Sample DAR - 06-16-20

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 17

DAILY ACTIVITY REPORT Chart TitleTitle

Chart
Weather Chart: 11:00 PM 12:00 AM
Project Title: Upgrading of Jct. National-Bua-Bulala-Macabenga Road Legend: 10:00 PM 01:00 AM
02:00 AM
9:00 PM
Sunny 8:00 PM
03:00 AM

Fair 04:00 AM
7:00 PM
Location: Kasibu, Nueva Vizcaya Cloudy 05:00 AM
6:00 PM
Rain Shower
Rainy 5:00 PM
Day: Tuesday Date: June 16, 2020
Heavy Rain 4:00 PM

Work from 6:00 (AM/PM) Stormy


Contract No.
Shift: to 3:00 (AM/PM)

WORK ACCOMPLISHED/ACTIVITIES

Item No. Description of Works Unit Quantity Remarks / Station

Relocate signages - Sta. 272+130


Leveling of Aggregate Subbase Coarse -
-
-
-
-
-

MANPOWER
Manhours
No. Description Remarks
No. Regular Hrs. OT Hrs.
1 Project Manager 1 4 0
2 Cost Control Engineer/QS 1 8 0
3 Site Supervisor 0 0 0
4 HR/Admin 0 0 0
5 Warehouseman 0 0 0
6 Surveyor (common) 1 4 0
7 Instrument Man (common) 1 4 0
8 Survey Aide (common) 0 0 0
9 Buyer (common) 0 0 0
10 Maintenance Supervisor (common) 0 0 0
11 Maintenance Planner (common) 0 0 0
12 Foreman 1 8 0
13 H.E. Mechanic 1 8 0
14 H.E. Helper Mechanic 1 8 0
15 Welder 1 8 0
16 Tireman 1 8 0
17 Excavator Operator 2 16 0
18 Dozer Operator 0 0 0
19 DT Driver 3 24 0
20 Fuel Truck Driver 1 8 0
21 Skilled Workers 9 72 0
22 Unskilled Workers 6 48 0
23 Watchman 1 8 3
TOTAL 31 236 3

MATERIAL AND CONSUMABLES

Item No. Work Description Material Description Unit Qnty Remarks

1
2
3

EQUIPMENT USED
Equipment SMR
No. Description Total Oprtnl Hrs. Fuel Consumption Fuel Burn Location Status / Remarks / Activities
Body No. from to (Ltr / hr)
1 Service Vehicle SUV-190 - - - - Service Vehicle on Site
2 Service Vehicle XXX-020 - - - Service Vehicle for Engineers
3 20T Hydraulic Excavator HEX-254 - - Standby
4 20T Hydraulic Excavator HEX-257 - Defective - Standby

5 20T Hydraulic Excavator HEX-014 - - Standby

6 Wheel Loader WHL-102 - - Standby


7 20T Dumptruck ORD-197 - - Breakdown
8 20T Dumptruck ORD-122 - - Standby
9 20T Dumptruck ORD-162 - - Standby
10 20T Dumptruck ORD-120 - - Breakdown
11 20T Dumptruck ORD-140 - - Standby
12 20T Dumptruck ORD-148 - - Standby

Page 1 of 17
DAILY ACTIVITY REPORT Chart TitleTitle
Chart
Weather Chart: 11:00 PM 12:00 AM
Project Title: Upgrading of Jct. National-Bua-Bulala-Macabenga Road Legend: 10:00 PM 01:00 AM
02:00 AM
9:00 PM
Sunny 8:00 PM
03:00 AM

Fair 04:00 AM
7:00 PM
Location: Kasibu, Nueva Vizcaya Cloudy 05:00 AM
6:00 PM
Rain Shower
Rainy 5:00 PM
Day: Tuesday Date: June 16, 2020
Heavy Rain 4:00 PM

Work from 6:00 (AM/PM) Stormy


Contract No.
Shift: to 3:00 (AM/PM)
13 Road Grader RMG-001 - - Breakdown
14 Compactor VSC-004 - - Standby

15 3T Boom Truck SBT-055 - - Standby

16 Transit Mixer TMT - 006 - Defective - Standby


17 Transit Mixer TMT - 022 - Defective - Breakdown
18 Transit Mixer 531 - Defective - Standby
19 Transit Mixer TMT - 005 - Defective - Standby
20 Fuel Truck SFT-021 - - - - Standby
TOTAL 0.00
Notes: SMR of equipment is preferable unless it is defective.

NOTES / ISSUES / REMARKS

1 Reconciliation of accomplished quantities as per submitted stake plan

2 Need urgent delivery of Metal Beam End Piece

3 Breakdown of Units (On Road Dumptruck, Grader and Transit Mixer)


NOTE: USE ADDITIONAL SHEET(S) IF NECESSARY

Prepared by: Reviewed by: Noted by:

Ruel Jan C. Apigo Joseph C. Guiyab


CCE/QS Construction Manager Project Manager

Copy
Document Controller
received:

Page 2 of 17
ACTIVITY DESCRIPTION PHOTOS

Relocate signages

Leveling of Aggregate
Subbase Coarse
ACTIVITY DESCRIPTION PHOTOS
ACTUAL SITE CONDITION
UNPASSABLE WORKING AREA
ACTUAL, % 99.70%
PLANNED, % 99.11%
VAR, % 0.59%
Project: Upgrading of Jct. National-Bua-Bulala-Macabenga Road
Location: Kasibu, Nueva Vizcaya
Client: Provincial Engineering Office - Province of Nueva Vizcaya

SUMMARY DAILY ACCOMPLISHMENT REPORT


Accomplishment as of: 16-Jun-20

Accomplishment (To Date) Percentage % (To Date)


Item No. Description Contract Amount Variance (%) Remarks
Planned Actual Planned Actual
Part A FACILITIES FOR THE ENGINEERS 433,393.37 778,449.32 433,393.37 1.95% 100.00% 98.05%
Part B OTHER GENERAL REQUIREMENTS 518,534.50 417,261.82 494,431.33 1.04% 95.35% 94.31%
Part C EARTHWORKS 5,097,986.51 4,095,463.57 5,097,986.51 10.25% 100.00% 89.75%
Part D SUBBASE AND BASE COURSE 7,537,525.88 4,656,256.02 7,537,525.88 11.65% 100.00% 88.35%
Part E SURFACE COURSE 17,751,972.76 18,351,016.21 17,751,972.76 45.91% 100.00% 54.09%
Part G DRAINAGE AND SLOPE PROTECTION 3,613,338.19 4,737,052.52 3,613,338.19 11.85% 100.00% 88.15%
Part H MISCELLANEOUS STRUCTURES 5,021,139.52 6,584,105.01 4,924,937.95 16.47% 98.08% 81.61%
TOTAL 39,973,890.73 39,619,604.47 39,853,585.99 99.11% 99.70% 0.59%
DAILY ACCOMPLISHMENT REPORT
Accomplishment as of: 16-Jun-20

Project: Upgrading of Jct. National-Bua-Bulala-Macabenga Road


Location: Kasibu, Nueva Vizcaya
Client: Provincial Engineering Office - Province of Nueva Vizcaya
Contract Amount TO-DATE PREVIOUS TODAY REMAINING WORKS
Cost Code Description of Work Unit
Quantity Unit Price Amount Quantity Amount % Comp. Quantity Amount % Comp. Quantity Amount % Comp. Quantity Amount
PART A FACILITIES FOR THE ENGINEERS

A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) month 4.85 6,142.50 29,791.13 4.85 29,791.13 100.00% 4.85 29,791.13 100.00% - - 0.00% - -
Provision of 4x4 Pick Up Type Service Vehicle for the Engineer on Bare
A.1.2(2) Rental Basis month 4.85 83,216.96 403,602.24 4.85 403,602.24 100.00% 4.85 403,602.24 100.00% - - 0.00% - -

Subtotal for PART A 433,393.37 433,393.37 100.00% 433,393.37 100.00% - 0.00% -

PART B OTHER GENERAL REQUIREMENTS

B.4(1) Construction Survey and Staking km 1.95 37,234.09 72,684.67 1.95 72,684.67 100.00% 1.95 72,684.67 100.00% - - 0.00% - -

B.5 Project Billboard / Signboard ea. 2.00 6,317.62 12,635.25 2.00 12,635.25 100.00% 2.00 12,635.25 100.00% - - 0.00% - -

B.7 Construction Safety and Health lot 1.00 25,737.08 25,737.08 1.00 25,737.08 100.00% 1.00 25,737.08 100.00% - - 0.00% - -

B.8 Traffic Management month 4.85 50,200.37 243,471.78 4.85 243,471.78 100.00% 4.85 243,471.78 100.00% - - 0.00% - -

B.9 Mobilization / Demobilization LS 1.00 160,687.80 160,687.80 0.85 136,584.63 85.00% 0.85 136,584.63 85.00% - - 0.00% 0.15 24,103.17

B.12 Removal and Relocation of Utilities LS 1.00 3,317.92 3,317.92 1.00 3,317.92 100.00% 1.00 3,317.92 100.00% - - 0.00% - -

Subtotal for PART B 518,534.50 494,431.33 95.35% 139,902.55 26.98% - 0.00% 24,103.17

PART C EARTHWORKS

100(2) Clearing & Grubbing LS 1.00 321.08 321.08 1.00 321.08 100.00% 1.00 321.08 100.00% - - 0.00% - -

100(3)a1 Individual Removal of Trees (small a, 150-300mm Ø) ea. 33.00 1,315.47 43,410.63 33.00 43,410.63 100.00% 33.00 43,410.63 100.00% - - 0.00% - -

100(3)a2 Individual Removal of Trees (small b, 301-500mm Ø) ea. 3.00 3,737.58 11,212.73 3.00 11,212.73 100.00% 3.00 11,212.73 100.00% - - 0.00% - -

100(3)a3 Individual Removal of Trees (small b, 501-750mm Ø) ea. 1.00 27,510.83 27,510.83 1.00 27,510.83 100.00% 1.00 27,510.83 100.00% - - 0.00% - -

101(1) Removal of Structures and Obstruction LS 1.00 4,461.08 4,461.08 1.00 4,461.08 100.00% 1.00 4,461.08 100.00% - - 0.00% - -

101(4)a1 Removal of Actual Structures/Obstruction - 610mm Ø RCPC l.m. 46.00 521.61 23,994.29 46.00 23,994.29 100.00% 46.00 23,994.29 100.00% - - 0.00% - -

102(2) Surplus Common Excavation m3 18,567.60 214.27 3,978,563.38 18,567.60 3,978,563.38 100.00% 18,567.60 3,978,563.38 100.00% - - 0.00% - -

103(1)a Structure Excavation (Common Soil) m3 527.98 416.03 219,656.32 527.98 219,656.32 100.00% 527.98 219,656.32 100.00% - - 0.00% - -

103(6)a Pipe Culverts and Drain Excavation (Common soil) m3 298.04 412.65 122,987.14 298.04 122,987.14 100.00% 298.04 122,987.14 100.00% - - 0.00% - -

104(1)a Embankment from Roadway Excavation (Common Soil) m3 1,208.98 304.84 368,539.81 1,208.98 368,539.81 100.00% 1,208.98 368,539.81 100.00% - - 0.00% - -

105(1)a Subgrade Preparation (Common Material) m2 15,690.28 18.95 297,329.22 15,690.28 297,329.22 100.00% 15,690.28 297,329.22 100.00% - - 0.00% - -

Subtotal for PART C 5,097,986.51 5,097,986.51 100.00% 665,869.03 13.06% - 0.00% -

PART D SUBBASE AND BASE COURSE

200(1) Aggregate Subbase Course m3 3,603.74 2,091.58 7,537,525.88 3,603.74 7,537,525.88 100.00% 3,603.74 7,537,525.88 100.00% - - 0.00% - -

Subtotal for PART D 7,537,525.88 7,537,525.88 100.00% 7,537,525.88 100.00% - 0.00% -

PART E SURFACE COURSE

311(1)b Portland Cement Concrete Pavement (Unreinforced) - 0.20m thick m2 11,642.16 1,524.80 17,751,972.76 11,642.16 17,751,972.76 100.00% 11,642.16 17,751,972.76 100.00% - - 0.00% - -

Subtotal for PART E 17,751,972.76 17,751,972.76 100.00% 17,751,972.76 100.00% - 0.00% -

PART G DRAINAGE AND SLOPE PROTECTION

500(1)c Pipe Culverts, 910mm dia. (36" Ø) l.m. 79.00 6,359.18 502,375.44 79.00 502,375.44 100.00% 79.00 502,375.44 100.00% - - 0.00% - -
Removing, Cleaning, and Re-laying Salvaged Culvert Pipe (36" diam) -
504(2)c 910mm l.m. 19.00 3,091.45 58,737.48 19.00 58,737.48 100.00% 19.00 58,737.48 100.00% - - 0.00% - -

506(1) Stone Masonry m3 507.15 6,018.39 3,052,225.27 507.15 3,052,225.27 100.00% 507.15 3,052,225.27 100.00% - - 0.00% - -

Subtotal for PART G 3,613,338.19 3,613,338.19 100.00% 3,110,962.75 86.10% - 0.00% -

PART H MISCELLANEOUS STRUCTURES

603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam l.m. 619.00 3,677.08 2,276,110.04 619.00 2,276,110.04 100.00% 619.00 2,276,110.04 100.00% - - 0.00% - -

603(4)b Metal Beam End Piece ea. 40.00 1,761.61 70,464.38 14.00 24,662.53 35.00% 14.00 24,662.53 35.00% - - 0.00% 26.00 45,801.85

605(1)c1 Warning Signs - Horizontal Alignment Curve (60cm Triangle) ea. 17.00 8,399.95 142,799.23 17.00 142,799.23 100.00% 17.00 142,799.23 100.00% - - 0.00% - -

605(1)d1 Warning Signs - Horizontal Alignment Reverse Curve (60cm Triangle) ea. 3.00 8,399.95 25,199.86 - - 0.00% - - 0.00% - - 0.00% 3.00 25,199.86

605(1)e1 Warning Signs - Horizontal Alignment Winding Road (60cm Triangle) ea. 1.00 8,399.95 8,399.95 1.00 8,399.95 100.00% 1.00 8,399.95 100.00% - - 0.00% - -

Warning Signs Intersection and Junction Signs


605(1)k2 Y - Junction (60cm Triangle) ea. 1.00 8,399.95 8,399.95 1.00 8,399.95 100.00% 1.00 8,399.95 100.00% - - 0.00% - -

605(1)l2 Warning Signs Road Width Sign Narrow Bridge (60cm Triangle) ea. 3.00 8,399.95 25,199.86 - - 0.00% - - 0.00% - - 0.00% 3.00 25,199.86

612(1) Reflectorized Thermoplastic Pavement Markings (White) m2 488.52 879.41 429,608.14 488.52 429,608.14 100.00% 488.52 429,608.14 100.00% - - 0.00% - -

620(1)a1 Chevron Signs (450mm x 600mm) ea. 108.00 18,842.20 2,034,958.11 108.00 2,034,958.11 100.00% 108.00 2,034,958.11 100.00% - - 0.00% - -

Subtotal for PART H 5,021,139.52 4,924,937.95 98.08% 2,464,566.25 49.08% - 0.00% -

GRAND TOTAL (VAT INCLUSIVE) 39,973,890.73 39,853,585.99 99.70% 39,853,585.99 99.70% - 0.00% 120,304.74

Page 7 of 17
Project: Upgrading of Jct. National-Bua-Bulala-Macabenga Road 100.00% 170.09 40
Location: Kasibu, Nueva Vizcaya 100.000% 54.68 254.06
Client: Provincial Engineering Office - Province of Nueva Vizcaya 100.00% 838.34
QUANTITY VERIFICATION AND RECONCILIATION
ITEM DESCRIPTION OF WORKS UNIT CONTRACT PREVIOUS TODAY TO-DATE ADVANCE/V.O ACTUAL
PART A FACILITIES FOR THE ENGINEERS
Provision of Field Office for the Engineer (Rental
A.1.1(8) month 4.85 4.85 - 4.85 - 6.20
Basis)
Provision of 4x4 Pick Up Type Service Vehicle for the
A.1.2(2) month 4.85 4.85 - 4.85 -
Engineer on Bare Rental Basis
PART B OTHER GENERAL REQUIREMENTS -
B.4(1) Construction Survey and Staking km 1.95 1.95 - 1.95 -
B.5 Project Billboard / Signboard ea. 2.00 2.00 - 2.00 -
B.7 Construction Safety and Health lot 1.00 1.00 - 1.00 -
B.8 Traffic Management month 4.85 4.85 - 4.85 -
B.9 Mobilization / Demobilization LS 1.00 0.85 - 0.85 (0.15)
B.12 Removal and Relocation of Utilities LS 1.00 1.00 - 1.00 -
PART C EARTHWORKS -
100(2) Clearing & Grubbing LS 1.00 1.00 - 1.00 -

100(3)a1 Individual Removal of Trees (small a, 150-300mm Ø) ea. 33.00 33.00 - 33.00 -

100(3)a2 Individual Removal of Trees (small b, 301-500mm Ø) ea. 3.00 3.00 - 3.00 -

100(3)a3 Individual Removal of Trees (small b, 501-750mm Ø) ea. 1.00 1.00 - 1.00 -

101(1) Removal of Structures and Obstruction LS 1.00 1.00 - 1.00 -


Removal of Actual Structures/Obstruction - 610mm
101(4)a1 l.m. 46.00 46.00 - 46.00 - 46.00
Ø RCPC
102(2) Surplus Common Excavation m3 18,567.60 18,567.60 - 18,567.60 - 19,095.04
103(1)a Structure Excavation (Common Soil) m3 527.98 527.98 - 527.98 - 743.58
103(6)a Pipe Culverts and Drain Excavation (Common soil) m3 298.04 298.04 - 298.04 - 213.40
Embankment from Roadway Excavation (Common
104(1)a m3 1,208.98 1,208.98 - 1,208.98 - 1,208.98
Soil)
105(1)a Subgrade Preparation (Common Material) m2 15,690.28 15,690.28 - 15,690.28 -
PART D SUBBASE AND BASE COURSE -
200(1) Aggregate Subbase Course m3 3,603.74 3,603.74 - 3,603.74 - 2,640.65
PART E SURFACE COURSE -
Portland Cement Concrete Pavement (Unreinforced)
311(1)b m2 11,642.16 11,642.16 - 11,642.16 - 11,660.76
- 0.20m thick
PART G DRAINAGE AND SLOPE PROTECTION -
500(1)c Pipe Culverts, 910mm dia. (36" Ø) l.m. 79.00 79.00 - 79.00 - 79.00
Removing, Cleaning, and Re-laying Salvaged Culvert
504(2)c l.m. 19.00 19.00 - 19.00 - 26.00
Pipe (36" diam) - 910mm
506(1) Stone Masonry m3 507.15 507.15 - 507.15 - 501.64
PART H MISCELLANEOUS STRUCTURES -
Metal Guardrail (Metal Beam) including Post, W-
603(3)a1 l.m. 619.00 619.00 - 619.00 -
Beam
603(4)b Metal Beam End Piece ea. 40.00 14.00 - 14.00 (26.00)
Warning Signs - Horizontal Alignment Curve (60cm
605(1)c1 ea. 17.00 17.00 - 17.00 -
Triangle)
Warning Signs - Horizontal Alignment Reverse Curve
605(1)d1 ea. 3.00 (3.00)
(60cm Triangle)
Warning Signs - Horizontal Alignment Winding Road
605(1)e1 ea. 1.00 1.00 - 1.00 -
(60cm Triangle)
Warning Signs Intersection and Junction Signs
605(1)k2 ea. 1.00 1.00 - 1.00 -
Y - Junction (60cm Triangle)
Warning Signs Road Width Sign Narrow Bridge
605(1)l2 ea. 3.00 (3.00)
(60cm Triangle)
Reflectorized Thermoplastic Pavement Markings
612(1) m2 488.52 488.52 - 488.52 -
(White)
620(1)a1 Chevron Signs (450mm x 600mm) ea. 108.00 108.00 - 108.00 -
102(2)

LOCATION DISTANCE Surplus Common Excavation Average Area

Cut Fill Cut Fill

SITE-1
Sta 272+140.00 - 7.754 - 7.754 -
Sta 272+160.00 20.00 4.086 - 5.920 -
Sta 272+180.00 20.00 4.700 - 4.393 -
Sta 272+200.00 20.00 5.712 - 5.206 -
Sta 272+220.00 20.00 7.364 - 6.538 -
Sta 272+240.00 20.00 11.746 - 9.555 -
Sta 272+260.00 20.00 9.595 - 10.671 -
Sta 272+280.00 20.00 8.889 - 9.242 -
Sta 272+300.00 20.00 4.885 - 6.887 -
Sta 272+320.00 20.00 4.264 - 4.575 -
Sta 272+340.00 20.00 5.107 - 4.686 -
Sta 272+360.00 20.00 2.665 - 3.886 -
Sta 272+380.00 20.00 5.298 - 3.982 -
Sta 272+400.00 20.00 7.800 - 6.549 -
Sta 272+420.00 20.00 9.166 8.483
Sta 272+440.00 20.00 9.726 9.446
Sta 272+460.00 20.00 6.820 8.273
Sta 272+480.00 20.00 3.401 5.111
Sta 272+500.00 20.00 1.526 2.464
Sta 272+510.30 10.30
Sta 272+520.00 9.70 0.634 1.080
Sta 272+540.00 20.00 6.226 3.430
Sta 272+560.00 20.00 5.132 5.679
Sta 272+566.80 6.80
Sta 272+580.00 13.20 7.256 6.194
Sta 272+600.00 20.00 5.849 6.553
Sta 272+620.00 20.00 2.943 4.396
Sta 272+640.00 20.00 12.252 7.598
Sta 272+660.00 20.00 5.306 8.779
Sta 272+662.80 2.80
Sta 272+680.00 17.20 8.010 6.658
Sta 272+700.00 20.00 13.472 10.741
Sta 272+720.00 20.00 5.455 9.464
2) 104(1)a

Volume Embankment from Roadway Average Area Volume


Excavation (Common Soil)

Cut Fill Cut Fill Cut Fill Cut

- - - 0.120 - 0.120 -
118.400 - - - - 0.060 -
87.860 - - 0.014 - 0.007 -
104.120 - - 0.082 - 0.048 -
130.760 - - - - 0.041 -
191.100 - - - - - -
213.410 - - - - - -
184.840 - - - - - -
137.740 - - - - - -
91.490 - - 0.038 - 0.019 -
93.710 - - - - 0.019 -
77.720 - - 0.425 - 0.213 -
79.630 - - 0.062 - 0.244 -
130.980 - - - - 0.031 -
169.660 -
188.920 - -
165.460 - -
102.210 0.239 0.120
49.270 0.176 0.208
9.430 4.803
10.476 1.466 5.448
68.600 0.205 0.836
113.580 0.028 0.116
9.621 4.825
81.761 0.099 4.860
131.050 1.161 0.630
87.920 0.037 0.599
151.950 0.116 0.077
175.580 0.114 0.115
9.135 4.625
114.518 - 4.568
214.820 - -
189.270 0.018 0.009
3,656.804 site 1 PEO
Volume REMARKS

Fill

-
1.200 0.60
0.140 0.07
0.960 0.48
0.820 0.41
-
-
-
-
0.380 0.19
0.380 0.19
4.250 2.13
4.870 4.06
0.620
-
-
-
2.390
4.150
49.471 24.74
52.846
16.710 45.20
2.330
32.807 16.40
64.152 41.14
12.600
11.980
1.530
2.300
12.949 6.47
78.561
-
0.180
358.575 W/ STONE MASONRY
87.000 W/O STONE MASONRY every 20m
102(2)

LOCATION DISTANCE Surplus Common Excavation Average Area

Cut Fill Cut Fill

SITE-1
Sta 272+140.00 - 7.754 - 7.754 -
Sta 272+160.00 20.00 4.086 - 5.920 -
Sta 272+180.00 20.00 4.700 - 4.393 -
Sta 272+200.00 20.00 5.712 - 5.206 -
Sta 272+220.00 20.00 7.364 - 6.538 -
Sta 272+240.00 20.00 11.746 - 9.555 -
Sta 272+260.00 20.00 9.595 - 10.671 -
Sta 272+280.00 20.00 8.889 - 9.242 -
Sta 272+300.00 20.00 4.885 - 6.887 -
Sta 272+320.00 20.00 4.264 - 4.575 -
Sta 272+340.00 20.00 5.107 - 4.686 -
Sta 272+360.00 20.00 2.665 - 3.886 -
Sta 272+380.00 20.00 5.298 - 3.982 -
Sta 272+400.00 20.00 7.800 - 6.549 -
Sta 272+420.00 20.00 9.166 8.483
Sta 272+440.00 20.00 9.726 9.446
Sta 272+460.00 20.00 6.820 8.273
Sta 272+480.00 20.00 3.401 5.111
Sta 272+500.00 20.00 1.526 2.464
Sta 272+520.00 20.00 0.634 1.080
Sta 272+540.00 20.00 6.226 3.430
Sta 272+560.00 20.00 5.132 5.679
Sta 272+580.00 20.00 7.256 6.194
Sta 272+600.00 20.00 5.849 6.553
Sta 272+620.00 20.00 2.943 4.396
Sta 272+640.00 20.00 12.252 7.598
Sta 272+660.00 20.00 5.306 8.779
Sta 272+680.00 20.00 8.010 6.658
Sta 272+700.00 20.00 13.472 10.741
Sta 272+720.00 20.00 5.455 9.464
2) 104(1)a

Volume Embankment from Roadway Average Area Volume


Excavation (Common Soil)

Cut Fill Cut Fill Cut Fill Cut

- - - - - - -
118.400 - - 0.520 - 0.260 -
87.860 - - 0.435 - 0.478 -
104.120 - - 0.122 - 0.278 -
130.760 - - - - 0.061 -
191.100 - - - - - -
213.410 - - - - - -
184.840 - - - - - -
137.740 - - - - - -
91.490 - - 0.030 - 0.015 -
93.710 - - 0.120 - 0.075 -
77.720 - - 0.077 - 0.099 -
79.630 - - - - 0.039 -
130.980 - - - - - -
169.660 0.170
188.920 - 0.085
165.460 0.024 0.012
102.210 0.274 0.149
49.270 1.536 0.905
21.600 - 0.768
68.600 1.073 0.537
113.580 0.471 0.772
123.880 0.040 0.256
131.050 1.280 0.660
87.920 0.184 0.732
151.950 - 0.092
175.580 0.043 0.022
133.160 - 0.022
214.820 - -
189.270 - -
3,728.690
Volume REMARKS

Fill

-
5.200
9.550
5.570
1.220
-
-
-
-
0.300
1.500
1.970
0.770
-
-
1.700
0.240
2.980
18.100
15.360
10.730
15.440
5.110
13.200
14.640
1.840
0.430
0.430
-
-
126.280
Project ID 8000-000-1-1-08-001-001-053

Project Upgrading of Jct. National-Bua-Bulala-Macabenga Road


Scope Road Construction EOT sept - nov dec - jan 16
Subject Program of Work weather 17.00 20.00
Location Kasibu, Nueva Vizcaya total 60.00

OUTPUT FEBRUARY 2020


ITEM NO. DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT REL. WT. % DURATION DATE START DATE FINISHED
PER HOUR ###
UPGRADING OF JCT. NATIONAL-BUA-BULALA-MACABENGA ROAD 196.00 12-Sep-19 25-Mar-20 ###
PART A FACILITIES FOR THE ENGINEERS 60.00
A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) month 6.33 4,500.00 28,485.00 0.09% 188.00 20-Sep-19 25-Mar-20 ###

A.1.2(2) Provision of 4x4 Pick Up Type Service Vehicle for the Engineer month 6.33 89,284.74 565,172.40 1.85% 185.00 23-Sep-19 25-Mar-20 ###

A Subtotal for PART A 593,657.40 1.95% ###

PART B OTHER GENERAL REQUIREMENTS


B.4(1) Construction Survey and Staking km 1.9511 18,769.57 36,621.31 0.12% 185.00 23-Sep-19 25-Mar-20 ###

B.5 Project Billboard / Signboard ea. 2.00 5,278.64 10,557.28 0.03% 1.00 181.00 27-Sep-19 25-Mar-20 ###

B.7 Construction Safety and Health lot 1.00 26,680.00 26,680.00 0.09% 181.00 17-Sep-19 15-Mar-20 ###

B.8 Traffic Management month 6.33 30,727.04 194,502.16 0.64% 181.00 27-Sep-19 25-Mar-20 ###

B.9 Mobilization LS 1.00 17,655.41 17,655.41 0.06% 15.00 14-Sep-19 28-Sep-19


B.9 Demobilization LS 1.00 17,655.41 17,655.41 0.06% 42.00 19-Feb-20 17-Mar-20
B Subtotal for PART B 303,671.57 0.9961% ###
PART C EARTHWORKS
100(2) Clearing & Grubbing (with Stripping) ha. 0.00024 254,189.55 61.01 0.00% 10.00 20-Sep-19 29-Sep-19
100(3)a1 Individual Removal of Trees (small a, 150-300mm Ø) ea. 11.00 1,049.32 11,542.48 0.04% 3.00 8.00 26-Sep-19 03-Oct-19
100(3)a2 Individual Removal of Trees (small b, 301-500mm Ø) ea. 4.00 3,007.95 12,031.80 0.04% 1.00 2.00 01-Oct-19 02-Oct-19
101(1) Removal of Structures and Obstruction LS 1.00 3,647.07 3,647.07 0.01% 1.00 3.00 01-Oct-19 03-Oct-19
101(4)a1 Removal of Actual Structures/Obstruction - 610mm Ø RCPC l.m. 16.00 544.80 8,716.75 0.03% 6.00 2.00 10-Oct-19 11-Oct-19
101(6) Removal of Structures and Obstruction - Concrete m3 0.62 530.74 329.06 0.00% 10-Oct-19 11-Oct-19
102(2) Surplus Common Excavation m3 695.56 230.97 160,652.02 0.53% 80.00 38.00 30-Sep-19 06-Nov-19
103(1)a Structure Excavation (Common Soil) m3 1,385.20 418.07 579,113.20 1.90% 20.00 12.00 14-Oct-19 25-Oct-19
103(6)a Pipe Culverts and Drain Excavation (Common soil) m3 21.17 418.07 8,850.58 0.03% 20.00 20.00 04-Nov-19 11-Nov-19
104(1)a Embankment from Roadway Excavation (Common Soil) m3 7,805.11 345.35 2,695,533.58 8.84% 20.00 29.00 29-Oct-19 17-Nov-19
105(1)a Subgrade Preparation (Common Material) m2 15,828.06 22.40 354,489.58 1.16% 300.00 157.00 24-Oct-19 12-Mar-20 ###

C Subtotal for PART C 3,834,967.13 12.58% ###


RIVER QUARRYING ACTIVITIES
PART D AGGREATE SUBBASE COURSE
200(1) Aggregate Subbase Course m3 4,329.82 705.93 3,056,539.66 10.03% 50.00 147.00 25-Nov-19 23-Mar-20 ###

D Subtotal for PART D 3,056,539.66 10.026% ###


PART E SURFACE COURSE
311(1)b Portland Cement Concrete Pavement (Unreinforced) - 0.20m thick m2 11,901.59 1,181.47 14,061,389.03 46.13% 80.50 110.00 19-Dec-19 23-Mar-20 ###

E Subtotal for PART E 14,061,389.03 46.13% ###


PART G DRAINAGE AND SLOPE PROTECTION
500(1)c Pipe Culverts, 910mm dia. (36" Ø) l.m. 79.00 6,359.18 502,375.44 1.65% 1.00 88.00 25-Nov-19 20-Feb-20 ###

Removing/Cleaning,& Re-laying Salvaged Culvert Pipe (36") -


504(2)c l.m. 19.00 3,091.45 58,737.48 0.19% 1.00 53.00 25-Nov-19 13-Jan-20
910mm
506(1) Stone Masonry m3 507.15 6,018.39 3,052,225.27 10.01% 2.00 111.00 25-Nov-19 14-Mar-20 ###

G Subtotal for PART G 3,613,338.19 11.85% ###


PART H MISCELLANEOUS STRUCTURES
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam l.m. 619.00 3,677.08 2,276,110.04 7.47% 4.20 17.00 26-May-20 11-Jun-20
603(4)b Metal Beam End Piece ea. 40.00 1,761.61 70,464.38 0.23% 6.00 2.00 13-Jun-20 14-Jun-20
605(1)c1 Warning Signs - Horizontal Alignment Curve (60cm Triangle) ea. 17.00 8,399.95 142,799.23 0.47% 1.00 7.00 08-Jun-20 14-Jun-20
605(1)d1 Warning Signs - Horizontal Alignment Reverse Curve (60cm Triangle) ea. 3.00 8,399.95 25,199.86 0.08% 1.00 2.00 10-Jun-20 11-Jun-20
605(1)e1 Warning Signs - Horizontal Alignment Winding Road (60cm Triangle) ea. 1.00 8,399.95 8,399.95 0.03% 1.00 1.00 11-Jun-20 11-Jun-20
605(1)k2 Warning Signs Intersection/Junction Y - Junction (60cm Triangle) ea. 1.00 8,399.95 8,399.95 0.03% 1.00 1.00 10-Jun-20 10-Jun-20
605(1)l2 Warning Signs Road Width Sign Narrow Bridge (60cm Triangle) ea. 3.00 8,399.95 25,199.86 0.08% 1.00 1.00 09-Jun-20 09-Jun-20
612(1) Reflectorized Thermoplastic Pavement Markings (White) m2 488.52 879.41 429,608.14 1.41% 20.00 16.00 26-May-20 10-Jun-20
620(1)a1 Chevron Signs (450mm x 600mm) ea. 108.00 18,842.20 2,034,958.11 6.68% 1.00 21.00 25-May-20 14-Jun-20
H Subtotal for PART H 5,021,139.52 16.47% Daily ###
Cumulative

TOTAL AMOUNT 30,484,702.50 100.00% ###

FORECASTED WEEKLY ACCOMPLISMENT###


CUMMULATIVE FORECASTED WEEKLY ACCOMPLISMENT
###
Project: Upgrading of Jct. National - Bua - Bulala - Macabenga Road
Location: Kasibu, Nueva Vizcaya
Subject: Weekly Monitoring Rev. 2 ( Catch Up Plan)

Weekly Accomplishment Cummulative


Week Planned Actual Planned Actual Slippage
Sept. 12 - Sept. 15 1 0.03% 0.03% 0.03% 0.03% 0.00%
Sept. 16 - Sept. 22 2 0.098% 0.64% 0.125% 0.66% 0.54%
Sept. 23 - Sept. 29 3 0.213% 0.73% 0.338% 1.39% 1.05%
Sept. 30 - Oct. 06 4 2.247% 0.82% 2.585% 2.20% -0.38%
Oct. 07 -Oct. 13 5 2.112% 1.73% 4.697% 3.93% -0.77%
Oct. 14 - Oct. 20 6 2.631% 3.35% 7.328% 7.28% -0.05%
Oct. 21 - Oct. 27 7 2.110% 2.82% 9.438% 10.10% 0.66%
Oct. 28 - Nov 03 8 2.769% 0.37% 12.206% 10.47% -1.74%
Nov 04 - Nov 10 9 0.448% 0.26% 12.654% 10.73% -1.93%
Nov. 11 - Nov. 17 10 0.140% 2.38% 12.795% 13.11% 0.31%
Nov. 18 - Nov. 24 11 0.140% 1.30% 12.935% 14.41% 1.47%
Nov. 25 - Dec. 01 12 2.389% 1.91% 15.324% 16.32% 0.99%
Dec. 02 - Dec. 08 13 3.186% 1.38% 18.510% 17.70% -0.81%
Dec. 09 - Dec. 15 14 7.834% 26.344%
Dec. 16 - Dec. 22 15 8.292% 34.636%
Dec. 23 - Dec. 29 16 9.647% 44.283%
Dec. 30 - Jan. 05 17 9.647% 53.930%
Jan. 06 - Jan. 12 18 9.501% 63.431%
Jan. 13 - Jan. 19 19 8.416% 71.847%
Jan. 20 - Jan. 26 20 8.274% 80.122%
Jan. 27 - Feb. 02 21 9.234% 89.356%
Feb. 03 - Feb. 09 22 6.841% 96.197%
Feb. 10 - Feb. 16 23 2.694% 98.892%
Feb. 17 - Feb. 23 24 1.108% 100%