Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Well Productivity Index

Challenge
It is critical for oil and gas companies to understand how productive their
wells are, and when it is time for decommissioning. The Well Productivity Index
is a valuable measure of individual well health, but it is difficult to scale to the
number of wells owned, which typically number in the thousands for each operator.
Traditionally, oil and gas companies have performed well health calculations
manually offline. This is a cumbersome process requiring significant engineering
time, as it is difficult to continually measure the key performance indicators (KPIs)
for thousands of wells. The process has the potential to generate many errors, as
OIL & GAS
calculations are performed manually within Excel spreadsheets or on paper. It has
been difficult for oil and gas companies to do the necessary analysis to ensure all
their wells are properly maintained and productive. Often, ineffective wells are not
Data Sources decommissioned, and they continue to consume valuable resources that would
better be spent on productive wells.
• Process Data Historian: OSIsoft PI
A super major U.S. oil and gas firm wanted greater visibility into the productivity of
•A
 sset Structure: OSIsoft Asset its wells, gaining a better understanding of when it is no longer worthwhile to keep a
Framework well in operation. Toward that end, the firm needed to implement a Well Productivity
Index calculation to give a standard measure of well performance.
Data Cleansing
•E
 nables removal of invalid data
points from communications
Solution
dropouts
The Seeq advanced analytics solution eliminates manual data entry and dramatically
Calculations & Conditions shortens analysis time, increasing process efficiencies. Using Seeq, the oil and
gas firm’s engineers were able to calculate the productivity index for each well
• W
 ell productivity is calculated
based on flows and pressures. Their analysis easily scaled to thousands of wells for
by dividing the well liquid flow
performance monitoring, giving granular visibility that was not possible previously.
rate by the delta between the
“reservoir pressure” and the
bottom hole pressure
Results
• T
 his Index can then be averaged
to get a longer term view of how The oil and gas firm has saved a dramatic 500 hours of engineer time for 1,000 wells –
the well is performing a major improvement. The team was able to reduce data entry errors and improve the
quality of its well productivity calculations.
Reporting & Collaboration The Seeq analysis provides engineers with both calculations and visual data to easily
• U
 tilizing Seeq provides monitor and optimize well performance across wells. Leveraging Seeq and Asset Trees,
engineers with a significant an engineer can save 5 to 30 minutes in calculation time per well per calculation.
reduction in effort and elapsed On top of the time reduction, it has succeeded in reducing manual data entry errors.
time, and supplies Delta Being able to identify and decommission wells that are no longer producing helps
pressures and Well Productivity ensure the optimum allocation of resources.
for each well, which can be
benchmarked and reported over
time, providing a holistic and
thorough process evaluation
Part of a report created with Seeq Organizer highlighting the
results for three wells.

Seeq Corporation
1301 2nd Avenue, Suite 2850
Seattle, WA 98101
www.seeq.com | (206) 801-9339

You might also like