BILL OF QUANTITY
PROJECT : SITE IMPROVEMENT OF ROHINGYA CAMP
ACTIVITY : WASH INFRASTRUCTURE
LOCATION : MINA RAYA CAMP, ACEH PIDIE
DATE : 2023
* English language is official version
* Site visit must be conducted prior submitted the unit prices
1 Deep Well Drilling works, depth minimum 60m or Pengeboran Sumur dalam, kedalaman minimal 60m atau lot 1.00 12,500,000 12,500,000
Production capacity minimum 2000 liter/hour kapasitas produksi minimal 2000 liter/jam
Scope of works: Lingkup pekerjaan:
1.1 Setting up the drilling rig and mud pit Pembuatan Spull Bak dan Setting up Mesin Bor
1.2 Drilling of pilot hole dia. 6 inch Pengeboran Pilot hole dia. 6 inch
1.3 Drilling of Reaming Hole from dia. 5 inch ke dia. 6 inch Pengeboran reaming Hole dari dia. 5 inch ke dia. 6 inch
1.4 Taking dan examination of rock specimens Pengambilan dan Pemeriksaan contoh batuan (cutting)
1.5 Measuring Electrical well logging consist of Spontaneous Pengukuran Electrical well logging terdiri dari
Potential (SP) and Resistivity Spontaneous Potential (SP) dan Resistivity
2 Deep Well Construction, depth minimum 60m or Konstruksi Sumur dalam, kedalaman minimal 60m atau lot 1.00 6,500,000 6,500,000
Production capacity minimum 2000 liter/hour kapasitas produksi minimal 2000 liter/jam
Scope of works: Lingkup pekerjaan:
2.1 PVC Pipe dia. 4 inch for casing Pipa PVC dia. 4 inch untuk casing
2.2 PVC Pipe dia. 2 inch for supply Pipa PVC dia. 2 inch untuk pipa suplai
2.3 Bottom Plug (end cup) Penutup ujung pipa bawah
2.4 PVC Flanges dia. 4 inch Penutup sumur atau pipa atas dia. 4 inch
2.5 Screen production pipe Saringan produksi dalam pipa
2.6 Gravel pack to prevent sand and fine particles moving Pengisian kerikil untuk mencegah pasir dan material
from the aquifer formation into the well halus lain masuk dari formasi aquifer ke sumur
2.7 Grouting Works (cement grout) Supply grouting material Pengisian mortar semen, Menyediakan material pengisi
and grout annular space between bore hole and casing celah antara sumur bor dan casing untuk mencegah air
to prevent surface water from drainage downward and permukaan mengalir kebawah disekeliling luar casing
contaminating the well and aquifer. The grout must be dan mengkontaminasi sumur dan aquifer. Material
added from the bottom of the annular space upward in grout ini diisi dari bawah naik keatas secara terus
one continuous operation until the annular space is menerus tanpa terputus hingga seluruh celah terisi.
filled.
3 Well Development and pumping test Pekerjaan penyempurnaan sumur dan tes pemompaan lot 1.00 7,000,000
Page 1 of 7
[Company header / Kop perusahaan]
BILL OF QUANTITY
PROJECT : SITE IMPROVEMENT OF ROHINGYA CAMP
ACTIVITY : WASH INFRASTRUCTURE
LOCATION : MINA RAYA CAMP, ACEH PIDIE
DATE : 2023
* English language is official version
* Site visit must be conducted prior submitted the unit prices
4 Mechanical and Electrical Pekerjaan mekanikal dan listrik lot 1.00 49,000,000 49,000,000
Scope of works: Lingkup pekerjaan:
4.1 Supply and installation of Control Panel 3 phase (50 x 60 Pengadaan dan pemasangan Panel kontrol 3 phase
cm) and automatic control unit for all pumps, MCB and ukutan 50 x 60 cm dan unit kontrol otomatis untuk
all Water Level Control (WLC) including indicator lamp semua pompa air terpasang, MCB dan semua WLC
termasuk lampu indikator
4.2 Wire sling f 12mm Kabel baja sling f 12mm gantungan pompa celup
4.3 Water resistant cable for submersible pump Kabel tahan air untuk pompa submersible
4.4 Electroda cable Kabel elektroda
4.5 Electrode at well and raw water reservoir Elektroda pada sumur dan reservoir
4.6 Cable NYM 3x2.5mm for 3 unit WLC Kabel NYM 3x2.5mm untuk 3 unit WLC
4.7 Water Level Control (WLC) incl. all accessories Water Level Control (WLC) termasuk aksesoris
4.8 High quality Submersible pump 3 HP, 3 phase, Pompa submersible 3 HP, 3 Phase kualitas tinggi,
stainlessteel, Capacity 7m3/hr, Total Head min. 150m stainlessteel, kapasitas min. 7m3/jam, total head min.
for deep well 150m untuk sumur dalam
4.9 Supply and installation of Centrifugal Pump (Grundfos Pengadaan dan pemasangan Pompa air sentrifugal
type NF 30-18) head 18-9m, capacity 12-37m3/h. Both merk Grundfos type NF 30-18 head 18-9m, kapasitas 12-
the pumps installed paralelly include gate valves to 37m3/jam. Kedua pompa dipasang paralel termasuk
allow the pump working alternately (Clean water stop kran sehingga pompa bisa bekerja bergantian
reservoir to roof tank)
4.10 Supply and install control pit for well 50cm x 50cm x Pembuatan bak kontrol sumur uk. 50cm x 50cm x 50cm
50cm, brick wall, plaster including steel plate 5mm cover dari pasangan bata, plaster dan termasuk plat besi
penutup tebal 5mm.
5.2 Supply and installation of PVC pipe dia. 2 inch and all Sediakan dan pasang pipa PVC dia. 2 inchi, dan semua
acessories, as listed below aksesoris lain seperti tersebut dibawah ini.
5.3 PVC pipe dia 2 inch from deep well to water tank Pemasangan pipa PVC dia. 2 inch dari sumur dalam ke
tangki air
5.4 Steel Socket 2" Pemasangan sambungan pipa 2"
5.5 GIP Gate Valve 2" (wash out) Pemasangan stop kran GIP Gate 2" (pembuang)
5.6 GIP Gate Valves flange 2" Pemasangan stop kran galvanis 2" dengan flange
5.7 GIP Tee 2" at top of deep weel Pemasangan simpang tiga galvanis 2" pd sumur
5.8 GIP elbow 2" Pemasangan elbow galvanis 2"
1.2 Including all required plumbing and accessories Termasuk seluruh pipa dan aksesoris yang diperlukan
Page 2 of 7
[Company header / Kop perusahaan]
BILL OF QUANTITY
PROJECT : SITE IMPROVEMENT OF ROHINGYA CAMP
ACTIVITY : WASH INFRASTRUCTURE
LOCATION : MINA RAYA CAMP, ACEH PIDIE
DATE : 2023
* English language is official version
* Site visit must be conducted prior submitted the unit prices
Note:
All supply and delivery cost to the work's site is contractor reponsibility.
IOM is not responsible for the government tax, fees, and other miscellaneous fee. All the work stated above must be in accordance with scope of works.
Catatan:
Semua harga pengangkutan dan penyediaan material ke lapangan akan menjadi tanggung jawab kontraktor.
IOM tidak bertanggung jawab terhadap pajak, potongan dan biaya lainnya dari pemerintah RI. Semua pekerjaan di atas harus mengacu pada " lingkupan kerja"
Submitted by
PT / CV …...............................
Page 3 of 7
[Company header / Kop perusahaan]
BILL OF QUANTITY
PROJECT : SITE IMPROVEMENT OF ROHINGYA CAMP
ACTIVITY : REFURBISHMENT OF EXISTING TOILET (M/F)
LOCATION : MINA RAYA CAMP, ACEH PIDIE
DATE : 2023
* English language is official version
* Site visit must be conducted prior submitted the unit prices
1 To provide tools and equipment required to complete the Menyediakan seluruh peralatan dan perlengkapan kerja, lot 1.00
works, including housekeeping and removal of excess termasuk pembersihan area kerja dari sampah dan sisa
material from the working area during and after works material selama pekerjaan berlangsung dan setelah
completion. pekerjaan selesai
3 Concrete foundation (pedestal), mortar 1:2:3 (K-175) Pondasi beton cor (umpak), campuran 1:2:3 (K-175) m3 0.10
4 Reinforced concrete tie beam, mortar 1:2:3 (K-175) Sloof beton bertulang, campuran 1:2:3 (K-175) m3 0.66
● Size: 20x20cm, Length as shown in drawing ● Ukuran: 20x20cm, Panjang sesuai petunjuk gambar
● Rebar 4 x dia.10mm ● Pembesian 4 x dia. 10mm
● Location: all area with walls ● Lokasi: seluruh area berdinding
5 Reinforced concrete column, mortar 1:2:3 (K-175) Kolom beton bertulang, campuran 1:2:3 (K-175) m3 0.60
● Size: 20x20cm, Height as shown in drawing ● Ukuran: 20x20cm, Tinggi sesuai petunjuk gambar
● Rebar 4 x dia.10mm ● Pembesian 4 x dia. 10mm
● Location: all corners and wall joints ● Lokasi: seluruh sudut dan sambungan dinding
6 Reinforced concrete floor, thickness 7cm, mortar 1:2:3 (K- Lantai beton bertulang tebal 7cm, campuran 1:2:3 (K-175) m3 0.79
175)
● Septic tank dimension L 4,5m, W 2,5m ● Ukuran Septic tank P 4,5m, L 2,5m
● Rebar dia.8mm, 15cm x 15cm, 1 layer ● Pembesian dia. 8mm, 15cm x 15cm, 1 lapis
● Location: bottom floor of septic tank ● Lokasi: lantai bagian dasar septic tank
7 Half brick masonry walls, mortar 1:4 Dinding pasangan 1/2 bata, campuran 1:4 m2 41.25
● Including plastering on both sides, mortar 1:4 ● Termasuk pekerjaan plaster di kedua sisi, campuran 1:4
● Size: height 2,5m, length as shown in drawing ● Ukuran: tinggi 2,5m, panjang sesuai petunjuk gambar
9 Reinforced concrete floor (top cover), thickness 10cm, Lantai beton bertulang (tutup atas) tebal 10cm, campuran m3 1.13
mortar 1:2:3 (K225) 1:2:3 (K225)
● Septic tank dimension L 4,5m, W 2,5m ● Ukuran Septic tank P 4,5m, L 2,5m
● Rebar dia.8mm, 15cm x 15cm, 1 layer ● Pembesian dia. 8mm, 15cm x 15cm, 1 lapis
● Including manhole 60x60 cm and it's cover, 2 units ● Termasuk lubang 60x60 cm dan tutupnya, 2 unit
● Location: top floor of septic tank ● Lokasi: lantai bagian atas septic tank
9 Waste water pipe, SEPTIC TANK & SOAK PIT Pipa air kotoran, SEPTIC TANK & RESAPAN m' 22.00
● Pipa PVC dia. 4 inch ● PVC pipe dia. 4 inch
● Icluding all required accessories ● Termasuk seluruh aksesoris yang dibutuhkan
● Location: as shown in drawing ● Lokasi: sesuai petunjuk gambar
10 Ventilation pipe Pipa ventilasi pcs 3.00
● Pipa PVC dia. 3 inch ● PVC pipe dia. 3 inch
● Height 1m from top cover ● Tinggi 1m dari permukaan lantai atas
● Location: as shown in drawing ● Lokasi: sesuai petunjuk gambar
11 Waste water pipe, from each Toilet to SEPTIC TANK Pipa air kotoran, dari tiap Toilet ke SEPTIC TANK m' 27.00
Page 4 of 7
[Company header / Kop perusahaan]
BILL OF QUANTITY
PROJECT : SITE IMPROVEMENT OF ROHINGYA CAMP
ACTIVITY : REFURBISHMENT OF EXISTING TOILET (M/F)
LOCATION : MINA RAYA CAMP, ACEH PIDIE
DATE : 2023
* English language is official version
* Site visit must be conducted prior submitted the unit prices
Scope of work, dimension, specification, and price refer to Lingkup kerja, ukuran, spesifikasi, dan harga mengacu lot 1.00 - -
point B. Toilet Male Shelter: Septic Tank and Soak Pit pada poin B. Toilet Hunian Laki-laki: Septic Tank dan
Sumur Resapan
RECAPITULATION REKAPITULASI -
Page 5 of 7
[Company header / Kop perusahaan]
BILL OF QUANTITY
PROJECT : SITE IMPROVEMENT OF ROHINGYA CAMP
ACTIVITY : REFURBISHMENT OF EXISTING TOILET (M/F)
LOCATION : MINA RAYA CAMP, ACEH PIDIE
DATE : 2023
* English language is official version
* Site visit must be conducted prior submitted the unit prices
1 To provide tools and equipment required to complete the Menyediakan seluruh peralatan dan perlengkapan kerja, lot 1.00
works, including housekeeping and removal of excess termasuk pembersihan area kerja dari sampah dan sisa
material from the working area during and after works material selama pekerjaan berlangsung dan setelah
completion. pekerjaan selesai
2 Mobilization and demobilization of heavy equipment: Mobilisasi dan demobilisasi alat berat: Excavator lot 1.00
Excavator (backhoe) (Backhoe)
B Land Clearing and Excavation Pembersihan Area dan Galian -
1 Provision and operation of of heavy equipment: Excavator Penyerdiaan dan pengoperasian alat berat: Excavator lot 1.00
(backhoe) (backhoe)
● Excavator dimesion and spesification should be adjusted ● Dimensi dan spesifikasi excavator harus disesuaikan
with the condition and access of the site. Vendor is dengan kondisi dan akses di lokasi kerja. Vendor
required to do survey prior to the works. diwajibkan melakukan survey terlebih dahulu.
4. Excavation for drainage (dimension as drawing) 4. Galian untuk saluran air (ukuran sesuai gambar)
5. Excavation for soak pit area (dimension as drawing) 5. Galian untuk area resapan (ukuran sesuai gambar)
6. Ensure waste water from washing area flows to the 6. Memastikan air kotor dari area mandi mengalir ke
drainage and soak pit area saluran dan resapan
7. Spread and leveling of all material result from the 7. Menebar dan meratakan sisa material dari galian di
excavation around the site sekitar area kerja
8. Final cleaning 8. Pembersihan akhir
Page 6 of 7
[Company header / Kop perusahaan]
BILL OF QUANTITY
PROJECT : SITE IMPROVEMENT OF ROHINGYA CAMP
ACTIVITY : REFURBISHMENT OF EXISTING TOILET (M/F)
LOCATION : MINA RAYA CAMP, ACEH PIDIE
DATE : 2023
* English language is official version
* Site visit must be conducted prior submitted the unit prices
Submitted by