Design Calculations Type1 HT 0 2 0
Design Calculations Type1 HT 0 2 0
Design Calculations Type1 HT 0 2 0
23.08.2010
DATE
FRA LTD
UBASH PROJECTS & MARKETING LTD
PLOT NO 65, SECTOR-32,
GURGOAN, HARYAYA-122001
S.
PILLAR (ABOVE GROUND HT < 2 m)
ISSUE : R0
5/402
S.No ITEMS
1) SCOPE ……………….…………………………………………………………………………………
2) UNITS ………………………………………………………………………………………………….
3) CODES AND STANDARDS …….….…………………………………………...……………….
4) MATERIAL ………………………………………………………………………………………………….
5) SOIL DATA ………………………………………………………………………………………………….
6) DESIGN METHODOLOGY ……...……………………………………………..……………….
7) BASIC DATA ……………...……………………………………………………………………………….
8) LOAD CALCULATIONS ……...…………………………………………………………….
9) STAAD ANALYSIS
……...…………………………………………………………………………………………………
OF PILLAR FRAME
10) STAAD ANALYSIS
……...…………………………………………………………………………………………………
OF PILE FRAME
80491645.xls 01/07/2012
6/402
2) UNITS
SI units
4) MATERIAL
The grade of concrete used is M25 and the grade of reinforcing steel is Fe 415 ( Tender document, section 8, pg
5) SOIL DATA
As per Cl. 6.3.1,pg 16/18 of of Geo-technical report, net SBC of soil is considered as 10 t/m2 for all the foundatio
6) Design Methodology:
I) The overground pipeline passing through the weak soil strata is proposed to be supported on RCC pillars resting
These pillars are T-shaped Frame as shown in Fig.1.The frame consists of top beam to support the pipe,which in
supported on column resting on pile cap.Pile cap bottom is kept 1500 mm below existing ground level (EGL) to a
cover through which services like pipes, cables, etc could cross, if required.the frame is varying in height with res
existing ground level.The frames are grouped in the following categories
a) 0.0 m to 2.0 m
b) 2.1 m to 3.0 m
II) Following are the Loads considered for the design of Frame:
A) Vertical Load:
80491645.xls 01/07/2012
7/402
b) Seismic force.
a) Seismic force.
b) Wind load.
iii) The T- frame is analysed using Staad-Pro model as shown in fig 1.with column base as fixed.The RCC members
as per IS-456-2000;(Limit state method).The pillar frame is analysed by Staad -Pro(Structural analysis & design S
the frame column fixed at top of Pile cap.The pile reactions and the pile design is then done using Staad-pro.The
on the pile cap are taken as per the output file of previous pillar frame Staad Ananysis.The codal provisions of IS
(clause:5.5.2,pg 9) have also been used in the design for calculating the fixidity length of pile which in turn is use
pile frame.
iv) Load Cases considered in Staad for analysis and design of T-frames are:
Following are the load combinations which are been adopted in the design of the frame.
80491645.xls 01/07/2012
8/402
Fig 1
E.G.L E.G.L
80491645.xls 01/07/2012
9/402
400
80491645.xls 01/07/2012
10/402
80491645.xls 01/07/2012
11/402
80491645.xls 01/07/2012
12/402
80491645.xls 01/07/2012
13/402
80491645.xls 01/07/2012
14/402
80491645.xls 01/07/2012
15/402
80491645.xls 01/07/2012
16/402
80491645.xls 01/07/2012
17/402
80491645.xls 01/07/2012
18/402
80491645.xls 01/07/2012
19/402
80491645.xls 01/07/2012
20/402
80491645.xls 01/07/2012
21/402
80491645.xls 01/07/2012
22/402
80491645.xls 01/07/2012
23/402
80491645.xls 01/07/2012
24/402
80491645.xls 01/07/2012
25/402
80491645.xls 01/07/2012
26/402
80491645.xls 01/07/2012
27/402
80491645.xls 01/07/2012
28/402
80491645.xls 01/07/2012
29/402
80491645.xls 01/07/2012
30/402
80491645.xls 01/07/2012
31/402
80491645.xls 01/07/2012
32/402
80491645.xls 01/07/2012
33/402
80491645.xls 01/07/2012
34/402
80491645.xls 01/07/2012
35/402
80491645.xls 01/07/2012
36/402
80491645.xls 01/07/2012
37/402
80491645.xls 01/07/2012
38/402
80491645.xls 01/07/2012
39/402
80491645.xls 01/07/2012
40/402
80491645.xls 01/07/2012
41/402
80491645.xls 01/07/2012
42/402
80491645.xls 01/07/2012
43/402
eferggrthtyjuykuy
jhtyejyjjuj
80491645.xls 01/07/2012
44/402
80491645.xls 01/07/2012
45/402
0m)
Page.No
…………………… 2
……………………. 2
2
……………………. 2
……………………. 2
2-4
……………………. 5-6
7-11
………………… 12-24
………………… 25-37
80491645.xls 01/07/2012
46/402
0m)
I J
80491645.xls 01/07/2012
47/402
0m)
I J
80491645.xls 01/07/2012
48/402
0m)
I J
Height "H"
varies
Pipe ID = 1200
ctural steel
dle Supports
Max 2.0m high, For
Type 1 Pillar
80491645.xls 01/07/2012
49/402
0m)
I J
400
80491645.xls 01/07/2012
50/402
0m)
I J
80491645.xls 01/07/2012
51/402
0m)
I J
80491645.xls 01/07/2012
52/402
0m)
I J
80491645.xls 01/07/2012
53/402
0m)
I J
80491645.xls 01/07/2012
54/402
0m)
I J
80491645.xls 01/07/2012
55/402
0m)
I J
80491645.xls 01/07/2012
56/402
0m)
I J
80491645.xls 01/07/2012
57/402
0m)
I J
80491645.xls 01/07/2012
58/402
0m)
I J
80491645.xls 01/07/2012
59/402
0m)
I J
80491645.xls 01/07/2012
60/402
0m)
I J
80491645.xls 01/07/2012
61/402
0m)
I J
80491645.xls 01/07/2012
62/402
0m)
I J
80491645.xls 01/07/2012
63/402
0m)
I J
80491645.xls 01/07/2012
64/402
0m)
I J
80491645.xls 01/07/2012
65/402
0m)
I J
80491645.xls 01/07/2012
66/402
0m)
I J
80491645.xls 01/07/2012
67/402
0m)
I J
80491645.xls 01/07/2012
68/402
0m)
I J
80491645.xls 01/07/2012
69/402
0m)
I J
80491645.xls 01/07/2012
70/402
0m)
I J
80491645.xls 01/07/2012
71/402
0m)
I J
80491645.xls 01/07/2012
72/402
0m)
I J
80491645.xls 01/07/2012
73/402
0m)
I J
80491645.xls 01/07/2012
74/402
0m)
I J
80491645.xls 01/07/2012
75/402
0m)
I J
80491645.xls 01/07/2012
76/402
0m)
I J
80491645.xls 01/07/2012
77/402
0m)
I J
80491645.xls 01/07/2012
78/402
0m)
I J
80491645.xls 01/07/2012
79/402
0m)
I J
80491645.xls 01/07/2012
80/402
0m)
I J
80491645.xls 01/07/2012
81/402
0m)
I J
80491645.xls 01/07/2012
82/402
0m)
I J
80491645.xls 01/07/2012
83/402
0m)
I J
80491645.xls 01/07/2012
84/402
0m)
I J
80491645.xls 01/07/2012
6/402
35
36
80491645.xls 01/07/2012
6/402
60 Pile Data
65 Type of pile (from geo tech report pg 23/25) Bored cast in situ
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
1l;knjhvfy
80491645.xls 01/07/2012
6/402
I J
e FID = 1200
uctural steel
dle Supports
N/mm2
N/mm2
t/m3
t/m3
t/m3
t/m3
t/m3
<mm;m> 1.2
<mm;m> 0.01
<mm;m> 0.01
<mm;m> 1.25
<mm;m> 8.0
<mm;m> 1.5
<mm;m> 2.0
80491645.xls 01/07/2012
6/402
I J
<mm;m> 0.5
<mm;m> 0.5
<mm;m> 0.48
<mm;m> 2.20
<mm;m> 0.4
<mm;m> 0.6
m/s
<mm;m> 0.1
<mm;m> 0.05
<mm;m> 0.03
<mm;m> 0.5
ed cast in situ
80491645.xls 01/07/2012
6/402
I J
<mm;m> 8.0
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
6/402
I J
80491645.xls 01/07/2012
7/37
80491645.xls 01/07/2012
7/37
I J
<mm;m> 1.2
<mm;m> 0.01
<mm;m> 0.01
<mm;m> 1.21
<mm;m> 1.24
No's
<mm;m> 8
t/m 3
t/m3
t/m3
t/m3
t/m3
<t/m;Kn/m> 11.30
<t/m;Kn/m> 1.10
<t/m;Kn/m> 3.81
<t/m;Kn/m> 16.21
<t-m;Kn/m> 129.68
KN
KN
<t/m;Kn/m> 4.91
<t-m;Kn/m> 39.25
KN
Pipe OD =
1249
80491645.xls 01/07/2012
7/37
I J
80491645.xls 01/07/2012
11/402
2000
21
22
23
24 E.G.L E.G.L
25 800
26
27 700
28
PILE CAP
29
30
PIL
31 PIL
32 E
E
33
34
35
36 Load Calculations
37 RCC density γc = = 2.5
38 Internal dia of Pipe (FID) = = 1200
39 Thickness of cement mortar lining (CML) = T1 = 12
80491645.xls 01/07/2012
11/402
46 Total height of the column [Basic Data, Ref. cell H-34] = 2000
53
54 Lateral/Longitudnal force :
55 Co-efficeient of friction between PTF Bearings and Steel = 0.05
64
65 Time Period :
66 Fundamental time period (T) 2 xp x√( W/(K xg)
80491645.xls 01/07/2012
11/402
80491645.xls 01/07/2012
11/402
91 k2= terrain ,height & structure size factor [Basic Data, Ref. cell H-54] = 1.05
80491645.xls 01/07/2012
11/402
80491645.xls 01/07/2012
11/402
I J
ID = 1200
ctural steel
dle Supports
t/m3
<mm;m> 1.2
<mm;m> 0.01
80491645.xls 01/07/2012
11/402
I J
<mm;m> 0.01
<mm;m> 1.25
<mm;m> 8
<mm;m> 0.5
<mm;m> 0.5
<mm;m> 0.8
<mm;m> 2
<mm;m> 2.8
<mm;m> 2.2
<mm;m> 0.4
<mm;m> 0.6
<mm;m> 1.5
KN
KN
80491645.xls 01/07/2012
11/402
I J
N/mm 2
80491645.xls 01/07/2012
11/402
I J
<t;kN> 5.83
<t;kN> 13.19
<t;kN> 155.84
<t;kN> 161.67
mm4 0.0052
N/mm
N/mm
N/mm
Sec
<t;kN> 0.464
<t;kN> 13.66
KN
KN
m/s
m/s
80491645.xls 01/07/2012
11/402
I J
N/m 2
<N;KN> 8.76
KN
80491645.xls 01/07/2012
8
9
10
11 500 SQ
COLUMN
12 ABOVE
13
14
15 E.G.L E.G.L
16
17
18
19 PILE CAP BEAM
20
21
22
23 P P
24 I I
25 PILE DIA= 400
L L
26
27 E E
28
29 COLUMN SIZE =
30 WIDTH OF PILE CAP = 700 500X500
31
32
33
34
35
36
37 350 DISTANCE BETWEEN 2 PILES =3P = 1200
38
39 LENGTH OF PILE CAP = 1900
40
41 Typical Pile Reaction calculation of Pile cap for 1.0 m High Trestle:
42 Basic Inputs From staad output:
43 Support reactions (unfactored ) for trestle height of 1.0 m.
Horizontal Vertical Horizontal Moment
NodeL/C Fx kN Fy kN Fz kN Mx kN-m My kN-m Mz kN-m
4 20 (1+2+3+4) -7.14 169.58 -7.14 -19.99 0 19.99
21 (1+2+3+6) -13.8 169.58 -7.14 -19.99 0 38.64
22 (1+2+4+5) -7.14 169.58 -13.8 -38.64 0 19.99
44 Load case no = 20
45 Horizantal force acting in X-direction = (Fx) = -7.14
46 Vertical force acting in Y-direction = (Fy) = 169.58
47 Horizantal force acting in Z-direction = (Fz) = -7.14
48 Moment about X-direction = (Mx) = -19.99
49 Moment about Y-direction = (My) = 0
50 Moment about Z-direction = (Mz) = 19.99
51 Total number of piles below Column = = 2
52 Pile Cap Design:
53 RCC density γc = 2.5
54 Diameter of pile Dp = 400
55 Length of pile cap Lp = 1900
56 Width of pile cap Wp = 700
57 Spacing between 2 piles = 3P = 1200
58 Edge distance from centre of pile C/L = 350
59 Thickness of pile cap T Assumed = 700
60 Self weight of pile cap 1.9X0.7X0.7X2.5 = 2.33
61 Resultant Shear force √((Fz)^2+(Fx)^2)) = 10.10
62 Shear force on each pile 10.1/2 = 5.05
63 Shear capacity of each pile from Geo tech report,Pg 23 of 25) 10
64 Since 5.05<10 therefore design is SAFE
65 Total vertical Load acting on group of pile = =169.582+2.3275 171.91
66 Vertical force on each pile = =171.9095/2 = 85.95
67 Max Downward force acting on pile 1due to moment Mx
68 =-19.992X 0/0.6^2+0.6^2 = 0
69 Max Downward force acting on pile 2 due to moment Mx
70 =-19.992X 0/0.6^2+0.6^2 = 0
71 Max Downward force acting on pile 1due to moment Mz
72 =19.992X 0.6/0.6^2+0.6^2 = 16.66
73 Max Downward force acting on pile 2 due to moment Mz
74 =19.992*0.6/0.6^2+0.6^2" = -16.66
75 Total reaction on pile -1 =85.95475+0+16.66 = 102.61
76 Total reaction on pile -2 =85.95475+0+-16.66 = 69.29
77 Compression capacity of pile from Geo tech report,Pg 23 of 25) 300
78 Since 69.29<300 therefore design is SAFE
79
80 Design of Pile Cap Beam (PCB)
81 Concrete Grade [Cl. 4.4(b),Section 10; Pg. 282; Vol-IIA; TD] M25
82 Characteristic strength of concrete fck = 25
83 Characteristic strength of steel fy = 415
84 Length of beam L = 1900
85 Width of beam B = 700
86 Depth of beam D = 700
87 Clear Cover at bottom of beam = 100
88 at top of beam = 50
89 at sides of beam = 30
90 Diameter of bottom reinforcement = 16
91 Diameter of top reinforcement = 10
92 Effective depth to the bottom reinforcement =700-100-8 = 592
93 Effective depth to the top reinforcement =700-50-5 = 645
94 Bending moment about X-X axis (M) =102.6X0.6 = 61.57
95 Torsion on the beam (T) staad output load case no 21 38.64
700
P
I
L
E
350
350
350
KN
KN
KN
KN-m
KN-m
KN-m
No's
t/m3
<mm;m> 0.4
<mm;m> 1.9
<mm;m> 0.7
<mm;m> 1.2
<mm;m> 0.35
<mm;m> 0.7
KN
KN
KN
KN
KN
KN
KN
KN
KN
KN
KN
KN
KN
N/mm2
N/mm2
<mm;m> 1.9
<mm;m> 0.7
<mm;m> 0.7
<mm;m> 0.1
<mm;m> 0.05
<mm;m> 0.03
<mm;m> 0.02
<mm;m> 0.01
<mm;m> 0.59
<mm;m> 0.65
<Kn-m
<Kn-m
cl;41.4.2-456-
<Kn-m 2000
cl;41.4.2-IS-
<Kn-m 456-2000
<Kn-m
N/mm2
mm2
mm2
mm2
%
KN
cl;41.3,IS-457-
KN 2000
cl;41.3,IS-456-
KN 2000
KN
N/mm2
%
N/mm2
<mm;m> 0.01
<Kn-m
KN
<mm;m> 0.15
<mm;m> 0.62
<mm;m> 0.53
<mm;m> 0.7
N/mm2
N/mm2
mm2
mm2
onal shear reinforcement.
mm2
<mm;m> 0.55
<mm;m> 0.27
<mm;m> 0.55
<mm;m> 0.3
<mm;m> 0.01
mm2
No's
<mm;m> 0.99
mm2
KN
N/mm2
N/mm2
STAAD ANALYSIS FOR
PILLAR FRAME
80491645.xls 01/07/2012
****************************************************
* *
* STAAD.Pro *
* Version 2007 Build 05 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= SEP 1, 2010 *
* Time= 13:27:51 *
* *
* USER ID: *
****************************************************
1. STAAD SPACE
INPUT FILE: saddle support type1(Ht0-2m).STD
2. START JOB INFORMATION
3. ENGINEER DATE 23-AUG-10
4. END JOB INFORMATION
5. *********1200 DIA PIPE SADDLE SUPPORT.........FOR 0-2.0 MT HEIGHT
6. INPUT WIDTH 79
7. UNIT METER KN
8. JOINT COORDINATES
9. 1 -0.2 1.3 0; 2 0.9 1.3 0; 3 2 1.3 0; 4 0.9 -1.5 0
10. MEMBER INCIDENCES
11. 1 4 2; 2 1 2; 3 2 3
12. DEFINE MATERIAL START
13. ISOTROPIC CONCRETE
14. E 2.17184E+007
15. POISSON 0.17
16. DENSITY 23.6158
17. ALPHA 5E-006
18. DAMP 0.05
19. END DEFINE MATERIAL
20. MEMBER PROPERTY INDIAN
21. 2 3 PRIS YD 0.6 ZD 0.4
22. 1 PRIS YD 0.5 ZD 0.5
23. CONSTANTS
24. MATERIAL CONCRETE ALL
25. SUPPORTS
26. 4 FIXED
27. ****PRINT MEMBER INFORMATION ALL
28. LOAD 1 (DEAD LOAD OF FRAME)
80491645.xls 01/07/2012
29. SELFWEIGHT Y -1
30. LOAD 2 (PIPE EMPTY)
31. MEMBER LOAD
32. 2 CON GY -26.105 0.375
33. 3 CON GY -26.105 0.725
34. LOAD 3 (PIPE FULL)
35. MEMBER LOAD
36. 2 CON GY -71.33 0.375
37. 3 CON GY -71.33 0.725
38. LOAD 4 (FRICTIONAL FORCE ALONG PIPE LINE)
39. MEMBER LOAD
40. 2 CON GZ 3.57 0.375
STAAD SPACE -- PAGE NO. 2
80491645.xls 01/07/2012
72. PERFORM ANALYSIS PRINT STATICS CHECK
PROBLEM STATISTICS
-----------------------------------
NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 4/ 3/ 1
X = 0.899999996E+00
Y = 0.501954411E+00
Z = 0.000000000E+00
80491645.xls 01/07/2012
SUMMATION FORCE-Z = 0.00
X = 0.899999996E+00
Y = 0.129999999E+01
Z = 0.000000000E+00
STAAD SPACE -- PAGE NO. 4
80491645.xls 01/07/2012
MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 2)
MAXIMUMS AT NODE
X = -7.46809E-10 1
Y = -7.56631E-03 1
Z = 0.00000E+00 0
RX= 0.00000E+00 0
RY= 0.00000E+00 0
RZ= 4.38742E-05 1
X = 0.900000029E+00
Y = 0.129999999E+01
Z = 0.000000000E+00
80491645.xls 01/07/2012
X = 1.46774E-08 1
Y = -2.06744E-02 3
Z = 0.00000E+00 0
RX= 0.00000E+00 0
RY= 0.00000E+00 0
RZ= -1.19883E-04 3
X = 0.899999996E+00
Y = 0.129999999E+01
Z = 0.000000000E+00
80491645.xls 01/07/2012
STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 5
(WIND FORCE ACROSS PIPE LINE)
X = 0.900000029E+00
Y = 0.129999999E+01
Z = 0.000000000E+00
80491645.xls 01/07/2012
CENTER OF FORCE BASED ON Z FORCES ONLY (METE).
(FORCES IN NON-GLOBAL DIRECTIONS WILL INVALIDATE RESULTS)
X = 0.899999996E+00
Y = 0.129999999E+01
Z = 0.000000000E+00
80491645.xls 01/07/2012
X = 0.899999996E+00
Y = 0.129999999E+01
Z = 0.000000000E+00
80491645.xls 01/07/2012
SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE
-----------------
80491645.xls 01/07/2012
********** END OF FORCE ENVELOPE FROM INTERNAL STORAGE **********
80491645.xls 01/07/2012
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
===========================================================
B E A M N O. 2 DESIGN RESULTS
SHEAR DESIGN RESULTS AT DISTANCE d (EFFECTIVE DEPTH) FROM FACE OF THE SUPPORT
===========================================================
80491645.xls 01/07/2012
*** WARNING:LENGTH TO DEPTH RATIO FOR MEMBER 3 IS LESS THAN 2.5.
DEEP BEAM IS NOT DESIGNED. ASSUMING IT TO BE A PART OF A
CONTINUOUS BEAM AND AWAY FROM THE CRITICAL SECTION FOR
ENHANCED SHEAR, ORDINARY SHEAR CHECK IS PERFORMED.,
OTHERWISE PROVIDE ENSH AND RENSH PARAMETERS ***
STAAD SPACE -- PAGE NO. 13
===========================================================
B E A M N O. 3 DESIGN RESULTS
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 30 mm c/c @ 30 mm c/c @ 30 mm c/c @ 30 mm c/c @ 30 mm c/c
----------------------------------------------------------------------------
SHEAR DESIGN RESULTS AT DISTANCE d (EFFECTIVE DEPTH) FROM FACE OF THE SUPPORT
80491645.xls 01/07/2012
SHEAR DESIGN RESULTS AT 815.0 mm AWAY FROM START SUPPORT
VY = 1.62 MX = 0.00 LD= 23
Provide 2 Legged 8í @ 10 mm c/c
===========================================================
===========================================================
C O L U M N N O. 1 DESIGN RESULTS
80491645.xls 01/07/2012
********************END OF COLUMN DESIGN RESULTS********************
89. FINISH
************************************************************
* For questions on STAAD.Pro, please contact *
* Bentley Systems Offices at the following locations *
* *
* Telephone Web / Email *
* *
* USA: +1 (714)974-2500 *
* CANADA +1 (905)632-4771 detech@odandetech.com *
* UK +44(1454)207-000 *
* SINGAPORE +65 6225-6158 *
* EUROPE +31 23 5560560 *
* INDIA +91(033)4006-2021 *
* JAPAN +81(03)5952-6500 http://www.ctc-g.co.jp *
* CHINA +86 10 5929 7000 *
* THAILAND +66(0)2645-1018/19 partha.p@reisoftwareth.com *
* *
* Worldwide http://selectservices.bentley.com/en-US/ *
80491645.xls 01/07/2012
* *
************************************************************
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
=====================
=====================
80491645.xls 01/07/2012
=====================
80491645.xls 01/07/2012
=====================
=====================
=====================
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
60
61 Minimun Area of Shear Asv > 0.4
Reinforcement bsv 0.87fy
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
1l;knjhvfy
80491645.xls 01/07/2012
6/402
2 m)
H I J
904 mm2
2000 mm2
400
600
25 N/mm2
415 N/mm2
30 mm
20 mm
12 mm
16 mm
560 mm
564 mm
55.2 KN-m
7.6 KN-m
77.6 KN
80491645.xls 01/07/2012
6/402
2 m)
H I J
0.440 N/mm 2
80491645.xls 01/07/2012
6/402
2 m)
H I J
0.13 %
284.48 mm2
458.80 mm2
942 mm2
0.37 %
600 mm
362 mm
0.10 N/mm2
0.084 %
182.45 mm2
445 mm2
603 mm2
339 mm2
77.6 KN
0.35 N/mm2
0.37 %
0.43 N/mm2
S 456,Pg 72
100.52 mm2
226.8 mm
420 mm
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
STAAD ANALYSIS FOR
PILE FRAME
80491645.xls 01/07/2012
****************************************************
* *
* STAAD.Pro *
* Version 2007 Build 05 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= SEP 1, 2010 *
* Time= 15:50:57 *
* *
* USER ID: *
****************************************************
1. STAAD SPACE
INPUT FILE: Pile support type1(Ht 0-2m).STD
2. START JOB INFORMATION
3. ENGINEER DATE 06-AUG-10
4. END JOB INFORMATION
5. *********PILE FRAME FOR 0-2.0M HT.........
6. INPUT WIDTH 79
7. UNIT METER KN
8. JOINT COORDINATES
9. 5 -0.25 -0.500004 0; 6 2.05 -0.500004 0; 9 1.65 -3.50001 0
10. 11 0.149998 -3.50001 0; 12 0.149998 -0.500003 0; 13 1.65 -0.500003 0
11. 15 0.9 -0.500001 0
12. MEMBER INCIDENCES
13. 5 15 13; 8 13 9; 9 5 12; 10 12 11; 11 12 15; 12 13 6
14. DEFINE MATERIAL START
15. ISOTROPIC CONCRETE
16. E 2.17184E+007
17. POISSON 0.17
18. DENSITY 23.6158
19. ALPHA 5E-006
20. DAMP 0.05
21. END DEFINE MATERIAL
22. MEMBER PROPERTY INDIAN
23. 5 9 11 12 PRIS YD 0.7 ZD 0.8
24. MEMBER PROPERTY INDIAN
25. 8 10 PRIS YD 0.5
80491645.xls 01/07/2012
26. CONSTANTS
27. MATERIAL CONCRETE ALL
28. SUPPORTS
29. 9 11 FIXED
30. ****PRINT MEMBER INFORMATION ALL
31. LOAD 1 (DEAD LOAD OF FRAME)
32. SELFWEIGHT Y -1 LIST 5 8 TO 12
33. LOAD 2 LOADTYPE NONE TITLE LOAD CASE 2
34. MEMBER LOAD
35. 11 CON GY -171.66 0.75 0.75
36. *LOAD 3 LOADTYPE NONE TITLE LOAD CASE 3
37. *MEMBER LOAD
38. *11 CON GX -7.14 0.6 0.6
39. *LOAD 4 LOADTYPE NONE TITLE LOAD CASE 4
40. *MEMBER LOAD
STAAD SPACE -- PAGE NO. 2
PROBLEM STATISTICS
-----------------------------------
NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 7/ 6/ 2
80491645.xls 01/07/2012
ORIGINAL/FINAL BAND-WIDTH= 4/ 4/ 18 DOF
TOTAL PRIMARY LOAD CASES = 4, TOTAL DEGREES OF FREEDOM = 30
SIZE OF STIFFNESS MATRIX = 1 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 12.0/ 22486.4 MB
X = 0.899999548E+00
Y = -0.121658120E+01
Z = 0.000000000E+00
80491645.xls 01/07/2012
MAXIMUMS AT NODE
X = 4.96039E-07 12
Y = -1.74987E-03 15
Z = 0.00000E+00 0
RX= 0.00000E+00 0
RY= 0.00000E+00 0
RZ= -1.90209E-06 12
X = 0.899999996E+00
Y = -0.500001015E+00
Z = 0.000000000E+00
STAAD SPACE -- PAGE NO. 4
80491645.xls 01/07/2012
MAXIMUMS AT NODE
X = -1.11840E-05 13
Y = -9.71764E-03 15
Z = 4.34748E-01 15
RX= 3.01787E-03 15
RY= 5.47858E-09 15
RZ= 4.30622E-05 6
80491645.xls 01/07/2012
STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 6
LOADTYPE NONE TITLE LOAD CASE 6
80491645.xls 01/07/2012
SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE
-----------------
80491645.xls 01/07/2012
0.00 0.00 11 0.00 0.00 11 0.00 0.00 11
MIN -5.29 0.40 11 0.00 0.00 11
0.00 0.40 11 0.00 0.40 11 0.00 T 0.40 11
80491645.xls 01/07/2012
60. START CONCRETE DESIGN
61. CODE INDIAN
62. FYSEC 25000 ALL
63. MAXMAIN 25 MEMB 5 9 11 12
64. MAXSEC 16 MEMB 5 9 11 12
65. DESIGN BEAM 5 9 11 12
STAAD SPACE -- PAGE NO. 9
=============================================================
B E A M N O. 5 DESIGN RESULTS
80491645.xls 01/07/2012
REINF. 1 layer(s) 1 layer(s) 1 layer(s) 1 layer(s) 1 layer(s)
SHEAR 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í
REINF. @ 10 mm c/c @ 10 mm c/c @ 10 mm c/c @ 10 mm c/c @ 10 mm c/c
----------------------------------------------------------------------------
=============================================================
=============================================================
B E A M N O. 9 DESIGN RESULTS
80491645.xls 01/07/2012
----------------------------------------------------------------------------
SECTION 0.0 mm 100.0 mm 200.0 mm 300.0 mm 400.0 mm
----------------------------------------------------------------------------
TOP 2-10í 14-10í 14-10í 14-10í 14-10í
REINF. 1 layer(s) 1 layer(s) 1 layer(s) 1 layer(s) 1 layer(s)
=============================================================
=============================================================
B E A M N O. 11 D E S I G N R E S U L T S
80491645.xls 01/07/2012
STAAD SPACE -- PAGE NO. 11
SHEAR 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í
REINF. @ 10 mm c/c @ 10 mm c/c @ 10 mm c/c @ 10 mm c/c @ 10 mm c/c
----------------------------------------------------------------------------
=============================================================
=============================================================
B E A M N O. 12 D E S I G N R E S U L T S
80491645.xls 01/07/2012
BOTTOM 0.00 0.00 0.00 0.00 0.00
REINF. (Sq. mm) (Sq. mm) (Sq. mm) (Sq. mm) (Sq. mm)
----------------------------------------------------------------------------
=============================================================
=============================================================
C O L U M N N O. 8 DESIGN RESULTS
80491645.xls 01/07/2012
REQD. STEEL AREA : 1186.01 Sq.mm.
REQD. CONCRETE AREA: 148250.66 Sq.mm.
MAIN REINFORCEMENT : Provide 6 - 16 dia. (0.61%, 1206.37 Sq.mm.)
(Equally distributed)
TIE REINFORCEMENT : Provide 8 mm dia. circular ties @ 255 mm c/c
=============================================================
C O L U M N N O. 10 D E S I G N R E S U L T S
80491645.xls 01/07/2012
----------------------------------------------------------
Puz : 3003.85 Muz1 : 99.45 Muy1 : 99.45
71. FINISH
80491645.xls 01/07/2012
************************************************************
* For questions on STAAD.Pro, please contact *
* Bentley Systems Offices at the following locations *
* *
* Telephone Web / Email *
* *
* USA: +1 (714)974-2500 *
* CANADA +1 (905)632-4771 detech@odandetech.com *
* UK +44(1454)207-000 *
* SINGAPORE +65 6225-6158 *
* EUROPE +31 23 5560560 *
* INDIA +91(033)4006-2021 *
* JAPAN +81(03)5952-6500 http://www.ctc-g.co.jp *
* CHINA +86 10 5929 7000 *
* THAILAND +66(0)2645-1018/19 partha.p@reisoftwareth.com *
* *
* Worldwide http://selectservices.bentley.com/en-US/ *
* *
************************************************************
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
80491645.xls 01/07/2012
======================
80491645.xls 01/07/2012
======================
======================
80491645.xls 01/07/2012
======================
======================
80491645.xls 01/07/2012
======================
======================
80491645.xls 01/07/2012
======================
======================
80491645.xls 01/07/2012
======================
======================
80491645.xls 01/07/2012
======================
80491645.xls 01/07/2012
80491645.xls 01/07/2012
6/402
16
17
18 2-16 dia
19
20 Design of Pile
21 The pile frame is designed by applying the Loads which are coming from pillar frame(staad out), the Axial load (F
lateral direction (Mx) & moment in longitudinal direction (Mz) is applied in the pile frame.
21 Safe vertical carrying capacity of pile (from geo tech report pg 23/25)
22 Safe lateral carrying capacity of pile (from geo tech report pg 23/25)
23
24 Staad Output (
25
31 Required vertical capacity of pile as per staad out put =
32 Required horizantal capacity of pile as per staad out put =
33
34
35 8/125 mm c/c
36 9-12 dia
37
38
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
80491645.xls 01/07/2012
6/402
1l;knjhvfy
80491645.xls 01/07/2012
6/402
2 m)
H I J
1097 mm2
12 mm
113.04 mm2
103 mm
400 700
40 T
2.5 T
21 T
0.28 T
8/125 mm c/c
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012
6/402
2 m)
H I J
80491645.xls 01/07/2012