

Storage temp. [C] RT


Parameters and condition of the mixed product
Consistency liquid
Color green
Gap [mm] (D–d)/2 0,05–0,15
Activator Locquic T
Application time [min] —
Airing time [min] —
Curing temp. [C] RT 2)
0 5 h at 70 " 5
1 h at RT + 0.5
Curing time 2 to 4 h 3)
Humidity [%] not less than 30
Bonding strength [N/mm2] [ 10

(Units of time: s = second, min = minute, h = hour, d = day, a = year)


1) In original containers with specified contents.
2) At least 17 C
3) Curing time for bonding test not less than 24 h.

Earlier issue: 06/86


Copying of this document, and giving it to others and the use or communication of the contents thereof, are forbidden without express authority. Offen-
ders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
Process Specification

Installation of Bearings/Bushes by Bonding 80–T–34–9020


Data Sheet 6
– Loctite 648 – Issue: 09/98
Page 1 / 1

Product Loctite 648


Manufacturer Loctite Technik
Material data sheet —
Selection list —
Basis dimethacrylic ester
Accelerator —
Mixture proportions —
parts by weight —
parts by volume —
Storage life [a] 1 1)

Storage temp. [C] RT


Parameters and condition of the mixed product
Consistency liquid
Color green
Gap [mm] (D–d)/2 0,05–0,15
Activator Locquic T
Application time [min] —
Airing time [min] —
Curing temp. [C] RT 2)

Curing time 2 to 4 h 3)
Humidity [%] not less than 30
Bonding strength [N/mm2]  10

(Units of time: s = second, min = minute, h = hour, d = day, a = year)


1) In original containers with specified contents.
2) At least 17 C
3) Curing time for bonding test not less than 24 h.

Earlier issue: 06/86


Copying of this document, and giving it to others and the use or communication of the contents thereof, are forbidden without express authority. Offen-
ders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
Process Specification

Installation of Bearings/Bushes by Bonding 80–T–34–9020


Data Sheet 8
– Program A300/A310 – Issue: 09/98
Page 1 / 1

This data sheet is type–related and is effective for the Airbus program A300/A310.
According to NT A007//10053, product Loctite 675 is to be used.

Earlier issue: 06/86


Copying of this document, and giving it to others and the use or communication of the contents thereof, are forbidden without express authority. Offen-
ders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
Process Specification

Installation of Bearings/Bushes by Bonding 80–T–34–9020


Data Sheet 9
– Loctite 603 – Issue: 09/98
Page 1 / 1

Product Loctite 603


Manufacturer Loctite GmbH, Germany
Material data sheet —
Selection list —
Basis urethan methacrylate
Storage life [a] 1 1)

Storage temp. [C] RT


Parameters and condition of the product
Consistency liquid
Color green, fluorescent
Gap [mm] (D–d)/2 0,05 to 0,15
Activator Loctite 7471 2) 3)

Application time [min] —


Airing time [min] —
Curing temp. [C] 23 " 2 90 " 5
Curing time [h] 14 1
Humidity [%] 30 minimum
Bonding strength [N/mm2] [ 10

(Units of time: s = second, min = minute, h = hour, d = day, a = year)


1) In original containers with specified level.
2) Applicable only for active (not passivated) metal surfaces without activator.
3) Only for complete filling of a circumferential gap.

Earlier issue: 02/94


Copying of this document, and giving it to others and the use or communication of the contents thereof, are forbidden without express authority. Offen-
ders are liable to the payment of damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.

You might also like