JHA For Maintenance of Floating Type Heat Exchanger 1
JHA For Maintenance of Floating Type Heat Exchanger 1
JHA For Maintenance of Floating Type Heat Exchanger 1
Rev. : 0
Detailed Job Hazard Analysis Worksheet Date : 18.09.2012
Page : 1 of 1
Area: NGL 3 Location: NGL 3 Date: 12-02-2015
Task Description: Maintenance of Floating type heat exchanger. Team- composition: Fitter, Fabricator ,
Welder, Rigger, Folder, Helper, Supervisor
1 Awareness among the work Incompetence, Lack of Site working M Safety Induction. L Training
force knowledge, crew. Daily TI meeting before the job Detp.
start. JHA to be discussed Safety
during the TI. Personn
Follow work method statement el.
& JHA.
Trained & certified equipment
operators(3rd party certificate)
2 Issuance of Permit to work Improper communication Worker M Only trained & authorized L Permit
(PTW) among the group & supervisor personnel will be able to apply Receiver
for the permit. and
PTW not properly issued/risk Permit Issuer & Permit Coordina
not individuated Receiver to conduct a joint tor
inspection of the area prior to
issuing the permit
PTW issued not at job location PTW must be filled out
correctly prior to submission.
PTW copies not properly Permit to work format must be
distributed/traced signed off by all parties.
Approved PTW must be
displayed at worksite into
permit box.
PTW coordinator to trace
properly all permits
QFM-OM(G)-038-001
Rev. : 0
Detailed Job Hazard Analysis Worksheet Date : 18.09.2012
Page : 1 of 1
Area: NGL 3 Location: NGL 3 Date: 12-02-2015
Task Description: Maintenance of Floating type heat exchanger. Team- composition: Fitter, Fabricator ,
Welder, Rigger, Folder, Helper, Supervisor
3 Shifting all required tools, Improper lifting Working M Follow safe lifting procedure L Equipme
blinds, mobile air - Vehicle movement inside Crew and Competent operators and nt
compressor and bundle process area. Co Workers riggers Superviso
puller near the heat - Falling of material All lifting must be carried out as r, lead
exchanger per STI/ 23 approved lifting worker
plan and
Barricade where the tools and Superviso
equipment are located r
Barricade working area
4 Spading activity. Vapor/ Gas/ Liquid leak Working M Blinding “only rated blind to be L Mechanic
Work on high elevation Crew and used “as per approved blind al
Manual Handling Equipment list, drawings marked for blind Superviso
Fall of material/tools Operator locations and tagged flanges. r Lead
Safe manual handling Worker
technique
Wear appropriate PPE’s
Use of lifting machine (chain
pulley block, jacks) if load is
heavier to lift manually.
Inspection of lifting tools
Control measure in case of
Vapour/ Gas/ Liquid leak to be
identified.
Ensure the equipment is fully
isolated depressurized and
inerted. Gas test to be carried
QFM-OM(G)-038-001
Rev. : 0
Detailed Job Hazard Analysis Worksheet Date : 18.09.2012
Page : 1 of 1
Area: NGL 3 Location: NGL 3 Date: 12-02-2015
Task Description: Maintenance of Floating type heat exchanger. Team- composition: Fitter, Fabricator ,
Welder, Rigger, Folder, Helper, Supervisor
5 Lifting works Failure of lifting points or Working M Ensure all rigging connections L Mechanic
Using crane/Hiab structural integrity of load being Crew and are done by experience and al
lifted Equipment competent rigger. Superviso
Operator All non-essential personnel to r Lead
- Swinging loads be cleared from slew path Worker
area. All personnel are to
- Load unbalanced remain clear from swing radius
or from load path area.
Load is to be slewed at a slow
and constant speed.
Ensure to follow the lifting
connections as per
manufacturer’s
QFM-OM(G)-038-001
Rev. : 0
Detailed Job Hazard Analysis Worksheet Date : 18.09.2012
Page : 1 of 1
Area: NGL 3 Location: NGL 3 Date: 12-02-2015
Task Description: Maintenance of Floating type heat exchanger. Team- composition: Fitter, Fabricator ,
Welder, Rigger, Folder, Helper, Supervisor
recommendation or refer to
lifting plan.
Taglines to be used at all times.
Ensure load/material is lifted
with respect to center of
gravity.
Ensure load is lifted evenly. If
not, back into original position
and make necessary
adjustments.
Stop work in case the wind
speed exceeds the STI/23
recommended speed.
6 Removal of insulation from Dust/Particulates Working M Wear appropriate PPE’s L Mechanic
flanges, cover or predefine - Slips, Trips and Fall Crew Remove material imposed al
locations - High Surface temperature tripping hazard Superviso
(where applicable/as - Material fall Removed claddings /glass wool r Lead
required) - high wind should be stored into jumbo Worker
bags and barricade
MSDS of insulation material to
be attached and
recommendations to be
followed.
Maintain good housekeeping
Ensure appropriate precautions
to avoid flying of fibers
QFM-OM(G)-038-001
Rev. : 0
Detailed Job Hazard Analysis Worksheet Date : 18.09.2012
Page : 1 of 1
Area: NGL 3 Location: NGL 3 Date: 12-02-2015
Task Description: Maintenance of Floating type heat exchanger. Team- composition: Fitter, Fabricator ,
Welder, Rigger, Folder, Helper, Supervisor
Task Description: Maintenance of Floating type heat exchanger. Team- composition: Fitter, Fabricator ,
Welder, Rigger, Folder, Helper, Supervisor
Task Description: Maintenance of Floating type heat exchanger. Team- composition: Fitter, Fabricator ,
Welder, Rigger, Folder, Helper, Supervisor
Task Description: Maintenance of Floating type heat exchanger. Team- composition: Fitter, Fabricator ,
Welder, Rigger, Folder, Helper, Supervisor
Task Description: Maintenance of Floating type heat exchanger. Team- composition: Fitter, Fabricator ,
Welder, Rigger, Folder, Helper, Supervisor
Emergency phone not know by Workers. Conduct toolbox talk and L Supervis
Emergency the working crew. M ensure that everyone or and
Personal injury understands the emergency Safety
number to call. Personn
Follow approved emergency el and
response procedure and rescue ERP
plan. Team
NGL 3 Control Room 40145300
Work permit not closed out Workers Ensure the permit is signed off L Job
Job Completion and Cleaning not done M and closed. Supervis
cleanup & demobilizing Clean up the area and to be or and
QFM-OM(G)-038-001
Rev. : 0
Detailed Job Hazard Analysis Worksheet Date : 18.09.2012
Page : 1 of 1
Area: NGL 3 Location: NGL 3 Date: 12-02-2015
Task Description: Maintenance of Floating type heat exchanger. Team- composition: Fitter, Fabricator ,
Welder, Rigger, Folder, Helper, Supervisor