Sample DAR - 06-16-20
Sample DAR - 06-16-20
Sample DAR - 06-16-20
Chart
Weather Chart: 11:00 PM 12:00 AM
Project Title: Upgrading of Jct. National-Bua-Bulala-Macabenga Road Legend: 10:00 PM 01:00 AM
02:00 AM
9:00 PM
Sunny 8:00 PM
03:00 AM
Fair 04:00 AM
7:00 PM
Location: Kasibu, Nueva Vizcaya Cloudy 05:00 AM
6:00 PM
Rain Shower
Rainy 5:00 PM
Day: Tuesday Date: June 16, 2020
Heavy Rain 4:00 PM
WORK ACCOMPLISHED/ACTIVITIES
MANPOWER
Manhours
No. Description Remarks
No. Regular Hrs. OT Hrs.
1 Project Manager 1 4 0
2 Cost Control Engineer/QS 1 8 0
3 Site Supervisor 0 0 0
4 HR/Admin 0 0 0
5 Warehouseman 0 0 0
6 Surveyor (common) 1 4 0
7 Instrument Man (common) 1 4 0
8 Survey Aide (common) 0 0 0
9 Buyer (common) 0 0 0
10 Maintenance Supervisor (common) 0 0 0
11 Maintenance Planner (common) 0 0 0
12 Foreman 1 8 0
13 H.E. Mechanic 1 8 0
14 H.E. Helper Mechanic 1 8 0
15 Welder 1 8 0
16 Tireman 1 8 0
17 Excavator Operator 2 16 0
18 Dozer Operator 0 0 0
19 DT Driver 3 24 0
20 Fuel Truck Driver 1 8 0
21 Skilled Workers 9 72 0
22 Unskilled Workers 6 48 0
23 Watchman 1 8 3
TOTAL 31 236 3
1
2
3
EQUIPMENT USED
Equipment SMR
No. Description Total Oprtnl Hrs. Fuel Consumption Fuel Burn Location Status / Remarks / Activities
Body No. from to (Ltr / hr)
1 Service Vehicle SUV-190 - - - - Service Vehicle on Site
2 Service Vehicle XXX-020 - - - Service Vehicle for Engineers
3 20T Hydraulic Excavator HEX-254 - - Standby
4 20T Hydraulic Excavator HEX-257 - Defective - Standby
Page 1 of 17
DAILY ACTIVITY REPORT Chart TitleTitle
Chart
Weather Chart: 11:00 PM 12:00 AM
Project Title: Upgrading of Jct. National-Bua-Bulala-Macabenga Road Legend: 10:00 PM 01:00 AM
02:00 AM
9:00 PM
Sunny 8:00 PM
03:00 AM
Fair 04:00 AM
7:00 PM
Location: Kasibu, Nueva Vizcaya Cloudy 05:00 AM
6:00 PM
Rain Shower
Rainy 5:00 PM
Day: Tuesday Date: June 16, 2020
Heavy Rain 4:00 PM
Copy
Document Controller
received:
Page 2 of 17
ACTIVITY DESCRIPTION PHOTOS
Relocate signages
Leveling of Aggregate
Subbase Coarse
ACTIVITY DESCRIPTION PHOTOS
ACTUAL SITE CONDITION
UNPASSABLE WORKING AREA
ACTUAL, % 99.70%
PLANNED, % 99.11%
VAR, % 0.59%
Project: Upgrading of Jct. National-Bua-Bulala-Macabenga Road
Location: Kasibu, Nueva Vizcaya
Client: Provincial Engineering Office - Province of Nueva Vizcaya
A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) month 4.85 6,142.50 29,791.13 4.85 29,791.13 100.00% 4.85 29,791.13 100.00% - - 0.00% - -
Provision of 4x4 Pick Up Type Service Vehicle for the Engineer on Bare
A.1.2(2) Rental Basis month 4.85 83,216.96 403,602.24 4.85 403,602.24 100.00% 4.85 403,602.24 100.00% - - 0.00% - -
B.4(1) Construction Survey and Staking km 1.95 37,234.09 72,684.67 1.95 72,684.67 100.00% 1.95 72,684.67 100.00% - - 0.00% - -
B.5 Project Billboard / Signboard ea. 2.00 6,317.62 12,635.25 2.00 12,635.25 100.00% 2.00 12,635.25 100.00% - - 0.00% - -
B.7 Construction Safety and Health lot 1.00 25,737.08 25,737.08 1.00 25,737.08 100.00% 1.00 25,737.08 100.00% - - 0.00% - -
B.8 Traffic Management month 4.85 50,200.37 243,471.78 4.85 243,471.78 100.00% 4.85 243,471.78 100.00% - - 0.00% - -
B.9 Mobilization / Demobilization LS 1.00 160,687.80 160,687.80 0.85 136,584.63 85.00% 0.85 136,584.63 85.00% - - 0.00% 0.15 24,103.17
B.12 Removal and Relocation of Utilities LS 1.00 3,317.92 3,317.92 1.00 3,317.92 100.00% 1.00 3,317.92 100.00% - - 0.00% - -
Subtotal for PART B 518,534.50 494,431.33 95.35% 139,902.55 26.98% - 0.00% 24,103.17
PART C EARTHWORKS
100(2) Clearing & Grubbing LS 1.00 321.08 321.08 1.00 321.08 100.00% 1.00 321.08 100.00% - - 0.00% - -
100(3)a1 Individual Removal of Trees (small a, 150-300mm Ø) ea. 33.00 1,315.47 43,410.63 33.00 43,410.63 100.00% 33.00 43,410.63 100.00% - - 0.00% - -
100(3)a2 Individual Removal of Trees (small b, 301-500mm Ø) ea. 3.00 3,737.58 11,212.73 3.00 11,212.73 100.00% 3.00 11,212.73 100.00% - - 0.00% - -
100(3)a3 Individual Removal of Trees (small b, 501-750mm Ø) ea. 1.00 27,510.83 27,510.83 1.00 27,510.83 100.00% 1.00 27,510.83 100.00% - - 0.00% - -
101(1) Removal of Structures and Obstruction LS 1.00 4,461.08 4,461.08 1.00 4,461.08 100.00% 1.00 4,461.08 100.00% - - 0.00% - -
101(4)a1 Removal of Actual Structures/Obstruction - 610mm Ø RCPC l.m. 46.00 521.61 23,994.29 46.00 23,994.29 100.00% 46.00 23,994.29 100.00% - - 0.00% - -
102(2) Surplus Common Excavation m3 18,567.60 214.27 3,978,563.38 18,567.60 3,978,563.38 100.00% 18,567.60 3,978,563.38 100.00% - - 0.00% - -
103(1)a Structure Excavation (Common Soil) m3 527.98 416.03 219,656.32 527.98 219,656.32 100.00% 527.98 219,656.32 100.00% - - 0.00% - -
103(6)a Pipe Culverts and Drain Excavation (Common soil) m3 298.04 412.65 122,987.14 298.04 122,987.14 100.00% 298.04 122,987.14 100.00% - - 0.00% - -
104(1)a Embankment from Roadway Excavation (Common Soil) m3 1,208.98 304.84 368,539.81 1,208.98 368,539.81 100.00% 1,208.98 368,539.81 100.00% - - 0.00% - -
105(1)a Subgrade Preparation (Common Material) m2 15,690.28 18.95 297,329.22 15,690.28 297,329.22 100.00% 15,690.28 297,329.22 100.00% - - 0.00% - -
200(1) Aggregate Subbase Course m3 3,603.74 2,091.58 7,537,525.88 3,603.74 7,537,525.88 100.00% 3,603.74 7,537,525.88 100.00% - - 0.00% - -
311(1)b Portland Cement Concrete Pavement (Unreinforced) - 0.20m thick m2 11,642.16 1,524.80 17,751,972.76 11,642.16 17,751,972.76 100.00% 11,642.16 17,751,972.76 100.00% - - 0.00% - -
500(1)c Pipe Culverts, 910mm dia. (36" Ø) l.m. 79.00 6,359.18 502,375.44 79.00 502,375.44 100.00% 79.00 502,375.44 100.00% - - 0.00% - -
Removing, Cleaning, and Re-laying Salvaged Culvert Pipe (36" diam) -
504(2)c 910mm l.m. 19.00 3,091.45 58,737.48 19.00 58,737.48 100.00% 19.00 58,737.48 100.00% - - 0.00% - -
506(1) Stone Masonry m3 507.15 6,018.39 3,052,225.27 507.15 3,052,225.27 100.00% 507.15 3,052,225.27 100.00% - - 0.00% - -
603(3)a1 Metal Guardrail (Metal Beam) including Post, W-Beam l.m. 619.00 3,677.08 2,276,110.04 619.00 2,276,110.04 100.00% 619.00 2,276,110.04 100.00% - - 0.00% - -
603(4)b Metal Beam End Piece ea. 40.00 1,761.61 70,464.38 14.00 24,662.53 35.00% 14.00 24,662.53 35.00% - - 0.00% 26.00 45,801.85
605(1)c1 Warning Signs - Horizontal Alignment Curve (60cm Triangle) ea. 17.00 8,399.95 142,799.23 17.00 142,799.23 100.00% 17.00 142,799.23 100.00% - - 0.00% - -
605(1)d1 Warning Signs - Horizontal Alignment Reverse Curve (60cm Triangle) ea. 3.00 8,399.95 25,199.86 - - 0.00% - - 0.00% - - 0.00% 3.00 25,199.86
605(1)e1 Warning Signs - Horizontal Alignment Winding Road (60cm Triangle) ea. 1.00 8,399.95 8,399.95 1.00 8,399.95 100.00% 1.00 8,399.95 100.00% - - 0.00% - -
605(1)l2 Warning Signs Road Width Sign Narrow Bridge (60cm Triangle) ea. 3.00 8,399.95 25,199.86 - - 0.00% - - 0.00% - - 0.00% 3.00 25,199.86
612(1) Reflectorized Thermoplastic Pavement Markings (White) m2 488.52 879.41 429,608.14 488.52 429,608.14 100.00% 488.52 429,608.14 100.00% - - 0.00% - -
620(1)a1 Chevron Signs (450mm x 600mm) ea. 108.00 18,842.20 2,034,958.11 108.00 2,034,958.11 100.00% 108.00 2,034,958.11 100.00% - - 0.00% - -
GRAND TOTAL (VAT INCLUSIVE) 39,973,890.73 39,853,585.99 99.70% 39,853,585.99 99.70% - 0.00% 120,304.74
Page 7 of 17
Project: Upgrading of Jct. National-Bua-Bulala-Macabenga Road 100.00% 170.09 40
Location: Kasibu, Nueva Vizcaya 100.000% 54.68 254.06
Client: Provincial Engineering Office - Province of Nueva Vizcaya 100.00% 838.34
QUANTITY VERIFICATION AND RECONCILIATION
ITEM DESCRIPTION OF WORKS UNIT CONTRACT PREVIOUS TODAY TO-DATE ADVANCE/V.O ACTUAL
PART A FACILITIES FOR THE ENGINEERS
Provision of Field Office for the Engineer (Rental
A.1.1(8) month 4.85 4.85 - 4.85 - 6.20
Basis)
Provision of 4x4 Pick Up Type Service Vehicle for the
A.1.2(2) month 4.85 4.85 - 4.85 -
Engineer on Bare Rental Basis
PART B OTHER GENERAL REQUIREMENTS -
B.4(1) Construction Survey and Staking km 1.95 1.95 - 1.95 -
B.5 Project Billboard / Signboard ea. 2.00 2.00 - 2.00 -
B.7 Construction Safety and Health lot 1.00 1.00 - 1.00 -
B.8 Traffic Management month 4.85 4.85 - 4.85 -
B.9 Mobilization / Demobilization LS 1.00 0.85 - 0.85 (0.15)
B.12 Removal and Relocation of Utilities LS 1.00 1.00 - 1.00 -
PART C EARTHWORKS -
100(2) Clearing & Grubbing LS 1.00 1.00 - 1.00 -
100(3)a1 Individual Removal of Trees (small a, 150-300mm Ø) ea. 33.00 33.00 - 33.00 -
100(3)a2 Individual Removal of Trees (small b, 301-500mm Ø) ea. 3.00 3.00 - 3.00 -
100(3)a3 Individual Removal of Trees (small b, 501-750mm Ø) ea. 1.00 1.00 - 1.00 -
SITE-1
Sta 272+140.00 - 7.754 - 7.754 -
Sta 272+160.00 20.00 4.086 - 5.920 -
Sta 272+180.00 20.00 4.700 - 4.393 -
Sta 272+200.00 20.00 5.712 - 5.206 -
Sta 272+220.00 20.00 7.364 - 6.538 -
Sta 272+240.00 20.00 11.746 - 9.555 -
Sta 272+260.00 20.00 9.595 - 10.671 -
Sta 272+280.00 20.00 8.889 - 9.242 -
Sta 272+300.00 20.00 4.885 - 6.887 -
Sta 272+320.00 20.00 4.264 - 4.575 -
Sta 272+340.00 20.00 5.107 - 4.686 -
Sta 272+360.00 20.00 2.665 - 3.886 -
Sta 272+380.00 20.00 5.298 - 3.982 -
Sta 272+400.00 20.00 7.800 - 6.549 -
Sta 272+420.00 20.00 9.166 8.483
Sta 272+440.00 20.00 9.726 9.446
Sta 272+460.00 20.00 6.820 8.273
Sta 272+480.00 20.00 3.401 5.111
Sta 272+500.00 20.00 1.526 2.464
Sta 272+510.30 10.30
Sta 272+520.00 9.70 0.634 1.080
Sta 272+540.00 20.00 6.226 3.430
Sta 272+560.00 20.00 5.132 5.679
Sta 272+566.80 6.80
Sta 272+580.00 13.20 7.256 6.194
Sta 272+600.00 20.00 5.849 6.553
Sta 272+620.00 20.00 2.943 4.396
Sta 272+640.00 20.00 12.252 7.598
Sta 272+660.00 20.00 5.306 8.779
Sta 272+662.80 2.80
Sta 272+680.00 17.20 8.010 6.658
Sta 272+700.00 20.00 13.472 10.741
Sta 272+720.00 20.00 5.455 9.464
2) 104(1)a
- - - 0.120 - 0.120 -
118.400 - - - - 0.060 -
87.860 - - 0.014 - 0.007 -
104.120 - - 0.082 - 0.048 -
130.760 - - - - 0.041 -
191.100 - - - - - -
213.410 - - - - - -
184.840 - - - - - -
137.740 - - - - - -
91.490 - - 0.038 - 0.019 -
93.710 - - - - 0.019 -
77.720 - - 0.425 - 0.213 -
79.630 - - 0.062 - 0.244 -
130.980 - - - - 0.031 -
169.660 -
188.920 - -
165.460 - -
102.210 0.239 0.120
49.270 0.176 0.208
9.430 4.803
10.476 1.466 5.448
68.600 0.205 0.836
113.580 0.028 0.116
9.621 4.825
81.761 0.099 4.860
131.050 1.161 0.630
87.920 0.037 0.599
151.950 0.116 0.077
175.580 0.114 0.115
9.135 4.625
114.518 - 4.568
214.820 - -
189.270 0.018 0.009
3,656.804 site 1 PEO
Volume REMARKS
Fill
-
1.200 0.60
0.140 0.07
0.960 0.48
0.820 0.41
-
-
-
-
0.380 0.19
0.380 0.19
4.250 2.13
4.870 4.06
0.620
-
-
-
2.390
4.150
49.471 24.74
52.846
16.710 45.20
2.330
32.807 16.40
64.152 41.14
12.600
11.980
1.530
2.300
12.949 6.47
78.561
-
0.180
358.575 W/ STONE MASONRY
87.000 W/O STONE MASONRY every 20m
102(2)
SITE-1
Sta 272+140.00 - 7.754 - 7.754 -
Sta 272+160.00 20.00 4.086 - 5.920 -
Sta 272+180.00 20.00 4.700 - 4.393 -
Sta 272+200.00 20.00 5.712 - 5.206 -
Sta 272+220.00 20.00 7.364 - 6.538 -
Sta 272+240.00 20.00 11.746 - 9.555 -
Sta 272+260.00 20.00 9.595 - 10.671 -
Sta 272+280.00 20.00 8.889 - 9.242 -
Sta 272+300.00 20.00 4.885 - 6.887 -
Sta 272+320.00 20.00 4.264 - 4.575 -
Sta 272+340.00 20.00 5.107 - 4.686 -
Sta 272+360.00 20.00 2.665 - 3.886 -
Sta 272+380.00 20.00 5.298 - 3.982 -
Sta 272+400.00 20.00 7.800 - 6.549 -
Sta 272+420.00 20.00 9.166 8.483
Sta 272+440.00 20.00 9.726 9.446
Sta 272+460.00 20.00 6.820 8.273
Sta 272+480.00 20.00 3.401 5.111
Sta 272+500.00 20.00 1.526 2.464
Sta 272+520.00 20.00 0.634 1.080
Sta 272+540.00 20.00 6.226 3.430
Sta 272+560.00 20.00 5.132 5.679
Sta 272+580.00 20.00 7.256 6.194
Sta 272+600.00 20.00 5.849 6.553
Sta 272+620.00 20.00 2.943 4.396
Sta 272+640.00 20.00 12.252 7.598
Sta 272+660.00 20.00 5.306 8.779
Sta 272+680.00 20.00 8.010 6.658
Sta 272+700.00 20.00 13.472 10.741
Sta 272+720.00 20.00 5.455 9.464
2) 104(1)a
- - - - - - -
118.400 - - 0.520 - 0.260 -
87.860 - - 0.435 - 0.478 -
104.120 - - 0.122 - 0.278 -
130.760 - - - - 0.061 -
191.100 - - - - - -
213.410 - - - - - -
184.840 - - - - - -
137.740 - - - - - -
91.490 - - 0.030 - 0.015 -
93.710 - - 0.120 - 0.075 -
77.720 - - 0.077 - 0.099 -
79.630 - - - - 0.039 -
130.980 - - - - - -
169.660 0.170
188.920 - 0.085
165.460 0.024 0.012
102.210 0.274 0.149
49.270 1.536 0.905
21.600 - 0.768
68.600 1.073 0.537
113.580 0.471 0.772
123.880 0.040 0.256
131.050 1.280 0.660
87.920 0.184 0.732
151.950 - 0.092
175.580 0.043 0.022
133.160 - 0.022
214.820 - -
189.270 - -
3,728.690
Volume REMARKS
Fill
-
5.200
9.550
5.570
1.220
-
-
-
-
0.300
1.500
1.970
0.770
-
-
1.700
0.240
2.980
18.100
15.360
10.730
15.440
5.110
13.200
14.640
1.840
0.430
0.430
-
-
126.280
Project ID 8000-000-1-1-08-001-001-053
A.1.2(2) Provision of 4x4 Pick Up Type Service Vehicle for the Engineer month 6.33 89,284.74 565,172.40 1.85% 185.00 23-Sep-19 25-Mar-20 ###
B.5 Project Billboard / Signboard ea. 2.00 5,278.64 10,557.28 0.03% 1.00 181.00 27-Sep-19 25-Mar-20 ###
B.7 Construction Safety and Health lot 1.00 26,680.00 26,680.00 0.09% 181.00 17-Sep-19 15-Mar-20 ###
B.8 Traffic Management month 6.33 30,727.04 194,502.16 0.64% 181.00 27-Sep-19 25-Mar-20 ###