Professional Documents
Culture Documents
JRA No 11-191 Maintenance Work of 500 Ton Crane at FEC Area
JRA No 11-191 Maintenance Work of 500 Ton Crane at FEC Area
Part 1: Job Description: Maintenance work of 500 ton crane at FEC area Location: FEC Area
JRA Date: 12-02-2011 JRA No./ Revision: 11-191 JRA Leader: Dean Degannes Scribe: Abrar-ul-Hassan
Review Team: (e.g. Ops Review Team) Naveed, Ashafaq Ali, Nabi Bux, Abrar-ul-Hassan & Abdul Rasheed
List Associated Procedures/work instructions or Temporary WIs:
Hazard Check List (FRCP identified below must reference applicable FRCP Control Measures – refer to FRCP Handbooks)
Falls from Heights Access / Egress Confined Space √ Manual Handling Fatigue/Over Exertion √ Slips, Trips & Falls
√ Competence of
Falling Objects √ Collisions Noise Illumination Environmental
Personnel
Liquid/Gas Under √ Flaring/Hydrocarbon
Oil/Chemical Flammable Materials Moving Machinery Electricity
Pressure Release
Surface Mobile
Ignition Source Light Vehicles
Corrosive Substance Chemical Exposure Naked Flames Equipment
(Sparks/Electrical) (FRCP)
(FRCP)
Hazardous Materials Equipment Other
Isolation Working at Heights Lifting Operations (please specify)
Management Safeguarding
(FRCP) (FRCP) (FRCP)
(FRCP) (FRCP)
Step
Hazard Hazard Effect Hazard Controls Controls Acceptable
Job Steps Use Checklist as a Guide to Injury/Damage or
No. Use Hierarchy of Controls/FRCP Control Measures Y/N
be Specific Environmental Effect
01 Mobilization of Un inducted Personal Ensure inducted and medically fit and Yes
personals, people injury approved people only should be enter in
Equipment and the working area
Hand Tools
Workers Risk to Emergency response requirements,
unaware of property Emergency access, Muster Points and
access & other relevant protocols as per standard
protocols of FRCP shall be reinforced during
toolbox meeting.
Discussed work scope with team
Conduct daily Tool box Meeting before
CONTROLLED DOCUMENT
Page 1 of 4
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
CONTROLLED DOCUMENT
Page 2 of 4
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
CONTROLLED DOCUMENT
Page 3 of 4
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
Alternatives Considered: What are the other possible means of achieving the job outcome?
Part 3: Contingency Plans: What rescue equipment, PPE etc could be needed if something went wrong? Reference Field ERP
Full time communication with CCR to be made in case of any emergency / muster (Secure the place and go to the designated operation muster
point.
Fire Extinguisher shall be placed on site
CONTROLLED DOCUMENT
Page 4 of 4
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal