10'" WIDE
10'-9"
HT Line PASSAGE
RAMP RAMP
3' DOOR 44'-9"
8' SHUTTER 6' X 6' COMPONENT WASHING 8' SHUTTER 8"
AREA
TECH CHANGING
AGGREGATE
9'10" X 9'0" ROOM ACP PANNEL
6'
OH ROOM
30'
20'-10"
8'
GLASS
26'
FLOAT
WARRANTY
STORAGE
8' SHUTTER ROOM TOILET
2'
ACP PANNEL
RAMP 23'0" X 11'0"
16'0" X 20'6" 4'0" X 11'0"
1' 6" VENTILATOR
8'
GLASS
LUBE STORAGE
AREA
ACP PANNEL
23'0" X 9'2"
1'11"
RAMP 8' SHUTTER
43'-6"
PARTS WH
90'
43'6" X 53'4"
53'-4"
121'-6"
ENTIRE OPEN
AREA TO BE
PAVED
31' WIDE 6' WINDOW
RCC
PART
2'6" DOOR
RAMP 8' SHUTTER
TOILET F. TOILET
1' 6" VENTILATOR
2'6" DOOR 4' X 4' 8' X 4'
3' DOOR 3' DOOR
WH
RECEPTION IN-CHARGE
& BILLING & STAFF
DESK ROOM
19'0" X 24'2" X
14'6" 14'6"
UP
44'-9"
20'-9"
SECURITY PARKING
9'
15' WIDE
ENTRANCE
5' 31'
76'-6"
1
16'-22"
SLOPPED ROOF
6'
6' 6'
6'
5'
5'
6' WINDOW
26'
25'
SLOPPED ROOF
6'
12'
5'
10'
6' WINDOW
8' SHUTTER 8' SHUTTER 6' WIDE DOOR
8'
8'
8'
8' SHUTTER
90' *NOTE:- DRAIN PIPE LOCATION WILL BE AS PER THE STRUCTURAL DRAWINGS OF MS SHADE
SLOPPED ROOF
6' WINDOW
6' WINDOW
6' WINDOW 6' WINDOW
31'
121'-6"
6' WINDOW
6' WINDOW 6' WINDOW
SERVER ROOM
9'0" X 8'0" 6' HT. STEP 6' HT. STEP
6' HT. STEP
6' HT. STEP 6' HT. STEP
6' HT. STEP 6' HT. STEP 6' HT. STEP
RECORD ROOM
9'0" X 9'0" 5' WIDE
PASSAGE
33'-2"
76'-6"