Professional Documents
Culture Documents
Proforma - B: Kailas Ramd HAN Damre
Proforma - B: Kailas Ramd HAN Damre
45
0.42 0.42
PROFORMA -B 17/18
0.85
A
13.95 1.70 41.407.96 1.70 13.95 1.30 13.95 1.70 7.96 1.70 7.00
CONTENTS OF SHEET
1.00
1.00
1.00
1.00
1.00
1.00
1.00
41.40 5 2 3 3 2
21ST(AH/R&R) [PART] FLOOR PLAN, TERRACE FLOOR PLAN, OHT, LMR & ROOF FLOOR PLAN,
FLOWER BED (ELEVATION FLOWER BED (ELEVATION 1
2.20
2.20
2.20
2.20
4
2.20
2.20
2.20
2.20
LINE AREA DIAGRAM & AREA CALCULATION, REFUGE AREA STATEMENT, CARPET AREA SATEMENT
TREATMENT COUNTED IN TREATMENT COUNTED IN
CHAJJA
FSI) 3.78 X 2.05 FSI) 3.78 X 2.05 CHAJJA (WING-2 [TOWER-2])
1.50 x 4.30 X 0.40 4.30 X 0.40 1.50 x 1.20 mtr. HIGH STAMP OF DATE OF APPROVAL OF PLAN
3.90
3.90
3.90
BATH & W/C 0.95 0.95 PARAPET WALL
0.75 1.96 x 1.84 M.P ROOM 1.45 X 1.45 X
Alcove
Alcove
Alcove
Alcove
x 1.02 X 1.02 X
M.P ROOM R.C.C. WALL
1.20 x (with alcove) 2.44 2.44 1.20 x 1.20 mtr. HIGH
1.24 1.84 1.84 (with alcove)
M.P ROOM 1.25 3.95 x 4.14 3.95 x 4.14 1.25 PARAPET WALL
M.P ROOM M.P ROOM
(with Alcove) AH/R&R 2.71
4.90
(with alcove) (with alcove) AH/R&R
4.84 x 4.75 BATH (TO BE HANDED (TO BE HANDED BATH
AH/R&R W.C. 0.87 x 4.83 x 4.15 4.83 x 4.15 0.87 x W.C. 0.25
& W/C OVER TO MCGM) 1.10 1.10 1.45 X 0.95 OVER TO MCGM) & W/C
1.45 X0.95
2.89
AH/R&R 0.73
Alcove
1.06
1.06
CARPET AREA =27.88 SQ.MT. 0.73x BATH & W/C CARPET AREA =27.88 SQ.MT. BATH & W/C 0.73x D1 D1
3.34 X 0.61 1.06 1.45 X 1.06 CARPET AREA =27.88 SQ.MT. 1.45 X 1.06 1.06 3.49 X 0.61
AVS
AVS
AVS
AVS 6
FRD FRD FRD FRD FRD
06 05 04 03 02 12.45 0.75 2.25
5.58
5.58
5.58
2.16x1.72
2.00
CORRIDOR R.C.C. WALL
2.15
2.15
LO1 16
2.76
23.40 X 2.00
07
FRD 08 11
FRD FRD
1.76x1.02 5.79 4.10 3.20 4.25 7.25
BATH & W/C
M.P ROOM 1.75 x 1.47
BATH & W/C Alcove 1.20 mtr. HIGH
(with alcove)
2.40 x 1.22 PART TERRACE PARAPET WALL
M.P.ROOM 4.95 x 4.00 AVS
LIFT LIFT AVS
AH/R&R (TREATED AS REFUGE)
0.86 X 2.38
x CARPET AREA =
3.90
3.90
3.90
1.80 x 2.11 AH/R&R
1.51
27.88 SQ.MT. 1.20 mtr. HIGH
0.30x0.95
0.90
0.90
3.20 X 12.23 10.85
CHAJJA CHAJJA 7
0.20
15
Alcove
12.22
12.22
0.30 L2 LO2 L1 B
12.68
LIFT LIFT
1.05 3.10 X 3.18 3.10 X 3.18 1.05
AH/R&R
33.18
33.18
33.18
(TO BE HANDED
OVER TO MCGM) PR. PR.
PARAPET WALL
SH SH
1.20 mtr. HIGH
CARPET AREA =
27.88 SQ.MT.
M.P ROOM
(with Alcove) LIFT LIFT 8
9.40
9.40
9.40
3.20 x 7.57 3.10 X 3.08 3.10 X 3.08
1.00 X
0.39
BATH/W.C 1.11 1.05 2.75 1.10 1.60 1.10 2.75 1.20
1.05 11.40 X 0.75 1.05
2.05 X 1.20 FRD FRD
2.10
2.10
2.10
LOBBY 1.15 1.15 6.10
2.45
2.45
2.45
2.46
09 10 LO4 LO5 LO4 ROOF OF LIFT
1.85
1.85
13.70 X 1.25 2.20 MACHINE ROOM
14
1.31
S.DUCT S.DUCT 9 LO6 LO3
1.60
0.35
0.35
0.35
2.05 X 0.45 ED ED PR. SH FD (FHC) PR. SH ED ED 2.05 X 0.45 1.30 E.D.1 2.75 E.D.2 E.D.1 2.75
FRD FRD
1.10
2.86 6.00 2.60 6.00 2.86 2.94
1.40
1.40
V 2.60 X 0.80 V
0.35 2.25 PLAN FOR APPROVAL
3.15
SMOKE CHECK
2.20
2.45
LOBBY LO7
FD
2.15 X
FD
DN UP 2.60 DN UP
DNYAN
KAILAS
Digitally signed by DNYANDIP
13 BHAGWAN KASAVKAR
DN: c=IN, o=MUNICIPAL
2.60
DIP CORPORATION OF GREATER Digitally signed by KAILAS
MUMBAI, ou=DY. CHIEF RAMDHAN DAMRE
ST1 ENGINEER (BUILDING DN: c=IN, o=MUNICIPAL JITENDRA
BHAGW
RAMD
PROPOSAL) CITY, CORPORATION OF GREATER
10 ST1
9.40
9.40
9.40
9.40
9.40
9.40
2.5.4.20=4367a448a8801de6d
bdf98a906709b09eaace4ed12 MUMBAI, ou=DY. CHIEF ENGINEER ARJUNRAO
3.30
3.30
8.00
8.00
8.00
69fed420eeb2c5320e88faeae09927
FIRE LIFT
HAN
11 11 serialNumber=EA78B41DDC0
91c84c607613, postalCode=400037,
Digitally signed by JITENDRA ARJUNRAO KHONDE
DN: c=IN, o=MUNICIPAL CORPORATION OF GREATER
KASAVK
BF61E8367B3867CD1A391C73 MUMBAI, ou=DY. CHIEF ENGINEER (BUILDING
st=Maharashtra,
4.50
2.60 X 3.68
PROPOSAL) CITY,
5EB0D05ACB7BEF50692E06D 2.5.4.20=8f9403dafda78ae6245a8c07e211d6efa6c4f8a4
L3 B9C768, cn=DNYANDIP
BHAGWAN KASAVKAR
serialNumber=DF208620843AEDA6
D0B7A64A5F90C93AA8C99325F1D
af3b0bdda8d500bde2cf775f, postalCode=400037,
st=Maharashtra,
AR
serialNumber=7D4F0E236A92AC078266FF4B95DD58D7
F8F7FE354017690BA6EBDD3CB26D18E6, cn=JITENDRA
Date: 2023.09.08 19:19:07 DDE309ACA6C8506522D9E,
DAMRE
ARJUNRAO KHONDE
+05'30' Date: 2023.09.12 11:13:03 +05'30'
cn=KAILAS RAMDHAN DAMRE
Date: 2023.09.11 16:53:17 +05'30'
2.10
1.35
12
OPEN BELOW
AVS AVS
LIFT LIFT
3.10 X 2.78 3.10 X 2.78 TERRACE BELOW
VASANT Date:
2023.09.08
KADU
SCALE = 1:100