Lafigue ROM Bin Lifting Design
Lafigue ROM Bin Lifting Design
Design Calculation
Lifting weight of each lift (including bin PL, stiff PL, linner, exclude grizzly and grizzly supporting beam):
Top portion:
Total vplume form model (m3)= 5.916
Total weight (kN)= 464.406
middle portion:
Total vplume form model (m3)= 2.9123
Total weight (kN)= 228.6156
bottom portion:
Total vplume form model (m3)= 2.9144
Total weight (kN)= 228.7804
3rd lifting:
To be conservative, design for the total weight of the ROM bin without grizzly and grizzly supporting beam
Total lifting load (kN) = 921.80
Lifting point = 4
N (kN)= 391
Load design load = 688
See A-4 for lifting lug design detail
4-9-1
Project Name: Lafigue Project
Client: Endeavour Mining
Design Calculation
Lifting point = 4
1st lifting:
Design for the weight of the ROM bin below the bottom splice line
Lifting point = 4
4-9-2
Project Name: Lafigue Project
Client: Endeavour Mining
Design Calculation
Add the spreader bar at the corner to stiffen the bin during lifting
The spreader bar will be JP5.
Apply 3 load factor to be conservative to check the bin plate stress under lifting. All plate stresses are less than 0.9Fy. The max stress is
around 143kpa. The high stress is only locally at the lifting point. The bin still remains rigid during lifting.
4-9-3
Project Name: Lafigue Project
Client: Endeavour Mining
Design Calculation
Check the bin lifting without the spreader beam, the stress is still small. It is ok to lift without spreader beam