Project Name: Lafigue Project

Client: Endeavour Mining

Design Calculation

Calculation Primary Crusher Project No. 2237


Title: ROM Bin Steel Platework Page No. of
Doc. No: 2237-SCAL-011 RevNo. A
Prepared Print & Initials Date Checked Print & initials Date
By: Mengyu Han 2022-10-11 By: Ali Mirza Hessabi 2023-01-06

4-9-LIFTING LUG DESIGN


The bin will be lifting in 3 lifts
1st lifting-lower portion below the bottom splice line (bottom portion)
2nd lifting-middle portion bottom splice line and the second splice line (middle portion)
3rd lifting-portion above the second splice line (top portion)

Lifting weight of each lift (including bin PL, stiff PL, linner, exclude grizzly and grizzly supporting beam):

Top portion:
Total vplume form model (m3)= 5.916
Total weight (kN)= 464.406
middle portion:
Total vplume form model (m3)= 2.9123
Total weight (kN)= 228.6156
bottom portion:
Total vplume form model (m3)= 2.9144
Total weight (kN)= 228.7804

Total bin weight (kN)= 921.802

3rd lifting:
To be conservative, design for the total weight of the ROM bin without grizzly and grizzly supporting beam
Total lifting load (kN) = 921.80

Design factor = 1.2 (as per 000-SD-014)

Hook load (kN)= 1106

Lifting point = 4

Design Sling Vertical Offset Angle, b (Deg) = 45 (max 45 as per 000-SD-014)

N (kN)= 391
Load design load = 688
See A-4 for lifting lug design detail

4-9-1
Project Name: Lafigue Project
Client: Endeavour Mining

Design Calculation

Calculation Primary Crusher Project No. 2237


Title: ROM Bin Steel Platework Page No. of
Doc. No: 2237-SCAL-011 RevNo. A
Prepared Print & Initials Date Checked Print & initials Date
By: Mengyu Han 2022-10-11 By: Ali Mirza Hessabi 2023-01-06
2nd lifting:
design for the weight of the middle portion

Consider symmetrical lifting

Total lifting load (kN) = 228.62


Design factor = 1.2 (as per 000-SD-014)
Hook load (kN)= 274

Lifting point = 4

Design Sling Vertical Offset Angle, b (Deg) = 45 (max 45 as per 000-SD-014)


Lug design load (kN)= 97

Use VLBG-plus-20t -M48


For 4 lifting points, load direction less than 45, symmetrucal total recommended lifting load (kN) =
420 <274
M48 is ok

1st lifting:
Design for the weight of the ROM bin below the bottom splice line

Total lifting load (kN) = 228.78


Design factor = 1.2 (as per 000-SD-014)
Hook load (kN)= 275

Lifting point = 4

Design Sling Vertical Offset Angle, b (Deg) = 45 (max 45 as per 000-SD-014)


Lug design load (kN)= 97

Use VLBG-plus-20t -M48


For 4 lifting points, load direction less than 45, symmetrucal total recommended lifting load (kN) =
420 <274
M48 is ok

4-9-2
Project Name: Lafigue Project
Client: Endeavour Mining

Design Calculation

Calculation Primary Crusher Project No. 2237


Title: ROM Bin Steel Platework Page No. of
Doc. No: 2237-SCAL-011 RevNo. A
Prepared Print & Initials Date Checked Print & initials Date
By: Mengyu Han 2022-10-11 By: Ali Mirza Hessabi 2023-01-06
Check the ROM bin to see if the bin is ok during inclined lifting

Add the spreader bar at the corner to stiffen the bin during lifting
The spreader bar will be JP5.

Apply 3 load factor to be conservative to check the bin plate stress under lifting. All plate stresses are less than 0.9Fy. The max stress is
around 143kpa. The high stress is only locally at the lifting point. The bin still remains rigid during lifting.

See staadpro model 2237-SCAL-014 ROM Bin -Lifting Check

4-9-3
Project Name: Lafigue Project
Client: Endeavour Mining

Design Calculation

Calculation Primary Crusher Project No. 2237


Title: ROM Bin Steel Platework Page No. of
Doc. No: 2237-SCAL-011 RevNo. A
Prepared Print & Initials Date Checked Print & initials Date
By: Mengyu Han 2022-10-11 By: Ali Mirza Hessabi 2023-01-06

Check the bin lifting without the spreader beam, the stress is still small. It is ok to lift without spreader beam

4-9-4