1 TITLE
SCALE 1:20 @ A1 DRAWING LABEL GSS
GAS SUPPRESSION SYSTEM CONTROL
PANEL LOAD BREAK SWITCH SINGLE PHASE ISOLATOR 14 ω< UNDER SPEED RELAY 51G I₀ >>>
NON-DIRECTIONAL DEFINITE TIME
EARTH FAULT/INVERSE TIME O.C.
KHAZZAN
(REFER TO FIRE PROTECTION PACKAGE) Kingdom of Saudi Arabia
N www.damacproperties.com
1 SHEET KEYNOTE BS 1363 13A UNSWITCHED SOCKET OUTLET DISCONNECTOR (ISOLATOR) NON-MOTOR LOAD 21 FLOC FAULT LOCATOR 50 EARTH-FAULT ARC FAULT PROTECTION
N DONATES NO. OF GANGS FL NARC
LEAD CONSULTANT
N
1
REVISION CLOUD (DELTA 1) BS 1363 13A SWITCHED SOCKET OUTLET SWITCH DISCONNECTOR (ON-LOAD) M MOTOR LOAD 21G Z< UNDER IMPEDANCE 51 I >> NON-DIRECTIONAL INVERSE TIME O.C.
N DONATES NO. OF GANGS
N
NORTH ARROW (N: NORTH | M: MAKKAH) 15A UNSWITCHED SOCKET OUTLET DISCONNECTOR/ISOLOATOR (FUZED/OFF-LOAD) 24 U/f > OVER EXCITATION 51C I >> SHUNT CAPACITORS OVERCURRENT
GROUNDED NEUTRAL R
LEVEL 1 RESIDUAL CURRENT CIRCUIT BREAKER AUTOMATIC PFC WITH DELTA CSA CONSULTANT
LEVEL ANNOTATION (SECTIONS/ELEVATIONS) SWITCHED FUSED SPUR 27 U< UNDERVOLTAGE 55 cos φ > POWER FACTOR RELAY
4.00m WITH OVERLOAD PROTECTION (RCBO) CONNECTED CAPACITOR BANK
UNSWITCHED SPUR OUTLETS WITHDRAWABLE CIRCUIT BREAKER WITH VOLTAGE CHOKE/REACTOR 32 P< DIRECTIONAL UNDER POWER RELAY 59 U> OVERVOLTAGE
CONTAINMENT N
CONNECTION UNITS DISCONNECTION FUNCTIONALITY
MOTORIZED WITHDRAWABLE CIRCUIT BREAKER DRUPS NEUTRAL POINT (RESIDUAL)
WP UNSWITCHED WEATHERPROOF 13A SOCKET AR D G 32 P> DIRECTIONAL OVER POWER RELAY 59N U₀ >
(ACCUROTOR+DIESEL+ALTERNATOR)
M
WITH DISCONNECTION FUNCTIONALITY OVERVOLTAGE
HOT-DIPPED GALVANIZING (BS EN ISO N 47037 Abu Dhabi, United Arab Emirates
1461:2009) EPOXY POWDER COATED HDG + WP SWITCHED WEATHERPROOF 13A SOCKET WITHDRAWABLE SWITCH DISCONNECTOR GROUND (EARTH) REFERENCE 32P P ACTIVE POWER 63 PRESSURE SWITCH www.hdp-os.com
EPOXY POWDER COATED STAINLESS STEEL 304
MOTORIZED WITHDRAWABLE SWITCH RESTRICTED EARTH FAULT
PRE-GALVANIZED STEEL WIRE GRID CABLE IEC 60309 UNSWITCHED 1Ph+N SOCKET ACTIVE HARMONIC FILTER 32Q Q REACTIVE POWER 64R AoR/EoR
PROTECTION (REF)
M
DISCONNECTOR
TRAY 600mm WIDE WITH 4-IN X 5-IN GRID
PATTERN USED FOR RACK INTERCABLING IEC 60309 SWITCHED 1Ph+N SOCKET WITHDRAWABLE DEVICE (GENERAL) CT
CURRENT TRANSFORMER 37 I< NON-DIRECTIONAL UNDERCURRENT 66 N> EXCESSIVE START PROTECTION
MH: MANHOLE FAN SWITCH TRANSFORMER (DELTA-DELTA) SURGE ARRESTER 49G T> THERMAL PROTECTION FOR GENERATOR 81 f FREQUENCY RELAY
LV HH: HANDHOLE IMD
HH LV: LOW VOLTAGE CABLES INSULATION MONITORING DEVICE+IMPEDANCE
WH WATER HEATER AUTO TRANSFORMER Z 49T T> THERMAL PROTECTION FOR TRASFORMER 81L f< OVER FREQUENCY
MV: MEDIUM VOLTAGE RELAY+VOLTAGE LIMITER (SPARK GAP)
LEVEL #
HD HAND DRYER AC/DC CONVERTER (RECTIFIER) PMU MULTIFUNCTIONAL POWER METER UNIT 50 I >> INST NON-DIRECTIONAL OVERCURRENT 81U f< OVER FREQUENCY
SWITCHBOARD COMPARTMENT
ELECTRIC VEHICLE SUPPLY EQUIPMENT DC/AC CONVERTER (INVERTER) LIGHTING 50
ARC
ARC FAULT PROTECTION 81O f> OVER FREQUENCY
GENERAL NOTES
FLOOR BOX TYPE 1: TWO COMPARTMENT AC/AC CONVERTER LIGHTING CONTROL PANEL 50G GROUND FAULT RELAY 87 ΔI > DIFFERENTIAL PROTECTION; CONDITIONS, THE SPECIFICATIONS,
EQUIPMENT SCHEDULES AND THE
FB – 87G, ΔI> - GENERATOR
1 WITH TWIN 13A BS SOCKET OUTLETS, NON-DIRECTIONAL DEFINITE TIME ARCHITECTURAL DRAWINGS.
– 87M, ΔI> - MOTOR
GROUNDING (EARTHING) INTEGRAL RCD AND 2 × CAT6A/RJ45 OUTLET BATTERY CENTRAL BATTERY PANEL I₀ > EARTH FAULT/INVERSE TIME
+
50N
–
EARTH BAR FLOOR BOX TYPE 3: FOUR COMPARTMENT D O L DIRECT ONLINE MOTOR STARTER ONE-WAY/TWO GANG LIGHTING SWITCH OTHERWISE SPECIFIED.
FB WITH 2 × TWIN 13A BS SOCKET OUTLETS, 5. ANY COMMUNICATION WITH SPECIALIZED
3 INTEGRAL RCD, 4 × CAT6A/RJ45 OUTLET AND (REFER TO DRAWING E-003 AND SPECIFICATION SECTION 262400) (REFER TO SPECIFICATION SECTIONS 260513 AND 260519) DISCIPLINES SHOWN IN THE DRAWINGS
EARTH PIT AV/KVM OUTLETS Y – Δ START-DELTA MOTOR STARTER ONE-WAY/THREE GANG LIGHTING SWITCH SHALL BE THROUGH THE ENGINEER.
COPPER AIR TERMINAL OVERHEAD BUSWAY (WITH END-FEED BOX) S T S RACK-MOUNT STATIC TRANSFER SWITCH TWO-WAY/THREE GANG LIGHTING SWITCH P: № TRIP UNIT POLES 4 30.12.2021 STAGE 4T PACKAGE
d: № PROTECTED POLES CABLE JACKET TYPE 5 31.01.2022 ADDENDUM
QS-A1-01
4P4d PVC/LSZH/PVC
STRIKE PAD UNDERFLOOR BUSBAR AUTOMATIC TRANSFER SWITCH DOUBLE POLE SWITCH In: 630A FRAME RATED CAPACITY
Ir: 500A ACTIVE CONDUCTOR AND NEUTRAL © 2021 SH GROUP, INC.ALL RIGHTS RESERVED, INCLUDING BUT
Icu: 50kA THERMAL/OVERLOAD SETTING NOT LIMITED TO THE COPYRIGHT, DESIGN AND PATENTS ACT 1988
25mm X 6mm CONCEALED COPPER TAPE DADO TRUNKING P F C POWER FACTOR CORRECTION CIRCUIT REFERENCE LSI [TU-4] XLPE / SWA / PVC RUNS X CORES X CSA [mm²]
1R ☓ 4C ☓ 95 PROJECT NO.: 2021-PR-003374
X1/DB-XX-XX
SHORT-CIRCUIT BREAKING CAPACITY 1R ☓ 1C ☓ 50 DRAWN BY: S.K. CHECKED BY: K.T.
CIRCUIT PROTECTIVE CONDUCTORS
IB METALLIC INSPECTION BOX DISTRIBUTION BOARD LABELINGA MSCHEME
F AUTOMATIC MAINS FAILURE OS1
CEILING-MOUNT PRESENCE DETECTOR, IK04,
IP20, COMPLETE WITH SURFACE MOUNTED BOX
2V 15m 31/E
RUNS X CORES X CSA [mm²] SHEET SIZE: A1
M
TU-1 LSI
100A (0.4–1.0)
FIXED
CLEARING
(1.5–10.0)
MAXIMUM
CLEARING > 11☓ In
ELECTRIC CABLES – THERMOSETTING INSULATED, ARMOURED KHAZZAN
160A ☓ In ☓ Ir CABLES FOR VOLTAGES OF 600/1000 V AND 1900/3300 V, HAVING LOW 600/1000 V Kingdom of Saudi Arabia
TIME TIME OF 60ms BS 6724 90 °C
EMISSION OF SMOKE AND CORROSIVE GASES WHEN AFFECTED BY 1900/3300 V www.damacproperties.com
100A THE TRIP UNIT FOR FRAME SIZE 400A HAS TO BE FITTED WITH A "LCD" SCREEN, DISPLAYING THE FIRE
160A CURRENTS (lL1, IL2, IL3, IN, Ief AND EARTH LEAKAGE).
(0.4–1.0) 0.5–24 sec (1.5–10.0) (2–15.0) ELECTRIC CABLES – THERMOSETTING INSULATED, ARMOURED, LEAD CONSULTANT
TU-2 LSI 250A @ 6 x Ir 0.1–0.4 sec YES
☓ In ☓ Ir ☓ In THE TRIP UNIT FOR FRAME SIZE 630A HAS TO BE FITTED WITH A "LCD" SCREEN, DISPLAYING THE POWER FIRE-RESISTANT CABLES OF RATED VOLTAGE 600/1000 V FOR FIXED
400A BS 7846 90 °C 600/1000 V
MEASUREMENTS (IL1, IL2, IL3, IN, Ief , EARTH LEAKAGE, V, kW, kVA, kVAR, kWh, PF, Vpeak, Ipeak). INSTALLATIONS, HAVING LOW EMISSION OF SMOKE AND CORROSIVE
630A
GASES WHEN AFFECTED BY FIRE.
PHASE-IMBALANCE PROTECTION (AS PER IEC 60947-4.1): TRIPPING THRESHOLD: HIGHER OR EQUAL TO R
40% IMBALANCE WITH FIXED CLEARING TIME. ELECTRIC CABLES – SPECIFICATION FOR 300/500 V FIRE RESISTANT
100A SCREENED CABLES HAVING LOW EMISSION OF SMOKE AND
160A BS 7629-1 70 °C 300/500 V
(0.4–1.0) 0.5–24 sec (1.5–10.0) (2–15.0) (0.3–1) THE TRIP UNIT FOR FRAME SIZE 400A HAS TO BE FITTED WITH A "LCD" SCREEN, DISPLAYING THE CORROSIVE GASES WHEN AFFECTED BY FIRE. MULTICORE AND
TU-3 LSI 250A @ 6 x Ir 0.1–0.4 sec YES 0.1–0.4 sec YES CURRENTS (IL1, IL2, IL3, IN, Ief AND EARTH LEAKAGE). MULTIPAIR CABLES A MEMBER OF SYSKA HENNESSY GROUP, INC.
☓ In ☓ Ir ☓ In ☓ In
400A ELECTRIC CABLES – THERMOSETTING INSULATED, NON-ARMOURED
www.syska.com
630A THE TRIP UNIT FOR FRAME SIZE 630A HAS TO BE FITTED WITH A "LCD" SCREEN, DISPLAYING THE POWER CABLES FOR VOLTAGES UP TO AND INCLUDING 450/750 V, FOR CSA CONSULTANT
MEASUREMENTS (IL1, IL2, IL3, IN, Ief , EARTH LEAKAGE, V, kW, kVA, kVAR, kWh, PF, Vpeak, Ipeak). BS 7211 ELECTRIC POWER, LIGHTING AND INTERNAL WIRING, AND HAVING LOW 90 °C 450/750 V
EMISSION OF SMOKE AND CORROSIVE GASES WHEN AFFECTED BY
THE TRIP UNIT HAS TO BE FITTED WITH A "LCD" SCREEN DISPLAYING THE FOLLOWINGS: FIRE
ELECTRIC CABLES – PVC INSULATED, NON-ARMOURED CABLES FOR
– METERING OF ACTIVE, REACTIVE AND APPARENT ENERGY. BS 6004 VOLTAGES UP TO AND INCLUDING 450/750 V, FOR ELECTRIC POWER, 70 °C 450/750 V
– PHASE TO PHASE AND PHASE TO NEUTRAL VOLTAGES. LIGHTING AND INTERNAL WIRING
– ACTIVE, REACTIVE AND APPARENT POWER.
– CURRENTS (IL1, IL2, IL3 IN, Ief , EARTH LEAKAGE). ELECTRIC CABLES – THERMOSETTING INSULATED, NON-ARMOURED 47037 Abu Dhabi, United Arab Emirates
800A 0.5–24 sec BS 7889 90 °C 600/1000 V www.hdp-os.com
(0.4–1.0) (1.5–10.0) (2–15.0) – MAXIMUM CURRENTS (Ipeak). CABLES WITH A VOLTAGE OF 600/1000 V, FOR FIXED INSTALLATIONS
TU-4 LSI 1000A @ 6 x Ir 0.1–0.4 sec YES
☓ In ☓ Ir ☓ In – POWER FACTOR.
1250A AoR/EoR
– FAULT INDICATIONS. ELECTRIC CABLES – SPECIFICATION FOR 300/500 V SCREENED
– LONG-TIME PROTECTION, MINIMUM AND MAXIMUM VOLTAGE AND FREQUENCY, VOLTAGE AND ELECTRIC CABLES HAVING LOW EMISSION OF SMOKE AND CORROSIVE
CURRENT IMBALANCE, PHASE SEQUENCE, REVERSE POWER. BS 8436 70 °C 300/500 V
GASES WHEN AFFECTED BY FIRE, FOR USE IN WALLS, PARTITIONS
– LOAD SHEDDING AND RECONNECTION DEPENDING ON POWER OR CURRENT.
– MEASUREMENTS OF INTERRUPTED CURRENTS, MAINTENANCE INDICATIONS, EVENT HISTORIES AND
AND BUILDING VOIDS. MULTICORE CABLES
ELECTRIC CABLES – THERMOSETTING INSULATED, NON-ARMOURED
SAUDI
TINE-STAMPING.
CABLES WITH A VOLTAGE OF 600/1000V, FOR FIXED INSTALLATIONS,
BS 8573 90 °C 600/1000 V ARABTECH JARDANEH & PARTNES
THE TRIP UNIT HAS TO BE FITTED WITH A "LCD" SCREEN DISPLAYING THE FOLLOWINGS: HAVING LOW EMISSIONS OF SMOKE AND CORROSIVE GASES WHEN Al Ashre' Building, Dammam, KSA
AFFECTED BY FIRE www.aj-group.com
– METERING OF ACTIVE, REACTIVE AND APPARENT ENERGY. ELECTRIC CABLES – THERMOSETTING INSULATED, NON-ARMOURED,
– PHASE TO PHASE AND PHASE TO NEUTRAL VOLTAGES. FIRE-RESISTANT, SINGLE CORE NON-SHEATHED CABLES OF RATED
– ACTIVE, REACTIVE AND APPARENT POWER. BS 8592 90 °C 450/750 V KEY PLAN
VOLTAGE 450/750 V, HAVING LOW EMISSION OF SMOKE AND
– CURRENTS (IL1, IL2, IL3 IN, Ief , EARTH LEAKAGE). CORROSIVE GASES WHEN AFFECTED BY FIRE.
800A 0.5–24 sec
(0.4–1.0) (1.5–10.0) (2–15.0) (0.3–1) – MAXIMUM CURRENTS (Ipeak).
TU-5 LSI 1000A @ 6 x Ir 0.1–0.4 sec YES 0.1–0.4 sec YES
☓ In ☓ Ir ☓ In ☓ In – POWER FACTOR.
1250A
– FAULT INDICATIONS.
– LONG-TIME PROTECTION, MINIMUM AND MAXIMUM VOLTAGE AND FREQUENCY, VOLTAGE AND
MINIMUM RATINGS AND CLEARANCES FOR DISTRIBUTION BOARDS
CURRENT IMBALANCE, PHASE SEQUENCE, REVERSE POWER.
– LOAD SHEDDING AND RECONNECTION DEPENDING ON POWER OR CURRENT. DISTRIBUTION BOARD TYPE IP RATING IEC 60529 FORM IEC 61439 FRONT REAR SIDE
– MEASUREMENTS OF INTERRUPTED CURRENTS, MAINTENANCE INDICATIONS, EVENT HISTORIES AND
TINE-STAMPING. MAIN SWITCHBOARDS IP42 FORM 4B, TYPE 6 1,500 mm 750 mm 750 mm
SUB DISTRIBUTION BOARDS < 630 A IP31 FORM 2B, TYPE 2 1,200 mm
– METERING OF ACTIVE, REACTIVE AND APPARENT ENERGY.
– PHASE TO PHASE AND PHASE TO NEUTRAL VOLTAGES.
SUB DISTRIBUTION BOARDS > 630 A IP31 FORM 3B, TYPE 2 1,200 mm
800A – PER PHASE ACTIVE, REACTIVE AND APPARENT POWER.
1000A – CURRENTS (IL1, IL2, IL3, IN, Ief , EARTH LEAKAGE). 1,200 mm
FINAL DISTRIBUTION BOARDS < 100 A IP31
1250A – MAXIMUM CURRENTS (Ipeak).
1600A – POWER FACTOR. MOTOR CONTROL CENTERS IP42 FORM 4B, TYPE 6 1,200 mm
2000A (0.4–1.0) 0.5–24 sec (1.5–10.0) (2–15.0) (0.3–1) – FAULT INDICATIONS.
TU-6 LSI @ 6 x Ir 0.1–0.4 sec YES 0.1–0.4 sec YES
2500A ☓ In ☓ Ir ☓ In ☓ In – LONG-TIME PROTECTION, MINIMUM AND MAXIMUM VOLTAGE AND FREQUENCY, VOLTAGE AND EMERGENCY DISTRIBUTION EQUIPMENT IP31 FORM 4B, TYPE 6 1,200 mm
3200A CURRENT IMBALANCE, PHASE SEQUENCE, REVERSE POWER. GENERAL NOTES
4000A – LOAD SHEDDING AND RECONNECTION DEPENDING ON POWER OR CURRENT. 1. DO NOT SCALE FROM DRAWINGS. IF IN
5000A
6300A
– MEASUREMENTS OF INTERRUPTED CURRENTS, MAINTENANCE INDICATIONS, EVENT HISTORIES AND
TINE-STAMPING.
MAXIMUM EARTH-FAULT LOOP IMPEDANCE
s) (Z DOUBT, REQUEST MORE FURTHER
INFORMATION.
– MEASUREMENT OF HARMONIC DISTORTION IN VOLTAGE (THDV) AND CURRENT (THDi) AND TRUE "RMS" TABLE 41.3 OF BS 7671:2018: MAXIMUM EARTH LOOP IMPEDANCE (Zs) FOR CIRCUIT BREAKERS WITH U0 OF 230V, FOR OPERATION GIVING 2. THIS DRAWING SHALL BE READ IN
CONJUNCTION WITH THE CONTRACT
– MEASUREMENTS UP TO THE 51st HARMONIC FOR VOLTAGE, CURRENT, FREQUENCY, POWER AND COMPLIANCE WITH THE 0.4s DISCONNECTION TIME OF REGULATIONS 411.3.2.2 AND 5s DISCONNECTION TIME OF REGULATIONS 411.3.2.3 CONDITIONS, THE SPECIFICATIONS,
POWER FACTOR. EQUIPMENT SCHEDULES AND THE
TYPE B CIRCUIT BREAKER (BS EN 60898 MCB AND BS EN 61009-1 RCBO) ARCHITECTURAL DRAWINGS.
– WAVEFORM CAPTURE AFTER FAULT, ALARM OR ON
3. REFER TO THE ARCHITECTURAL
RATED DRAWINGS FOR DETAILS OF ALL SETTING
3A 6A 10A 16A 20A 25A 32A 40A 50A 63A 80A 100A 125A In OUT INFORMATION. NO DIMENSIONS SHALL
CURRENT
BE MEASURED FROM THIS DRAWINGS.
SUPPLY CHARACTERISTICS AND EARTHING ARRANGEMENTS SUPPLEMENTARY BONDING CONDUCTOR SIZES Zs 14.57Ω 7.28Ω 4.37Ω 2.73Ω 2.19Ω 1.75Ω 1.37Ω 1.09Ω 0.87Ω 0.69Ω 0.55Ω 0.44Ω 0.35Ω
230V ☓
0.95/(5 ☓ In)
4. ALL DIMENSIONS IN MILLIMETER AND
ELEVATIONS IN METERS UNLESS
1/31/2022 10:28:56 PM BIM 360://Damac Data Center/DMC20001M_SHG_ELEC_R20_CENTRAL.rvt
IF ONE OF THE EXTRANEOUS-CONDUCTIVE-PARTS IS CONNECTED TO AN EXPOSED-CONDUCTIVE-PART, THE BOND MUST BE NO SMALLER OTHERWISE SPECIFIED.
TYPE C CIRCUIT BREAKER (BS EN 60898 MCB AND BS EN 61009-1 RCBO)
EARTHING THAN THAT REQUIRED FOR BONDS BETWEEN EXPOSED-CONDUCTIVE-PARTS. 5. ANY COMMUNICATION WITH SPECIALIZED
NUMBER AND TYPE OF LIVE CONDUCTORS NATURE OF SUPPLY PARAMETERS SUPPLY PROTECTIVE DEVICE RATED DISCIPLINES SHOWN IN THE DRAWINGS
ARRANGEMENTS 3A 6A 10A 16A 20A 25A 32A 40A 50A 63A 80A 100A 125A In SHALL BE THROUGH THE ENGINEER.
PROTECTED CABLES CURRENT
NOMINAL VOLTAGE EXPOSED-TO-EXPOSED EXPOSED-TO-EXTRANEOUS EXTRANEOUS-TO-EXTRANEOUS
TN-C AC
× DC (Un/U0) 13.8kV/7.9kV BS/EN/IEC IEC 62271-100 CIRCUIT CONDUCTOR SIZE
CONDUCTIVE PARTS CONDUCTIVE PARTS CONDUCTIVE PARTS Zs N/A 3.64Ω 2.19Ω 1.37Ω 1.09Ω 0.87Ω 0.68Ω 0.55Ω 0.44Ω 0.35Ω 0.27Ω 0.22Ω 0.17Ω
230V ☓
0.95/(10 ☓ In)
MARK DATE DESCRIPTION
0 16.08.2021 DESIGN DEVELOPMENT
1 mm2 4mm2 4mm2 4mm2
1-PHASE, NOMINAL 1 14.09.2021 TCDD SUBMISSION
TN-S 2-WIRE 60Hz 1.5 mm2 4mm2 4mm2 4mm2 TYPE D CIRCUIT BREAKER (BS EN 60898 MCB AND BS EN 61009-1 RCBO)
2-WIRE FREQUENCY (f) 2 19.10.2021 LONG LEAD EQUIPMENT
VACUUM CIRCUIT
TYPE 2.5mm 2
4mm 2
4mm 2
4mm 2 RATED 26.10.2021
BREAKER (VCB) 3 TECHNICAL DESIGN
TN-C-S × 2-PHASE,
3-WIRE
PROSPECTIVE
FAULT CURRENT (Ipf )
25kA 4mm2 4mm2 4mm2 4mm2
CURRENT
3A 6A 10A 16A 20A 25A 32A 40A 50A 63A 80A 100A 125A In
4 31.01.2022 ADDENDUM
AT LV SIDE 3-WIRE Zs 230V ☓
6mm2 6mm2 4mm2 4mm2 (0.1s –3s) N/A 1.82Ω 1.09Ω 0.68Ω 0.55Ω 0.44Ω 0.34Ω 0.27Ω 0.22Ω 0.17Ω 0.14Ω 0.11Ω 0.09Ω 0.95/(20 ☓ In)
3-PHASE,
TT
3-WIRE × EXTERNAL
RATED 10mm2 10mm2 6mm2 4mm2 Zs
N/A 3.64Ω 1.09Ω 1.37Ω 1.09Ω 0.87Ω 0.68Ω 0.55Ω 0.44Ω 0.35Ω 0.27Ω 0.22Ω 0.17Ω
230V ☓
© 2021 SH GROUP, INC.ALL RIGHTS RESERVED, INCLUDING BUT
OTHER N/A CURRENT 630A 16mm 2
16mm 2
10mm 2
4mm 2 (5s) 0.95/(20 ☓ In) NOT LIMITED TO THE COPYRIGHT, DESIGN AND PATENTS ACT 1988
LOOP IMPEDANCE (Ze)
3-PHASE, (In) PROJECT NO.: 2021-PR-003374
IT UNPROTECTED CABLES
4-WIRE DRAWN BY: S.K. CHECKED BY: K.T.
GENERAL NOTES LIGHTING TRANSFORMERS ELECTRICAL UTILITY SERVICES GROUNDING & BONDING POWER MANAGEMENT SYSTEM (EPMS)
DATA CENTRE & CLOUD SERVICES
1. SPECIFICATIONS ARE AN INTEGRAL PART OF THESE DRAWINGS. 1. DRAWING TO BE READ IN CONJUNCTION WITH SPECIFICATIONS 1. TRANSFORMERS SHALL BE TOTALLY ENCLOSED HIGH QUALITY 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE 1. THE CONTRACTOR PROVIDE A LOW IMPEDANCE EARTH FAULT 1. THE INDICATED POINT LIST IS FOR ONLY ONE TYPICAL “A1” SIDE OF EDGNEX DMM-1 Data Center
G+2+R | PLOT EI_028 & EI_029
AND LUMINAIRE SCHEDULE. CAST RESIN TYPE AND MANUFACTURED TO INTERNATIONAL COORDINATION OF INCOMING MV SUPPLIES MV METERING, MV PATH TO ACHIEVE AUTOMATIC DISCONNECTION TIMES, WITHIN DISTRIBUTION. THERE ARE TOTAL FIVE TYPICAL DISTRIBUTIONS King Salman Energy Park (SPARK), Dammam
2. NO PIPING, DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL STANDARDS. TRANSFORMERS SHALL BE MANUFACTURED USING SWITCHGEAR; CABLING AND TRANSFORMERS TO ENSURE THESE SPECIFIED LIMITS AND PROVIDE PROTECTION AGAINST INDIRECT “A1/2” – “B1/2” – “C1/2” – “D1/2” – “E1/2” WITH SIMILAR EQUIPMENT. Kingdom of Saudi Arabia
www.edgnex.com
EQUIPMENT SHALL BE PERMITTED TO BE LOCATED WITHIN THE 2. ALL THE LUMINAIRES IN THE SPECIFIED ROOMS INSIDE THE HIGH QUALITY MANUFACTURING PROCESS TO LIMIT THE ARE SUPPLIED, INSTALLED, TESTED AND COMMISSIONED TO MEET CONTACT WITH EXPOSED CONDUCTIVE PARTS OF THE THE ELECTRICAL EQUIPMENT VENDORS AND EPMS VENDOR SHALL
DEDICATED SPACE ABOVE THE ELECTRICAL EQUIPMENT. BUILDING SHALL BE CONTROLLED VIA PIR MOTION SENSOR: DATA POSSIBILITY OF CRACKS OCCURRING IN THE RESIN DUE TO THE BUILDING CONSTRUCTION PROGRAM AND TO COMPLY WITH INSTALLATION. INCLUDE ALL POINTS OF ALL EQUIPMENT INDICATED IN ALL FIVE CLIENT
HALLS, COLD AISLES, HOT AISLES, CRAH/FANWALL ROOMS, WATER CHANGES IN TEMPERATURE/HUMIDITY. THE REQUIREMENTS OF LOCAL AUTHORITIES HAVING DISTRIBUTIONS.
3. INSULATED ECC COPPER GROUNDING CONDUCTOR SHALL BE PLANTS, ELECTRICAL ROOMS, TELECOM ROOMS, LV ROOMS, MV JURISDICTIONS SUCH AS: MV DEPARTMENTS, LV DEPARTMENTS, 2. THE CONTRACTOR SHALL NOTE THAT THE BUILDING STRUCTURE;
INSTALLED IN ALL FINAL CIRCUITS AND FEEDERS. ROOMS, TRANSFORMER ROOMS, UPS ROOMS. 2. TRANSFORMERS SHALL BE SELECTED FROM THOSE
MANUFACTURERS WHO MANUFACTURE CAST RESIN
AND METERING DEPARTMENTS. COMPRISING REINFORCED PILES, REINFORCED COLUMNS, 2. THE EPMS SYSTEM WILL BE A SEPARATE FROM THE BMS SYSTEM.
REINFORCED SLABS, WALLS AND STRUCTURAL STEELWORK SHALL THE EPMS VENDOR UNDER DIVISION 26 – ELECTRICAL DESIGN
KHAZZAN
Kingdom of Saudi Arabia
4. EXTERIOR ELECTRICAL EQUIPMENT AND INSTALLATION SHALL BE 3. ALL LUMINAIRES INSIDE THE BUILDING THAT ARE NOT TRANSFORMERS USING A CAST RESIN WHICH IS IMPREGNATED 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING BE BONDED TOGETHER TO FORM A FARADAY CAGE. THE DOCUMENT WILL PROVIDE ALL HEAD END EQUIPMENT, SOFTWARE, www.damacproperties.com
WEATHERPROOF. CONTROLLED BY PIR MOTION SENSOR SHALL BE CONTROLLED VIA WITH DENSE GLASS FIBRE MATTING PROVIDING A MORE ELASTIC DETAILS OF LOCAL AUTHORITIES HAVING JURISDICTIONS REINFORCING WILL BE UTILIZED AS THE LIGHTNING PROTECTION SERVER, NETWORKING EQUIPMENT ETC. REQUIRED FOR THE
NORMAL LIGHTING SWITCH. INSULATION. PROTECTION RELAYS, RELAY SETTINGS AND COORDINATE THESE SYSTEM AND SHALL BE CONNECTED TO THE GENERAL EARTHING EPMS SYSTEM FUNCTION AND OPERATION. THE MEP
5. ALL OTHER SERVICES SHOWN ARE INDICATIVE AND SHALL BE LEAD CONSULTANT
SETTINGS WITH THE CLIENTS MV SWITCHGEAR PROTECTION SYSTEM. CONTRACTOR AND ELECTRICAL EQUIPMENT VENDORS WILL
VERIFIED, COORDINATED AND APPROVED BY QUALIFIED AGENCY 4. EXACT LOCATIONS OF ALL LIGHT FITTINGS, SENSORS, AND 3. TRANSFORMERS SHALL BE PROVIDED WITH AUTOMATIC FORCED SETTINGS. PROVIDE ALL WORK IN THE ELECTRICAL EQUIPMENT AS
PRIOR TO ANY WORK ONSITE. SWITCHES TO BE INSTALLED AS PER THE DRAWING. COOLING. 3. THE EARTHING SYSTEM SHALL COMPRISE AN MV EARTHING DESCRIBED IN THE ELECTRICAL DESIGN DOCUMENTS AND SHALL
3. THE CONTRACTOR SHALL PROVIDE ALL MV AND LV UTILITY SYSTEM, GENERATOR NEUTRAL EARTHING SYSTEM AND LV COORDINATE ALL WORK AND PROVIDE ETHERNET CONNECTION
6. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS 5. ELECTRICAL INSTALLATION FOR LIGHTING AND EMERGENCY 4. TRANSFORMER TO CARRY THE FULL LOAD OF THE LV METERS SOURCED FROM LOCAL AUTHORITIES HAVING EARTHING SYSTEM SUPPLIED AND INSTALLED IN ACCORDANCE FOR EPMS VENDOR. R
FOR APPROVAL PRIOR TO ANY WORK ONSITE. LIGHTING SHALL COMPLY WITH LOCAL AUTHORITIES HAVING SWITCHBOARD. AUTOMATIC LOAD SHEDDING OF NON CRITICAL JURISDICTIONS OR AN LOCAL AUTHORITIES HAVING WITH BS 7430:2011+A1:2015, BS EN 50522:2010, BS EN
JURISDICTIONS REGULATIONS. CIRCUITS SHALL NOT BE REQUIRED TO PREVENT OVERLOADING JURISDICTIONS APPROVED SUPPLIER. 61936-1:2010+A1:2014 AND LOCAL AUTHORITIES SPECIFIC 3. EACH ELECTRICAL EQUIPMENT VENDOR, THE EPMS VENDOR, AND
7. A SINGLE OUTLET INSTALLED ON AN INDIVIDUAL FINAL CIRCUIT THE TRANSFORMER. REQUIREMENTS. THE BMS VENDOR SHALL FULLY COORDINATE ALL WORK IN
SHALL HAVE AN AMPERE RATING OF NOT LESS THAN THAT OF THE 6. LIGHTING INSTALLATION TO BE CARRIED OUT USING SINGLE CORE A MEMBER OF SYSKA HENNESSY GROUP, INC.
4. THE CONTRACTOR SHALL CONTACT THE LOCAL AUTHORITIES WRITING AND PROVIDE FULL DETAILS OF EACH TYPE OF POINTS www.syska.com
FINAL CIRCUIT. INDICATE THE OUTLET RATING. (PVC) CABLES IN GALVANIZED STEEL TRUNKING AND SURFACE 5. TRANSFORMERS SHALL HAVE AN IP RATING OF 31 AND SHALL BE HAVING JURISDICTIONS METERING DEPARTMENT AND OBTAIN 4. THE EARTH ELECTRODE RESISTANCE INCLUDING ALL PARALLEL AND WIRING PROVIDED, MODULES PROVIDED ETC. EACH
MOUNTED STEEL CONDUITS. CLASSIFIED F1 ACCORDING TO THE HD 538 1 S1 AND HD 464 S1 COSTS FOR ALL THE LOCAL AUTHORITIES HAVING JURISDICTIONS PATHS SHALL BE 1 OHM OR LESS IN ACCORDANCE WITH LOCAL EQUIPMENT VENDOR, THE EPMS VENDOR AND THE BMS VENDOR CSA CONSULTANT
8. ALL CIRCUITS FEEDING LIFE SAFETY AND FIRE EQUIPMENT SHALL STANDARDS. METERS REQUIRED AND INCLUDE THESE COSTS WITHIN THE AUTHORITIES REGULATIONS. WILL BE RESPONSIBLE FOR A WORKING EPMS SYSTEM. THE
BE UNDERTAKEN USING FIRE-RATED, MECHANICALLY PROTECTED 7. ALL EXTERNAL LIGHTING LUMINAIRES TO BE IP68 AND TENDER. THE CONTRACTOR SHALL INSTALL THE MV METERING ELECTRICAL EQUIPMENT MANUFACTURERS SHALL COORDINATE
CABLES TO BS 8519:2010. APPROPRIATELY RATED FOR ENVIRONMENTAL CONDITIONS. 6. IF LV BUSBAR ARE PROVIDED FOR INTERCONNECTION BETWEEN WITHIN THE MV SUBSTATION, AND INSTALL LV METERING FOR 5. THE INCOMING MV SUPPLY FROM LOCAL AUTHORITIES WILL ALL WORK WITH EMPS VENDOR FOR - PQ METERS, ETHERNET
TRANSFORMERS AND MAIN LV DISTRIBUTION BOARDS, BUSBAR DATA CENTER IN LV ELECTRICAL ROOMS WITHIN THE BUILDING. COMPRISE MULTIPLE 13.8kV FEEDERS FROM THE LOCAL GATEWAYS, I/O DEVICE, PATCH PANEL REQUIREMENTS THAT ARE
9. THREE LEVELS OF SURGE PROTECTION DEVICES (SPD) WITH HIGH 8. ELECTRICAL INSTALLATION SHALL COMPLY WITH LOCAL SHALL BE COMPLETE WITH MANUFACTURER’S PROPRIETARY MV METERING WILL INCLUDE DUPLICATE CHECK METERING (I.E. 2 AUTHORITIES PRIMARY SUBSTATION. CONTINUITY OF THE TO BE PROVIDED AND MOUNTED AND WIRED IN THE ELECTRICAL
IMPEDANCE SHALL BE INSTALLED IN THE ELECTRICAL AUTHORITIES HAVING JURISDICTIONS ELECTRICITY REGULATIONS. BENDS, COMPONENTS AND SUPPORTS TO FORM A COMPLETE METERS FOR BOTH INCOMING AND OUTGOING MV CIRCUIT INCOMING LOCAL AUTHORITIES MV EARTH IS MADE AT THE EQUIPMENT BY THE ELECTRICAL EQUIPMENT MANUFACTURER, TO
DISTRIBUTION SYSTEM ACCORDING TO IEC 61643-11: BUSBAR INSTALLATION. BREAKERS). METERING SHALL BE SUPPLIED AND INSTALLED IN SUBSTATION VIA THE INCOMING CABLE ARMOUR. ENSURE COMPATIBILITY WITH THE EPMS SYSTEM. THIS
9. ELECTRICAL CONTRACTOR TO ENSURE THAT LIGHTING LOADS ACCORDANCE WITH LOCAL AUTHORITIES REGULATIONS. COORDINATION SHALL INCLUDE INFORMING THE EQUIPMENT 47037 Abu Dhabi, United Arab Emirates
· TYPE 1+2+3 SPD AT ALL MAIN DISTRIBUTION ARE WELL BALANCED ACROSS PHASES. www.hdp-os.com
7. MV ISOLATORS SHALL BE PROVIDED AND LOCATED ADJACENT TO 6. THE MV EARTHING SYSTEM SHALL COMPRISE A MAIN EARTH BAR MANUFACTURER OF ALL REQUIRED MONITORING POINTS.
BOARDS/SWITCHBOARDS REMOTE TRANSFORMER CUBICLES; THE MV ISOLATOR SHALL BE 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITHIN THE MV SWITCH ROOM, MAIN EARTH CABLE AND A
· TYPE 2+3 SPD AT ALL SUB-MAIN DISTRIBUTION BOARDS 10. LIGHTING IN MEETING ROOMS TO BE DIMMABLE. LINKED TO THE MV MONITORING SYSTEM. CASTELL KEYS SHALL BE OF THE CABLE DUCT SYSTEM AND DRAW PITS FOR THE INCOMING SEPARATE EARTH ARRAYS/MATRIX COMPLYING WITH BS 4. EACH ELECTRICAL EQUIPMENT VENDOR AND THE EPMS VENDOR AoR/EoR
· TYPE 1+3 SPD AT ALL FINAL BOARDS, PDUS, RPPS AND PDUS PROVIDED ON TRANSFORMER DOORS, MV ISOLATORS AND LOCAL AUTHORITIES HAVING JURISDICTIONS SERVICES TO 7430:2011+A1:2015 AND LOCAL AUTHORITIES REQUIREMENTS. SHALL REVIEW THE EQUIPMENT REQUIREMENTS AND SHALL
11. TERMINAL BOXES SHALL BE PROVIDED WITH DIN RAIL MOUNTED CORRESPONDING ACBS TO PREVENT ACCESS TO THE ENSURE THESE ARE INSTALLED/CONNECTED TO MEET THE CALCULATE FINAL QUANTITIES OF EQUIPMENT, CIRCUIT
LIGHTNING PROTECTION TERMINALS. TRANSFORMER ENCLOSURE WHEN THE TRANSFORMER IS
ENERGIZED.
BUILDING CONSTRUCTION PROGRAM AND ARE IN ACCORDANCE
WITH LOCAL AUTHORITIES HAVING JURISDICTIONS REGULATIONS.
7. SEPARATE EARTHING ARRAYS SHALL BE PROVIDED FOR THE
LOCAL AUTHORITIES MV SUPPLY, CLIENT MV SUPPLY, CLIENT LV
BREAKERS, I/O POINTS ETC. FROM THE ELECTRICAL SINGLE LINE
DIAGRAMS AND FLOOR PLANS. THE EQUIPMENT VENDOR, THE SAUDI
12. EXTERNAL LUMINAIRES TO BE CONTROLLED USING PHOTOCELL. SYSTEM, CLIENT MV GENERATOR SYSTEMS AND CLIENT LV EPMS VENDOR AND THE BMS VENDOR SHALL INCLUDE THE
THE CONTRACTOR SHALL DESIGN, SUPPLY AND INSTALL THE 8. ALL TRANSFORMERS SHALL BE PROVIDED WITH THERMISTERS 6. IT SHOULD BE NOTED THAT THE LOCAL AUTHORITIES INCOMING GENERATOR SYSTEMS. HIGHER QUANTITIES SHOWN, EITHER ON THE EPMS POINT LIST OR ARABTECH JARDANEH & PARTNES
LIGHTING PROTECTION SYSTEM WITH THE FOLLOWING 13. PIR DETECTORS AND TIME SWITCH CONTROL TO OVERRIDE FOR OVER TEMPERATURE PROTECTION. CABLES WILL BE TERMINATED ADJACENT TO THE SITE BOUNDARY; ON THE FLOOR PLANS/SINGLE LINE DIAGRAMS. Al Ashre' Building, Dammam, KSA
PHOTOCELL CONTROL. www.aj-group.com
REQUIREMENTS: THE CONTRACTOR SHALL JOINT AND EXTEND THE MV CABLES (3C 8. THE CONTRACTOR SHALL ALLOW FOR A FURTHER 100 EARTH
9. A DIGITAL THERMAL PROTECTION MODULE SHALL BE PROVIDED ☓ 300mm2) TO THE MV ROOM. RODS IN THE TENDER TO ALLOW FOR UNKNOWN GROUND 5. FOR THE PURPOSE OF BIDDING, THE EPMS POINT LIST AND
1. PROVIDE LIGHTNING PROTECTION SYSTEM ASSESSMENT 14. WIRING OUTSIDE THE BUILDING SHALL BE XPLE/SWA CABLE (PVC FOR EACH TRANSFORMER, THE DIGITAL THERMOMETER SHALL BE CONDITIONS. DETAILS SHOWN ON THE DRAWINGS SHALL SERVE AS A GUIDELINE
ANALYSIS AND REPORT. SUBMIT REPORT FOR REVIEW BY OWNER
AND ENGINEER PRIOR TO ORDERING ANY MATERIAL OR WORK
TYPE) ON TRAY OR IN CONDUIT. INSTALLED ON THE RELEVANT SECTION OF THE LV PANEL. THE
CONTRACTOR SHALL INSTALL ALL NECESSARY CABLING BETWEEN
MECHANICAL SERVICES 9. THE MAIN 13.8kV INTAKE SWITCHGEAR SHALL BE BONDED TO THE
TO THE EQUIPMENT MANUFACTURERS FOR THE EPMS WORK; AND
TO THE BMS/EPMS VENDOR, FOR THE TYPE AND QUANTITY OF
KEY PLAN
RELATED TO INSTALLATION. 15. WIRING IN U/G DUCTS SHALL BE XPLE/SWA/PVC. THE SENSORS AND DIGITAL THERMOMETER, ALL CABLING SHALL MAIN EARTH BAR; THE EARTH BAR SHALL BE BONDED TO EARTH EQUIPMENT, DEVICES, AND POINTS THAT ARE TO BE
BE ENCLOSED IN CONDUIT AND TRUNKING. 1. MECHANICAL SERVICES EQUIPMENT INCLUDING MECHANICAL RODS ARRAYS EXTERNAL TO THE BUILDING AS INDICATED ON THE INCORPORATED INTO THE EPMS.
2. DESIGN AND INSTALL PER IEC/EN 62305 AND IEC 60364 16. LIGHTS INSIDE THE AISLES CONTAINMENTS (HACS OR CACS) WILL EQUIPMENT CONTROL PANELS ARE SPECIFIED IN THE DRAWINGS.
REQUIREMENTS. BE CONTROLLED BY ACCESS CARD READER/CCTV THROUGH 10. CAST RESIN TRANSFORMERS SHALL BE SUITABLE FOR MECHANICAL SERVICES SPECIFICATION SECTIONS AND BMS 6. FOR THE EPMS SYSTEM, EACH ELECTRICAL EQUIPMENT VENDOR
LIGHTING ACTUATOR. CONTINUOUS INDOOR OPERATION IN A TROPICAL CLIMATE ON A 3 SPECIFICATION SECTION IN DIVISIONS 21, 22, 23 AND 25 – 10. AT THE MV SUBSTATIONS THE ARMOUR OF EACH INCOMING SHALL PROVIDE NECESSARY MONITORING HARDWARE/SOFTWARE
3. THE MASTER INSTALLER SHALL BE A MEMBER OF CENELEC AND PHASE DISTRIBUTION SYSTEM WITH SOLIDLY EARTHED NEUTRAL. MECHANICAL SERVICES SPECIFICATION. REFERENCE MUST ALSO FEEDER CABLE SHALL BE BONDED TO THE MV SWITCHGEAR IN THE ELECTRICAL EQUIPMENT/DEVICES FOR EACH EPMS POINT
SHALL BE IN A GOOD STANDING. 17. ALL LUMINAIRES, INCLUDING EMERGENCY LIGHTING LUMINAIRES BE MADE TO THE MECHANICAL EQUIPMENT SCHEDULES, EARTH BAR VIA THE CABLE GLAND EARTH TAG. (SUCH AS BREAKER POSITION CONTACTS, ALARM POINTS, SMART
SHALL COMPLY WITH RELEVANT STANDARDS, REPORTS AND 11. CAST RESIN TRANSFORMERS SHALL BE DESIGNED, SCHEMATICS AND LAYOUT DRAWINGS FOR DETAILS (NUMBERS, TRIP UNITS, ETHERNET INTERFACE, MODBUS INTERFACE ETC.).
4. THE CONTRACTOR SHALL SUBMIT THE INFORMATION OF CODES OF PRACTICES MENTIONED IN THE SPECIFICATION. ALL MANUFACTURED AND TESTED ACCORDING TO THE LATEST TYPE, RATINGS) OF MECHANICAL PLANT AND EQUIPMENT. 11. A SEPARATE EARTH CONDUCTOR SHALL BE INSTALLED BETWEEN THE ELECTRICAL EQUIPMENT VENDOR SHALL PROVIDE ALL EPMS
COMPANY/BUSINESS INFORMATION WITH SHOP DRAWING REVIEW LUMINAIRES SHALL CARRY EN EC CERTIFICATION. EDITION OF INTERNATIONAL ELECTRO TECHNICAL COMMISSION THE SWITCHGEAR AND EACH SUBSTATION EARTH BAR AND AS DEVICES SUCH AS - ETHERNET GATEWAYS, I/O MODULES, POWER
SEAL
BY THE ENGINEER. (IEC) STANDARD 60076-11, CENELEC HARMONIZATION DOCUMENT 2. ISOLATORS, SUB MAIN CABLING, FINAL CIRCUIT CABLING AND INDICATED ON THE EARTHING SCHEMATIC DRAWINGS. WHERE SUPPLIES FOR EPMS DEVICES ETC. THE ELECTRICAL EQUIPMENT
18. EMERGENCY LIGHTING LEVELS SHALL BE AN AVERAGE OF 10.8 HD 398-1 TO 398-5, HD 538-2 S1, HD 464-S1, BS EN 60076. CONTAINMENT ARE SPECIFIED IN THE ELECTRICAL SPECIFICATION SUBSTATIONS ARE REMOTE FROM THE TRANSFORMER ROOMS, VENDOR SHALL PROVIDE WIRING FROM EACH EPMS MONITORING
5. THE CONTRACTOR SHALL SUBMIT THE INFORMATION OF MASTER LUX. AND INDICATED ON THE ELECTRICAL CONTAINMENT AND PLANT THE MV EARTH SHALL BE EXTENDED VIA THE CABLE ARMOUR TO POINTS TO THE RELEVANT EPMS DEVICE. EACH EPMS POINT,
INSTALLER QUALIFICATION AND CENELEC MEMBERSHIP WITH 12. CAST RESIN TRANSFORMERS SHALL BE COMPACT AND SUITABLE ROOM POWER LAYOUT AND SCHEMATIC DRAWINGS. SUB MAIN EACH SUB STATION TRANSFORMER ISOLATOR. FROM EACH ELECTRICAL EQUIPMENT, SHALL BE WIRED AND
SHOP DRAWING REVIEW BY THE ENGINEER. 19. SELF CONTAINED EMERGENCY LIGHTING SHALL SUPPLY FOR 3 FOR EASY INSTALLATION ON SITE. ALL TRANSFORMERS SHALL BE CABLES ARE SIZED IN THE ELECTRICAL CABLE SCHEDULES. CONNECTED WITH REQUIRED MODULES FOR ETHERNET
HOURS UNDER MAINS FAILURE CONDITIONS. OF THE SAME MANUFACTURE AND SIZED AS INDICATED ON THE 12. THE LV EARTHING SYSTEM SHALL BE TN-S AND SHALL COMPRISE A TERMINATIONS IN A COPPER PATCH PANEL (RJ45) WITHIN
6. COMPLY WITH THE GENERAL CONDITIONS OF CONTRACT AND DRAWINGS. 3. ISOLATORS SHALL BE PROVIDED FOR EACH ITEM OF MECHANICAL MAIN EARTH BAR IN EACH LV ROOM, AND SEPARATE EARTH BARS ELECTRICAL EQUIPMENT BY ICT CONTRACTOR. EACH ELECTRICAL
COORDINATE ALL WORK WITH ALL OTHER TRADES AND ROOFING 20. FINAL CIRCUIT CABLING TO INDOOR LUMINAIRES SHALL IN PLANT AND EQUIPMENT SPECIFIED, REFERENCE SHALL BE MADE SHALL BE PROVIDED IN EACH ELECTRICAL ROOM AND EACH EQUIPMENT SHALL HAVE FINAL ETHERNET CONNECTIONS
CONTRACTOR. GENERAL BE SINGLE CORE PVC INSULATED CABLES ENCLOSED IN 13. THE INSULATION LEVEL OF THE CAST RESIN TRANSFORMER SHALL TO THE MECHANICAL SERVICES SCHEDULES IN DIVISION 23 FOR TELECOM ROOM. CONNECTED TO ELECTRICAL EQUIPMENT VENDOR PROVIDED
METALLIC CONDUIT AND TRUNKING, PVC CONDUITS SHALL BE COMPLY WITH THE REQUIREMENTS OF IEC 60076-11. DETAILS OF EQUIPMENT. PATCH PANEL WITHIN ELECTRICAL EQUIPMENT. THE ICT GENERAL NOTES
7. DO NOT USE ANY DISSIMILAR METALS ON THE PROJECT WITHOUT USED WHERE IT IS REQUIRED TO CAST IN CONDUITS AND CABLES 13. ALL TRANSFORMER ENCLOSURES SHALL BE BONDED TO FORM A CONTRACTOR PROVIDED PATCH PANELS SHALL HAVE SEPARATE
PRIOR APPROVAL OF ALL THREE: STRUCTURAL ENGINEER, INTO CONCRETE WALLS, CEILINGS AND FLOORS. 14. THE MV AND THE LV WINDING SHALL BE OF INSULATION CLASS F IN 4. ISOLATORS SHALL BE SUITABLE FOR THE AREA AND CONTINUOUSLY EARTHED ASSEMBLY AND THEN BONDED TO THE COPPER 500MHZ U/UTP CAT6A CABLING PATCHING AREA FOR THE 1. DO NOT SCALE FROM DRAWINGS. IF IN
DOUBT, REQUEST MORE FURTHER
ARCHITECT AND ELECTRICAL ENGINEER, ON SHOP DRAWING WITH RESPECT OF MECHANICAL AND ELECTRICAL (PARTIAL DISCHARGE ENVIRONMENT AND SHALL BE COLOR CODED TO INDICATE TRANSFORMER BODIES USING SINGLE CORE CONDUCTORS. BMS AND OTHER VENDORS-CONTRACTORS. INFORMATION.
FULL DETAILS OF MATERIAL USED 21. UNLESS OTHERWISE INDICATED, ENCLOSURES FOR LUMINAIRES TEST). THE MAXIMUM CONTINUOUS OPERATION TEMPERATURE FUNCTION, GENERAL EQUIPMENT ISOLATORS SHALL BE GREY INCOMING OR OUTGOING MV, LV CABLES AND BUS DUCT SHALL BE
2. THIS DRAWING SHALL BE READ IN
SHALL PROVIDE A MINIMUM DEGREE OF PROTECTION OF IP20 SHALL BE WITHIN THE LIMIT OF THE MAXIMUM SYSTEM (MANUFACTURERS STANDARD), ISOLATORS SERVING LIFE SAFETY BONDED TO THE ENCLOSURE METAL WORK. 7. ALL EPMS SYSTEM NETWORK SWITCHES, FIBER OPTIC CABLING, CONJUNCTION WITH THE CONTRACT
CONNECT/DISCONNECT DEVICES AS INDICATED ON THE INSULATION MATERIAL “CARELITE” COVERING BOTH SIDES. THE SINGLE CORE PVC CABLES ENCLOSED IN GALVANIZED CONDUIT SHALL BE VIA COPPER LINKS OF CSA NOT LESS THAN THE EARTH SECTION WITHIN A SWITCHGEAR/SWITCHBOARD/PANELBOARD 4. ALL DIMENSIONS IN MILLIMETER AND
DRAWINGS AND AS REQUIRED FOR SAFE MAINTENANCE OF ALL 1. THE CONTRACTOR SHALL BE REQUIRED TO SUPPLY AND INSTALL MITRED INTERLEAVED JOINTS OF THE LIMBS AND YOKES SHALL BE AND TRUNKING; THIS SHALL BE PROVIDED BY THE ELECTRICAL BAR, THE NEUTRAL CABLE BETWEEN THE TRANSFORMER STAR ELEVATIONS IN METERS UNLESS
FOR ALL EPMS DEVICES ETC.
1/31/2022 10:29:14 PM BIM 360://Damac Data Center/DMC20001M_SHG_ELEC_R20_CENTRAL.rvt
ENGINEERS’ DRAWINGS, CABLE SCHEDULES, DISTRIBUTION TECHNIQUE AND SHALL BE IN SUCH A WAY THAT A LINEAR ANY ITEM OF EQUIPMENT WHICH IS DUCT MOUNTED OR MOUNTED 16. IN GENERAL ALL SUB MAIN CABLES SHALL BE PROVIDED WITH A THE EPMS VENDOR FOR FULLY COORDINATED AND WORKING PROJECT NO.: 2021-PR-003374
BOARD SCHEDULES AND CALCULATIONS AS THE BASIS OF DESIGN 5. THE CONTRACTOR SHALL EMPLOY A SPECIALIST AND USE POTENTIAL DISTRIBUTION DURING IMPULSE STRESSES IS WITHIN PART OF AN AHU AND IS REQUIRED TO BE WITHDRAWABLE SEPARATE CPC CLIPPED TO THE SUB MAIN CABLE, THE CPC SIZE EPMS POINTS OF EACH EQUIPMENT. SUBMIT THIS LIST TO THE DRAWN BY: S.K. CHECKED BY: K.T.
AND CONVERT THEM IN TO THE LOCAL AUTHORITIES HAVING SUITABLE POWER MONITORING EQUIPMENT AT EACH OF THE MAIN ACHIEVED. THE RESONANCE FREQUENCY OF THE WINDING SHALL SHALL BE WIRED USING MULTICORE DOUBLE INSULATED HOFR SHALL BE THE SAME SIZE AS THE PHASE CONDUCTOR. ENGINEER ALONG WITH THE OTHER CLOSE OUT DOCUMENTS.
JURISDICTIONS/LOCAL AUTHORITIES HAVING JURISDICTIONS LV AND MV SWITCH ROOM LOCATIONS TO MONITOR AND RECORD BE BELOW 20 KHZ TO AVOID RESONANCE WITH THE SWITCHING CABLE. SHEET SIZE: A1
REQUIRED FORMAT AS PART OF THE SUBMITTAL AND APPROVALS POWER QUALITY. IMPULSE OF VCBS AND OVER STRESS OF THE INSULATION. 17. THE CONTRACTOR SHALL SUPPLY AND INSTALL MAIN 11. ALL WORK MUST BE APPROVED BY THE ENGINEER PRIOR TO SCALE: NTS
M
PROCESS. 8. WIRING FOR LIFE SAFETY SYSTEMS SHALL BE CARRIED OUT USING EQUIPOTENTIAL BONDS AND SUPPLEMENTARY BONDS IN COMMENCEMENT OF PURCHASING AND OR INSTALLATION. THE SHEET TITLE & NUMBER
6. UPON COMPLETION OF ASSESSMENT OF HARMONIC DISTORTION 20. THE WINDING PROCESS MUST POSITION EACH WINDING FIRE RATED FP400 MULTI-CORE CABLE AND MICC CABLE. ACCORDANCE WITH THE LOCAL AUTHORITIES WIRING VENDOR TO VENDOR COORDINATION NOTES IN FORM OF PROJECT
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRODUCING ALL THE CONTRACTOR SHALL PREPARE AND PRESENT A DETAILED ACCURATELY IN ORDER TO MINIMIZE AND CONTROL THE ELECTRIC REGULATIONS. MEMO MUST BE SUBMITTED TO ENGINEER FOR RECORDS AND FOR
DOCUMENTATION REQUIRED FOR LOCAL AUTHORITIES HAVING REPORT OF THE FINDINGS TO THE ENGINEER. STRESS ON THE INSULATION MATERIAL. COOLING DUCTS FORMED 9. REFERENCE SHALL BE MADE TO THE CABLE SCHEDULES IN THE APPROVAL.
ELECTRICAL
JURISDICTIONS APPROVALS. IN THE MV WINDING SHALL MINIMIZE THE TEMPERATURE ELECTRICAL SCHEDULES OF THIS SPECIFICATION FOR CABLE 18. MAIN EQUIPOTENTIAL BONDS AND SUPPLEMENTARY BONDS SHALL GENERAL NOTES
7. THE CONTRACTOR SHALL SELECT AND INSTALL ACTIVE HARMONIC GRADIENT IN THE COIL TO ACHIEVE THE MOST EFFICIENT TYPES AND SIZES FED FROM MOTOR POWER DISTRIBUTION COMPRISE SINGLE CORE PVC INSULATED CABLE SIZED IN 12. THE EPMS WILL UTILIZE ETHERNET AS THE HIGH-SPEED
6. THE CONTRACTOR SHALL BE AWARE AND CONVERSANT WITH THE FILTERING EQUIPMENT TO MEET WITH THE REQUIREMENTS OF COOLING. PANELS. ALL OTHER POWER AND CONTROL WIRING AND ACCORDANCE WITH LOCAL AUTHORITIES WIRING REGULATIONS. BACKBONE NETWORK.
REQUIREMENTS OF THE LOCAL AUTHORITIES PUBLICATIONS AND SEC HARMONICS LIMITS. (REFER TO APPROVED SEC HV CONTAINMENT SHALL BE DESIGNED BY THE MECHANICAL
SUBMISSION).
CODES WHEN MAKING SUBMISSIONS. SERVICES/ BMS SPECIALIST CONTRACTOR.
DMM-1-E-004
SHEET N/OTES PROJECT
SPARK SCOPE
COLOR CODE
1. THIS DRAWING IS FOR ILLUSTRATION
SPARK SUBSTATION SPARK SUBSTATION SPARK SUBSTATION PURPOSES ONLY. IT DOES N/OT REPRESENT
ALL THE LOADS OR COMPONENTS IN THE
POWER SOURCE A POWER SOURCE D PROJECT. THIS DRAWING SHALL BE READ IN
CONJUN/CTION WITH MV AND LV SINGLE DATA CENTRE & CLOUD SERVICES
13.8kV/293A/7MW FEEDER 13.8kV/293A/7MW FEEDER 13.8kV/293A/7MW FEEDER LINE DIAGRAMS AND LOAD SCHEDULES. EDGNEX DMM-1 Data Center
POWER SOURCE B POWER SOURCE E 3C x 185sqmm Cu/XLPE/SWA/PVC 3C x 185sqmm Cu/XLPE/SWA/PVC 3C x 185sqmm Cu/XLPE/SWA/PVC G+2+R | PLOT EI_028 & EI_029
KHAZZAM SCOPE
2. THE TOPOLOGY SHOWN IS BASED ON 5N/4 King Salman Energy Park (SPARK), Dammam
DISTRIBUTED REDUNDAN/CY. Kingdom of Saudi Arabia
POWER SOURCE C UTILITY INTERFACE www.edgnex.com
CLIENT
3P/13.8kV/630A/21kA MV-SG-1 3P/13.8kV/630A/21kA MV-SG-2 3P/13.8kV/630A/21kA MV-SG-3
TO O1FICE RMU
LEAD CONSULTANT
13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP
3C x 185sqmmCu/XLPE/SWA/PVC 3C x 185sqmmCu/XLPE/SWA/PVC 3C x 185sqmmCu/XLPE/SWA/PVC 3C x 185sqmmCu/XLPE/SWA/PVC
CSA CONSULTANT
GEN-A1 XFMR-A1 GEN-B1 XFMR-B1 GEN-C1 XFMR-C1 GEN-D1 XFMR-D1 GEN-E1 XFMR-E1
3125kVA 3125kVA AN 3125kVA 3125kVA AN 3125kVA 3125kVA AN 3125kVA 3125kVA AN 3125kVA 3125kVA AN
2500kW (0.8 PF) @ 50DegC 2500kW (0.8 PF) @ 50DegC 2500kW (0.8 PF) @ 50DegC 2500kW (0.8 PF) @ 50DegC 2500kW (0.8 PF) @ 50DegC
60Hz/400Y/230V 60Hz/Dyn11 60Hz/400Y/230V 60Hz/Dyn11 60Hz/400Y/230V 60Hz/Dyn11 60Hz/400Y/230V 60Hz/Dyn11 60Hz/400Y/230V 60Hz/Dyn11 47037 Abu Dhabi, United Arab Emirates
3Φ, 4W, Xd'' = 12% LBB 13.8kV/400Y/230V/60Hz 3Φ, 4W, Xd'' = 12% LBB 13.8kV/400Y/230V/60Hz 3Φ, 4W, Xd'' = 12% LBB 13.8kV/400Y/230V/60Hz 3Φ, 4W, Xd'' = 12% LBB 13.8kV/400Y/230V/60Hz 3Φ, 4W, Xd'' = 12% LBB 13.8kV/400Y/230V/60Hz www.hdp-os.com
DCP RATED 3Φ, 4W, %uk=7% DCP RATED 3Φ, 4W, %uk=7% DCP RATED 3Φ, 4W, %uk=7% DCP RATED 3Φ, 4W, %uk=7% DCP RATED 3Φ, 4W, %uk=7%
@ 50DegC CAST-RESIN @ 50DegC CAST-RESIN @ 50DegC CAST-RESIN @ 50DegC CAST-RESIN @ 50DegC CAST-RESIN
AoR/EoR
TVRT DRY-TYPE TVRT DRY-TYPE TVRT DRY-TYPE TVRT DRY-TYPE TVRT DRY-TYPE
LOAD LOAD LOAD LOAD LOAD
IP21 IP21 IP21 IP21 IP21
BANK BANK BANK BANK BANK
TN-C-S TN-C-S TN-C-S TN-C-S TN-C-S
MSB-A1 (5000A) MSB-B1 (5000A) MSB-C1 (5000A) MSB-D1 (5000A) MSB-E1 (5000A) SAUDI
D1 A1 A1 C1 E1 D1
RIB SIB C1 B1 RIB SIB RIB SIB RIB SIB RIB SIB ARABTECH JARDANEH & PARTNES
Al Ashre' Building, Dammam, KSA
www.aj-group.com
ACCH ACCH
MAINTENANCE BYPASS
MAINTENANCE BYPASS
MAINTENANCE BYPASS
MAINTENANCE BYPASS
MAINTENANCE BYPASS
ACCH- ACCH- -RF-16 -RF-18
RF-01 RF-13 ACCH ACCH ACCH ACCH ACCH ACCH ACCH ACCH ACCH ACCH ACCH ACCH ACCH ACCH
-RF-02 -RF-07 -RF-14 -RF-03 -RF-08 -RF-15 -RF-06 -RF-04 -RF-11 -RF-16 -RF-12 -RF-05 -RF-12 -RF-17
ACCH- ACCH- KEY PLAN
UPS AHF-A1 PFC-A1 RF-06 RF-18 UPS UPS AHF-B1 PFC-B1 UPS UPS AHF-C1 PFC-C1 UPS UPS AHF-D1 PFC-D1 UPS UPS AHF-E1 PFC-E1 UPS
IT-A1-1/2 + A1-3 IT-B1-1/2 + B1-3 IT-C1-1/2 + C1-3 IT-D1-1/2 + D1-3 IT-E1-1/2 + E1-3
1800kW – 150kW 1800kW – 150kW 1800kW – 150kW 1800kW – 150kW 1800kW – 150kW
LI-ION
SDB-A1-GF LI-ION
SDB-B1-GF LI-ION
SDB-C1-GF LI-ION
SDB-D1-GF LI-ION
SDB-E1-GF
(5MIN) (5MIN) (5MIN) (5MIN) (5MIN)
EXTERNAL MAINTENANCE BYPASS
SDB-CC-A1-FF SDB-CC-A1-RF SDB-CC-B1-FF SDB-CC-B1-RF SDB-CC-C1-FF SDB-CC-C1-RF SDB-CC-D1-FF SDB-CC-D1-RF SDB-CC-E1-FF SDB-CC-E1-RF SEAL
C1 B1 C1 B1 D1 A1 D1 A1 A1 A1 C1 E1 C1 E1 D1 D1
UIB CRFW CRFW CRFW CRFW PUMP PUMP PUMP PUMP UIB CRFW CRFW CRFW CRFW CRFW PUMP PUMP PUMP PUMP PUMP UIB CRFW CRFW CRFW CRFW PUMP PUMP PUMP PUMP UIB CRFW CRFW CRFW CRFW PUMP PUMP PUMP PUMP UIB CRFW CRFW CRFW PUMP PUMP PUMP
-1F-01 -1F-06 -1F-13 -1F-18 -RF-01 -RF-06 -RF-13 -RF-18 -1F-02 -1F-07 -1F-14 -1F-16 -1F-18 -RF-02 -RF-07 -RF-14 -RF-16 -RF-18 -1F-03 -1F-08 -1F-15 -1F-06 -RF-03 -RF-08 -RF-15 -RF-06 -1F-04 -1F-11 -1F-16 -1F-12 -RF-04 -RF-11 -RF-16 -RF-12 -1F-05 -1F-12 -1F-17 -RF-05 -RF-12 -RF-17
UPS-IT-OUT-A1 (3200A) UPS-IT-OUT-B1 (3200A) UPS-IT-OUT-C1 (3200A) UPS-IT-OUT-D1 (3200A) UPS-IT-OUT-E1 (3200A)
GENERAL NOTES
LBB LBB LBB LBB LBB
1. DO NOT SCALE FROM DRAWINGS. IF IN
LOAD LOAD LOAD LOAD LOAD DOUBT, REQUEST MORE FURTHER
BANK PDU PDU PDU PDU PDU PDU PDU BANK PDU PDU PDU PDU PDU PDU PDU BANK PDU PDU PDU PDU PDU PDU PDU BANK PDU PDU PDU PDU PDU PDU PDU BANK PDU PDU PDU PDU PDU PDU PDU INFORMATION.
A1-1 A1-2 A1-3 A1-4 A1-5 A1-6 A1-7 B1-1 B1-2 B1-3 B1-4 B1-5 B1-6 B1-7 C1-1 C1-2 C1-3 C1-4 C1-5 C1-6 C1-7 D1-1 D1-2 D1-3 D1-4 D1-5 D1-6 D1-7 E1-1 E1-2 E1-3 E1-4 E1-5 E1-6 E1-7 2. THIS DRAWING SHALL BE READ IN
CONJUNCTION WITH THE CONTRACT
CONDITIONS, THE SPECIFICATIONS,
EQUIPMENT SCHEDULES AND THE
320A 320A 320A 320A 320A ARCHITECTURAL DRAWINGS.
RACK X-X-01
RACK X-X-01
RACK X-X-01
RACK X-X-01
RACK X-X-02
RACK X-X-02
RACK X-X-02
RACK X-X-02
RACK X-X-02
RACK X-X-20
RACK X-X-20
RACK X-X-20
RACK X-X-20
RACK X-X-20
RACK X-X-03
RACK X-X-03
RACK X-X-03
RACK X-X-03
RACK X-X-03
ELEVATIONS IN METERS UNLESS
1/31/2022 11:52:49 PM BIM 360://Damac Data Center/DMC20001M_SHG_ELEC_R20_CENTRAL.rvt
OTHERWISE SPECIFIED.
... ... ... ... ...
5. ANY COMMUNICATION WITH SPECIALIZED
DISCIPLINES SHOWN IN THE DRAWINGS
SHALL BE THROUGH THE ENGINEER.
320A A/B 320A B/C 320A C/D 320A D/E 320A E/A 3 26.10.2021 TECHNICAL DESIGN
4 15.11.2021 LONG LEAD EQUIPMENT
BW BW BW BW BW
5 31.01.2022 ADDENDUM
RACK X-X-01
RACK X-X-01
RACK X-X-01
RACK X-X-01
RACK X-X-01
RACK X-X-02
RACK X-X-02
RACK X-X-02
RACK X-X-02
RACK X-X-02
RACK X-X-20
RACK X-X-20
RACK X-X-20
RACK X-X-20
RACK X-X-20
RACK X-X-03
RACK X-X-03
RACK X-X-03
RACK X-X-03
RACK X-X-03
© 2021 SH GROUP, INC.ALL RIGHTS RESERVED, INCLUDING BUT
NOT LIMITED TO THE COPYRIGHT, DESIGN AND PATENTS ACT 1988
SHEET SIZE: A1
M
DMM-1-E-005
SHEET NOTES PROJECT
PLC
TIE BREAKER CUBICAL
CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA
· THE CONTRACTOR SHALL BE RESPONSIBLE
CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA
13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V
FOR CO-ORDINATION OF THE CABLE DUCT
√3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3
SYSTEM AND DRAW PITS FOR THE
INCOMING LOCAL AUTHORITIES HAVING
JURISDICTIONS SERVICES TO ENSURE A MEMBER OF SYSKA HENNESSY GROUP, INC.
THESE ARE INSTALLED/CONNECTED TO www.syska.com
MEET THE BUILDING CONSTRUCTION
PROGRAM AND ARE IN ACCORDANCE WITH
LOCAL AUTHORITIES HAVING CSA CONSULTANT
13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP JURISDICTIONS REGULATIONS.
3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC
K N/C M
K N/O
M
K N/C
M
N/C M N/O
M
N/C
M
N/C M N/O
M
N/C
M
N/C M N/O
M
N/C
M
N/C M N/O
M
SETTINGS OF 13.8kV SWITCHGEAR. ALL
OC OC OC CK CK CK CK OC
K
OC
K
OC
K
OC
K
OC
K
OC
K
OC
K
OC
K
LO O O LO
INT
ERL
INT
ER
L
86 74T INT
E RL
INT
ER
INT
ERL
86 74T INT
ERL
INT
ER
INT
E RL
86 74T INT
ERL
INT
ERL
INT
ERL
86 74T INT
ER
L
INT
ER
L
INT
ERL
86 74T INT
ER
L
RELATED CALCULATIONS TO BE SUBMITTED
BY THE SPECIALIST CONTRACTOR.
C1 L1-L3 C1 L1-L3 50 51 C1 L1-L3 C1 L1-L3 C1 L1-L3 50 51 C1 L1-L3 C1 L1-L3 C1 L1-L3 50 51 C1 L1-L3 C1 L1-L3 C1 L1-L3 50 51 C1 L1-L3 C1 L1-L3 C1 L1-L3 50 51 C1 L1-L3 D C B A
L1/L2/L3 50N 51N L1/L2/L3 50N 51N L1/L2/L3 50N 51N L1/L2/L3 50N 51N L1/L2/L3 50N 51N
T1 ASS A T1 ASS A T1 ASS A T1 ASS A T1 ASS A
150/1A 3
VSS
50G 51G
150/1A 3
VSS
50G 51G
150/1A 3
VSS
50G 51G
150/1A 3
VSS
50G 51G
150/1A 3
VSS
50G 51G · IT IS THE MV SPECIALIST CONTRACTOR
L1/L2/L3
T2 TTB
64R
L1/L2/L3
T2 TTB
64R
L1/L2/L3
T2 TTB
64R
L1/L2/L3
T2 TTB
64R
L1/L2/L3
T2 TTB
64R
RESPONSIBILITY TO PROVIDE FOR ALL
400/1A 3 94 49 400/1A 3 94 49 400/1A 3 94 49 400/1A 3 94 49 400/1A 3 94 49
13.8kV WORK WITHOUT INTERRUPTION TO
LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2
PQM TTB 51G PQM TTB 51G PQM TTB 51G PQM TTB 51G PQM TTB 51G THE EXISTING FACILITY. METHOD
49A 49T 49A 49T 49A 49T 49A 49T 49A 49T
STATEMENTS SHALL BE PUT IN PLACE FOR
ALL WORKS AND SHALL DEMONSTRATE SEAL
HOW THE WORK SHALL BE CARRIED OUT
FROM FROM FROM FROM FROM
TRANSFORMER TRANSFORMER TRANSFORMER TRANSFORMER TRANSFORMER WITHOUT INTERRUPTION TO THE EXISTING
FACILITY.
M
LEVEL 2
PQM TTB 51G
2 19.10.2021 LONG LEAD EQUIPMENT
49A 49T MOTORIZED SWITCH DISCONNECTOR 49 THERMAL OVERLOAD
3 26.10.2021 TECHNICAL DESIGN
M
FROM MOTORIZED VACUUM CIRCUIT BREAKER 49A TRANSFORMER FAULT ALARM
4 17.11.2021 LONG LEAD EQUIPMENT
TRANSFORMER
M
5 30.12.2021 STAGE 4T PACKAGE
EARTH SWITCH 49T TRANSFORMER FAULT TRIP
6 31.01.2022 ADDENDUM
LEVEL #
PQM POWER QUALITY METER (LEVEL #) 94 TRIP-FREE RELAY
DMM-1-E-006
SHEET NOTES PROJECT
PLC
TIE BREAKER CUBICAL
CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA CL 0.2, 15VA
· THE CONTRACTOR SHALL BE RESPONSIBLE
CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA CL 3P, 15VA
13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V 13.8kV 110V 110V
FOR CO-ORDINATION OF THE CABLE DUCT
√3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3 √3
SYSTEM AND DRAW PITS FOR THE
INCOMING LOCAL AUTHORITIES HAVING
JURISDICTIONS SERVICES TO ENSURE A MEMBER OF SYSKA HENNESSY GROUP, INC.
THESE ARE INSTALLED/CONNECTED TO www.syska.com
MEET THE BUILDING CONSTRUCTION
PROGRAM AND ARE IN ACCORDANCE WITH
LOCAL AUTHORITIES HAVING CSA CONSULTANT
13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP 13.8kV/293A RATED LOOP JURISDICTIONS REGULATIONS.
3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC 3C x 300sqmmCu/XLPE/SWA/PVC
K N/C M
K N/O
M
K N/C
M
N/C M N/O
M
N/C
M
N/C M N/O
M
N/C
M
N/C M N/O
M
N/C
M
N/C M N/O
M
SETTINGS OF 13.8kV SWITCHGEAR. ALL
OC OC OC CK CK CK CK OC
K
OC
K
OC
K
OC
K
OC
K
OC
K
OC
K
OC
K
LO O O LO
INT
ERL
INT
ER
L
86 74T INT
ERL
INT
ER
INT
ERL
86 74T INT
ERL
INT
ER
INT
E RL
86 74T INT
ERL
INT
ERL
INT
ERL
86 74T INT
ER
L
INT
ER
L
INT
ERL
86 74T INT
ER
L
RELATED CALCULATIONS TO BE SUBMITTED
BY THE SPECIALIST CONTRACTOR.
C1 L1-L3 C1 L1-L3 50 51 C1 L1-L3 C1 L1-L3 C1 L1-L3 50 51 C1 L1-L3 C1 L1-L3 C1 L1-L3 50 51 C1 L1-L3 C1 L1-L3 C1 L1-L3 50 51 C1 L1-L3 C1 L1-L3 C1 L1-L3 50 51 C1 L1-L3 D C B A
L1/L2/L3 50N 51N L1/L2/L3 50N 51N L1/L2/L3 50N 51N L1/L2/L3 50N 51N L1/L2/L3 50N 51N
T1 ASS A T1 ASS A T1 ASS A T1 ASS A T1 ASS A
150/1A 3
VSS
50G 51G
150/1A 3
VSS
50G 51G
150/1A 3
VSS
50G 51G
150/1A 3
VSS
50G 51G
150/1A 3
VSS
50G 51G · IT IS THE MV SPECIALIST CONTRACTOR
L1/L2/L3
T2 TTB
64R
L1/L2/L3
T2 TTB
64R
L1/L2/L3
T2 TTB
64R
L1/L2/L3
T2 TTB
64R
L1/L2/L3
T2 TTB
64R
RESPONSIBILITY TO PROVIDE FOR ALL
400/1A 3 94 49 400/1A 3 94 49 400/1A 3 94 49 400/1A 3 94 49 400/1A 3 94 49
13.8kV WORK WITHOUT INTERRUPTION TO
LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2
PQM TTB 51G PQM TTB 51G PQM TTB 51G PQM TTB 51G PQM TTB 51G THE EXISTING FACILITY. METHOD
49A 49T 49A 49T 49A 49T 49A 49T 49A 49T
STATEMENTS SHALL BE PUT IN PLACE FOR
ALL WORKS AND SHALL DEMONSTRATE SEAL
HOW THE WORK SHALL BE CARRIED OUT
FROM FROM FROM FROM FROM
TRANSFORMER TRANSFORMER TRANSFORMER TRANSFORMER TRANSFORMER WITHOUT INTERRUPTION TO THE EXISTING
FACILITY.
PHASE 2 MARK
0
DATE
19.08.2021
DESCRIPTION
DESIGN DEVELOPMENT
1 14.09.2021 TCDD SUBMISSION
MOTORIZED DISCONNECTOR 27 UNDERVOLTAGE
M
2 19.10.2021 LONG LEAD EQUIPMENT
MOTORIZED SWITCH DISCONNECTOR 49 THERMAL OVERLOAD
3 26.10.2021 TECHNICAL DESIGN
M
MOTORIZED VACUUM CIRCUIT BREAKER 49A TRANSFORMER FAULT ALARM
4 17.11.2021 LONG LEAD EQUIPMENT
M
5 30.12.2021 STAGE 4T PACKAGE
EARTH SWITCH 49T TRANSFORMER FAULT TRIP
6 31.01.2022 ADDENDUM
LEVEL #
PQM POWER QUALITY METER (LEVEL #) 94 TRIP-FREE RELAY
DMM-1-E-007
OTHER NOTES MAINS RETURN SEQUENCE OF OPERATION MAINS FAILURE SEQUENCE OF OPERATION SEQUENCE OF OPERATION NOTES SHEET NOTES PROJECT
1. MAINS SUPPLY RETURNS. 1. MAINS SUPPLY FAILS. 1. THE PROGRAMING OF MSB SWITCHBOARD 1. ANY CHANGES TO THE DISTRIBUTION
FOR ASSETS REGISTER REFER CONTROLLER SHALL BE DONE IN A WAY BOARDS DURING CONSTRUCTION MUST BE
1 TO DMM-1-E-RPT-08
GEN-IN-A1 2. GENERATOR CONTINUES TO WORK FOR THE 2. TRANSFORMER INCOMER CIRCUIT BREAKER THAT "SWINGING"" BETWEEN GENERATOR SUBMITTED AS "REVISION" ON APPROVED
4P4d GEN-A1 NEXT 5 MINUTES ON MAIN LV SWITCHBOARD OPENS. AND TRANSFORMER SOURCES IS AVOIDED. DRAWINGS TO SPARK FOR APPROVAL
In: 5000A 3125kVA DATA CENTRE & CLOUD SERVICES
M
Ir: 5000A XFMR-A1 BEFORE PROCUREMENT OF THESE PANELS.
13 2 3 2500kW (0.8 PF) 3. MAINS HEALTHY TIMER (5 MINUTES 3. REMOTE SIGNAL "TO START" IS SENT TO 2. THE SWITCHING TIME BETWEEN THE TWO
Icu: 50kA TVRT TYPE EDGNEX DMM-1 Data Center
LSIG [TU-6] 5000A/400Y/230V/4P/50kA@1sec 60Hz/400Y/230V 3150kVA AN @ 50DegC MINIMUM) TIMES OUT AND OPEN GENERATOR CONTROL PANEL. SOURCES OF THE RMU (AT 13.8kV LEVEL) 2. LEGEND: REFER TO DRAWING DMM-1-E-001. G+2+R | PLOT EI_028 & EI_029
LBB-GEN-A1 GEN-OUT-A1 3Φ, 4W, Xd'' = 12% 60Hz/Dyn11 LONG LEAD ITEM GENERATOR INCOMER CIRCUIT BREAKER SHALL NOT BE TREATED AS A UTILITY King Salman Energy Park (SPARK), Dammam
4P4d 4P4d DCP RATED 13.8kV/400Y/230V SCOPE OF WORK AT MSB SWITCHBOARD AND CLOSES 4. GENERATOR STARTS, STABILIZES AND FAILURE. 2. FOR LOAD SCHEDULES REFER TO DRAWING
In: 5000A In: 5000A Kingdom of Saudi Arabia
M M @ 55DegC 3Φ, 4W, %uk=8% (EXCLUDED FROM MEP TRANSFORMER INCOMER CIRCUIT BREAKER "READY" SIGNAL IS ISSUED. DMM-1-E-RPT-02.
Ir: 5000A Ir: 5000A www.edgnex.com
OPERATING CAST-RESIN CONTRACTOR SCOPE) AT MSB SWITCHBOARD. THIS TRANSITION 3. EACH MSB SWITCHBOARD SHALL HAVE A
Icu: 50kA LEVEL 2 Icu: 50kA
LSIG [TU-6] P M U LSIG [TU-6] TEMP. DRY-TYPE REFER TO ASSOCIATED SHALL BE DONE WITH MINIMUM TIME DELAY 5. GENERATOR INTERNAL CIRCUIT BREAKER DUAL CONTROLLERS FOR REDUNDANCY. 3. THIS DRAWING SHOWS SYSTEM AND
CLIENT
IP21 RESPONSIBILITY ON MAIN LV SWITCHBOARD. CLOSES. PRINCIPLE, IF THE DRAWING DOES NOT
TN-C-S 13 MATRIX. 4. VOLTAGE SENSING AT MSB SWITCHBOARD MEET THE MINIMUM REQUIREMENTS OF THE
TAP-CHANGER: 4 x 2.5% 4. GENERATOR SYSTEM RUNS DOWN. 6. GENERATOR INCOMER CIRCUIT BREAKER INCOMERS SHALL CONSIDER EITHER VT OR LOCAL REGULATIONS, THE CONTRACTOR
BI-DIRECTIONAL CONNECTION
(MOBILE LOAD BANK AND
HOOK-UP GENERATOR)
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
5. THE SITE RETURNS TO NORMAL AND
SUPPORTED BY MAINS.
ON MAIN LV SWITCHBOARD CLOSES. VOLTAGE SENIORS. SHALL ADD COMPONENTS TO MEET THESE
REQUIREMENTS. KHAZZAN
0.8V 50m 34/F 0.4V 25m 34/F 4. NO PIPING, DUCTS OR EQUIPMENT FOREIGN Kingdom of Saudi Arabia
TO ELECTRICAL EQUIPMENT SHALL BE www.damacproperties.com
PERMITTED TO BE LOCATED WITHIN THE
MSB-A1 9
N: 1890kW [1890kW] CB-GEN-A1 CB-XFMR-A1 DEDICATED SPACE ABOVE THE ELECTRICAL
4P4d 4P4d TYPE EQUIPMENT.
5N/4: 2276kW
FORM 4B TYPE 6 In: 5000A M M
In: 5000A 1+2+3 LEAD CONSULTANT
POWER ROOM A1 Ir: 5000A AMF WITH Ir: 5000A
Icu: 65kA LEVEL 1 E&M INTERLOCK LEVEL 1 Icu: 65kA 5. INSULATED ECC/CPC COPPER GROUNDING
5000A/400Y/230V/4P/65kA FOR 1sec LSIG [TU-6] PMU PMU LSIG [TU-6] CONDUCTOR SHALL BE INSTALLED IN ALL
CB-ACCH-RF-01 CB-ACCH-RF-06 CB-ACCH-RF-13 CB-ACCH-RF-18 BIB-A2 RIB-A1-1 SIB-A1-1 RIB-A1-2 SIB-A1-2 RIB-A1-3 BIB-A1-3 BYPASS-A1 CB-SDB-A1-GF CB-PFC-A1-1 CB-HF-A1 CB-SDB-A1-FF FINAL CIRCUITS AND FEEDERS.
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P3d 4P4d 4P4d
In: 400A In: 400A In: 400A In: 400A In: 3200A In: 1600A In: 1600A In: 1600A In: 1600A In: 400A In: 400A In: 400A In: 400A In: 630A In: 630A In: 160A 6. ALL EXTERIOR ELECTRICAL EQUIPMENT
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 3200A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 320A Ir: 320A Ir: 320A Ir: 350A Ir: 500A Ir: 630A Ir: 160A
LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA SHALL BE IP68 WEATHERPROOF. R
LEVEL 2 LEVEL 2
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6]
7. ALL CIRCUITS FEEDING LIFE SAFETY AND
FIRE EQUIPMENT SHALL BE UNDERTAKEN
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC USING FIRE-RATED, MECHANICALLY
1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 1R ☓ 4C ☓ 240 2R ☓ 4C ☓ 120 2R ☓ 4C ☓ 185 1R ☓ 4C ☓ 70 PROTECTED CABLES TO BS 8519:2010.
1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 120 2R ☓ 1C ☓ 75 2R ☓ 1C ☓ 95 1R ☓ 1C ☓ 35
7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 0.8V 12m 31/E -V 15m 31/E -V 15m 31/E 5.5V 45m 31/E A MEMBER OF SYSKA HENNESSY GROUP, INC.
8. ALL INDUCTIVE LOAD SHALL BE EQUIPPED www.syska.com
WITH 100mA OR 300mA RCD.
FROM FROM
MSB-C1 MSB-B1 – – – – – – –
9. ALL NON-INDUCTIVE LOADS SHALL BE CSA CONSULTANT
ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH 12 EQUIPPED WITH 30mA RCD.
-RF-01 -RF-06 -RF-06 -RF-13 -RF-18 -RF-18 + +
5
+ + +
5
+ +
[4P/400A] [4P/400A] [4P/400A] [4P/400A] [4P/400A] [4P/400A] PFC-A1-1 AHF-A1 10. PROVIDE UNDERVOLTAGE RELAY AND ART
IP66 IP66 IP66 IP66 IP66 IP66 250kVAR 600A FOR CRAH, CRFW, CHILLERS AND ALL
5X 50kVAR OTHER MOTOR LOADS.
V F D V F D
· WORST-CASE REACTIVE
4 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P 3P 3P 3P 3P 3P
In: 630A In: 630A In: 630A In: 630A In: 630A In: 630A In: 630A In: 160A 4P4d In: 3200A In: 40A In: 250A In: 40A In: 160A In: 160A In: 40A In: 50A In: 40A ENCLOSURE AND CLOSE THE SUPPLY
Ir: 630A Ir: 630A Ir: 630A Ir: 630A Ir: 630A Ir: 630A Ir: 630A Ir: 160A In: 3200A Ir: 3200A Ir: 40A Ir: 200A Ir: 40A Ir: 125A Ir: 125A Ir: 40A Ir: 50A Ir: 40A
Ir: 3200A LEVEL 2 LEVEL 2 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4
BREAKER TO MAIN LV SWITCHBOARD
LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2 Icu: 50kA Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA P M U Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA SUPPORTING THE CRITICAL LOADS.
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] Icu: 50kA LSI [TU-6] LSI LSI LSI LSI LSI LSI LSI LSI
LSI
4. EXCLUDING LOSSES AT NORMAL MODE.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC D C B A
2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 240 2R ☓ 4C ☓ 240 2R ☓ 4C ☓ 240 1R ☓ 4C ☓ 70 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 95 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 50 1R ☓ 4C ☓ 50 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16
2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 120 2R ☓ 1C ☓ 120 2R ☓ 1C ☓ 120 1R ☓ 1C ☓ 35 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 50 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 5. LI-ION BATTERY WITH MONITORING SYSTEM.
-V 55m 31/E -V 55m 31/E -V 55m 31/E -V 55m 31/E -V 110m 31/E -V 105m 31/E -V 100m 31/E -V 15m 31/E 0.7V 45m 31/E 0.7V 45m 31/E -V 15m 31/E -V 50m 31/E -V 50m 31/E -V 60m 31/E -V 15m 31/E -V 50m 31/E BACKUP TIME AT FULL LOAD SHALL NOT BE
LESS THAN 5 MINUTES.
[4P/125A] [4P/125A] [4P/40A] [4P/40A]
MOBILE LOAD 6. REFER TO DMC-DH-E-020 FOR TYPICAL PDU
PDU-A1-G BANK AND BUSWAY INSTALLATION.
N: 50kW [50kW] SEAL
5N/4: 63kW DB-FO-A1-GF D O L D O L D O L DB-GF-A1 D O L
FORM 2B TYPE 2 TCL: 7kW TCL: 25kW 7. THE POWER FACTOR DURING ANY MODE OF
POWER ROOM A1 MD: 7kW MD: 25kW OPERATION SHALL NOT BE BELOW 0.95 LAG
M M M M MEASURED AT MV BUS.
CRAC-GF-01 CRAC-GF-06 CRAC-GF-23 FCU-GF-02A
55kW 55kW 15kW 14kW 8. ALL CONTROL CABLING BETWEEN UPS
–FLA –FLA –FLA –FLA UNITS, UPS OUTPUT OVERCORRECT
–LRA –LRA –LRA –LRA PROTECTIVE DEVICES, AND INTERFACE UNIT
TO UPS OUTPUT PANEL SHALL BE
INSTALLED BY UPS SUPPLIER.
13 6
9. THE AUTOMATIC CHANGEOVER OF
SOURCES SHALL BE OVER "PAIRED" AIR
PDU-A1-1 PDU-A1-2 PDU-A1-3 PDU-A1-4 PDU-A1-5 PDU-A1-6 PDU-A1-7 SDB-CC-A1-FF SDB-A1-FF CIRCUIT BREAKERS AND THEIR ASSOCIATED
Q-PDU-A1-1 N: 78kW [78kW] Q-PDU-A1-2 N: 156kW [156kW] Q-PDU-A1-3 N: 156kW [156kW] Q-PDU-A1-4 N: 156kW [156kW] Q-PDU-A1-5 N: 156kW [156kW] Q-PDU-A1-6 N: 156kW [156kW] Q-PDU-A1-7 N: 156kW [156kW] SW-SDB-CC-A1-FF N: 96kW [96kW] N: 80kW [80kW] SW-SDB-A1-FF
3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d TYPE TYPE CONTRACTORS. NO EXTERNAL CONTROL
5N/4: 156kW 5N/4: 312kW 5N/4: 312kW 5N/4: 312kW 5N/4: 312kW 5N/4: 312kW 5N/4: 234kW 4P 5N/4: 96kW 5N/4: 80kW 4P GENERAL NOTES
In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 250A 2+3 FORM 2B TYPE 2 FORM 2B TYPE 2 160A 2+3 SUPPLY VOLTAGE (i.e. STATION BATTERIES)
Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 FF MECH. COORIDOR FF. ELEC. CORRIDOR ARE TO BE USED. POWER FOR MOTOR
Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA 1. DO NOT SCALE FROM DRAWINGS. IF IN
LSI LSI LSI LSI LSI LSI LSI 250A/400Y/230V/4P/25kA FOR 1sec 160A/400Y/230V/4P/15kA FOR 1sec OPERATIONS AND CONTROLS ARE TO BE
DOUBT, REQUEST MORE FURTHER
CB-A1-CC-1 CB-A1-CC-2 CB-A1-CC-3 CB-A1-CC-4 CB-SDB-A1-FF-1 CB-SDB-A1-FF-2 TAKEN FROM INCOMING SIDE OF THE
TYPE TYPE TYPE TYPE TYPE TYPE TYPE INFORMATION.
XFMR-PDU-A1-1 XFMR-PDU-A1-2 XFMR-PDU-A1-3 XFMR-PDU-A1-4 XFMR-PDU-A1-5 XFMR-PDU-A1-6 XFMR-PDU-A1-7 3P 3P 3P 3P 3P 3P DEVICE BEING POWERED.
2+3 2+3 2+3 2+3 2+3 2+3 2+3 In: 50A In: 50A In: 50A In: 50A In: 80A In: 80A
400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN Ir: 50A Ir: 50A Ir: 50A Ir: 50A Ir: 80A Ir: 80A 2. THIS DRAWING SHALL BE READ IN
60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 4
Icu: 50kA LEVEL 4
Icu: 50kA 10. MASTER-SLAVE CONFIGURATION AND WITH
PMU PMU PMU PMU PMU PMU CONJUNCTION WITH THE CONTRACT
400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V LSI LSI LSI LSI LSI LSI 4.3% DE-TUNEING EACH.
CONDITIONS, THE SPECIFICATIONS,
3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% EQUIPMENT SCHEDULES AND THE
Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE XLPE / SWA / PVC XLPE / SWA / PVC
11. LRA SHALL NOT EXCEED FLA.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC ARCHITECTURAL DRAWINGS.
TN-S TN-S TN-S TN-S TN-S TN-S TN-S 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 12. ACTIVE HARMONIC FILTERS ARE SUBJECT
5.6V 35m 31/E 5.6V 35m 31/E FROM 5.6V 35m 31/E 5.6V 35m 31/E FROM -V 50m 31/E -V 50m 31/E
TO THE POWER QUALITY ASSESSMENT BY 3. REFER TO THE ARCHITECTURAL
CB-BW-A1-1 CB-BW-A1-S CB-BW-A1-2 CB-BW-A1-3 CB-BW-A1-4 CB-BW-A1-5 CB-BW-A1-6 CB-BW-A1-7 CB-BW-A1-8 CB-BW-A1-9 CB-BW-A1-10 CB-BW-A1-11 CB-BW-A1-12 CB-BW-A1-13
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d SDB-CC-C1-FF SDB-CC-B1-FF THE MEP CONTRACTOR SHALL BE BASED ON DRAWINGS FOR DETAILS OF ALL SETTING
ISO-CRFW ISO-CRFW ISO-CRFW ISO-CRFW
In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A ISO-CRFW ISO-CRFW [4P/80] [4P/80A] FINAL EQUIPMENT SELECTION AND OUT INFORMATION. NO DIMENSIONS SHALL
-1F-01 -1F-06 -1F-13 -1F-18
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A -1F-06 -1F-18 SEC/SPARK HARMONIC LIMITS FOR BE MEASURED FROM THIS DRAWINGS.
LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA [4P/50A] [4P/50A] [4P/50A] [4P/50A]
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI [4P/50A] [4P/50A] VOLTAGE AND CURRENT DISTORTIONS.'
D O L D O L 4. ALL DIMENSIONS IN MILLIMETER AND
SOFT SOFT 13. LONG LEAD TIME SCOPE. ELEVATIONS IN METERS UNLESS
1/31/2022 10:29:46 PM BIM 360://Damac Data Center/DMC20001M_SHG_ELEC_R20_CENTRAL.rvt
XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF OTHERWISE SPECIFIED.
1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 M M
14. THE UPS SHALL MAINTAIN ITS OPERATION,
1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 M SOFT M SOFT
0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E CRAC-1F-01 CRAC-1F-06 THE PHASE ROTATION AND PHASE BALANCE 5. ANY COMMUNICATION WITH SPECIALIZED
CRFW-1F-01 CRFW-1F-13 40kW 40kW UNDER FLOATING NEUTRAL CONDITION DUE DISCIPLINES SHOWN IN THE DRAWINGS
24kW M 24kW M –FLA –FLA TO MAIN LV SWITCHBOARD 4-POLE SHALL BE THROUGH THE ENGINEER.
40 FLA 40 FLA –LRA –LRA SWITCHING. THIS CONDITION SHALL NOT
CRFW-1F-06 CRFW-1F-18 IMPACTING UPS DOWNSTREAM CIRCUITS.
40 LRA 40 LRA
24kW 24kW MARK DATE DESCRIPTION
BW-A1-1/4P/400A/Icu: 10kA/400Y/230V
BW-A1-2/4P/400A/Icu: 10kA/400Y/230V
BW-A1-3/4P/400A/Icu: 10kA/400Y/230V
BW-A1-4/4P/400A/Icu: 10kA/400Y/230V
BW-A1-5/4P/400A/Icu: 10kA/400Y/230V
BW-A1-6/4P/400A/Icu: 10kA/400Y/230V
BW-A1-7/4P/400A/Icu: 10kA/400Y/230V
BW-A1-8/4P/400A/Icu: 10kA/400Y/230V
BW-A1-9/4P/400A/Icu: 10kA/400Y/230V
BW-A1-10/4P/400A/Icu: 10kA/400Y/230V
BW-A1-11/4P/400A/Icu: 10kA/400Y/230V
BW-A1-12/4P/400A/Icu: 10kA/400Y/230V
BW-A1-13/4P/400A/Icu: 10kA/400Y/230V
1. MAINS SUPPLY RETURNS. 1. MAINS SUPPLY FAILS. 1. THE PROGRAMING OF MSB SWITCHBOARD 1. ANY CHANGES TO THE DISTRIBUTION
FOR ASSETS REGISTER REFER CONTROLLER SHALL BE DONE IN A WAY BOARDS DURING CONSTRUCTION MUST BE
1 TO DMM-1-E-RPT-08
GEN-IN-B1 2. GENERATOR CONTINUES TO WORK FOR THE 2. TRANSFORMER INCOMER CIRCUIT BREAKER THAT "SWINGING"" BETWEEN GENERATOR SUBMITTED AS "REVISION" ON APPROVED
4P4d GEN-B1 NEXT 5 MINUTES ON MAIN LV SWITCHBOARD OPENS. AND TRANSFORMER SOURCES IS AVOIDED. DRAWINGS TO SPARK FOR APPROVAL
In: 5000A 3125kVA DATA CENTRE & CLOUD SERVICES
M
Ir: 5000A XFMR-B1 BEFORE PROCUREMENT OF THESE PANELS.
13 2 3 2500kW (0.8 PF) 3. MAINS HEALTHY TIMER (5 MINUTES 3. REMOTE SIGNAL "TO START" IS SENT TO 2. THE SWITCHING TIME BETWEEN THE TWO
Icu: 50kA TVRT TYPE EDGNEX DMM-1 Data Center
LSIG [TU-6] 5000A/400Y/230V/4P/50kA@1sec 60Hz/400Y/230V
3150kVA AN @ 50DegC MINIMUM) TIMES OUT AND OPEN GENERATOR CONTROL PANEL. SOURCES OF THE RMU (AT 13.8kV LEVEL) 2. LEGEND: REFER TO DRAWING DMM-1-E-001. G+2+R | PLOT EI_028 & EI_029
LBB-GEN-B1 GEN-OUT-B1 3Φ, 4W, Xd'' = 12% 60Hz/Dyn11 LONG LEAD ITEM GENERATOR INCOMER CIRCUIT BREAKER SHALL NOT BE TREATED AS A UTILITY King Salman Energy Park (SPARK), Dammam
4P4d 4P4d DCP RATED 13.8kV/400Y/230V SCOPE OF WORK AT MSB SWITCHBOARD AND CLOSES 4. GENERATOR STARTS, STABILIZES AND FAILURE. 2. FOR LOAD SCHEDULES REFER TO DRAWING
In: 5000A In: 5000A Kingdom of Saudi Arabia
M M @ 55DegC (EXCLUDED FROM MEP TRANSFORMER INCOMER CIRCUIT BREAKER "READY" SIGNAL IS ISSUED. DMM-1-E-RPT-02.
Ir: 5000A Ir: 5000A 3Φ, 4W, %uk=8% www.edgnex.com
OPERATING CONTRACTOR SCOPE) AT MSB SWITCHBOARD. THIS TRANSITION 3. EACH MSB SWITCHBOARD SHALL HAVE A
Icu: 50kA LEVEL 2 Icu: 50kA CAST-RESIN
LSIG [TU-6] P M U LSIG [TU-6] TEMP. REFER TO ASSOCIATED SHALL BE DONE WITH MINIMUM TIME DELAY 5. GENERATOR INTERNAL CIRCUIT BREAKER DUAL CONTROLLERS FOR REDUNDANCY. 3. THIS DRAWING SHOWS SYSTEM AND
DRY-TYPE CLIENT
IP21 RESPONSIBILITY ON MAIN LV SWITCHBOARD. CLOSES. PRINCIPLE, IF THE DRAWING DOES NOT
TN-C-S 13 MATRIX. 4. VOLTAGE SENSING AT MSB SWITCHBOARD MEET THE MINIMUM REQUIREMENTS OF THE
TAP-CHANGER: 4 x 2.5% 4. GENERATOR SYSTEM RUNS DOWN. 6. GENERATOR INCOMER CIRCUIT BREAKER INCOMERS SHALL CONSIDER EITHER VT OR LOCAL REGULATIONS, THE CONTRACTOR
BI-DIRECTIONAL CONNECTION
(MOBILE LOAD BANK AND
HOOK-UP GENERATOR)
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
5. THE SITE RETURNS TO NORMAL AND
SUPPORTED BY MAINS.
ON MAIN LV SWITCHBOARD CLOSES. VOLTAGE SENIORS. SHALL ADD COMPONENTS TO MEET THESE
REQUIREMENTS. KHAZZAN
0.8V 50m 34/F 0.4V 25m 34/F 4. NO PIPING, DUCTS OR EQUIPMENT FOREIGN Kingdom of Saudi Arabia
TO ELECTRICAL EQUIPMENT SHALL BE www.damacproperties.com
PERMITTED TO BE LOCATED WITHIN THE
MSB-B1 9
N: 1610kW [1610kW] CB-GEN-B1 CB-XFMR-B1 DEDICATED SPACE ABOVE THE ELECTRICAL
4P4d 4P4d TYPE EQUIPMENT.
5N/4: 2106kW
FORM 4B TYPE 6 In: 5000A M M
In: 5000A 1+2+3 LEAD CONSULTANT
POWER ROOM B1 Ir: 5000A AMF WITH Ir: 5000A
Icu: 65kA LEVEL 1 E&M INTERLOCK LEVEL 1 Icu: 65kA 5. INSULATED ECC/CPC COPPER GROUNDING
5000A/400Y/230V/4P/65kA FOR 1sec LSIG [TU-6] PMU PMU LSIG [TU-6] CONDUCTOR SHALL BE INSTALLED IN ALL
CB-ACCH-RF-02 CB-ACCH-RF-07 CB-ACCH-RF-14 CB-ACCH-RF-16 CB-ACCH-RF-18 BIB-B1 RIB-B1-1 SIB-B1-1 RIB-B1-2 SIB-B1-2 RIB-B1-3 BIB-B1-3 BYPASS-B1 CB-MV-1 CB-MV-2 CB-MV-3 CB-SDB-B1-GF CB-PFC-B1-1 CB-HF-B1 CB-SDB-B1-FF FINAL CIRCUITS AND FEEDERS.
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P3d 3P3d 3P3d 4P4d 3P3d 4P4d 4P4d
In: 400A In: 400A In: 400A In: 400A In: 400A In: 3200A In: 1600A In: 1600A In: 1600A In: 1600A In: 400A In: 400A In: 400A In: 40A In: 40A In: 40A In: 400A In: 630A In: 630A In: 160A
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 3200A Ir: 40A Ir: 40A Ir: 40A 6. ALL EXTERIOR ELECTRICAL EQUIPMENT
Ir: 400A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 320A Ir: 320A Ir: 320A Ir: 350A Ir: 500A Ir: 630A Ir: 160A
LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 25kA LEVEL 2 Icu: 25kA LEVEL 2 Icu: 25kA Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA SHALL BE IP68 WEATHERPROOF. R
LEVEL 2 LEVEL 2
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-4] PMU LSI [TU-4] PMU LSI [TU-4] PMU LSI [TU-6] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6]
7. ALL CIRCUITS FEEDING LIFE SAFETY AND
FIRE EQUIPMENT SHALL BE UNDERTAKEN
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC
1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16
XLPE / SWA / PVC
XLPE / SWA / PVC
USING FIRE-RATED, MECHANICALLY
1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 XLPE / SWA / PVC 2R ☓ 4C ☓ 120 XLPE / SWA / PVC
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 4C ☓ 240 2R ☓ 4C ☓ 185 1R ☓ 4C ☓ 70
PROTECTED CABLES TO BS 8519:2010.
1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 2R ☓ 1C ☓ 75
7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E -V 10m 72/D -V 10m 72/D -V 10m 72/D 1R ☓ 1C ☓ 120 -V 15m 31/E 2R ☓ 1C ☓ 95 1R ☓ 1C ☓ 35 A MEMBER OF SYSKA HENNESSY GROUP, INC.
-V 15m 31/E -V 15m 31/E 1.7V 15m 31/E 8. ALL INDUCTIVE LOAD SHALL BE EQUIPPED www.syska.com
MSB-O1 MSB-O1 MSB-O1 WITH 100mA OR 300mA RCD.
FROM
MSB-E1 – – – – – – –
9. ALL NON-INDUCTIVE LOADS SHALL BE CSA CONSULTANT
ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH ATS-MV-1 ATS-MV-2 ATS-MV-3 12 EQUIPPED WITH 30mA RCD.
FEEDING FEEDING
-RF-02 -RF-02 -RF-07 -RF14 + + + + + + + [4P/40A] [4P/40A] [4P/40A]
ACCH-RF-16 ACCH-RF-18 5 5
[4P/400A] [4P/400A] [4P/400A] [4P/400A] PFC-B1-1 AHF-B1 10. PROVIDE UNDERVOLTAGE RELAY AND ART
IP66 IP66 IP66 IP66 XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC 250kVAR 600A FOR CRAH, CRFW, CHILLERS AND ALL
1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 5X 50kVAR OTHER MOTOR LOADS.
V F D V F D 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16
-V 10m 72/D -V 10m 72/D -V 10m 72/D · WORST-CASE REACTIVE
4 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P 3P 3P 3P 3P 3P 3P 3P 3P
In: 630A In: 630A In: 630A In: 630A In: 630A In: 630A In: 160A 4P4d In: 3200A In: 40A In: 250A In: 40A In: 40A In: 40A In: 40A In: 160A In: 160A In: 40A In: 40A In: 40A ENCLOSURE AND CLOSE THE SUPPLY
Ir: 630A Ir: 630A Ir: 630A Ir: 630A Ir: 630A Ir: 630A Ir: 160A In: 3200A Ir: 3200A Ir: 40A Ir: 200A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 125A Ir: 125A Ir: 40A Ir: 40A Ir: 40A
Ir: 3200A LEVEL 2 LEVEL 2 LEVEL 4
BREAKER TO MAIN LV SWITCHBOARD
LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2 Icu: 50kA Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA LEVEL
PMU
4
Icu: 50kA LEVEL
PMU
4
Icu: 50kA LEVEL
PMU
4
Icu: 50kA LEVEL 4
PMU Icu: 50kA LEVEL 4
PMU Icu: 50kA LEVEL 4
PMU Icu: 50kA LEVEL 4
PMU Icu: 50kA LEVEL 4
PMU Icu: 50kA SUPPORTING THE CRITICAL LOADS.
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] Icu: 50kA LSI [TU-6] LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI
LSI
4. EXCLUDING LOSSES AT NORMAL MODE.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC D C B A
1R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 240 1R ☓ 4C ☓ 70 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 95 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 50 1R ☓ 4C ☓ 50 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16
1R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 120 1R ☓ 1C ☓ 35 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 50 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 5. LI-ION BATTERY WITH MONITORING SYSTEM.
-V 55m 31/E -V 55m 31/E -V 55m 31/E -V 55m 31/E -V 55m 31/E -V 105m 31/E -V 15m 31/E 0.7V 45m 31/E 0.7V 45m 31/E -V 65m 31/E -V 65m 31/E -V 65m 31/E -V 65m 31/E -V 20m 31/E -V 20m 31/E -V 60m 31/E -V 15m 31/E -V 60m 31/E BACKUP TIME AT FULL LOAD SHALL NOT BE
LESS THAN 5 MINUTES.
[4P/125A] [4P/125A] [4P/125A] [4P/40A]
MOBILE LOAD 6. REFER TO DMC-DH-E-020 FOR TYPICAL PDU
PDU-B1-G BANK AND BUSWAY INSTALLATION.
N: 50kW [50kW] SEAL
5N/4: 63kW DB-B1-BMS-1 DB-B1-BMS-2 DB-B1-BMS-3 DB-B1-BMS-4 D O L D O L D O L DB-GF-B1 D O L
FORM 2B TYPE 2 TCL: 4kW TCL: 4kW TCL: 4kW TCL: 4kW TCL: 25kW 7. THE POWER FACTOR DURING ANY MODE OF
POWER ROOM B1 MD: 4kW MD: 4kW MD: 4kW MD: 4kW MD: 25kW OPERATION SHALL NOT BE BELOW 0.95 LAG
M M M M MEASURED AT MV BUS.
CRAC-GF-02 CRAC-GF-07 CRAC-GF-24 FCU-GF-02B
55kW 55kW 15kW 14kW 8. ALL CONTROL CABLING BETWEEN UPS
–FLA –FLA –FLA –FLA UNITS, UPS OUTPUT OVERCORRECT
–LRA –LRA –LRA –LRA PROTECTIVE DEVICES, AND INTERFACE UNIT
TO UPS OUTPUT PANEL SHALL BE
INSTALLED BY UPS SUPPLIER.
13 6
9. THE AUTOMATIC CHANGEOVER OF
SOURCES SHALL BE OVER "PAIRED" AIR
PDU-B1-1 PDU-B1-2 PDU-B1-3 PDU-B1-4 PDU-B1-5 PDU-B1-6 SDB-CC-B1-FF SDB-B1-FF CIRCUIT BREAKERS AND THEIR ASSOCIATED
Q-PDU-B1-1 N: 78kW [78kW] Q-PDU-B1-2 N: 156kW [156kW] Q-PDU-B1-3 N: 156kW [156kW] Q-PDU-B1-4 N: 156kW [156kW] Q-PDU-B1-5 N: 156kW [156kW] Q-PDU-B1-6 N: 156kW [156kW] SW-SDB-CC-B1-FF N: 72kW [72kW] N: 80kW [80kW] SW-SDB-B1-FF
3P3d 3P3d 3P3d 3P3d 3P3d 3P3d TYPE TYPE CONTRACTORS. NO EXTERNAL CONTROL
5N/4: 156kW 5N/4: 312kW 5N/4: 312kW 5N/4: 312kW 5N/4: 234kW 5N/4: 312kW 4P 5N/4: 96kW 5N/4: 80kW 4P GENERAL NOTES
In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 250A 2+3 FORM 2B TYPE 2 FORM 2B TYPE 2 160A 2+3 SUPPLY VOLTAGE (i.e. STATION BATTERIES)
Ir: 400A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 500A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 FF MECH. COORIDOR FF. ELEC. CORRIDOR ARE TO BE USED. POWER FOR MOTOR
Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA 1. DO NOT SCALE FROM DRAWINGS. IF IN
LSI LSI LSI LSI LSI LSI 250A/400Y/230V/4P/25kA FOR 1sec 160A/400Y/230V/4P/15kA FOR 1sec OPERATIONS AND CONTROLS ARE TO BE
DOUBT, REQUEST MORE FURTHER
CB-B1-CC-1 CB-B1-CC-2 CB-B1-CC-3 CB-B1-CC-4 CB-B1-CC-5 CB-SDB-B1-FF-1 CB-SDB-B1-FF-2 TAKEN FROM INCOMING SIDE OF THE
TYPE TYPE TYPE TYPE TYPE TYPE INFORMATION.
XFMR-PDU-B1-1 XFMR-PDU-B1-2 XFMR-PDU-B1-3 XFMR-PDU-B1-4 XFMR-PDU-B1-5 XFMR-PDU-B1-6 3P 3P 3P 3P 3P 3P 3P DEVICE BEING POWERED.
2+3 2+3 2+3 2+3 2+3 2+3 In: 50A In: 50A In: 50A In: 50A In: 50A In: 80A In: 80A
400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN Ir: 50A Ir: 50A Ir: 50A Ir: 50A Ir: 50A Ir: 80A Ir: 80A 2. THIS DRAWING SHALL BE READ IN
60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 4
Icu: 15kA LEVEL 4
Icu: 15kA 10. MASTER-SLAVE CONFIGURATION AND WITH
PMU PMU PMU PMU PMU PMU PMU CONJUNCTION WITH THE CONTRACT
400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V LSI LSI LSI LSI LSI LSI LSI 4.3% DE-TUNEING EACH.
CONDITIONS, THE SPECIFICATIONS,
3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% EQUIPMENT SCHEDULES AND THE
Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC
11. LRA SHALL NOT EXCEED FLA.
1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 ARCHITECTURAL DRAWINGS.
TN-S TN-S TN-S TN-S TN-S TN-S 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16
5.6V 35m 31/E 5.6V 35m 31/E 5.6V 35m 31/E 5.6V 35m 31/E 5.6V 35m 31/E
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 12. ACTIVE HARMONIC FILTERS ARE SUBJECT
-V 50m 31/E -V 50m 31/E
TO THE POWER QUALITY ASSESSMENT BY 3. REFER TO THE ARCHITECTURAL
CB-BW-B1-1 CB-BW-B1-S CB-BW-B1-2 CB-BW-B1-3 CB-BW-B1-4 CB-BW-B1-5 CB-BW-B1-6 CB-BW-B1-7 CB-BW-B1-8 CB-BW-B1-9 CB-BW-B1-10 CB-BW-B1-11 FROM
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d THE MEP CONTRACTOR SHALL BE BASED ON DRAWINGS FOR DETAILS OF ALL SETTING
ISO-CRFW SDB-CC-E1-FF ISO-CRFW ISO-CRFW
In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A [4P/80] [4P/80A] FINAL EQUIPMENT SELECTION AND OUT INFORMATION. NO DIMENSIONS SHALL
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A -1F-02 ISO-CRFW -1F-07 -1F-14 SEC/SPARK HARMONIC LIMITS FOR BE MEASURED FROM THIS DRAWINGS.
LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA [4P/50A] -1F-02 [4P/50A] [4P/50A]
LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI [4P/50A] VOLTAGE AND CURRENT DISTORTIONS.'
FEEDING FEEDING D O L D O L 4. ALL DIMENSIONS IN MILLIMETER AND
SOFT SOFT CRFW-1F-16 CRFW-1F-18 13. LONG LEAD TIME SCOPE. ELEVATIONS IN METERS UNLESS
1/31/2022 10:30:03 PM BIM 360://Damac Data Center/DMC20001M_SHG_ELEC_R20_CENTRAL.rvt
XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF OTHERWISE SPECIFIED.
1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 M M
14. THE UPS SHALL MAINTAIN ITS OPERATION,
1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 SOFT M M
0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E CRAC-1F-02 CRAC-1F-07 THE PHASE ROTATION AND PHASE BALANCE 5. ANY COMMUNICATION WITH SPECIALIZED
CRFW-1F-07 CRFW-1F-14 40kW 40kW UNDER FLOATING NEUTRAL CONDITION DUE DISCIPLINES SHOWN IN THE DRAWINGS
M 24kW 24kW –FLA –FLA TO MAIN LV SWITCHBOARD 4-POLE SHALL BE THROUGH THE ENGINEER.
40 FLA 40 FLA –LRA –LRA SWITCHING. THIS CONDITION SHALL NOT
CRFW-1F-02 IMPACTING UPS DOWNSTREAM CIRCUITS.
40 LRA 40 LRA
24kW MARK DATE DESCRIPTION
BW-B1-1/4P/400A/Icu: 10kA/400Y/230V
BW-B1-2/4P/400A/Icu: 10kA/400Y/230V
BW-B1-3/4P/400A/Icu: 10kA/400Y/230V
BW-B1-4/4P/400A/Icu: 10kA/400Y/230V
BW-B1-5/4P/400A/Icu: 10kA/400Y/230V
BW-B1-6/4P/400A/Icu: 10kA/400Y/230V
BW-B1-7/4P/400A/Icu: 10kA/400Y/230V
BW-B1-8/4P/400A/Icu: 10kA/400Y/230V
BW-B1-9/4P/400A/Icu: 10kA/400Y/230V
BW-B1-10/4P/400A/Icu: 10kA/400Y/230V
BW-B1-11/4P/400A/Icu: 10kA/400Y/230V
1. MAINS SUPPLY RETURNS. 1. MAINS SUPPLY FAILS. 1. THE PROGRAMING OF MSB SWITCHBOARD 1. ANY CHANGES TO THE DISTRIBUTION
FOR ASSETS REGISTER REFER CONTROLLER SHALL BE DONE IN A WAY BOARDS DURING CONSTRUCTION MUST BE
1 TO DMM-1-E-RPT-08
GEN-IN-C1 2. GENERATOR CONTINUES TO WORK FOR THE 2. TRANSFORMER INCOMER CIRCUIT BREAKER THAT "SWINGING"" BETWEEN GENERATOR SUBMITTED AS "REVISION" ON APPROVED
4P4d GEN-C1 NEXT 5 MINUTES ON MAIN LV SWITCHBOARD OPENS. AND TRANSFORMER SOURCES IS AVOIDED. DRAWINGS TO SPARK FOR APPROVAL
In: 5000A 3125kVA DATA CENTRE & CLOUD SERVICES
M
Ir: 5000A XFMR-C1 BEFORE PROCUREMENT OF THESE PANELS.
13 2 3 2500kW (0.8 PF) 3. MAINS HEALTHY TIMER (5 MINUTES 3. REMOTE SIGNAL "TO START" IS SENT TO 2. THE SWITCHING TIME BETWEEN THE TWO
Icu: 50kA TVRT TYPE EDGNEX DMM-1 Data Center
LSIG [TU-6] 5000A/400Y/230V/4P/50kA@1sec 60Hz/400Y/230V 3150kVA AN @ 50DegC MINIMUM) TIMES OUT AND OPEN GENERATOR CONTROL PANEL. SOURCES OF THE RMU (AT 13.8kV LEVEL) 2. LEGEND: REFER TO DRAWING DMM-1-E-001. G+2+R | PLOT EI_028 & EI_029
LBB-GEN-C1 GEN-OUT-C1 3Φ, 4W, Xd'' = 12% 60Hz/Dyn11 LONG LEAD ITEM GENERATOR INCOMER CIRCUIT BREAKER SHALL NOT BE TREATED AS A UTILITY King Salman Energy Park (SPARK), Dammam
4P4d 4P4d DCP RATED 13.8kV/400Y/230V SCOPE OF WORK AT MSB SWITCHBOARD AND CLOSES 4. GENERATOR STARTS, STABILIZES AND FAILURE. 2. FOR LOAD SCHEDULES REFER TO DRAWING
In: 5000A In: 5000A Kingdom of Saudi Arabia
M M @ 55DegC 3Φ, 4W, %uk=8% (EXCLUDED FROM MEP TRANSFORMER INCOMER CIRCUIT BREAKER "READY" SIGNAL IS ISSUED. DMM-1-E-RPT-02.
Ir: 5000A Ir: 5000A www.edgnex.com
OPERATING CAST-RESIN CONTRACTOR SCOPE) AT MSB SWITCHBOARD. THIS TRANSITION 3. EACH MSB SWITCHBOARD SHALL HAVE A
Icu: 50kA LEVEL 2 Icu: 50kA
LSIG [TU-6] P M U LSIG [TU-6] TEMP. DRY-TYPE REFER TO ASSOCIATED SHALL BE DONE WITH MINIMUM TIME DELAY 5. GENERATOR INTERNAL CIRCUIT BREAKER DUAL CONTROLLERS FOR REDUNDANCY. 3. THIS DRAWING SHOWS SYSTEM AND
CLIENT
IP21 RESPONSIBILITY ON MAIN LV SWITCHBOARD. CLOSES. PRINCIPLE, IF THE DRAWING DOES NOT
TN-C-S 13 MATRIX. 4. VOLTAGE SENSING AT MSB SWITCHBOARD MEET THE MINIMUM REQUIREMENTS OF THE
TAP-CHANGER: 4 x 2.5% 4. GENERATOR SYSTEM RUNS DOWN. 6. GENERATOR INCOMER CIRCUIT BREAKER INCOMERS SHALL CONSIDER EITHER VT OR LOCAL REGULATIONS, THE CONTRACTOR
BI-DIRECTIONAL CONNECTION
(MOBILE LOAD BANK AND
HOOK-UP GENERATOR)
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
5. THE SITE RETURNS TO NORMAL AND
SUPPORTED BY MAINS.
ON MAIN LV SWITCHBOARD CLOSES. VOLTAGE SENIORS. SHALL ADD COMPONENTS TO MEET THESE
REQUIREMENTS. KHAZZAN
0.8V 50m 34/F 0.4V 25m 34/F 4. NO PIPING, DUCTS OR EQUIPMENT FOREIGN Kingdom of Saudi Arabia
TO ELECTRICAL EQUIPMENT SHALL BE www.damacproperties.com
PERMITTED TO BE LOCATED WITHIN THE
MSB-C1 9
N: 1810kW [1810kW] CB-GEN-C1 CB-XFMR-C1 DEDICATED SPACE ABOVE THE ELECTRICAL
4P4d 4P4d TYPE EQUIPMENT.
5N/4: 2358kW
FORM 4B TYPE 6 In: 5000A M M
In: 5000A 1+2+3 LEAD CONSULTANT
POWER ROOM C1 Ir: 5000A AMF WITH Ir: 5000A
Icu: 65kA LEVEL 1 E&M INTERLOCK LEVEL 1 Icu: 65kA 5. INSULATED ECC/CPC COPPER GROUNDING
5000A/400Y/230V/4P/65kA FOR 1sec LSIG [TU-6] PMU PMU LSIG [TU-6] CONDUCTOR SHALL BE INSTALLED IN ALL
CB-ACCH-RF-03 CB-ACCH-RF-08 CB-ACCH-RF-15 CB-ACCH-RF-06 BIB-C1 RIB-C1-1 SIB-C1-1 RIB-C1-2 SIB-C1-2 RIB-C1-3 BIB-C1-3 BYPASS-C1 CB-SDB-C1-GF CB-PFC-C1-1 CB-HF-C1 CB-SDB-C1-FF FINAL CIRCUITS AND FEEDERS.
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P3d 4P4d 4P4d
In: 400A In: 400A In: 400A In: 400A In: 3200A In: 1600A In: 1600A In: 1600A In: 1600A In: 400A In: 400A In: 400A In: 400A In: 630A In: 630A In: 160A 6. ALL EXTERIOR ELECTRICAL EQUIPMENT
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 3200A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 320A Ir: 320A Ir: 320A Ir: 300A Ir: 500A Ir: 630A Ir: 160A
LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA SHALL BE IP68 WEATHERPROOF. R
LEVEL 2 LEVEL 2
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6]
7. ALL CIRCUITS FEEDING LIFE SAFETY AND
FIRE EQUIPMENT SHALL BE UNDERTAKEN
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC USING FIRE-RATED, MECHANICALLY
1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 XLPE / SWA / PVC 2R ☓ 4C ☓ 120 XLPE / SWA / PVC XLPE / SWA / PVC
1R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 1R ☓ 4C ☓ 70
PROTECTED CABLES TO BS 8519:2010.
1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 2R ☓ 1C ☓ 75
7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 1R ☓ 1C ☓ 95 -V 15m 31/E 2R ☓ 1C ☓ 95 1R ☓ 1C ☓ 35 A MEMBER OF SYSKA HENNESSY GROUP, INC.
-V 12m 31/E -V 15m 31/E 1.7V 45m 31/E 8. ALL INDUCTIVE LOAD SHALL BE EQUIPPED www.syska.com
WITH 100mA OR 300mA RCD.
FROM
MSB-D1 – – – – – – –
9. ALL NON-INDUCTIVE LOADS SHALL BE CSA CONSULTANT
ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH 12 EQUIPPED WITH 30mA RCD.
FEEDING
-RF-03 -RF-08 -RF-08 -RF-15 + +
5
+ + +
5
+ +
ACCH-RF-06 PFC-C1-1 AHF-C1
[4P/250A] [4P/250A] [4P/250A] [4P/250A] 10. PROVIDE UNDERVOLTAGE RELAY AND ART
IP68 IP68 IP68 IP68 250kVAR 600A FOR CRAH, CRFW, CHILLERS AND ALL
5X 50kVAR OTHER MOTOR LOADS.
V F D V F D
· WORST-CASE REACTIVE
4 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P 3P 3P 3P 3P 3P 3P 3P
In: 630A In: 630A In: 630A In: 630A In: 400A In: 630A In: 630A In: 250A 4P4d In: 3200A In: 40A In: 250A In: 40A In: 40A In: 40A In: 40A In: 160A In: 160A In: 40A In: 50A ENCLOSURE AND CLOSE THE SUPPLY
Ir: 630A Ir: 630A Ir: 6300A Ir: 630A Ir: 400A Ir: 630A Ir: 630A Ir: 250A In: 3200A Ir: 3200A Ir: 40A Ir: 160A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 125A Ir: 125A Ir: 40A Ir: 50A
Ir: 3200A LEVEL 2 LEVEL 2 LEVEL 4
BREAKER TO MAIN LV SWITCHBOARD
LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2 Icu: 50kA Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA LEVELPMU
4
Icu: 50kA LEVEL
PMU
4
Icu: 50kA LEVEL
PMU
4
Icu: 50kA LEVEL 4
PMU Icu: 50kA LEVEL 4
PMU Icu: 50kA LEVEL 4
PMU Icu: 50kA LEVEL 4
PMU Icu: 50kA SUPPORTING THE CRITICAL LOADS.
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] Icu: 50kA LSI [TU-6] LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI
LSI
4. EXCLUDING LOSSES AT NORMAL MODE.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC D C B A
2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 240 2R ☓ 4C ☓ 240 2R ☓ 4C ☓ 240 1R ☓ 4C ☓ 70 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 95 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 50 1R ☓ 4C ☓ 50 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16
2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 120 2R ☓ 1C ☓ 120 2R ☓ 1C ☓ 120 1R ☓ 1C ☓ 35 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 50 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 5. LI-ION BATTERY WITH MONITORING SYSTEM.
-V 55m 31/E -V 55m 31/E -V 55m 31/E -V 55m 31/E -V 110m 31/E -V 105m 31/E -V 100m 31/E -V 10m 31/E 0.7V 45m 31/E 0.7V 45m 31/E -V 65m 31/E -V 65m 31/E -V 65m 31/E -V 65m 31/E -V 50m 31/E -V 50m 31/E -V 50m 31/E -V 50m 31/E BACKUP TIME AT FULL LOAD SHALL NOT BE
LESS THAN 5 MINUTES.
[4P/125A] [4P/125A] [4P/40A]
MOBILE LOAD 6. REFER TO DMC-DH-E-020 FOR TYPICAL PDU
PDU-C1-G BANK AND BUSWAY INSTALLATION.
N: 75kW [75kW] SEAL
5N/4: 113kW DB-C1-BMS-1 DB-C1-BMS-2 DB-C1-BMS-3 DB-C1-BMS-4 D O L D O L D O L DB-C1-GF
FORM 2B TYPE 2 TCL: 4kW TCL: 4kW TCL: 4kW TCL: 4kW TCL: 25kW 7. THE POWER FACTOR DURING ANY MODE OF
POWER ROOM C1 MD: 4kW MD: 4kW MD: 4kW MD: 4kW MD: 25kW OPERATION SHALL NOT BE BELOW 0.95 LAG
M M M MEASURED AT MV BUS.
CRAC-GF-03 CRAC-GF-08 CRAC-GF-25
55kW 55kW 15kW 8. ALL CONTROL CABLING BETWEEN UPS
–FLA –FLA –FLA UNITS, UPS OUTPUT OVERCORRECT
–LRA –LRA –LRA PROTECTIVE DEVICES, AND INTERFACE UNIT
TO UPS OUTPUT PANEL SHALL BE
INSTALLED BY UPS SUPPLIER.
13 6
9. THE AUTOMATIC CHANGEOVER OF
SOURCES SHALL BE OVER "PAIRED" AIR
PDU-C1-1 PDU-C1-2 PDU-C1-3 PDU-C1-4 PDU-C1-5 PDU-C1-6 PDU-C1-7 SDB-CC-C1-FF SDB-C1-FF CIRCUIT BREAKERS AND THEIR ASSOCIATED
Q-PDU-C1-1 N: 156kW [156kW] Q-PDU-C1-2 N: 156kW [156kW] Q-PDU-C1-3 N: 156kW [156kW] Q-PDU-C1-4 N: 156kW [156kW] Q-PDU-C1-5 N: 78kW [78kW] Q-PDU-C1-6 N: 156kW [156kW] Q-PDU-C1-7 N: 156kW [156kW] SW-SDB-CC-C1-FF N: 96kW [96kW] N:80kW [80kW] SW-SDB-C1-FF
3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d TYPE TYPE CONTRACTORS. NO EXTERNAL CONTROL
5N/4: 312kW 5N/4: 312kW 5N/4: 234kW 5N/4: 312kW 5N/4: 156kW 5N/4: 312kW 5N/4: 312kW 4P 5N/4: 96kW 5N/4: 80kW 4P GENERAL NOTES
In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 250A 2+3 FORM 2B TYPE 2 FORM 2B TYPE 2 160A 2+3 SUPPLY VOLTAGE (i.e. STATION BATTERIES)
Ir: 630A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 500A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 400A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 FF MECH. COORIDOR FF. ELEC. CORRIDOR ARE TO BE USED. POWER FOR MOTOR
Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA 1. DO NOT SCALE FROM DRAWINGS. IF IN
LSI LSI LSI LSI LSI LSI LSI 250A/400Y/230V/4P/25kA FOR 1sec 160A/400Y/230V/4P/15kA FOR 1sec OPERATIONS AND CONTROLS ARE TO BE
DOUBT, REQUEST MORE FURTHER
CB-C1-CC-1 CB-C1-CC-2 CB-C1-CC-3 CB-C1-CC-4 CB-SDB-C1-FF-1 CB-SDB-C1-FF-2 CB-SDB-C1-FF-3 TAKEN FROM INCOMING SIDE OF THE
TYPE TYPE TYPE TYPE TYPE TYPE TYPE INFORMATION.
XFMR-PDU-C1-1 XFMR-PDU-C1-2 XFMR-PDU-C1-3 XFMR-PDU-C1-4 XFMR-PDU-C1-5 XFMR-PDU-C1-6 XFMR-PDU-C1-7 3P 3P 3P 3P 3P 3P 3P DEVICE BEING POWERED.
2+3 2+3 2+3 2+3 2+3 2+3 2+3 In: 50A In: 50A In: 50A In: 50A In: 80A In: 80A In: 40A
400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN Ir: 50A Ir: 50A Ir: 50A Ir: 50A Ir: 80A Ir: 80A Ir: 40A 2. THIS DRAWING SHALL BE READ IN
60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 4
Icu: 50kA LEVEL 4
Icu: 50kA LEVEL 4
Icu: 50kA 10. MASTER-SLAVE CONFIGURATION AND WITH
PMU PMU PMU PMU PMU PMU PMU CONJUNCTION WITH THE CONTRACT
400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V LSI LSI LSI LSI LSI LSI LSI 4.3% DE-TUNEING EACH.
CONDITIONS, THE SPECIFICATIONS,
3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% EQUIPMENT SCHEDULES AND THE
Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC
11. LRA SHALL NOT EXCEED FLA.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC ARCHITECTURAL DRAWINGS.
TN-S TN-S TN-S TN-S TN-S TN-S TN-S 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 12. ACTIVE HARMONIC FILTERS ARE SUBJECT
5.6V 35m 31/E 5.6V 35m 31/E FROM 5.6V 35m 31/E 5.6V 35m 31/E -V 35m 31/E -V 35m 31/E -V 50m 31/E
TO THE POWER QUALITY ASSESSMENT BY 3. REFER TO THE ARCHITECTURAL
CB-BW-C1-1 CB-BW-C1-2 CB-BW-C1-3 CB-BW-C1-4 CB-BW-C1-5 CB-BW-C1-6 CB-BW-C1-7 CB-BW-C1-8 CB-BW-C1-9 CB-BW-C1-7 CB-BW-C1-10 CB-BW-C1-11 CB-BW-C1-12 CB-BW-C1-13
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d SDB-CC-D1-FF THE MEP CONTRACTOR SHALL BE BASED ON DRAWINGS FOR DETAILS OF ALL SETTING
In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A ISO-CRFW ISO-CRFW ISO-CRFW ISO-CRFW [4P/80] [4P/80A] FINAL EQUIPMENT SELECTION AND OUT INFORMATION. NO DIMENSIONS SHALL
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A -1F-03 -1F-08 -1F-08 -1F-15 SEC/SPARK HARMONIC LIMITS FOR BE MEASURED FROM THIS DRAWINGS.
LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2
Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA [4P/50A] [4P/50A] [4P/50A]
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI [4P/50A] VOLTAGE AND CURRENT DISTORTIONS.'
FEEDING D O L D O L 4. ALL DIMENSIONS IN MILLIMETER AND
SOFT SOFT CRFW-1F-06 13. LONG LEAD TIME SCOPE. ELEVATIONS IN METERS UNLESS
1/31/2022 10:30:35 PM BIM 360://Damac Data Center/DMC20001M_SHG_ELEC_R20_CENTRAL.rvt
XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF OTHERWISE SPECIFIED.
1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 M M
14. THE UPS SHALL MAINTAIN ITS OPERATION,
1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 M SOFT M
0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E CRAC-1F-03 CRAC-1F-08 THE PHASE ROTATION AND PHASE BALANCE 5. ANY COMMUNICATION WITH SPECIALIZED
CRFW-1F-03 CRFW-1F-15 40kW 40kW UNDER FLOATING NEUTRAL CONDITION DUE DISCIPLINES SHOWN IN THE DRAWINGS
24kW M 24kW –FLA –FLA TO MAIN LV SWITCHBOARD 4-POLE SHALL BE THROUGH THE ENGINEER.
40 FLA 40 FLA –LRA –LRA SWITCHING. THIS CONDITION SHALL NOT
CRFW-1F-08 IMPACTING UPS DOWNSTREAM CIRCUITS.
40 LRA 40 LRA
24kW MARK DATE DESCRIPTION
BW-C1-1/4P/400A/Icu: 10kA/400Y/230V
BW-C1-2/4P/400A/Icu: 10kA/400Y/230V
BW-C1-3/4P/400A/Icu: 10kA/400Y/230V
BW-C1-4/4P/400A/Icu: 10kA/400Y/230V
BW-C1-5/4P/400A/Icu: 10kA/400Y/230V
BW-C1-6/4P/400A/Icu: 10kA/400Y/230V
BW-C1-7/4P/400A/Icu: 10kA/400Y/230V
BW-C1-8/4P/400A/Icu: 10kA/400Y/230V
BW-C1-9/4P/400A/Icu: 10kA/400Y/230V
BW-C1-10/4P/400A/Icu: 10kA/400Y/230V
BW-C1-11/4P/400A/Icu: 10kA/400Y/230V
BW-C1-12/4P/400A/Icu: 10kA/400Y/230V
BW-C1-13/4P/400A/Icu: 10kA/400Y/230V
1. MAINS SUPPLY RETURNS. 1. MAINS SUPPLY FAILS. 1. THE PROGRAMING OF MSB SWITCHBOARD 1. ANY CHANGES TO THE DISTRIBUTION
FOR ASSETS REGISTER REFER CONTROLLER SHALL BE DONE IN A WAY BOARDS DURING CONSTRUCTION MUST BE
1 TO DMM-1-E-RPT-08
GEN-IN-D1 2. GENERATOR CONTINUES TO WORK FOR THE 2. TRANSFORMER INCOMER CIRCUIT BREAKER THAT "SWINGING"" BETWEEN GENERATOR SUBMITTED AS "REVISION" ON APPROVED
4P4d GEN-D1 NEXT 5 MINUTES ON MAIN LV SWITCHBOARD OPENS. AND TRANSFORMER SOURCES IS AVOIDED. DRAWINGS TO SPARK FOR APPROVAL
In: 5000A 3125kVA DATA CENTRE & CLOUD SERVICES
M
Ir: 5000A XFMR-D1 BEFORE PROCUREMENT OF THESE PANELS.
13 2 3 2500kW (0.8 PF) 3. MAINS HEALTHY TIMER (5 MINUTES 3. REMOTE SIGNAL "TO START" IS SENT TO 2. THE SWITCHING TIME BETWEEN THE TWO
Icu: 50kA TVRT TYPE EDGNEX DMM-1 Data Center
LSIG [TU-6] 5000A/400Y/230V/4P/50kA@1sec 60Hz/400Y/230V 3150kVA AN @ 50DegC MINIMUM) TIMES OUT AND OPEN GENERATOR CONTROL PANEL. SOURCES OF THE RMU (AT 13.8kV LEVEL) 2. LEGEND: REFER TO DRAWING DMM-1-E-001. G+2+R | PLOT EI_028 & EI_029
LBB-GEN-D1 GEN-OUT-D1 3Φ, 4W, Xd'' = 12% 60Hz/Dyn11 LONG LEAD ITEM GENERATOR INCOMER CIRCUIT BREAKER SHALL NOT BE TREATED AS A UTILITY King Salman Energy Park (SPARK), Dammam
4P4d 4P4d DCP RATED 13.8kV/400Y/230V SCOPE OF WORK AT MSB SWITCHBOARD AND CLOSES 4. GENERATOR STARTS, STABILIZES AND FAILURE. 2. FOR LOAD SCHEDULES REFER TO DRAWING
In: 5000A In: 5000A Kingdom of Saudi Arabia
M M @ 55DegC 3Φ, 4W, %uk=8% (EXCLUDED FROM MEP TRANSFORMER INCOMER CIRCUIT BREAKER "READY" SIGNAL IS ISSUED. DMM-1-E-RPT-02.
Ir: 5000A Ir: 5000A www.edgnex.com
OPERATING CAST-RESIN CONTRACTOR SCOPE) AT MSB SWITCHBOARD. THIS TRANSITION 3. EACH MSB SWITCHBOARD SHALL HAVE A
Icu: 50kA LEVEL 2 Icu: 50kA
LSIG [TU-6] P M U LSIG [TU-6] TEMP. DRY-TYPE REFER TO ASSOCIATED SHALL BE DONE WITH MINIMUM TIME DELAY 5. GENERATOR INTERNAL CIRCUIT BREAKER DUAL CONTROLLERS FOR REDUNDANCY. 3. THIS DRAWING SHOWS SYSTEM AND
CLIENT
IP21 RESPONSIBILITY ON MAIN LV SWITCHBOARD. CLOSES. PRINCIPLE, IF THE DRAWING DOES NOT
TN-C-S 13 MATRIX. 4. VOLTAGE SENSING AT MSB SWITCHBOARD MEET THE MINIMUM REQUIREMENTS OF THE
TAP-CHANGER: 4 x 2.5% 4. GENERATOR SYSTEM RUNS DOWN. 6. GENERATOR INCOMER CIRCUIT BREAKER INCOMERS SHALL CONSIDER EITHER VT OR LOCAL REGULATIONS, THE CONTRACTOR
BI-DIRECTIONAL CONNECTION
(MOBILE LOAD BANK AND
HOOK-UP GENERATOR)
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
5. THE SITE RETURNS TO NORMAL AND
SUPPORTED BY MAINS.
ON MAIN LV SWITCHBOARD CLOSES. VOLTAGE SENIORS. SHALL ADD COMPONENTS TO MEET THESE
REQUIREMENTS. KHAZZAN
0.8V 50m 34/F 0.4V 25m 34/F 4. NO PIPING, DUCTS OR EQUIPMENT FOREIGN Kingdom of Saudi Arabia
TO ELECTRICAL EQUIPMENT SHALL BE www.damacproperties.com
PERMITTED TO BE LOCATED WITHIN THE
MSB-D1 9
N: 1822kW [1822kW] CB-GEN-D1 CB-XFMR-D1 DEDICATED SPACE ABOVE THE ELECTRICAL
4P4d 4P4d TYPE EQUIPMENT.
5N/4: 2408kW
FORM 4B TYPE 6 In: 5000A M M
In: 5000A 1+2+3 LEAD CONSULTANT
POWER ROOM D1 Ir: 5000A AMF WITH Ir: 5000A
Icu: 65kA LEVEL 1 E&M INTERLOCK LEVEL 1 Icu: 65kA 5. INSULATED ECC/CPC COPPER GROUNDING
5000A/400Y/230V/4P/65kA FOR 1sec LSIG [TU-6] PMU PMU LSIG [TU-6] CONDUCTOR SHALL BE INSTALLED IN ALL
CB-ACCH-RF-04 CB-ACCH-RF-11 CB-ACCH-RF-16 CB-ACCH-RF-08 CB-ACCH-RF-12 BIB-D1 RIB-D1-1 SIB-D1-1 RIB-D1-2 SIB-D1-2 RIB-D1-3 BIB-D1-3 BYPASS-D1 CB-SDB-D1-GF CB-PFC-D1-1 CB-HF-D1 CB-SDB-D1-FF FINAL CIRCUITS AND FEEDERS.
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P3d 4P4d 4P4d
In: 400A In: 400A In: 400A In: 400A In: 400A In: 3200A In: 1600A In: 1600A In: 1600A In: 1600A In: 400A In: 400A In: 400A In: 400A In: 630A In: 630A In: 250A 6. ALL EXTERIOR ELECTRICAL EQUIPMENT
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 3200A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 320A Ir: 320A Ir: 320A Ir: 350A Ir: 500A Ir: 630A Ir: 250A
LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA SHALL BE IP68 WEATHERPROOF. R
LEVEL 2 LEVEL 2
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6]
7. ALL CIRCUITS FEEDING LIFE SAFETY AND
FIRE EQUIPMENT SHALL BE UNDERTAKEN
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC USING FIRE-RATED, MECHANICALLY
1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 XLPE / SWA / PVC 2R ☓ 4C ☓ 120 XLPE / SWA / PVC
1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 120
PROTECTED CABLES TO BS 8519:2010.
1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 2R ☓ 1C ☓ 75
7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 1R ☓ 1C ☓ 120 -V 15m 31/E 1R ☓ 1C ☓ 70 A MEMBER OF SYSKA HENNESSY GROUP, INC.
-V 15m 31/E -V 45m 31/E 8. ALL INDUCTIVE LOAD SHALL BE EQUIPPED www.syska.com
WITH 100mA OR 300mA RCD.
FROM
MSB-B1 – – – – – – –
9. ALL NON-INDUCTIVE LOADS SHALL BE CSA CONSULTANT
ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH 12 EQUIPPED WITH 30mA RCD.
FEEDING FEEDING
-RF-04 -RF-11 -RF-16 -RF-16 + +
5
+ + +
5
+ +
ACCH-RF-08 ACCH-RF-12 PFC-D1-1 AHF-D1
[4P/400A] [4P/400A] [4P/400A] [4P/400A] 10. PROVIDE UNDERVOLTAGE RELAY AND ART
IP66 IP66 IP66 IP66 250kVAR 600A FOR CRAH, CRFW, CHILLERS AND ALL
5X 50kVAR OTHER MOTOR LOADS.
V F D V F D
· WORST-CASE REACTIVE
4 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P 3P 3P 3P 3P 3P 3P 3P 3P
In: 630A In: 630A In: 400A In: 630A In: 630A In: 630A In: 630A In: 100A 4P4d In: 3200A In: 40A In: 250A In: 40A In: 160A In: 160A In: 40A In: 40A In: 50A In: 80A In: 80A In: 50A ENCLOSURE AND CLOSE THE SUPPLY
Ir: 630A Ir: 630A Ir: 400A Ir: 630A Ir: 500A Ir: 630A Ir: 630A Ir: 100A In: 3200A Ir: 3200A Ir: 40A Ir: 225A Ir: 40A Ir: 125A Ir: 125A Ir: 40A Ir: 40A Ir: 50A Ir: 80A Ir: 80A Ir: 50A
Ir: 3200A LEVEL 2 LEVEL 2 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4
BREAKER TO MAIN LV SWITCHBOARD
LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2 Icu: 50kA Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA SUPPORTING THE CRITICAL LOADS.
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] Icu: 50kA LSI [TU-6] LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI
LSI
4. EXCLUDING LOSSES AT NORMAL MODE.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC D C B A
2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 1R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 150 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 1R ☓ 4C ☓ 70 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 120 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 50 1R ☓ 4C ☓ 50 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 16
2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 1R ☓ 1C ☓ 35 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 70 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 5. LI-ION BATTERY WITH MONITORING SYSTEM.
-V 55m 31/E -V 55m 31/E -V 55m 31/E -V 80m 31/E -V 80m 31/E -V 80m 31/E -V 80m 31/E -V 20m 31/E 0.7V 65m 31/E 0.7V 45m 31/E -V 15m 31/E -V 20m 31/E -V 20m 31/E -V 60m 31/E -V 60m 31/E -V 15m 31/E -V 35m 31/E -V 40m 31/E -V 35m 31/E BACKUP TIME AT FULL LOAD SHALL NOT BE
LESS THAN 5 MINUTES.
[4P/125A] [4P/125A] [4P/40A] [4P/40A] [4P/80]
MOBILE LOAD 6. REFER TO DMC-DH-E-020 FOR TYPICAL PDU
PDU-D1-G BANK AND BUSWAY INSTALLATION.
N: 38kW [38kW] SEAL
5N/4: 50kW DB-FO-D1-GF D O L D O L D O L D O L DB-GF-D1 D O L
FORM 2B TYPE 2 TCL: 7kW TCL: 25kW 7. THE POWER FACTOR DURING ANY MODE OF
POWER ROOM D1 MD: 7kW MD: 25kW OPERATION SHALL NOT BE BELOW 0.95 LAG
M M M M M MEASURED AT MV BUS.
CRAC-GF-04 CRAC-GF-09 CRAC-GF-21 CRAC-GF-28 CRAC-1F-04
55kW 55kW 15kW 15kW 40kW 8. ALL CONTROL CABLING BETWEEN UPS
–FLA –FLA –FLA –FLA –FLA UNITS, UPS OUTPUT OVERCORRECT
–LRA –LRA –LRA –LRA –LRA PROTECTIVE DEVICES, AND INTERFACE UNIT
TO UPS OUTPUT PANEL SHALL BE
INSTALLED BY UPS SUPPLIER.
13 6
9. THE AUTOMATIC CHANGEOVER OF
SOURCES SHALL BE OVER "PAIRED" AIR
PDU-D1-1 PDU-D1-2 PDU-D1-3 PDU-D1-4 PDU-D1-5 PDU-D1-6 PDU-D1-7 SDB-CC-D1-FF SDB-D1-RF CIRCUIT BREAKERS AND THEIR ASSOCIATED
Q-PDU-D1-1 N: 156kW [156kW] Q-PDU-D1-2 N: 156kW [156kW] Q-PDU-D1-3 N: 78kW [78kW] Q-PDU-D1-4 N: 156kW [156kW] Q-PDU-D1-5 N: 156kW [156kW] Q-PDU-D1-6 N: 156kW [156kW] Q-PDU-D1-7 N: 156kW [156kW] SW-SDB-CC-D1-FF N: 120kW [120kW] N: 42kW [42kW] SW-SDB-D1-RF
3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d TYPE CONTRACTORS. NO EXTERNAL CONTROL
5N/4: 312kW 5N/4: 312kW 5N/4: 156kW 5N/4: 312kW 5N/4: 234kW 5N/4: 312kW 5N/4: 312kW 4P 5N/4: 120kW 5N/4: 48kW 4P GENERAL NOTES
In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 250A 2+3 FORM 2B TYPE 2 FORM 2B TYPE 2 80A SUPPLY VOLTAGE (i.e. STATION BATTERIES)
Ir: 630A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 400A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 500A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 FF MECH. COORIDOR ROOF (IP68) ARE TO BE USED. POWER FOR MOTOR
Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA 1. DO NOT SCALE FROM DRAWINGS. IF IN
LSI LSI LSI LSI LSI LSI LSI 250A/400Y/230V/4P/25kA FOR 1sec 80A/400Y/230V/4P/15kA FOR 1sec OPERATIONS AND CONTROLS ARE TO BE
DOUBT, REQUEST MORE FURTHER
CB-D1-CC-1 CB-D1-CC-2 CB-D1-CC-3 CB-D1-CC-4 CB-D1-CC-5 CB-SDB-D1-RF-1 CB-SDB-D1-RF-2 TAKEN FROM INCOMING SIDE OF THE
TYPE TYPE TYPE TYPE TYPE TYPE TYPE INFORMATION.
XFMR-PDU-D1-1 XFMR-PDU-D1-2 XFMR-PDU-D1-3 XFMR-PDU-D1-4 XFMR-PDU-D1-5 XFMR-PDU-D1-6 XFMR-PDU-D1-7 3P 3P 3P 3P 3P 3P 3P DEVICE BEING POWERED.
2+3 2+3 2+3 2+3 2+3 2+3 2+3 In: 50A In: 50A In: 50A In: 50A In: 50A In: 80A In: 40A
400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN Ir: 50A Ir: 50A Ir: 50A Ir: 50A Ir: 50A Ir: 80A Ir: 40A 2. THIS DRAWING SHALL BE READ IN
60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 4
Icu: 15kA LEVEL 4
Icu: 15kA 10. MASTER-SLAVE CONFIGURATION AND WITH
PMU PMU PMU PMU PMU PMU PMU CONJUNCTION WITH THE CONTRACT
400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V LSI LSI LSI LSI LSI LSI LSI 4.3% DE-TUNEING EACH.
CONDITIONS, THE SPECIFICATIONS,
3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% EQUIPMENT SCHEDULES AND THE
Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE XLPE / SWA / PVC XLPE / SWA / PVC
11. LRA SHALL NOT EXCEED FLA.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC ARCHITECTURAL DRAWINGS.
TN-S TN-S TN-S TN-S TN-S TN-S TN-S 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 16
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 12. ACTIVE HARMONIC FILTERS ARE SUBJECT
5.6V 35m 31/E 5.6V 35m 31/E 5.6V 35m 31/E FROM 5.6V 35m 31/E 5.6V 35m 31/E -V 15m 31/E -V 15m 31/E
TO THE POWER QUALITY ASSESSMENT BY 3. REFER TO THE ARCHITECTURAL
CB-BW-D1-1 CB-BW-D1-2 CB-BW-D1-3 CB-BW-D1-4 CB-BW-D1-5 CB-BW-D1-S CB-BW-D1-6 CB-BW-D1-7 CB-BW-D1-8 CB-BW-D1-9 CB-BW-D1-10 CB-BW-D1-11 CB-BW-D1-12 CB-BW-D1-13
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d SDB-CC-B1-FF THE MEP CONTRACTOR SHALL BE BASED ON DRAWINGS FOR DETAILS OF ALL SETTING
In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A ISO-CRFW ISO-CRFW ISO-CRFW ISO-CRFW [4P/80] [4P/40] FINAL EQUIPMENT SELECTION AND OUT INFORMATION. NO DIMENSIONS SHALL
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A -1F-04 -1F-11 -1F-16 -1F-16 SEC/SPARK HARMONIC LIMITS FOR BE MEASURED FROM THIS DRAWINGS.
LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2
Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA [4P/50A] [4P/50A] [4P/50A]
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI [4P/50A] VOLTAGE AND CURRENT DISTORTIONS.'
FEEDING FEEDING CONTROL CONTROL 4. ALL DIMENSIONS IN MILLIMETER AND
PANEL PANEL
SOFT SOFT CRFW-1F-08 CRFW-1F-12 13. LONG LEAD TIME SCOPE. ELEVATIONS IN METERS UNLESS
1/31/2022 10:30:54 PM BIM 360://Damac Data Center/DMC20001M_SHG_ELEC_R20_CENTRAL.rvt
XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF M OTHERWISE SPECIFIED.
1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 M
14. THE UPS SHALL MAINTAIN ITS OPERATION,
1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 M M SOFT
0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E SERVICE SERVICE THE PHASE ROTATION AND PHASE BALANCE 5. ANY COMMUNICATION WITH SPECIALIZED
CRFW-1F-04 CRFW-1F-11 ELEVATOR ELEVATOR UNDER FLOATING NEUTRAL CONDITION DUE DISCIPLINES SHOWN IN THE DRAWINGS
24kW 24kW M 36kW 6kW TO MAIN LV SWITCHBOARD 4-POLE SHALL BE THROUGH THE ENGINEER.
40 FLA 40 FLA SWITCHING. THIS CONDITION SHALL NOT
CRFW-1F-16 IMPACTING UPS DOWNSTREAM CIRCUITS.
40 LRA 40 LRA
24kW MARK DATE DESCRIPTION
BW-D1-1/4P/400A/Icu: 10kA/400Y/230V
BW-D1-2/4P/400A/Icu: 10kA/400Y/230V
BW-D1-3/4P/400A/Icu: 10kA/400Y/230V
BW-D1-4/4P/400A/Icu: 10kA/400Y/230V
BW-D1-5/4P/400A/Icu: 10kA/400Y/230V
BW-D1-6/4P/400A/Icu: 10kA/400Y/230V
BW-D1-7/4P/400A/Icu: 10kA/400Y/230V
BW-D1-8/4P/400A/Icu: 10kA/400Y/230V
BW-D1-9/4P/400A/Icu: 10kA/400Y/230V
BW-D10-6/4P/400A/Icu: 10kA/400Y/230V
BW-D1-11/4P/400A/Icu: 10kA/400Y/230V
BW-D1-12/4P/400A/Icu: 10kA/400Y/230V
BW-D1-13/4P/400A/Icu: 10kA/400Y/230V
1. MAINS SUPPLY RETURNS. 1. MAINS SUPPLY FAILS. 1. THE PROGRAMING OF MSB SWITCHBOARD 1. ANY CHANGES TO THE DISTRIBUTION
FOR ASSETS REGISTER REFER CONTROLLER SHALL BE DONE IN A WAY BOARDS DURING CONSTRUCTION MUST BE
1 TO DMM-1-E-RPT-08
GEN-IN-E1 2. GENERATOR CONTINUES TO WORK FOR THE 2. TRANSFORMER INCOMER CIRCUIT BREAKER THAT "SWINGING"" BETWEEN GENERATOR SUBMITTED AS "REVISION" ON APPROVED
4P4d GEN-E1 NEXT 5 MINUTES ON MAIN LV SWITCHBOARD OPENS. AND TRANSFORMER SOURCES IS AVOIDED. DRAWINGS TO SPARK FOR APPROVAL
In: 5000A 3125kVA DATA CENTRE & CLOUD SERVICES
M
Ir: 5000A XFMR-E1 BEFORE PROCUREMENT OF THESE PANELS.
13 2 3 2500kW (0.8 PF) 3. MAINS HEALTHY TIMER (5 MINUTES 3. REMOTE SIGNAL "TO START" IS SENT TO 2. THE SWITCHING TIME BETWEEN THE TWO
Icu: 50kA TVRT TYPE EDGNEX DMM-1 Data Center
LSIG [TU-6] 5000A/400Y/230V/4P/50kA@1sec 60Hz/400Y/230V
3150kVA AN @ 50DegC MINIMUM) TIMES OUT AND OPEN GENERATOR CONTROL PANEL. SOURCES OF THE RMU (AT 13.8kV LEVEL) 2. LEGEND: REFER TO DRAWING DMM-1-E-001. G+2+R | PLOT EI_028 & EI_029
LBB-GEN-E1 GEN-OUT-E1 3Φ, 4W, Xd'' = 12% 60Hz/Dyn11 LONG LEAD ITEM GENERATOR INCOMER CIRCUIT BREAKER SHALL NOT BE TREATED AS A UTILITY King Salman Energy Park (SPARK), Dammam
4P4d 4P4d DCP RATED 13.8kV/400Y/230V SCOPE OF WORK AT MSB SWITCHBOARD AND CLOSES 4. GENERATOR STARTS, STABILIZES AND FAILURE. 2. FOR LOAD SCHEDULES REFER TO DRAWING
In: 5000A In: 5000A Kingdom of Saudi Arabia
M M @ 55DegC (EXCLUDED FROM MEP TRANSFORMER INCOMER CIRCUIT BREAKER "READY" SIGNAL IS ISSUED. DMM-1-E-RPT-02.
Ir: 5000A Ir: 5000A 3Φ, 4W, %uk=8% www.edgnex.com
OPERATING CONTRACTOR SCOPE) AT MSB SWITCHBOARD. THIS TRANSITION 3. EACH MSB SWITCHBOARD SHALL HAVE A
Icu: 50kA LEVEL 2 Icu: 50kA CAST-RESIN
LSIG [TU-6] P M U LSIG [TU-6] TEMP. REFER TO ASSOCIATED SHALL BE DONE WITH MINIMUM TIME DELAY 5. GENERATOR INTERNAL CIRCUIT BREAKER DUAL CONTROLLERS FOR REDUNDANCY. 3. THIS DRAWING SHOWS SYSTEM AND
DRY-TYPE CLIENT
IP21 RESPONSIBILITY ON MAIN LV SWITCHBOARD. CLOSES. PRINCIPLE, IF THE DRAWING DOES NOT
TN-C-S 13 MATRIX. 4. VOLTAGE SENSING AT MSB SWITCHBOARD MEET THE MINIMUM REQUIREMENTS OF THE
TAP-CHANGER: 4 x 2.5% 4. GENERATOR SYSTEM RUNS DOWN. 6. GENERATOR INCOMER CIRCUIT BREAKER INCOMERS SHALL CONSIDER EITHER VT OR LOCAL REGULATIONS, THE CONTRACTOR
BI-DIRECTIONAL CONNECTION
(MOBILE LOAD BANK AND
HOOK-UP GENERATOR)
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
5. THE SITE RETURNS TO NORMAL AND
SUPPORTED BY MAINS.
ON MAIN LV SWITCHBOARD CLOSES. VOLTAGE SENIORS. SHALL ADD COMPONENTS TO MEET THESE
REQUIREMENTS. KHAZZAN
0.8V 50m 34/F 0.4V 25m 34/F 4. NO PIPING, DUCTS OR EQUIPMENT FOREIGN Kingdom of Saudi Arabia
TO ELECTRICAL EQUIPMENT SHALL BE www.damacproperties.com
PERMITTED TO BE LOCATED WITHIN THE
MSB-E1 9
N: 1797kW [1797kW] CB-GEN-E1 CB-XFMR-E1 DEDICATED SPACE ABOVE THE ELECTRICAL
4P4d 4P4d TYPE EQUIPMENT.
5N/4: 2299kW
FORM 4B TYPE 6 In: 5000A M M
In: 5000A 1+2+3 LEAD CONSULTANT
POWER ROOM E1 Ir: 5000A AMF WITH Ir: 5000A
Icu: 65kA LEVEL 1 E&M INTERLOCK LEVEL 1 Icu: 65kA 5. INSULATED ECC/CPC COPPER GROUNDING
5000A/400Y/230V/4P/65kA FOR 1sec LSIG [TU-6] PMU PMU LSIG [TU-6] CONDUCTOR SHALL BE INSTALLED IN ALL
CB-ACCH-RF-12 CB-ACCH-RF-05 CB-ACCH-RF-17 CB-ACCH-RF-02 BIB-E1 RIB-E1-1 SIB-E1-1 RIB-E1-2 SIB-E1-2 RIB-E1-3 BIB-E1-3 BYPASS-E1 CB-SDB-E1-GF CB-PFC-E1-1 CB-HF-E1 CB-SDB-E1-FF FINAL CIRCUITS AND FEEDERS.
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P3d 4P4d 4P4d
In: 400A In: 400A In: 400A In: 400A In: 3200A In: 1600A In: 1600A In: 1600A In: 1600A In: 400A In: 400A In: 400A In: 400A In: 630A In: 630A In: 250A 6. ALL EXTERIOR ELECTRICAL EQUIPMENT
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 3200A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 320A Ir: 320A Ir: 320A Ir: 400A Ir: 500A Ir: 630A Ir: 200A
LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA SHALL BE IP68 WEATHERPROOF. R
LEVEL 2 LEVEL 2
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6]
7. ALL CIRCUITS FEEDING LIFE SAFETY AND
FIRE EQUIPMENT SHALL BE UNDERTAKEN
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC USING FIRE-RATED, MECHANICALLY
1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 XLPE / SWA / PVC 2R ☓ 4C ☓ 120 XLPE / SWA / PVC XLPE / SWA / PVC PROTECTED CABLES TO BS 8519:2010.
1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 4R ☓ 4C ☓ 300 2R ☓ 1C ☓ 75 2R ☓ 4C ☓ 185 1R ☓ 4C ☓ 95
7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 4R ☓ 1C ☓ 150 -V 15m 31/E 2R ☓ 1C ☓ 95 1R ☓ 1C ☓ 50
A MEMBER OF SYSKA HENNESSY GROUP, INC.
0.9V 12m 31/E -V 15m 31/E 1.7V 45m 31/E 8. ALL INDUCTIVE LOAD SHALL BE EQUIPPED www.syska.com
WITH 100mA OR 300mA RCD.
FROM
MSB-D1 – – – – – – –
9. ALL NON-INDUCTIVE LOADS SHALL BE CSA CONSULTANT
ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH 12 EQUIPPED WITH 30mA RCD.
FEEDING
-RF-12 -RF-12 -RF-05 -RF-17 + +
5
+ + +
5
+ +
ACCH-RF-02 PFC-E1-1 AHF-E1
[4P/400A] [4P/400A] [4P/400A] [4P/400A] 10. PROVIDE UNDERVOLTAGE RELAY AND ART
IP66 IP66 IP66 IP66 250kVAR 600A FOR CRAH, CRFW, CHILLERS AND ALL
5X 50kVAR OTHER MOTOR LOADS.
V F D V F D
· WORST-CASE REACTIVE
4 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P 3P 3P 3P 3P 3P 3P 3P
In: 630A In: 630A In: 630A In: 400A In: 630A In: 630A In: 630A In: 100A 4P4d In: 3200A In: 40A In: 250A In: 160A In: 160A In: 40A In: 40A In: 40A In: 50A In: 40A In: 40A ENCLOSURE AND CLOSE THE SUPPLY
Ir: 630A Ir: 500A Ir: 630A Ir: 400A Ir: 630A Ir: 630A Ir: 630A Ir: 100A In: 3200A Ir: 3200A Ir: 40A Ir: 200A Ir: 125A Ir: 125A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A
Ir: 3200A LEVEL 2 LEVEL 2 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4
BREAKER TO MAIN LV SWITCHBOARD
LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2 Icu: 50kA Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA SUPPORTING THE CRITICAL LOADS.
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] Icu: 50kA LSI [TU-6] LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI
LSI
4. EXCLUDING LOSSES AT NORMAL MODE.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC D C B A
2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 240 2R ☓ 4C ☓ 240 2R ☓ 4C ☓ 240 1R ☓ 4C ☓ 35 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 95 1R ☓ 4C ☓ 50 1R ☓ 4C ☓ 50 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16
2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 120 2R ☓ 1C ☓ 120 2R ☓ 1C ☓ 120 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 50 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 5. LI-ION BATTERY WITH MONITORING SYSTEM.
-V 55m 31/E -V 55m 31/E -V 55m 31/E -V 55m 31/E -V 110m 31/E -V 105m 31/E -V 100m 31/E -V 15m 31/E 0.7V 45m 31/E 0.7V 45m 31/E -V 20m 31/E -V 20m 31/E -V 60m 31/E -V 60m 31/E -V 60m 31/E -V 15m 31/E -V 60m 31/E -V 60m 31/E BACKUP TIME AT FULL LOAD SHALL NOT BE
LESS THAN 5 MINUTES.
[4P/125A] [4P/125A] [4P/40A] [4P/40A] [4P/40A]
MOBILE LOAD 6. REFER TO DMC-DH-E-020 FOR TYPICAL PDU
PDU-E1-G LOADING ROLLING
BANK AND BUSWAY INSTALLATION. SEAL
N: 38kW [38kW] DOCK SHUTTER DOOR
5N/4: 50kW D O L D O L D O L D O L D O L DB-GF-E1 5kW 3kW
FORM 2B TYPE 2 TCL: 27kW 7. THE POWER FACTOR DURING ANY MODE OF
POWER ROOM E1 MD: 27kW OPERATION SHALL NOT BE BELOW 0.95 LAG
M M M M M X2 X2
MEASURED AT MV BUS.
CRAC-GF-05 CRAC-GF-10 CRAC-GF-22 CRAC-GF-26 CRAC-GF-27
55kW 55kW 15kW 15kW 15kW 8. ALL CONTROL CABLING BETWEEN UPS
–FLA –FLA –FLA –FLA –FLA UNITS, UPS OUTPUT OVERCORRECT
–LRA –LRA –LRA –LRA –LRA PROTECTIVE DEVICES, AND INTERFACE UNIT
TO UPS OUTPUT PANEL SHALL BE
INSTALLED BY UPS SUPPLIER.
13 6
9. THE AUTOMATIC CHANGEOVER OF
SOURCES SHALL BE OVER "PAIRED" AIR
PDU-E1-1 PDU-E1-2 PDU-E1-3 PDU-E1-4 PDU-E1-5 PDU-E1-6 PDU-E1-7 SDB-CC-E1-FF SDB-E1-FF CIRCUIT BREAKERS AND THEIR ASSOCIATED
Q-PDU-E1-1 N: 156kW [156kW] Q-PDU-E1-2 N: 156kW [156kW] Q-PDU-E1-3 N: 156kW [156kW] Q-PDU-E1-4 N: 78W [78kW] Q-PDU-E1-5 N: 156kW [156kW] Q-PDU-E1-6 N: 156kW [156kW] Q-PDU-E1-7 N: 156kW [156kW] SW-SDB-CC-E1-FF N: 96kW [96kW] N:82kW [82kW] SW-SDB-E1-FF
3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d TYPE TYPE CONTRACTORS. NO EXTERNAL CONTROL
5N/4: 312kW 5N/4:234kW 5N/4: 312kW 5N/4: 156kW 5N/4: 312kW 5N/4: 312kW 5N/4: 312kW 4P 5N/4: 72kW 5N/4: 82kW 4P GENERAL NOTES
In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 250A 2+3 FORM 2B TYPE 2 FORM 2B TYPE 2 250A 2+3 SUPPLY VOLTAGE (i.e. STATION BATTERIES)
Ir: 630A ELEC COR. FF-1 Ir: 500A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 400A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 FF MECH. COORIDOR FF. ELEC. CORRIDOR ARE TO BE USED. POWER FOR MOTOR
Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA 1. DO NOT SCALE FROM DRAWINGS. IF IN
LSI LSI LSI LSI LSI LSI LSI 250A/400Y/230V/4P/25kA FOR 1sec 250A/400Y/230V/4P/50kA FOR 1sec OPERATIONS AND CONTROLS ARE TO BE
DOUBT, REQUEST MORE FURTHER
CB-E1-CC-1 CB-E1-CC-2 CB-E1-CC-3 CB-D1-CC-4 CB-SDB-E1-FF-1 CB-SDB-E1-FF-2 TAKEN FROM INCOMING SIDE OF THE
TYPE TYPE TYPE TYPE TYPE TYPE TYPE INFORMATION.
XFMR-PDU-E1-1 XFMR-PDU-E1-2 XFMR-PDU-E1-3 XFMR-PDU-E1-4 XFMR-PDU-E1-5 XFMR-PDU-E1-6 XFMR-PDU-E1-7 3P 3P 3P 3P 3P 3P DEVICE BEING POWERED.
2+3 2+3 2+3 2+3 2+3 2+3 2+3 In: 50A In: 50A In: 50A In: 50A In: 80A In: 80A
400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN Ir: 50A Ir: 50A Ir: 50A Ir: 50A Ir: 80A Ir: 80A 2. THIS DRAWING SHALL BE READ IN
60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 3
Icu: 25kA LEVEL 4
Icu: 25kA LEVEL 4
Icu: 25kA 10. MASTER-SLAVE CONFIGURATION AND WITH
PMU PMU PMU PMU PMU PMU CONJUNCTION WITH THE CONTRACT
400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V LSI LSI LSI LSI LSI LSI 4.3% DE-TUNEING EACH.
CONDITIONS, THE SPECIFICATIONS,
3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% EQUIPMENT SCHEDULES AND THE
Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE XLPE / SWA / PVC XLPE / SWA / PVC
11. LRA SHALL NOT EXCEED FLA.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC ARCHITECTURAL DRAWINGS.
TN-S TN-S TN-S TN-S TN-S TN-S TN-S 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 12. ACTIVE HARMONIC FILTERS ARE SUBJECT
5.6V 35m 31/E FROM 5.6V 35m 31/E 5.6V 35m 31/E 5.6V 35m 31/E -V 35m 31/E -V 40m 31/E TO THE POWER QUALITY ASSESSMENT BY 3. REFER TO THE ARCHITECTURAL
CB-BW-E1-1 CB-BW-E1-2 CB-BW-E1-3 CB-BW-E1-4 CB-BW-E1-5 CB-BW-E1-6 CB-BW-E1-7 CB-BW-E1-S CB-BW-E1-8 CB-BW-E1-9 CB-BW-E1-10 CB-BW-E1-11 CB-BW-E1-12 CB-BW-E1-13
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d SDB-CC-D1-FF THE MEP CONTRACTOR SHALL BE BASED ON DRAWINGS FOR DETAILS OF ALL SETTING
In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A ISO-CRFW ISO-CRFW ISO-CRFW ISO-CRFW [4P/80] FINAL EQUIPMENT SELECTION AND OUT INFORMATION. NO DIMENSIONS SHALL
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A -1F-12 -1F-12 -1F-05 -1F-17 SEC/SPARK HARMONIC LIMITS FOR BE MEASURED FROM THIS DRAWINGS.
LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2
Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA [4P/50A] [4P/50A] [4P/50A]
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI [4P/50A] VOLTAGE AND CURRENT DISTORTIONS.'
FEEDING D O L 4. ALL DIMENSIONS IN MILLIMETER AND
SOFT SOFT CRFW-1F-02 13. LONG LEAD TIME SCOPE. ELEVATIONS IN METERS UNLESS
1/31/2022 10:31:11 PM BIM 360://Damac Data Center/DMC20001M_SHG_ELEC_R20_CENTRAL.rvt
XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF OTHERWISE SPECIFIED.
1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 M
14. THE UPS SHALL MAINTAIN ITS OPERATION,
1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 SOFT M M
0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E CRAC-1F-05 THE PHASE ROTATION AND PHASE BALANCE 5. ANY COMMUNICATION WITH SPECIALIZED
CRFW-1F-05 CRFW-1F-17 40kW UNDER FLOATING NEUTRAL CONDITION DUE DISCIPLINES SHOWN IN THE DRAWINGS
M 24kW 24kW –FLA TO MAIN LV SWITCHBOARD 4-POLE SHALL BE THROUGH THE ENGINEER.
40 FLA 40 FLA –LRA SWITCHING. THIS CONDITION SHALL NOT
CRFW-1F-12 IMPACTING UPS DOWNSTREAM CIRCUITS.
40 LRA 40 LRA
24kW MARK DATE DESCRIPTION
BW-E1-1/4P/400A/Icu: 10kA/400Y/230V
BW-E1-2/4P/400A/Icu: 10kA/400Y/230V
BW-E1-3/4P/400A/Icu: 10kA/400Y/230V
BW-E1-4/4P/400A/Icu: 10kA/400Y/230V
BW-E1-5/4P/400A/Icu: 10kA/400Y/230V
BW-E1-6/4P/400A/Icu: 10kA/400Y/230V
BW-E1-7/4P/400A/Icu: 10kA/400Y/230V
BW-E1-8/4P/400A/Icu: 10kA/400Y/230V
BW-E1-9/4P/400A/Icu: 10kA/400Y/230V
BW-E10-6/4P/400A/Icu: 10kA/400Y/230V
BW-E1-11/4P/400A/Icu: 10kA/400Y/230V
BW-E1-12/4P/400A/Icu: 10kA/400Y/230V
BW-E1-13/4P/400A/Icu: 10kA/400Y/230V
1. MAINS SUPPLY RETURNS. 1. MAINS SUPPLY FAILS. 1. THE PROGRAMING OF MSB SWITCHBOARD 1. ANY CHANGES TO THE DISTRIBUTION
FOR ASSETS REGISTER REFER CONTROLLER SHALL BE DONE IN A WAY BOARDS DURING CONSTRUCTION MUST BE
GEN-IN-O1 1 TO DMM-1-E-RPT-08 2. GENERATOR CONTINUES TO WORK FOR THE 2. TRANSFORMER INCOMER CIRCUIT BREAKER THAT "SWINGING"" BETWEEN GENERATOR SUBMITTED AS "REVISION" ON APPROVED
4P4d
In: 1600A NEXT 5 MINUTES ON MAIN LV SWITCHBOARD OPENS. AND TRANSFORMER SOURCES IS AVOIDED. DRAWINGS TO SPARK FOR APPROVAL
M
Ir: 1600A BEFORE PROCUREMENT OF THESE PANELS. DATA CENTRE & CLOUD SERVICES
Icu: 35kA 3. MAINS HEALTHY TIMER (5 MINUTES 3. REMOTE SIGNAL "TO START" IS SENT TO 2. THE SWITCHING TIME BETWEEN THE TWO EDGNEX DMM-1 Data Center
9 2 3 LSIG [TU-6] 1600A/400Y/230V/4P/35A@1sec GEN-O1 MINIMUM) TIMES OUT AND OPEN GENERATOR CONTROL PANEL. SOURCES OF THE RMU (AT 13.8kV LEVEL) 2. LEGEND: REFER TO DRAWING DMM-1-E-001.
XFMR-O1 G+2+R | PLOT EI_028 & EI_029
LBB-GEN-O1 GEN-OUT-O1 1250kVA LONG LEAD ITEM GENERATOR INCOMER CIRCUIT BREAKER SHALL NOT BE TREATED AS A UTILITY
1000kVA AN @ 50DegC King Salman Energy Park (SPARK), Dammam
4P4d 4P4d 1000kW (0.8 PF) SCOPE OF WORK AT MSB SWITCHBOARD AND CLOSES 4. GENERATOR STARTS, STABILIZES AND FAILURE. 2. FOR LOAD SCHEDULES REFER TO DRAWING
60Hz/Dyn11 Kingdom of Saudi Arabia
M
In: 1600A M
In: 1600A 60Hz/400Y/230V (EXCLUDED FROM MEP TRANSFORMER INCOMER CIRCUIT BREAKER "READY" SIGNAL IS ISSUED. DMM-1-E-RPT-02.
Ir: 1600A Ir: 1600A 13.8kV/400Y/230V www.edgnex.com
3Φ, 4W, Xd'' = 9% CONTRACTOR SCOPE) AT MSB SWITCHBOARD. THIS TRANSITION 3. EACH MSB SWITCHBOARD SHALL HAVE A
Icu: 35kA LEVEL 2 Icu: 35kA 3Φ, 4W, %uk=6%
LSIG [TU-6] P M U LSIG [TU-6] ESP RATED REFER TO ASSOCIATED SHALL BE DONE WITH MINIMUM TIME DELAY 5. GENERATOR INTERNAL CIRCUIT BREAKER DUAL CONTROLLERS FOR REDUNDANCY. 3. THIS DRAWING SHOWS SYSTEM AND
CAST-RESIN CLIENT
@ 50DegC RESPONSIBILITY ON MAIN LV SWITCHBOARD. CLOSES. PRINCIPLE, IF THE DRAWING DOES NOT
DRY-TYPE
IP21 9 MATRIX. 4. VOLTAGE SENSING AT MSB SWITCHBOARD MEET THE MINIMUM REQUIREMENTS OF THE
TAP-CHANGER: 4 x 2.5% 4. GENERATOR SYSTEM RUNS DOWN. 6. GENERATOR INCOMER CIRCUIT BREAKER INCOMERS SHALL CONSIDER EITHER VT OR LOCAL REGULATIONS, THE CONTRACTOR
BI-DIRECTIONAL CONNECTION
(MOBILE LOAD BANK AND
HOOK-UP GENERATOR)
XLPE / AWA / PVC
10R ☓ 4C ☓ 300
-R ☓ 1C ☓ -
XLPE / AWA / PVC
12R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
5. THE SITE RETURNS TO NORMAL AND
SUPPORTED BY MAINS.
ON MAIN LV SWITCHBOARD CLOSES. VOLTAGE SENIORS. SHALL ADD COMPONENTS TO MEET THESE
REQUIREMENTS. KHAZZAN
-V 50m 72/D -V 15m 34/F 4. NO PIPING, DUCTS OR EQUIPMENT FOREIGN Kingdom of Saudi Arabia
MSB-O1 TO ELECTRICAL EQUIPMENT SHALL BE www.damacproperties.com
TCL: 1231kW PERMITTED TO BE LOCATED WITHIN THE
MD: 1231kW CB-GEN-O1 5 CB-XFMR-O1 DEDICATED SPACE ABOVE THE ELECTRICAL
FORM 4B TYPE 6 4P4d 4P4d TYPE EQUIPMENT.
POWER ROOM O1 In: 1600A In: 1600A 1+2+3
Ir: 1600A
M
AMF WITH
M
Ir: 1600A LEAD CONSULTANT
Icu: 35kA LEVEL 1 E&M INTERLOCK LEVEL 1 Icu: 35kA 5. INSULATED ECC/CPC COPPER GROUNDING
LSIG [TU-6] PMU PMU LSIG [TU-6] 1600A/400Y/230V/4P/35kA FOR 1sec CONDUCTOR SHALL BE INSTALLED IN ALL
CB-ACCH-RF-37 CB-ACCH-RF-38 CB-O1-GF-1 CB-O1-FF-1 CB-O1-SF-1 CB-O1-BATT CB-ELEVATOR CB-O1-GF-2 CB-O1-FF-2 CB-O1-SF-2 CB-O1-EX CB-MV-1 CB-MV-2 CB-MV-3 CB-MV-4 CB-MV-5 CB-MV-6 CB-O1-RF CB-FIRE PUMP CB-HF-O1 RIB-D1-3 BIB-D1-3 CB-PFC-A1-1 FINAL CIRCUITS AND FEEDERS.
4P4d 4P4d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 4P4d 3P3d
In: 400A In: 400A In: 400A In: 160A In: 160A In: 40A In: 40A In: 160A In: 250A In: 250A In: 400A In: 40A In: 40A In: 40A In: 40A In: 40A In: 40A In: 80A In: 225A In: 250A In: 160A In: 400A In: 800A 6. ALL EXTERIOR ELECTRICAL EQUIPMENT
Ir: 400A Ir: 400A Ir: 400A Ir: 160A Ir: 160A Ir: 40A Ir: 40A Ir: 160A Ir: 225A Ir: 200A Ir: 300A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 80A Ir: 225A Ir: 200A Ir: 160A Ir: 320A Ir: 800A
LEVEL 2 Icu: 35kA LEVEL 2 Icu: 35kA Icu: 35kA LEVEL 2 Icu: 35kA LEVEL 2 Icu: 35kA LEVEL 2 Icu: 35kA LEVEL 2 Icu: 35kA LEVEL 2 Icu: 35kA Icu: 35kA LEVEL 2 Icu: 35kA LEVEL 2 Icu: 35kA LEVEL 2 Icu: 35kA LEVEL 2 Icu: 35kA LEVEL 2 Icu: 35kA LEVEL 2 Icu: 35kA LEVEL 2 Icu: 35kA LEVEL 2 Icu: 35kA LEVEL 2 Icu: 35kA Icu: 35kA LEVEL 2 Icu: 35kA Icu: 35kA LEVEL 2 Icu: 35kA Icu: 35kA SHALL BE IP68 WEATHERPROOF. R
PMU LSI [TU-3] PMU LSI [TU-3] LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] P M U LI PMU LSI [TU-3] PMU LSI [TU-3] LSI [TU-4] PMU LSI [TU-4] PMU LSI [TU-4] PMU LSI [TU-4] PMU LSI [TU-4] PMU LSI [TU-4] PMU LSI [TU-4] PMU LSI [TU-4] PMU LSI [TU-4] PMU LSI [TU-3] LSI [TU-6] PMU LSI LSI [TU-6] PMU LSI [TU-6] LSI [TU-6]
7. ALL CIRCUITS FEEDING LIFE SAFETY AND
FIRE EQUIPMENT SHALL BE UNDERTAKEN
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC MGT / SWA / PVC XLPE / SWA / PVC USING FIRE-RATED, MECHANICALLY
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC
1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 185 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 120 2R ☓ 4C ☓ 300
1R ☓ 4C ☓ 95 1R ☓ 4C ☓ 70 1R ☓ 4C ☓ 70 1R ☓ 4C ☓ 95 PROTECTED CABLES TO BS 8519:2010.
1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 MGT / SWA / PVC MGT / SWA / PVC 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 70 2R ☓ 1C ☓ 150
1R ☓ 1C ☓ 50 1R ☓ 1C ☓ 35 1R ☓ 1C ☓ 35 1R ☓ 1C ☓ 50
5.9V 100m 31/E 5.9V 100m 31/E 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 -V 10m 31/E -V 10m 72/D -V 10m 72/D -V 10m 72/D -V 10m 72/D -V 10m 72/D -V 10m 72/D -V 40m 31/E -V 10m 31/E A MEMBER OF SYSKA HENNESSY GROUP, INC.
ISO-ACCH ISO-ACCH -V 10m 31/E -V 25m 31/E -V 10m 31/E -V 10m 31/E
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 8. ALL INDUCTIVE LOAD SHALL BE EQUIPPED www.syska.com
-RF-37 -RF-38 -V 16m 31/E -V 10m 31/E
MSB-B1 MSB-B1 MSB-E2 MSB-E2 MSB-E2 WITH 100mA OR 300mA RCD.
[4P/250A] [4P/250A]
IP68 IP68 8 9. ALL NON-INDUCTIVE LOADS SHALL BE CSA CONSULTANT
V F D V F D ATS-MV-2 ATS-MV-3 ATS-MV-4 ATS-MV-5 ATS-MV-6 EQUIPPED WITH 30mA RCD.
[4P/40A] [4P/40A] [4P/40A] [4P/40A] [4P/40A] AHF-O1
CENTRAL BATT OFFICE
11 M 11 M PASSENGER 10. PROVIDE UNDERVOLTAGE RELAY AND ART
GROUND FOR CRAH, CRFW, CHILLERS AND ALL
ELEVATOR XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC
ACCH-RF-37 ACCH-RF-38 FLOOR 15kW 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 OTHER MOTOR LOADS.
15KW 40A/4P 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16
132kW 132kW MSB-B1
-V 10m 72/D -V 10m 72/D -V 10m 72/D -V 10m 72/D -V 10m 72/D
FLA: 250A FLA: 250A 11. ALL 3Ph+N PROTECTIVE DEVICES SHALL
50kA FOR 1sec 50kA FOR 1sec XLPE / SWA / PVC XLPE / SWA / PVC HAVE A REMOVABLE NEUTRAL LINK.
THDi < 6% THDi < 6% ATS-MV-1 1R ☓ 4C ☓ 70 4R ☓ 1C ☓ 185
[4P/40A] D O L 1R ☓ 1C ☓ 35 1R ☓ 1C ☓ 95
OFFICE OFFICE 0.7V 10m 31/E 0.6V 10m 31/E 6 4 12. THE CONTRACTOR IS RESPONSIBLE TO
BUILDING BUILDING CARRY OUT A FULL PROTECTION STUDY TO
XLPE / SWA / PVC DB-MV-2 DB-MV-3 DB-MV-4 DB-MV-5 DB-MV-6 DEMONSTRATE SELECTIVE COORDINATION 47037 Abu Dhabi, United Arab Emirates
NON-CRITICAL NON-CRITICAL M
1R ☓ 4C ☓ 16 TCL: 14kW TCL: 14kW TCL: 14kW TCL: 14kW TCL: 14kW www.hdp-os.com
CHILLER CHILLER 1R ☓ 1C ☓ 16 MD: 7kW MD: 7kW MD: 7kW MD: 7kW MD: 7kW PFC-O1 IS ACHIEVED. IF THERE IS ANY DEVIATION,
-V 10m 72/D FIRE PUMP 250kVAR THE CONTRACTOR SHALL INDICATE THEM
SDB-O1-GF-1 SDB-O1-GF-2 SDB-MV-1 FP-GF-02 7 STEPS X 50kVAR ON DRAWINGS AND SCHEDULES.
TCL: 94kW TCL: 69kW TCL: 14kW 111kW 5 + 1 STEP X 25kVAR AoR/EoR
MD: 50kW MD: 43kW MD: 7kW
–
SW-O1-GF-1 SW-O1-GF-1 SW-O1-MV-1 13. REFER TO MECHANICAL SCHEDULES FOR
FORM 2B TYPE 2 TYPE FORM 2B TYPE 2 TYPE FORM 2B TYPE 2 TYPE
LV ROOM OFFICE 4P LV ROOM OFFICE 4P MV ROOM 4P · WORST-CASE REACTIVE MORE DETAILS.
400A 2+3 2+3 160A 40A 2+3 +
POWER IS 573kVAR @0.85 PF. KEY NOTES
400A/400Y/230V/4P/15kA FOR 1sec 160A/400Y/230V/4P/15kA FOR 1sec 40A/400Y/230V/4P/15kA FOR 1sec · 375kVAR REQUIRED TO
CB-O1-GF-1
3P
In: 40A
CB-O1-GF-2
3P
In: 40A
CB-O1-GF-3
3P
In: 40A
CB-O1-GF-4
3P
In: 40A
CB-O1-GF-5
3P
In: 40A
CB-O1-GF-6
3P
In: 40A
CB-O1-GF-6
3P
In: 40A
CB-O1-GF-7
3P
In: 40A
CB-O1-GF-8
3P
In: 63A
CB-O1-GF-9
3P
In: 40A
CB-O1-GF-10
3P
In: 40A
CB-O1-MV-1
3P
In: 40A
CB-O1-SF-3
3P
In: 40A
MAINTAIN 0.95 LAGGING PF AT
MV BUS
1. REFER TO DMM-1-E-006 AND DMM-1-E-007
FOR MV SINGLE LINE DIAGRAM.
SAUDI
Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 63A Ir: 40A Ir: 40A Ir: 40A Ir: 40A UPS-O1
Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL 4
PMU Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL 4
PMU Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL 4
PMU Icu: 15kA LEVEL 4
PMU Icu: 15kA TYPE: VFI 2. GENERATORS SHALL BE RATED TO DELIVER
LI LI LI LI LI LI LI LI LI LI LI LI LI 100KW A CONSTANT LOAD FOR UNLIMITED ARABTECH JARDANEH & PARTNES
POWER ROOM D1 RUNNING HOURS OF OPERATIONS WITHOUT Al Ashre' Building, Dammam, KSA
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC MGT / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC 25kA FOR 1sec AN INTERRUPTION TO ISO 8528-1:2018(E) AT www.aj-group.com
1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 8 13 14 AMBIENT AND OPERATING TEMPERATURES
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 DEFINED IN GENERATOR SPECIFICATIONS.
-V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 40m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E
MD: 39kW MD: 61kW MD: 19kW MD: 71kW UIB-D1-3 OTHERWISE SPECIFIED.
FORM 2B TYPE 2 TYPE SW-O1-SF-1 FORM 2B TYPE 2 TYPE SW-O1-SF-2 FORM 2B TYPE 2 TYPE SW-O1-RF FORM 2B TYPE 2 K
4P4d TYPE 14. THE UPS SHALL MAINTAIN ITS OPERATION,
ELECTRICAL ROOM SF 2+3 4P ELE. CORRIDOR SF-2 2+3 4P ELECTRICAL ROOM SF 2+3 4P ELECTRICAL ROOM SF In: 160A 2+3 5. ANY COMMUNICATION WITH SPECIALIZED
160A 250A 80A THE PHASE ROTATION AND PHASE BALANCE
Ir: 160A UNDER FLOATING NEUTRAL CONDITION DUE DISCIPLINES SHOWN IN THE DRAWINGS
Icu: 35kA
160A/400Y/230V/4P/15kA FOR 1sec 250A/400Y/230V/4P/15kA FOR 1sec 80A/400Y/230V/4P/15kA FOR 1sec 160A/400Y/230V/4P/15kA FOR 1sec LSI TO MAIN LV SWITCHBOARD 4-POLE SHALL BE THROUGH THE ENGINEER.
CB-O1-SF-1 CB-O1-SF-2 CB-O1-SF-3 CB-O1-SF-4 CB-O1-SF-5 CB-O1-SF-6 CB-O1-SF-7 CB-O1-SF-8 CB-O1-SF-9 CB-O1-SF-10 CB-O1-RF-1 CB-O1-RF-2 CB-PUMP-RF-37 CB-PUMP-RF-38 CB-O1-RF-5 U-O1-1 U-O1-2 U-O1-3 U-O1-4 U-O1-5 SWITCHING. THIS CONDITION SHALL NOT
3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P3d 3P3d 3P 3P 3P 3P 3P 3P IMPACTING UPS DOWNSTREAM CIRCUITS.
In: 40A In: 63A In: 40A In: 40A In: 40A In: 40A In: 40A In: 40A In: 40A In: 100A In: 40A In: 40A In: 40A In: 40A In: 63A In: 40A In: 40A In: 40A In: 40A In: 40A MARK DATE DESCRIPTION
Ir: 40A Ir: 63A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 100A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 63A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A 15. MECHANICAL UPS IS FEEDING INDUCTIVE
LEVEL 4
LEVEL 4
PMU Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL
PMU
4
Icu: 15kA PMU Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL 4
PMU Icu: 15kA LEVEL 4
PMU Icu: 15kA LEVEL 4
PMU Icu: 15kA LEVEL
PMU
4
Icu: 15kA LEVEL 4
PMU Icu: 15kA LEVEL 4
PMU Icu: 15kA LEVEL 4
PMU Icu: 15kA LEVEL 4
PMU Icu: 15kA LEVEL 4
PMU Icu: 15kA LEVEL 4
PMU Icu: 15kA LEVEL 4
PMU Icu: 15kA 0 19.08.2021 DESIGN DEVELOPMENT
LI LI LI LI LI LI LI LI LI LI [TU-3] LI LI LSI LSI LI LI LI LI LI LI LOADS (MOTORS, FANS). UPS SUPPLIER
SHALL CONSIDER THE kVA WHILE 1 14.09.2021 TCDD SUBMISSION
SELECTING THE PROPOSED UPS RATING.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC
1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 35 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 2 19.10.2021 LONG LEAD EQUIPMENT
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 16. UPS DOWNSTREAM FEEDER CIRCUITS ARE
-V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E 7.2V 45m 31/E 7.2V 45m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E 3 26.10.2021 TECHNICAL DESIGN
SUBJECT TO THE FINAL TENANT
REQUIREMENTS. 4 15.11.2021 LONG LEAD EQUIPMENT
DESK BOLLARD COMMANDO
BUILDING
ERASER CONTROL SOCKET 5 31.12.2021 STAGE 4T SUBMISSION
MAINTENANCE
DB-O1-SF-AC DB-O1-SF-PWR-01 DB-O1-SF-PWR-04 DB-O1-SF-LTG-01 DB-O1-SF-LTG-04 DB-O1-SF-PWR-02 DB-O1-SF-PWR-03 DB-O1-SF-LTG-02 DB-O1-SF-LTG-03 55kW DB-O1-RF-1 DB-O1-RF-2 DB-SOC-O1 DB-IT-O1-FF DB-IT-O1-SF 40A/4P 40A/4P
TCL: 6.0kW TCL: 34kW TCL: 14kW TCL: 9kW TCL: 3kW TCL: 5kW TCL: 11kW ISO- ISO- UNIT (BMU) 6 31.01.2022 ADDENDUM
TCL: 10kW TCL: 10kW TCL: 14kW TCL: 15kW 100A/4P 40A/4P 40A/4P 40A/4P 15kW 15kW
MD: 6.0kW MD: 17kW MD: 9kW MD: 7kW MD: 2kW MD: 9kW MD: 9kW MD: 12kW MD: 12kW MD: 4kW MD: 10kW PUMP-RF-37 PUMP-RF-38 8kW
[4P/40A] [4P/40A] 13kW 13kW 13kW
ABBREVIATIONS © 2021 SH GROUP, INC.ALL RIGHTS RESERVED, INCLUDING BUT
NOT LIMITED TO THE COPYRIGHT, DESIGN AND PATENTS ACT 1988
D O L D O L
N: TCL [MD] : NORMAL MODE OF OPERATION: PROJECT NO.: 2021-PR-003374
TOTAL CONNECTED LOAD
M M [MAX. DEMAND] DRAWN BY: S.K. CHECKED BY: K.T.
DMM-1-E-013
OTHER NOTES MAINS RETURN SEQUENCE OF OPERATION MAINS FAILURE SEQUENCE OF OPERATION SEQUENCE OF OPERATION NOTES SHEET NOTES PROJECT
1. MAINS SUPPLY RETURNS. 1. MAINS SUPPLY FAILS. 1. THE PROGRAMING OF MSB SWITCHBOARD 1. ANY CHANGES TO THE DISTRIBUTION
FOR ASSETS REGISTER REFER CONTROLLER SHALL BE DONE IN A WAY BOARDS DURING CONSTRUCTION MUST BE
1 TO DMM-1-E-RPT-08
GEN-IN-A2 2. GENERATOR CONTINUES TO WORK FOR THE 2. TRANSFORMER INCOMER CIRCUIT BREAKER THAT "SWINGING"" BETWEEN GENERATOR SUBMITTED AS "REVISION" ON APPROVED
4P4d GEN-A2 NEXT 5 MINUTES ON MAIN LV SWITCHBOARD OPENS. AND TRANSFORMER SOURCES IS AVOIDED. DRAWINGS TO SPARK FOR APPROVAL
In: 5000A 3125kVA DATA CENTRE & CLOUD SERVICES
M XFMR-A2 BEFORE PROCUREMENT OF THESE PANELS.
BUILDING A
13 2 3 Ir: 5000A 2500kW (0.8 PF)
Icu: 50kA TVRT TYPE 3. MAINS HEALTHY TIMER (5 MINUTES 3. REMOTE SIGNAL "TO START" IS SENT TO 2. THE SWITCHING TIME BETWEEN THE TWO EDGNEX DMM-1 Data Center
LSIG [TU-6] 5000A/400Y/230V/4P/50kA@1sec 60Hz/400Y/230V 3150kVA AN @ 50DegC MINIMUM) TIMES OUT AND OPEN GENERATOR CONTROL PANEL. SOURCES OF THE RMU (AT 13.8kV LEVEL) 2. LEGEND: REFER TO DRAWING DMM-1-E-001. G+2+R | PLOT EI_028 & EI_029
LBB-GEN-A2 GEN-OUT-A2 3Φ, 4W, Xd'' = 12% 60Hz/Dyn11 LONG LEAD ITEM GENERATOR INCOMER CIRCUIT BREAKER SHALL NOT BE TREATED AS A UTILITY King Salman Energy Park (SPARK), Dammam
4P4d 4P4d DCP RATED 13.8kV/400Y/230V SCOPE OF WORK AT MSB SWITCHBOARD AND CLOSES 4. GENERATOR STARTS, STABILIZES AND FAILURE. 2. FOR LOAD SCHEDULES REFER TO DRAWING
In: 5000A In: 5000A Kingdom of Saudi Arabia
M M @ 55DegC 3Φ, 4W, %uk=8% (EXCLUDED FROM MEP TRANSFORMER INCOMER CIRCUIT BREAKER "READY" SIGNAL IS ISSUED. DMM-1-E-RPT-02.
PHASE 2
Ir: 5000A Ir: 5000A www.edgnex.com
OPERATING CAST-RESIN CONTRACTOR SCOPE) AT MSB SWITCHBOARD. THIS TRANSITION 3. EACH MSB SWITCHBOARD SHALL HAVE A
Icu: 50kA LEVEL 2 Icu: 50kA
LSIG [TU-6] P M U LSIG [TU-6] TEMP. DRY-TYPE REFER TO ASSOCIATED SHALL BE DONE WITH MINIMUM TIME DELAY 5. GENERATOR INTERNAL CIRCUIT BREAKER DUAL CONTROLLERS FOR REDUNDANCY. 3. THIS DRAWING SHOWS SYSTEM AND
CLIENT
IP21 RESPONSIBILITY ON MAIN LV SWITCHBOARD. CLOSES. PRINCIPLE, IF THE DRAWING DOES NOT
TN-C-S 13 MATRIX. 4. VOLTAGE SENSING AT MSB SWITCHBOARD MEET THE MINIMUM REQUIREMENTS OF THE
TAP-CHANGER: 4 x 2.5% 4. GENERATOR SYSTEM RUNS DOWN. 6. GENERATOR INCOMER CIRCUIT BREAKER INCOMERS SHALL CONSIDER EITHER VT OR LOCAL REGULATIONS, THE CONTRACTOR
BI-DIRECTIONAL CONNECTION
(MOBILE LOAD BANK AND
HOOK-UP GENERATOR)
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
5. THE SITE RETURNS TO NORMAL AND
SUPPORTED BY MAINS.
ON MAIN LV SWITCHBOARD CLOSES. VOLTAGE SENIORS. SHALL ADD COMPONENTS TO MEET THESE
REQUIREMENTS. KHAZZAN
0.8V 50m 34/F 0.4V 25m 34/F 4. NO PIPING, DUCTS OR EQUIPMENT FOREIGN Kingdom of Saudi Arabia
TO ELECTRICAL EQUIPMENT SHALL BE www.damacproperties.com
PERMITTED TO BE LOCATED WITHIN THE
MSB-A2 9
N: 1848kW [1848kW] CB-GEN-A2 CB-XFMR-A2 DEDICATED SPACE ABOVE THE ELECTRICAL
4P4d 4P4d TYPE EQUIPMENT.
5N/4: 2311kW
FORM 4B TYPE 6 In: 5000A M M
In: 5000A 1+2+3 LEAD CONSULTANT
POWER ROOM A2 Ir: 5000A AMF WITH Ir: 5000A
Icu: 65kA LEVEL 1 E&M INTERLOCK LEVEL 1 Icu: 65kA 5. INSULATED ECC/CPC COPPER GROUNDING
5000A/400Y/230V/4P/65kA FOR 1sec LSIG [TU-6] PMU PMU LSIG [TU-6] CONDUCTOR SHALL BE INSTALLED IN ALL
CB-ACCH-RF-19 CB-ACCH-RF-24 CB-ACCH-RF-31 CB-ACCH-RF-36 BIB-A2 RIB-A2-1 SIB-A2-1 RIB-A2-2 SIB-A2-2 RIB-A2-3 BIB-A2-3 BYPASS-A2 CB-SDB-A2-GF CB-PFC-A2-1 CB-HF-A2 CB-SDB-A2-FF FINAL CIRCUITS AND FEEDERS.
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P3d 4P4d 4P4d
In: 400A In: 400A In: 400A In: 400A In: 3200A In: 1600A In: 1600A In: 1600A In: 1600A In: 250A In: 250A In: 300A In: 400A In: 630A In: 630A In: 160A 6. ALL EXTERIOR ELECTRICAL EQUIPMENT
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 3200A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 225A Ir: 225A Ir: 250A Ir: 400A Ir: 500A Ir: 630A Ir: 160A
LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA SHALL BE IP68 WEATHERPROOF. R
LEVEL 2 LEVEL 2
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6]
7. ALL CIRCUITS FEEDING LIFE SAFETY AND
FIRE EQUIPMENT SHALL BE UNDERTAKEN
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC USING FIRE-RATED, MECHANICALLY
1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 1R ☓ 4C ☓ 185 2R ☓ 4C ☓ 120 2R ☓ 4C ☓ 185 1R ☓ 4C ☓ 70 PROTECTED CABLES TO BS 8519:2010.
1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 2R ☓ 1C ☓ 75 2R ☓ 1C ☓ 95 1R ☓ 1C ☓ 35
7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E -V 15m 31/E -V 15m 31/E -V 15m 31/E 1.7V 15m 31/E A MEMBER OF SYSKA HENNESSY GROUP, INC.
8. ALL INDUCTIVE LOAD SHALL BE EQUIPPED www.syska.com
WITH 100mA OR 300mA RCD.
FROM FROM
MSB-C2 MSB-B2 – – – – – – –
9. ALL NON-INDUCTIVE LOADS SHALL BE CSA CONSULTANT
ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH 12 EQUIPPED WITH 30mA RCD.
-RF-19 -RF-24 -RF-24 -RF-31 -RF-36 -RF-36 + +
5
+ + +
5
+ +
[4P/400A] [4P/400A] [4P/400A] [4P/400A] [4P/400A] [4P/400A] PFC-A2-1 AHF-A2 10. PROVIDE UNDERVOLTAGE RELAY AND ART
IP66 IP66 IP66 IP66 IP66 IP66 250kVAR 600A FOR CRAH, CRFW, CHILLERS AND ALL
5X 50kVAR OTHER MOTOR LOADS.
V F D V F D
· WORST-CASE REACTIVE
4 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P 3P 3P 3P
In: 630A In: 630A In: 630A In: 630A In: 630A In: 630A In: 630A In: 160A 4P4d In: 3200A In: 40A In: 250A In: 40A In: 160A In: 160A In: 40A In: 50A ENCLOSURE AND CLOSE THE SUPPLY
Ir: 630A Ir: 630A Ir: 630A Ir: 630A Ir: 630A Ir: 630A Ir: 630A Ir: 160A In: 3200A Ir: 3200A Ir: 40A Ir: 200A Ir: 40A Ir: 125A Ir: 125A Ir: 40A Ir: 50A
Ir: 3200A LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4
BREAKER TO MAIN LV SWITCHBOARD
LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2 Icu: 50kA Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA SUPPORTING THE CRITICAL LOADS.
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] Icu: 50kA LSI [TU-6] LSI LSI LI LSI LSI LSI LSI
LSI
4. EXCLUDING LOSSES AT NORMAL MODE.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC D C B A
2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 240 2R ☓ 4C ☓ 240 2R ☓ 4C ☓ 240 1R ☓ 4C ☓ 70 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 95 XLPE SWA PVC
/ / 1R ☓ 4C ☓ 35 1R ☓ 4C ☓ 35 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16
2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 120 2R ☓ 1C ☓ 120 2R ☓ 1C ☓ 120 1R ☓ 1C ☓ 35 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 50 1R ☓ 4C ☓ 16 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 5. LI-ION BATTERY WITH MONITORING SYSTEM.
-V 55m 31/E -V 55m 31/E -V 55m 31/E -V 55m 31/E -V 110m 31/E -V 105m 31/E -V 100m 31/E -V 15m 31/E 0.7V 45m 31/E 0.7V 45m 31/E 1R ☓ 1C ☓ 16 -V 50m 31/E -V 50m 31/E -V 60m 31/E -V 15m 31/E BACKUP TIME AT FULL LOAD SHALL NOT BE
-V 50m 31/E
LESS THAN 5 MINUTES.
[4P/100A] [4P/100A] [4P/40A]
MOBILE LOAD 6. REFER TO DMC-DH-E-020 FOR TYPICAL PDU
PDU-A2-G BANK AND BUSWAY INSTALLATION.
N: 50kW [50kW] DB-FO-A2 SEAL
5N/4: 63kW N: 6.75kW [6.75kW] D O L D O L D O L DB-GF-A2
FORM 2B TYPE 2 5N/4: 6.75kW TCL: 25kW 7. THE POWER FACTOR DURING ANY MODE OF
POWER ROOM A1 FORM 2B TYPE 2 MD: 25kW OPERATION SHALL NOT BE BELOW 0.95 LAG
CRAC-2 M M M MEASURED AT MV BUS.
CRAC-GF-01 CRAC-GF-06 CRAC-GF-23
50kW 50kW 14kW 8. ALL CONTROL CABLING BETWEEN UPS
–FLA –FLA –FLA UNITS, UPS OUTPUT OVERCORRECT
–LRA –LRA –LRA PROTECTIVE DEVICES, AND INTERFACE UNIT
TO UPS OUTPUT PANEL SHALL BE
INSTALLED BY UPS SUPPLIER.
13 6
9. THE AUTOMATIC CHANGEOVER OF
SOURCES SHALL BE OVER "PAIRED" AIR
PDU-A2-1 PDU-A2-2 PDU-A2-3 PDU-A2-4 PDU-A2-5 PDU-A2-6 PDU-A2-7 SDB-CC-A2-FF SDB-A2-FF CIRCUIT BREAKERS AND THEIR ASSOCIATED
Q-PDU-A2-1 N: 78kW [78kW] Q-PDU-A2-2 N: 156kW [156kW] Q-PDU-A2-3 N: 156kW [156kW] Q-PDU-A2-4 N: 156kW [156kW] Q-PDU-A2-5 N: 156kW [156kW] Q-PDU-A2-6 N: 156kW [156kW] Q-PDU-A2-7 N: 156kW [156kW] SW-SDB-CC-A2-FF N: 88kW [88kW] N: 76kW [76kW] SW-SDB-A2-FF
3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d TYPE TYPE CONTRACTORS. NO EXTERNAL CONTROL
5N/4: 156kW 5N/4: 312kW 5N/4: 312kW 5N/4: 312kW 5N/4: 312kW 5N/4: 312kW 5N/4: 234kW 4P 5N/4: 88kW 5N/4: 76kW 4P GENERAL NOTES
In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 250A 2+3 FORM 2B TYPE 2 FORM 2B TYPE 2 160A 2+3 SUPPLY VOLTAGE (i.e. STATION BATTERIES)
Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 : FF MECH. COORIDOR FF. ELEC. CORRIDOR : ARE TO BE USED. POWER FOR MOTOR
Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA 1. DO NOT SCALE FROM DRAWINGS. IF IN
LSI LSI LSI LSI LSI LSI LSI 250A/400Y/230V/4P/35kA FOR 1sec 160A/400Y/230V/4P/50kA FOR 1sec OPERATIONS AND CONTROLS ARE TO BE
DOUBT, REQUEST MORE FURTHER
CB-A2-CC-1 CB-A2-CC-2 CB-A2-CC-3 CB-A2-CC-4 CB-SDB-A2-FF-1 CB-SDB-A2-FF-2 TAKEN FROM INCOMING SIDE OF THE
TYPE TYPE TYPE TYPE TYPE TYPE TYPE INFORMATION.
XFMR-PDU-A2-1 XFMR-PDU-A2-2 XFMR-PDU-A2-3 XFMR-PDU-A2-4 XFMR-PDU-A2-5 XFMR-PDU-A2-6 XFMR-PDU-A2-7 3P 3P 3P 3P 3P 3P DEVICE BEING POWERED.
2+3 2+3 2+3 2+3 2+3 2+3 2+3 In: 40A In: 40A In: 40A In: 40A In: 80A In: 80A
400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 80A Ir: 80A 2. THIS DRAWING SHALL BE READ IN
60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 4
Icu: 50kA LEVEL 4
Icu: 50kA 10. MASTER-SLAVE CONFIGURATION AND WITH
PMU PMU PMU PMU PMU PMU CONJUNCTION WITH THE CONTRACT
400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V LSI LSI LSI LSI LSI LSI 4.3% DE-TUNEING EACH.
CONDITIONS, THE SPECIFICATIONS,
3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% EQUIPMENT SCHEDULES AND THE
Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE XLPE / SWA / PVC XLPE / SWA / PVC
11. LRA SHALL NOT EXCEED FLA.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC ARCHITECTURAL DRAWINGS.
TN-S TN-S TN-S TN-S TN-S TN-S TN-S 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 25
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 12. ACTIVE HARMONIC FILTERS ARE SUBJECT
5.6V 45m 31/E 5.6V 45m 31/E FROM 5.6V 45m 31/E 5.6V 45m 31/E FROM -V 50m 31/E -V 50m 31/E
TO THE POWER QUALITY ASSESSMENT BY 3. REFER TO THE ARCHITECTURAL
CB-BW-A2-1 CB-BW-A2-S CB-BW-A2-2 CB-BW-A2-3 CB-BW-A2-4 CB-BW-A2-5 CB-BW-A2-6 CB-BW-A2-7 CB-BW-A2-8 CB-BW-A2-9 CB-BW-A2-10 CB-BW-A2-11 CB-BW-A2-12 CB-BW-A2-13
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d SDB-CC-C2-FF SDB-CC-B2-FF THE MEP CONTRACTOR SHALL BE BASED ON DRAWINGS FOR DETAILS OF ALL SETTING
ISO-CRFW ISO-CRFW ISO-CRFW ISO-CRFW
In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A ISO-CRFW ISO-CRFW [4P/80] [4P/80A] FINAL EQUIPMENT SELECTION AND OUT INFORMATION. NO DIMENSIONS SHALL
-1F-19 -1F-24 -1F-31 -1F-36
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A -1F-24 -1F-36 SEC/SPARK HARMONIC LIMITS FOR BE MEASURED FROM THIS DRAWINGS.
LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA LEVEL 2
Icu: 10kA [4P/40A] [4P/40A] [4P/40A] [4P/40A]
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI [4P/40A] [4P/40A] VOLTAGE AND CURRENT DISTORTIONS.'
D O L D O L 4. ALL DIMENSIONS IN MILLIMETER AND
SOFT SOFT 13. LONG LEAD TIME SCOPE. ELEVATIONS IN METERS UNLESS
1/31/2022 10:32:14 PM BIM 360://Damac Data Center/DMC20001M_SHG_ELEC_R20_CENTRAL.rvt
XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF OTHERWISE SPECIFIED.
1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 M M
14. THE UPS SHALL MAINTAIN ITS OPERATION,
1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 M SOFT M SOFT
0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E CRAC-1F-01 CRAC-1F-06 THE PHASE ROTATION AND PHASE BALANCE 5. ANY COMMUNICATION WITH SPECIALIZED
CRFW-1F-19 CRFW-1F-31 38kW 38kW UNDER FLOATING NEUTRAL CONDITION DUE DISCIPLINES SHOWN IN THE DRAWINGS
22kW M 22kW M –FLA –FLA TO MAIN LV SWITCHBOARD 4-POLE SHALL BE THROUGH THE ENGINEER.
40 FLA 40 FLA –LRA –LRA SWITCHING. THIS CONDITION SHALL NOT
CRFW-1F-24 CRFW-1F-36 IMPACTING UPS DOWNSTREAM CIRCUITS.
40 LRA 40 LRA
22kW 22kW MARK DATE DESCRIPTION
BW-A2-1/4P/400A/Icu: 10kA/400Y/230V
BW-A2-2/4P/400A/Icu: 10kA/400Y/230V
BW-A2-3/4P/400A/Icu: 10kA/400Y/230V
BW-A2-4/4P/400A/Icu: 10kA/400Y/230V
BW-A2-5/4P/400A/Icu: 10kA/400Y/230V
BW-A2-6/4P/400A/Icu: 10kA/400Y/230V
BW-A2-7/4P/400A/Icu: 10kA/400Y/230V
BW-A2-8/4P/400A/Icu: 10kA/400Y/230V
BW-A2-9/4P/400A/Icu: 10kA/400Y/230V
BW-A2-10/4P/400A/Icu: 10kA/400Y/230V
BW-A2-11/4P/400A/Icu: 10kA/400Y/230V
BW-A2-12/4P/400A/Icu: 10kA/400Y/230V
BW-A2-13/4P/400A/Icu: 10kA/400Y/230V
1. MAINS SUPPLY RETURNS. 1. MAINS SUPPLY FAILS. 1. THE PROGRAMING OF MSB SWITCHBOARD 1. ANY CHANGES TO THE DISTRIBUTION
FOR ASSETS REGISTER REFER CONTROLLER SHALL BE DONE IN A WAY BOARDS DURING CONSTRUCTION MUST BE
1 TO DMM-1-E-RPT-08
GEN-IN-B2 2. GENERATOR CONTINUES TO WORK FOR THE 2. TRANSFORMER INCOMER CIRCUIT BREAKER THAT "SWINGING"" BETWEEN GENERATOR SUBMITTED AS "REVISION" ON APPROVED
4P4d GEN-B2 NEXT 5 MINUTES ON MAIN LV SWITCHBOARD OPENS. AND TRANSFORMER SOURCES IS AVOIDED. DRAWINGS TO SPARK FOR APPROVAL
In: 5000A 3125kVA DATA CENTRE & CLOUD SERVICES
M XFMR-B2 BEFORE PROCUREMENT OF THESE PANELS.
BUILDING A
13 2 3 Ir: 5000A 2500kW (0.8 PF)
Icu: 50kA TVRT TYPE 3. MAINS HEALTHY TIMER (5 MINUTES 3. REMOTE SIGNAL "TO START" IS SENT TO 2. THE SWITCHING TIME BETWEEN THE TWO EDGNEX DMM-1 Data Center
LSIG [TU-6] 5000A/400Y/230V/4P/50kA@1sec 60Hz/400Y/230V
3150kVA AN @ 50DegC MINIMUM) TIMES OUT AND OPEN GENERATOR CONTROL PANEL. SOURCES OF THE RMU (AT 13.8kV LEVEL) 2. LEGEND: REFER TO DRAWING DMM-1-E-001. G+2+R | PLOT EI_028 & EI_029
LBB-GEN-B2 GEN-OUT-B2 3Φ, 4W, Xd'' = 12% 60Hz/Dyn11 LONG LEAD ITEM GENERATOR INCOMER CIRCUIT BREAKER SHALL NOT BE TREATED AS A UTILITY King Salman Energy Park (SPARK), Dammam
4P4d 4P4d DCP RATED 13.8kV/400Y/230V SCOPE OF WORK AT MSB SWITCHBOARD AND CLOSES 4. GENERATOR STARTS, STABILIZES AND FAILURE. 2. FOR LOAD SCHEDULES REFER TO DRAWING
In: 5000A In: 5000A Kingdom of Saudi Arabia
M M @ 55DegC (EXCLUDED FROM MEP TRANSFORMER INCOMER CIRCUIT BREAKER "READY" SIGNAL IS ISSUED. DMM-1-E-RPT-02.
3Φ, 4W, %uk=8%
PHASE 2
Ir: 5000A Ir: 5000A www.edgnex.com
OPERATING CONTRACTOR SCOPE) AT MSB SWITCHBOARD. THIS TRANSITION 3. EACH MSB SWITCHBOARD SHALL HAVE A
Icu: 50kA LEVEL 2 Icu: 50kA CAST-RESIN
LSIG [TU-6] P M U LSIG [TU-6] TEMP. REFER TO ASSOCIATED SHALL BE DONE WITH MINIMUM TIME DELAY 5. GENERATOR INTERNAL CIRCUIT BREAKER DUAL CONTROLLERS FOR REDUNDANCY. 3. THIS DRAWING SHOWS SYSTEM AND
DRY-TYPE CLIENT
IP21 RESPONSIBILITY ON MAIN LV SWITCHBOARD. CLOSES. PRINCIPLE, IF THE DRAWING DOES NOT
TN-C-S 13 MATRIX. 4. VOLTAGE SENSING AT MSB SWITCHBOARD MEET THE MINIMUM REQUIREMENTS OF THE
TAP-CHANGER: 4 x 2.5% 4. GENERATOR SYSTEM RUNS DOWN. 6. GENERATOR INCOMER CIRCUIT BREAKER INCOMERS SHALL CONSIDER EITHER VT OR LOCAL REGULATIONS, THE CONTRACTOR
BI-DIRECTIONAL CONNECTION
(MOBILE LOAD BANK AND
HOOK-UP GENERATOR)
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
5. THE SITE RETURNS TO NORMAL AND
SUPPORTED BY MAINS.
ON MAIN LV SWITCHBOARD CLOSES. VOLTAGE SENIORS. SHALL ADD COMPONENTS TO MEET THESE
REQUIREMENTS. KHAZZAN
0.8V 50m 34/F 0.4V 25m 34/F 4. NO PIPING, DUCTS OR EQUIPMENT FOREIGN Kingdom of Saudi Arabia
TO ELECTRICAL EQUIPMENT SHALL BE www.damacproperties.com
PERMITTED TO BE LOCATED WITHIN THE
MSB-B2 9
N: 1769kW [1769kW] CB-GEN-B2 CB-XFMR-B2 DEDICATED SPACE ABOVE THE ELECTRICAL
4P4d 4P4d TYPE EQUIPMENT.
5N/4: 2209kW
FORM 4B TYPE 6 In: 5000A M M
In: 5000A 1+2+3 LEAD CONSULTANT
POWER ROOM B2 Ir: 5000A AMF WITH Ir: 5000A
Icu: 65kA LEVEL 1 E&M INTERLOCK LEVEL 1 Icu: 65kA 5. INSULATED ECC/CPC COPPER GROUNDING
5000A/400Y/230V/4P/65kA FOR 1sec LSIG [TU-6] PMU PMU LSIG [TU-6] CONDUCTOR SHALL BE INSTALLED IN ALL
CB-ACCH-RF-20 CB-ACCH-RF-25 CB-ACCH-RF-32 CB-ACCH-RF-34 CB-ACCH-RF-36 BIB-B2 RIB-B2-1 SIB-B2-1 RIB-B2-2 SIB-B2-2 RIB-B2-3 BIB-B2-3 BYPASS-B2 CB-SDB-B2-GF CB-PFC-B2-1 CB-HF-B2 CB-SDB-B2-FF FINAL CIRCUITS AND FEEDERS.
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P3d 4P4d 4P4d
In: 400A In: 400A In: 400A In: 400A In: 400A In: 3200A In: 1600A In: 1600A In: 1600A In: 1600A In: 250A In: 250A In: 250A In: 400A In: 630A In: 630A In: 100A 6. ALL EXTERIOR ELECTRICAL EQUIPMENT
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 3200A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 225A Ir: 225A Ir: 250A Ir: 400A Ir: 500A Ir: 630A Ir: 100A
LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA SHALL BE IP68 WEATHERPROOF. R
LEVEL 2 LEVEL 2
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6]
7. ALL CIRCUITS FEEDING LIFE SAFETY AND
FIRE EQUIPMENT SHALL BE UNDERTAKEN
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC
XLPE / SWA / PVC
USING FIRE-RATED, MECHANICALLY
1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 1C ☓ 185
300 4R ☓ 1C ☓ 185
300 4R ☓ 1C ☓ 185 XLPE / SWA / PVC 2R ☓ 4C ☓ 120 XLPE / SWA / PVC
1R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 1R ☓ 4C ☓ 35
PROTECTED CABLES TO BS 8519:2010.
1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 1R ☓ 1C ☓ 95
150 1R ☓ 1C ☓ 95
150 1R ☓ 1C ☓ 95 2R ☓ 1C ☓ 75
7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.9V 10m
0.6V 15m 31/E 0.9V 10m
0.6V 15m 31/E 0.6V 10m 31/E 1R ☓ 1C ☓ 95 -V 15m 31/E 2R ☓ 1C ☓ 95 1R ☓ 1C ☓ 16 A MEMBER OF SYSKA HENNESSY GROUP, INC.
-V 15m 31/E -V 15m 31/E 1.7V 15m 31/E 8. ALL INDUCTIVE LOAD SHALL BE EQUIPPED www.syska.com
WITH 100mA OR 300mA RCD.
FROM
MSB-E2 – – – – – – –
9. ALL NON-INDUCTIVE LOADS SHALL BE CSA CONSULTANT
ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH 12 EQUIPPED WITH 30mA RCD.
FEEDING FEEDING
-RF-20 -RF-20 -RF-25 -RF14 + +
5
+ + +
5
+ +
ACCH-RF-34 ACCH-RF-36 PFC-B2-1 AHF-B2
[4P/400A] [4P/400A] [4P/400A] [4P/400A] 10. PROVIDE UNDERVOLTAGE RELAY AND ART
IP66 IP66 IP66 IP66 250kVAR 600A FOR CRAH, CRFW, CHILLERS AND ALL
5X 50kVAR OTHER MOTOR LOADS.
V F D V F D
· WORST-CASE REACTIVE
4 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P 3P 3P 3P 3P
In: 400A In: 630A In: 630A In: 630A In: 630A In: 630A In: 160A 4P4d In: 3200A In: 40A In: 250A In: 40A In: 160A In: 160A In: 63A In: 63A In: 63A ENCLOSURE AND CLOSE THE SUPPLY
Ir: 400A Ir: 630A Ir: 630A Ir: 630A Ir: 630A Ir: 500A Ir: 160A In: 3200A Ir: 3200A Ir: 40A Ir: 200A Ir: 40A Ir: 125A Ir: 125A Ir: 40A Ir: 40A Ir: 50A
Ir: 3200A LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4
BREAKER TO MAIN LV SWITCHBOARD
LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2 Icu: 50kA Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA SUPPORTING THE CRITICAL LOADS.
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] Icu: 50kA LSI [TU-6] LSI LSI LI LSI LSI LSI LSI LSI
LSI
4. EXCLUDING LOSSES AT NORMAL MODE.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC D C B A
1R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 240 2R ☓ 4C ☓ 240 1R ☓ 4C ☓ 70 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 95 XLPE SWA PVC
/ / 1R ☓ 4C ☓ 35 1R ☓ 4C ☓ 35 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16
1R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 120 2R ☓ 1C ☓ 120 1R ☓ 1C ☓ 35 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 50 1R ☓ 4C ☓ 16 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 5. LI-ION BATTERY WITH MONITORING SYSTEM.
-V 55m 31/E -V 55m 31/E -V 55m 31/E -V 95m 31/E -V 90m 31/E -V 85m 31/E -V 15m 31/E 0.7V 45m 31/E 0.7V 45m 31/E 1R ☓ 1C ☓ 16 -V 50m 31/E -V 50m 31/E -V 60m 31/E -V 15m 31/E -V 50m 31/E BACKUP TIME AT FULL LOAD SHALL NOT BE
-V 50m 31/E
LESS THAN 5 MINUTES.
[4P/125A] [4P/125A] [4P/125A] [4P/125A]
MOBILE LOAD 6. REFER TO DMC-DH-E-020 FOR TYPICAL PDU
PDU-B2-G BANK AND BUSWAY INSTALLATION.
N: 50kW [50kW] DB-FO-B2 SEAL
5N/4: 63kW N: 5.0kW [5.0kW] D O L D O L D O L DB-GF-B2 D O L
FORM 2B TYPE 2 5N/4: 5.0kW TCL: 25kW 7. THE POWER FACTOR DURING ANY MODE OF
POWER ROOM B1 FORM 2B TYPE 2 MD: 25kW OPERATION SHALL NOT BE BELOW 0.95 LAG
CRAC-2 M M M M MEASURED AT MV BUS.
CRAC-GF-02 CRAC-GF-07 CRAC-GF-24 FCU-SOC-1
50kW 50kW 14kW 14kW 8. ALL CONTROL CABLING BETWEEN UPS
–FLA –FLA –FLA –FLA UNITS, UPS OUTPUT OVERCORRECT
–LRA –LRA –LRA –LRA PROTECTIVE DEVICES, AND INTERFACE UNIT
TO UPS OUTPUT PANEL SHALL BE
INSTALLED BY UPS SUPPLIER.
13 6
9. THE AUTOMATIC CHANGEOVER OF
SOURCES SHALL BE OVER "PAIRED" AIR
PDU-B2-1 PDU-B2-2 PDU-B2-3 PDU-B2-4 PDU-B2-5 PDU-B2-6 SDB-CC-B2-FF SDB-B2-FF CIRCUIT BREAKERS AND THEIR ASSOCIATED
Q-PDU-B2-1 N: 78kW [78kW] Q-PDU-B2-2 N: 156kW [156kW] Q-PDU-B2-3 N: 156kW [156kW] Q-PDU-B2-4 N: 156kW [156kW] Q-PDU-B2-5 N: 156kW [156kW] Q-PDU-B2-6 N: 156kW [156kW] SW-SDB-CC-B2-FF N: 88kW [88kW] N: 52kW [52kW] SW-SDB-B2-FF
3P3d 3P3d 3P3d 3P3d 3P3d 3P3d TYPE TYPE CONTRACTORS. NO EXTERNAL CONTROL
5N/4: 156kW 5N/4: 312kW 5N/4: 312kW 5N/4: 312kW 5N/4: 234kW 5N/4: 312kW 4P 5N/4: 88kW 5N/4: 52kW 4P GENERAL NOTES
In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 250A 2+3 FORM 2B TYPE 2 FORM 2B TYPE 2 100A 2+3 SUPPLY VOLTAGE (i.e. STATION BATTERIES)
Ir: 400A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 500A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 : FF MECH. COORIDOR FF. ELEC. CORRIDOR : ARE TO BE USED. POWER FOR MOTOR
Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA 1. DO NOT SCALE FROM DRAWINGS. IF IN
LSI LSI LSI LSI LSI LSI 250A/400Y/230V/4P/35kA FOR 1sec 100A/400Y/230V/4P/50kA FOR 1sec OPERATIONS AND CONTROLS ARE TO BE
DOUBT, REQUEST MORE FURTHER
CB-B2-CC-1 CB-B2-CC-2 CB-B2-CC-3 CB-B2-CC-4 CB-B2-CC-5 CB-SDB-B2-FF-1 CB-SDB-B2-FF-2 TAKEN FROM INCOMING SIDE OF THE
TYPE TYPE TYPE TYPE TYPE TYPE INFORMATION.
XFMR-PDU-B2-1 XFMR-PDU-B2-2 XFMR-PDU-B2-3 XFMR-PDU-B2-4 XFMR-PDU-B2-5 XFMR-PDU-B2-6 3P 3P 3P 3P 3P 3P 3P DEVICE BEING POWERED.
2+3 2+3 2+3 2+3 2+3 2+3 In: 40A In: 40A In: 40A In: 40A In: 40A In: 80A In: 40A
400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 80A Ir: 40A 2. THIS DRAWING SHALL BE READ IN
60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 4
Icu: 50kA LEVEL 4
Icu: 50kA 10. MASTER-SLAVE CONFIGURATION AND WITH
PMU PMU PMU PMU PMU PMU PMU CONJUNCTION WITH THE CONTRACT
400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V LSI LSI LSI LSI LSI LSI LSI 4.3% DE-TUNEING EACH.
CONDITIONS, THE SPECIFICATIONS,
3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% EQUIPMENT SCHEDULES AND THE
Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC
11. LRA SHALL NOT EXCEED FLA.
1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 ARCHITECTURAL DRAWINGS.
TN-S TN-S TN-S TN-S TN-S TN-S 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 16
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16
5.6V 45m 31/E 5.6V 45m 31/E 5.6V 45m 31/E 5.6V 45m 31/E 5.6V 45m 31/E
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 12. ACTIVE HARMONIC FILTERS ARE SUBJECT
-V 50m 31/E -V 50m 31/E
TO THE POWER QUALITY ASSESSMENT BY 3. REFER TO THE ARCHITECTURAL
CB-BW-B2-1 CB-BW-B2-S CB-BW-B2-2 CB-BW-B2-3 CB-BW-B2-4 CB-BW-B2-5 CB-BW-B2-6 CB-BW-B2-7 CB-BW-B2-8 CB-BW-B2-9 CB-BW-B2-10 CB-BW-B2-11 FROM
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d THE MEP CONTRACTOR SHALL BE BASED ON DRAWINGS FOR DETAILS OF ALL SETTING
ISO-CRFW SDB-CC-E2-FF ISO-CRFW ISO-CRFW
In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A [4P/80] [4P/40A] FINAL EQUIPMENT SELECTION AND OUT INFORMATION. NO DIMENSIONS SHALL
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A -1F-20 ISO-CRFW -1F-25 -1F-32 SEC/SPARK HARMONIC LIMITS FOR BE MEASURED FROM THIS DRAWINGS.
LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA LEVEL 2
PMU Icu: 10kA [4P/40A] -1F-20 [4P/40A] [4P/40A]
LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI [4P/40A] VOLTAGE AND CURRENT DISTORTIONS.'
FEEDING FEEDING D O L D O L 4. ALL DIMENSIONS IN MILLIMETER AND
SOFT SOFT CRFW-1F-34 CRFW-1F-36 13. LONG LEAD TIME SCOPE. ELEVATIONS IN METERS UNLESS
1/31/2022 10:32:39 PM BIM 360://Damac Data Center/DMC20001M_SHG_ELEC_R20_CENTRAL.rvt
XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF OTHERWISE SPECIFIED.
1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 M M
14. THE UPS SHALL MAINTAIN ITS OPERATION,
1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 SOFT M M
0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E CRAC-1F-02 CRAC-1F-07 THE PHASE ROTATION AND PHASE BALANCE 5. ANY COMMUNICATION WITH SPECIALIZED
CRFW-1F-25 CRFW-1F-32 38kW 17kW UNDER FLOATING NEUTRAL CONDITION DUE DISCIPLINES SHOWN IN THE DRAWINGS
M 22kW 22kW –FLA –FLA TO MAIN LV SWITCHBOARD 4-POLE SHALL BE THROUGH THE ENGINEER.
40 FLA 40 FLA –LRA –LRA SWITCHING. THIS CONDITION SHALL NOT
CRFW-1F-20 IMPACTING UPS DOWNSTREAM CIRCUITS.
40 LRA 40 LRA
22kW MARK DATE DESCRIPTION
BW-B2-1/4P/400A/Icu: 10kA/400Y/230V
BW-B2-2/4P/400A/Icu: 10kA/400Y/230V
BW-B2-3/4P/400A/Icu: 10kA/400Y/230V
BW-B2-4/4P/400A/Icu: 10kA/400Y/230V
BW-B2-5/4P/400A/Icu: 10kA/400Y/230V
BW-B2-6/4P/400A/Icu: 10kA/400Y/230V
BW-B2-7/4P/400A/Icu: 10kA/400Y/230V
BW-B2-8/4P/400A/Icu: 10kA/400Y/230V
BW-B2-9/4P/400A/Icu: 10kA/400Y/230V
BW-B2-10/4P/400A/Icu: 10kA/400Y/230V
BW-B2-11/4P/400A/Icu: 10kA/400Y/230V
1. MAINS SUPPLY RETURNS. 1. MAINS SUPPLY FAILS. 1. THE PROGRAMING OF MSB SWITCHBOARD 1. ANY CHANGES TO THE DISTRIBUTION
FOR ASSETS REGISTER REFER CONTROLLER SHALL BE DONE IN A WAY BOARDS DURING CONSTRUCTION MUST BE
1 TO DMM-1-E-RPT-08
GEN-IN-C2 2. GENERATOR CONTINUES TO WORK FOR THE 2. TRANSFORMER INCOMER CIRCUIT BREAKER THAT "SWINGING"" BETWEEN GENERATOR SUBMITTED AS "REVISION" ON APPROVED
4P4d GEN-C2 NEXT 5 MINUTES ON MAIN LV SWITCHBOARD OPENS. AND TRANSFORMER SOURCES IS AVOIDED. DRAWINGS TO SPARK FOR APPROVAL
In: 5000A 3125kVA DATA CENTRE & CLOUD SERVICES
M XFMR-C2 BEFORE PROCUREMENT OF THESE PANELS.
BUILDING A
13 2 3 Ir: 5000A 2500kW (0.8 PF)
Icu: 50kA TVRT TYPE 3. MAINS HEALTHY TIMER (5 MINUTES 3. REMOTE SIGNAL "TO START" IS SENT TO 2. THE SWITCHING TIME BETWEEN THE TWO EDGNEX DMM-1 Data Center
LSIG [TU-6] 5000A/400Y/230V/4P/50kA@1sec 60Hz/400Y/230V 3150kVA AN @ 50DegC MINIMUM) TIMES OUT AND OPEN GENERATOR CONTROL PANEL. SOURCES OF THE RMU (AT 13.8kV LEVEL) 2. LEGEND: REFER TO DRAWING DMM-1-E-001. G+2+R | PLOT EI_028 & EI_029
LBB-GEN-C2 GEN-OUT-C2 3Φ, 4W, Xd'' = 12% 60Hz/Dyn11 LONG LEAD ITEM GENERATOR INCOMER CIRCUIT BREAKER SHALL NOT BE TREATED AS A UTILITY King Salman Energy Park (SPARK), Dammam
4P4d 4P4d DCP RATED 13.8kV/400Y/230V SCOPE OF WORK AT MSB SWITCHBOARD AND CLOSES 4. GENERATOR STARTS, STABILIZES AND FAILURE. 2. FOR LOAD SCHEDULES REFER TO DRAWING
In: 5000A In: 5000A Kingdom of Saudi Arabia
M M @ 55DegC 3Φ, 4W, %uk=8% (EXCLUDED FROM MEP TRANSFORMER INCOMER CIRCUIT BREAKER "READY" SIGNAL IS ISSUED. DMM-1-E-RPT-02.
PHASE 2
Ir: 5000A Ir: 5000A www.edgnex.com
OPERATING CAST-RESIN CONTRACTOR SCOPE) AT MSB SWITCHBOARD. THIS TRANSITION 3. EACH MSB SWITCHBOARD SHALL HAVE A
Icu: 50kA LEVEL 2 Icu: 50kA
LSIG [TU-6] P M U LSIG [TU-6] TEMP. DRY-TYPE REFER TO ASSOCIATED SHALL BE DONE WITH MINIMUM TIME DELAY 5. GENERATOR INTERNAL CIRCUIT BREAKER DUAL CONTROLLERS FOR REDUNDANCY. 3. THIS DRAWING SHOWS SYSTEM AND
CLIENT
IP21 RESPONSIBILITY ON MAIN LV SWITCHBOARD. CLOSES. PRINCIPLE, IF THE DRAWING DOES NOT
TN-C-S 13 MATRIX. 4. VOLTAGE SENSING AT MSB SWITCHBOARD MEET THE MINIMUM REQUIREMENTS OF THE
TAP-CHANGER: 4 x 2.5% 4. GENERATOR SYSTEM RUNS DOWN. 6. GENERATOR INCOMER CIRCUIT BREAKER INCOMERS SHALL CONSIDER EITHER VT OR LOCAL REGULATIONS, THE CONTRACTOR
BI-DIRECTIONAL CONNECTION
(MOBILE LOAD BANK AND
HOOK-UP GENERATOR)
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
5. THE SITE RETURNS TO NORMAL AND
SUPPORTED BY MAINS.
ON MAIN LV SWITCHBOARD CLOSES. VOLTAGE SENIORS. SHALL ADD COMPONENTS TO MEET THESE
REQUIREMENTS. KHAZZAN
0.8V 50m 34/F 0.4V 25m 34/F 4. NO PIPING, DUCTS OR EQUIPMENT FOREIGN Kingdom of Saudi Arabia
TO ELECTRICAL EQUIPMENT SHALL BE www.damacproperties.com
PERMITTED TO BE LOCATED WITHIN THE
MSB-C2 9
N: 1783kW [1783kW] CB-GEN-C2 CB-XFMR-C2 DEDICATED SPACE ABOVE THE ELECTRICAL
4P4d 4P4d TYPE EQUIPMENT.
5N/4: 2308kW
FORM 4B TYPE 6 In: 5000A M M
In: 5000A 1+2+3 LEAD CONSULTANT
POWER ROOM C1 Ir: 5000A AMF WITH Ir: 5000A
Icu: 65kA LEVEL 1 E&M INTERLOCK LEVEL 1 Icu: 65kA 5. INSULATED ECC/CPC COPPER GROUNDING
5000A/400Y/230V/4P/65kA FOR 1sec LSIG [TU-6] PMU PMU LSIG [TU-6] CONDUCTOR SHALL BE INSTALLED IN ALL
CB-ACCH-RF-21 CB-ACCH-RF-26 CB-ACCH-RF-33 CB-ACCH-RF-24 BIB-C2 RIB-C2-1 SIB-C2-1 RIB-C2-2 SIB-C2-2 RIB-C2-3 BIB-C2-3 BYPASS-C2 CB-SDB-C2-GF CB-PFC-C2-1 CB-HF-C2 CB-SDB-C2-FF FINAL CIRCUITS AND FEEDERS.
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P3d 4P4d 4P4d
In: 400A In: 400A In: 400A In: 400A In: 3200A In: 1600A In: 1600A In: 1600A In: 1600A In: 250A In: 250A In: 250A In: 400A In: 630A In: 630A In: 160A 6. ALL EXTERIOR ELECTRICAL EQUIPMENT
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 3200A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 225A Ir: 225A Ir: 250A Ir: 400A Ir: 500A Ir: 630A Ir: 160A
LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA SHALL BE IP68 WEATHERPROOF. R
LEVEL 2 LEVEL 2
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6]
7. ALL CIRCUITS FEEDING LIFE SAFETY AND
FIRE EQUIPMENT SHALL BE UNDERTAKEN
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC USING FIRE-RATED, MECHANICALLY
1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 XLPE / SWA / PVC 2R ☓ 4C ☓ 120 XLPE / SWA / PVC XLPE / SWA / PVC
1R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 1R ☓ 4C ☓ 70
PROTECTED CABLES TO BS 8519:2010.
1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 2R ☓ 1C ☓ 75
7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 1R ☓ 1C ☓ 95 -V 15m 31/E 2R ☓ 1C ☓ 95 1R ☓ 1C ☓ 35 A MEMBER OF SYSKA HENNESSY GROUP, INC.
-V 15m 31/E -V 15m 31/E 1.7V 15m 31/E 8. ALL INDUCTIVE LOAD SHALL BE EQUIPPED www.syska.com
WITH 100mA OR 300mA RCD.
FROM
MSB-D2 – – – – – – –
9. ALL NON-INDUCTIVE LOADS SHALL BE CSA CONSULTANT
ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH 12 EQUIPPED WITH 30mA RCD.
FEEDING
-RF-21 -RF-26 -RF-26 -RF-33 + +
5
+ + +
5
+ +
ACCH-RF-24 PFC-C2-1 AHF-C2
[4P/400A] [4P/400A] [4P/400A] [4P/400A] 10. PROVIDE UNDERVOLTAGE RELAY AND ART
IP66 IP66 IP66 IP66 250kVAR 600A FOR CRAH, CRFW, CHILLERS AND ALL
5X 50kVAR OTHER MOTOR LOADS.
V F D V F D
· WORST-CASE REACTIVE
4 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P 3P 3P 3P 3P
In: 630A In: 630A In: 630A In: 630A In: 630A In: 630A In: 630A In: 160A 4P4d In: 3200A In: 40A In: 250A In: 160A In: 160A In: 40A In: 50A In: 100A ENCLOSURE AND CLOSE THE SUPPLY
Ir: 630A Ir: 630A Ir: 500A Ir: 630A Ir: 400A Ir: 630A Ir: 630A Ir: 160A In: 3200A Ir: 3200A Ir: 40A Ir: 200A Ir: 125A Ir: 125A Ir: 40A Ir: 50A Ir: 100A
Ir: 3200A LEVEL 2 LEVEL 2 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4
BREAKER TO MAIN LV SWITCHBOARD
LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2 Icu: 50kA Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA LEVEL 2 Icu: 50kA SUPPORTING THE CRITICAL LOADS.
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] Icu: 50kA LSI [TU-6] LSI LSI LSI LSI LSI LSI PMU LSI
LSI
4. EXCLUDING LOSSES AT NORMAL MODE.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC D C B A
2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 240 2R ☓ 4C ☓ 240 2R ☓ 4C ☓ 240 1R ☓ 4C ☓ 70 1R ☓ 4C ☓ 35 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 35 1R ☓ 4C ☓ 35 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 XLPE / SWA / PVC
2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 120 2R ☓ 1C ☓ 120 2R ☓ 1C ☓ 120 1R ☓ 1C ☓ 35 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 4C ☓ 50 5. LI-ION BATTERY WITH MONITORING SYSTEM.
-V 55m 31/E -V 55m 31/E -V 55m 31/E -V 85m 31/E -V 80m 31/E -V 75m 31/E -V 70m 31/E -V 20m 31/E 0.7V 45m 31/E 0.7V 45m 31/E -V 50m 31/E -V 50m 31/E -V 50m 31/E -V 50m 31/E 1R ☓ 1C ☓ 25
-V 50m 72/D BACKUP TIME AT FULL LOAD SHALL NOT BE
LESS THAN 5 MINUTES.
[4P/125A] [4P/125A] [4P/125A]
ATS-MV-1 6. REFER TO DMC-DH-E-020 FOR TYPICAL PDU
MOBILE LOAD
PDU-C2-G [4P/125A] AND BUSWAY INSTALLATION.
BANK SEAL
N: 50kW [50kW] XLPE / SWA / PVC
5N/4: 63kW D O L D O L D O L DB-GF-C2 1R ☓ 4C ☓ 35
FORM 2B TYPE 2 TCL: 25kW 1R ☓ 1C ☓ 25 7. THE POWER FACTOR DURING ANY MODE OF
POWER ROOM C1 MD: 25kW -V 15m 31/E OPERATION SHALL NOT BE BELOW 0.95 LAG
M M M MEASURED AT MV BUS.
CRAC-GF-03 CRAC-GF-08 CRAC-GF-25
50kW 50kW 14kW 8. ALL CONTROL CABLING BETWEEN UPS
–FLA –FLA –FLA UNITS, UPS OUTPUT OVERCORRECT
SDB-MV-1 PROTECTIVE DEVICES, AND INTERFACE UNIT
–LRA –LRA –LRA TCL: 40kW
MD: 38kW TO UPS OUTPUT PANEL SHALL BE
FORM 2B TYPE 2 INSTALLED BY UPS SUPPLIER.
13 6 MV ROOM 1
9. THE AUTOMATIC CHANGEOVER OF
SOURCES SHALL BE OVER "PAIRED" AIR
PDU-C2-1 PDU-C2-2 PDU-C2-3 PDU-C2-4 PDU-C2-5 PDU-C2-6 PDU-C2-7 SDB-CC-C2-FF SDB-C2-FF CIRCUIT BREAKERS AND THEIR ASSOCIATED
Q-PDU-C2-1 N: 156kW [156kW] Q-PDU-C2-2 N: 156kW [156kW] Q-PDU-C2-3 N: 156kW [156kW] Q-PDU-C2-4 N: 156kW [156kW] Q-PDU-C2-5 N: 78kW [78kW] Q-PDU-C2-6 N: 156kW [156kW] Q-PDU-C2-7 N: 156kW [156kW] SW-SDB-CC-C2-FF N: 88kW [88kW] N:76kW [76kW] SW-SDB-C2-FF
3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d TYPE TYPE CONTRACTORS. NO EXTERNAL CONTROL
5N/4: 312kW 5N/4: 312kW 5N/4: 234kW 5N/4: 312kW 5N/4: 156kW 5N/4: 312kW 5N/4: 312kW 4P 5N/4: 88kW 5N/4: 76kW 4P GENERAL NOTES
In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 250A 2+3 FORM 2B TYPE 2 FORM 2B TYPE 2 160A 2+3 SUPPLY VOLTAGE (i.e. STATION BATTERIES)
Ir: 630A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 500A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 400A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 : FF MECH. COORIDOR FF. ELEC. CORRIDOR : ARE TO BE USED. POWER FOR MOTOR
Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA 1. DO NOT SCALE FROM DRAWINGS. IF IN
LSI LSI LSI LSI LSI LSI LSI 250A/400Y/230V/4P/35kA FOR 1sec 160A/400Y/230V/4P/50kA FOR 1sec OPERATIONS AND CONTROLS ARE TO BE
DOUBT, REQUEST MORE FURTHER
CB-C2-CC-1 CB-C2-CC-2 CB-C2-CC-3 CB-C2-CC-4 CB-SDB-C2-FF-1 CB-SDB-C2-FF-2 CB-SDB-C2-FF-3 TAKEN FROM INCOMING SIDE OF THE
TYPE TYPE TYPE TYPE TYPE TYPE TYPE INFORMATION.
XFMR-PDU-C2-1 XFMR-PDU-C2-2 XFMR-PDU-C2-3 XFMR-PDU-C2-4 XFMR-PDU-C2-5 XFMR-PDU-C2-6 XFMR-PDU-C2-7 3P 3P 3P 3P 3P 3P 3P DEVICE BEING POWERED.
2+3 2+3 2+3 2+3 2+3 2+3 2+3 In: 40A In: 40A In: 40A In: 40A In: 80A In: 40A In: 50A
400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 80A Ir: 40A Ir: 50A 2. THIS DRAWING SHALL BE READ IN
60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 4
Icu: 50kA LEVEL 4
Icu: 50kA LEVEL 4
Icu: 50kA 10. MASTER-SLAVE CONFIGURATION AND WITH
PMU PMU PMU PMU PMU PMU PMU CONJUNCTION WITH THE CONTRACT
400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V LSI LSI LSI LSI LSI LSI LSI 4.3% DE-TUNEING EACH.
CONDITIONS, THE SPECIFICATIONS,
3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% EQUIPMENT SCHEDULES AND THE
Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC
11. LRA SHALL NOT EXCEED FLA.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC ARCHITECTURAL DRAWINGS.
TN-S TN-S TN-S TN-S TN-S TN-S TN-S 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 12. ACTIVE HARMONIC FILTERS ARE SUBJECT
5.6V 45m 31/E 5.6V 45m 31/E FROM 5.6V 45m 31/E 5.6V 45m 31/E -V 50m 31/E -V 50m 31/E -V 50m 31/E
TO THE POWER QUALITY ASSESSMENT BY 3. REFER TO THE ARCHITECTURAL
CB-BW-C2-1 CB-BW-C2-2 CB-BW-C2-3 CB-BW-C2-4 CB-BW-C2-5 CB-BW-C2-6 CB-BW-C2-7 CB-BW-C2-8 CB-BW-C2-9 CB-BW-C2-7 CB-BW-C2-10 CB-BW-C2-11 CB-BW-C2-12 CB-BW-C2-13
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d SDB-CC-D2-FF THE MEP CONTRACTOR SHALL BE BASED ON DRAWINGS FOR DETAILS OF ALL SETTING
In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A ISO-CRFW ISO-CRFW ISO-CRFW ISO-CRFW [4P/80] [4P/40A] FINAL EQUIPMENT SELECTION AND OUT INFORMATION. NO DIMENSIONS SHALL
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A -1F-21 -1F-26 -1F-26 -1F-33 SEC/SPARK HARMONIC LIMITS FOR BE MEASURED FROM THIS DRAWINGS.
LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2
Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA [4P/40A] [4P/40A] [4P/40A]
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI [4P/40A] VOLTAGE AND CURRENT DISTORTIONS.'
FEEDING D O L D O L 4. ALL DIMENSIONS IN MILLIMETER AND
SOFT SOFT CRFW-1F-24 13. LONG LEAD TIME SCOPE. ELEVATIONS IN METERS UNLESS
1/31/2022 10:32:58 PM BIM 360://Damac Data Center/DMC20001M_SHG_ELEC_R20_CENTRAL.rvt
XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF OTHERWISE SPECIFIED.
1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 M M
14. THE UPS SHALL MAINTAIN ITS OPERATION,
1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 M SOFT M
0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E CRAC-1F-03 CRAC-1F-08 THE PHASE ROTATION AND PHASE BALANCE 5. ANY COMMUNICATION WITH SPECIALIZED
CRFW-1F-21 CRFW-1F-33 38kW 14kW UNDER FLOATING NEUTRAL CONDITION DUE DISCIPLINES SHOWN IN THE DRAWINGS
22kW M 22kW –FLA –FLA TO MAIN LV SWITCHBOARD 4-POLE SHALL BE THROUGH THE ENGINEER.
40 FLA 40 FLA –LRA –LRA SWITCHING. THIS CONDITION SHALL NOT
CRFW-1F-26 IMPACTING UPS DOWNSTREAM CIRCUITS.
40 LRA 40 LRA
22kW MARK DATE DESCRIPTION
BW-C2-1/4P/400A/Icu: 10kA/400Y/230V
BW-C2-2/4P/400A/Icu: 10kA/400Y/230V
BW-C2-3/4P/400A/Icu: 10kA/400Y/230V
BW-C2-4/4P/400A/Icu: 10kA/400Y/230V
BW-C2-5/4P/400A/Icu: 10kA/400Y/230V
BW-C2-6/4P/400A/Icu: 10kA/400Y/230V
BW-C2-7/4P/400A/Icu: 10kA/400Y/230V
BW-C2-8/4P/400A/Icu: 10kA/400Y/230V
BW-C2-9/4P/400A/Icu: 10kA/400Y/230V
BW-C2-10/4P/400A/Icu: 10kA/400Y/230V
BW-C2-11/4P/400A/Icu: 10kA/400Y/230V
BW-C2-12/4P/400A/Icu: 10kA/400Y/230V
BW-C2-13/4P/400A/Icu: 10kA/400Y/230V
1. MAINS SUPPLY RETURNS. 1. MAINS SUPPLY FAILS. 1. THE PROGRAMING OF MSB SWITCHBOARD 1. ANY CHANGES TO THE DISTRIBUTION
FOR ASSETS REGISTER REFER CONTROLLER SHALL BE DONE IN A WAY BOARDS DURING CONSTRUCTION MUST BE
1 TO DMM-1-E-RPT-08
GEN-IN-D2 2. GENERATOR CONTINUES TO WORK FOR THE 2. TRANSFORMER INCOMER CIRCUIT BREAKER THAT "SWINGING"" BETWEEN GENERATOR SUBMITTED AS "REVISION" ON APPROVED
4P4d GEN-D2 NEXT 5 MINUTES ON MAIN LV SWITCHBOARD OPENS. AND TRANSFORMER SOURCES IS AVOIDED. DRAWINGS TO SPARK FOR APPROVAL
In: 5000A 3125kVA DATA CENTRE & CLOUD SERVICES
M XFMR-D2 BEFORE PROCUREMENT OF THESE PANELS.
BUILDING A
13 2 3 Ir: 5000A 2500kW (0.8 PF)
Icu: 50kA TVRT TYPE 3. MAINS HEALTHY TIMER (5 MINUTES 3. REMOTE SIGNAL "TO START" IS SENT TO 2. THE SWITCHING TIME BETWEEN THE TWO EDGNEX DMM-1 Data Center
LSIG [TU-6] 5000A/400Y/230V/4P/50kA@1sec 60Hz/400Y/230V 3150kVA AN @ 50DegC MINIMUM) TIMES OUT AND OPEN GENERATOR CONTROL PANEL. SOURCES OF THE RMU (AT 13.8kV LEVEL) 2. LEGEND: REFER TO DRAWING DMM-1-E-001. G+2+R | PLOT EI_028 & EI_029
LBB-GEN-D2 GEN-OUT-D2 3Φ, 4W, Xd'' = 12% 60Hz/Dyn11 LONG LEAD ITEM GENERATOR INCOMER CIRCUIT BREAKER SHALL NOT BE TREATED AS A UTILITY King Salman Energy Park (SPARK), Dammam
4P4d 4P4d DCP RATED 13.8kV/400Y/230V SCOPE OF WORK AT MSB SWITCHBOARD AND CLOSES 4. GENERATOR STARTS, STABILIZES AND FAILURE. 2. FOR LOAD SCHEDULES REFER TO DRAWING
In: 5000A In: 5000A Kingdom of Saudi Arabia
M M @ 55DegC 3Φ, 4W, %uk=8% (EXCLUDED FROM MEP TRANSFORMER INCOMER CIRCUIT BREAKER "READY" SIGNAL IS ISSUED. DMM-1-E-RPT-02.
PHASE 2
Ir: 5000A Ir: 5000A www.edgnex.com
OPERATING CAST-RESIN CONTRACTOR SCOPE) AT MSB SWITCHBOARD. THIS TRANSITION 3. EACH MSB SWITCHBOARD SHALL HAVE A
Icu: 50kA LEVEL 2 Icu: 50kA
LSIG [TU-6] P M U LSIG [TU-6] TEMP. DRY-TYPE REFER TO ASSOCIATED SHALL BE DONE WITH MINIMUM TIME DELAY 5. GENERATOR INTERNAL CIRCUIT BREAKER DUAL CONTROLLERS FOR REDUNDANCY. 3. THIS DRAWING SHOWS SYSTEM AND
CLIENT
IP21 RESPONSIBILITY ON MAIN LV SWITCHBOARD. CLOSES. PRINCIPLE, IF THE DRAWING DOES NOT
TN-C-S 13 MATRIX. 4. VOLTAGE SENSING AT MSB SWITCHBOARD MEET THE MINIMUM REQUIREMENTS OF THE
TAP-CHANGER: 4 x 2.5% 4. GENERATOR SYSTEM RUNS DOWN. 6. GENERATOR INCOMER CIRCUIT BREAKER INCOMERS SHALL CONSIDER EITHER VT OR LOCAL REGULATIONS, THE CONTRACTOR
BI-DIRECTIONAL CONNECTION
(MOBILE LOAD BANK AND
HOOK-UP GENERATOR)
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
5. THE SITE RETURNS TO NORMAL AND
SUPPORTED BY MAINS.
ON MAIN LV SWITCHBOARD CLOSES. VOLTAGE SENIORS. SHALL ADD COMPONENTS TO MEET THESE
REQUIREMENTS. KHAZZAN
0.8V 50m 34/F 0.4V 25m 34/F 4. NO PIPING, DUCTS OR EQUIPMENT FOREIGN Kingdom of Saudi Arabia
TO ELECTRICAL EQUIPMENT SHALL BE www.damacproperties.com
PERMITTED TO BE LOCATED WITHIN THE
MSB-D2 9
N: 1862kW [1862kW] CB-GEN-D2 CB-XFMR-D2 DEDICATED SPACE ABOVE THE ELECTRICAL
4P4d 4P4d TYPE EQUIPMENT.
5N/4: 2366kW
FORM 4B TYPE 6 In: 5000A M M
In: 5000A 1+2+3 LEAD CONSULTANT
POWER ROOM D1 Ir: 5000A AMF WITH Ir: 5000A
Icu: 65kA LEVEL 1 E&M INTERLOCK LEVEL 1 Icu: 65kA 5. INSULATED ECC/CPC COPPER GROUNDING
5000A/400Y/230V/4P/65kA FOR 1sec LSIG [TU-6] PMU PMU LSIG [TU-6] CONDUCTOR SHALL BE INSTALLED IN ALL
CB-ACCH-RF-22 CB-ACCH-RF-29 CB-ACCH-RF-34 CB-ACCH-RF-26 CB-ACCH-RF-30 BIB-D2 RIB-D2-1 SIB-D2-1 RIB-D2-2 SIB-D2-2 RIB-D2-3 BIB-D2-3 BYPASS-D2 CB-SDB-D2-GF CB-PFC-D2-1 CB-HF-D2 CB-SDB-D2-FF FINAL CIRCUITS AND FEEDERS.
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P3d 4P4d 4P4d
In: 400A In: 400A In: 400A In: 400A In: 400A In: 3200A In: 1600A In: 1600A In: 1600A In: 1600A In: 250A In: 250A In: 250A In: 400A In: 630A In: 630A In: 250A 6. ALL EXTERIOR ELECTRICAL EQUIPMENT
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 3200A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 225A Ir: 225A Ir: 250A Ir: 400A Ir: 500A Ir: 630A Ir: 250A
LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA SHALL BE IP68 WEATHERPROOF. R
LEVEL 2 LEVEL 2
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6]
7. ALL CIRCUITS FEEDING LIFE SAFETY AND
FIRE EQUIPMENT SHALL BE UNDERTAKEN
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC USING FIRE-RATED, MECHANICALLY
1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 XLPE / SWA / PVC 2R ☓ 4C ☓ 120 XLPE / SWA / PVC XLPE / SWA / PVC
1R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 1R ☓ 4C ☓ 150
PROTECTED CABLES TO BS 8519:2010.
1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 2R ☓ 1C ☓ 75
7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 1R ☓ 1C ☓ 95 -V 15m 31/E 2R ☓ 1C ☓ 95 1R ☓ 1C ☓ 70 A MEMBER OF SYSKA HENNESSY GROUP, INC.
-V 15m 31/E -V 15m 31/E -V 50m 31/E 8. ALL INDUCTIVE LOAD SHALL BE EQUIPPED www.syska.com
WITH 100mA OR 300mA RCD.
FROM
MSB-B2 – – – – – – –
9. ALL NON-INDUCTIVE LOADS SHALL BE CSA CONSULTANT
ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH 12 EQUIPPED WITH 30mA RCD.
FEEDING FEEDING
-RF-22 -RF-29 -RF-34 -RF-34 + +
5
+ + +
5
+ +
ACCH-RF-26 ACCH-RF-30 PFC-D2-1 AHF-D2
[4P/400A] [4P/400A] [4P/400A] [4P/400A] 10. PROVIDE UNDERVOLTAGE RELAY AND ART
IP66 IP66 IP66 IP66 250kVAR 600A FOR CRAH, CRFW, CHILLERS AND ALL
5X 50kVAR OTHER MOTOR LOADS.
V F D V F D
· WORST-CASE REACTIVE
4 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P 3P 3P 3P 3P 3P 3P 3P
In: 630A In: 630A In: 630A In: 630A In: 630A In: 630A In: 630A In: 160A 4P4d In: 3200A In: 40A In: 160A In: 160A In: 160A In: 40A In: 40A In: 50A In: 80A In: 100A In: 50A ENCLOSURE AND CLOSE THE SUPPLY
Ir: 630A Ir: 630A Ir: 400A Ir: 630A Ir: 500A Ir: 630A Ir: 630A Ir: 160A In: 3200A Ir: 3200A Ir: 40A Ir: 160A Ir: 125A Ir: 125A Ir: 40A Ir: 40A Ir: 50A Ir: 80A Ir: 100A Ir: 50A
Ir: 3200A LEVEL 2 LEVEL 2 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4 LEVEL 4
BREAKER TO MAIN LV SWITCHBOARD
LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2
Icu: 50kA LEVEL 2 Icu: 50kA Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA PMU Icu: 50kA SUPPORTING THE CRITICAL LOADS.
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] Icu: 50kA LSI [TU-6] LSI LSI LSI LSI LSI LSI LSI LSI LSI LSI
LSI
4. EXCLUDING LOSSES AT NORMAL MODE.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC D C B A
2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 1R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 150 2R ☓ 4C ☓ 185 2R ☓ 4C ☓ 185 1R ☓ 4C ☓ 70 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 70 1R ☓ 4C ☓ 35 1R ☓ 4C ☓ 35 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 35 1R ☓ 4C ☓ 16
2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 2R ☓ 1C ☓ 95 1R ☓ 1C ☓ 35 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 35 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 25 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 5. LI-ION BATTERY WITH MONITORING SYSTEM.
-V 55m 31/E -V 55m 31/E -V 55m 31/E -V 80m 31/E -V 80m 31/E -V 80m 31/E -V 80m 31/E -V 20m 31/E 0.7V 45m 31/E 0.7V 45m 31/E -V 15m 31/E -V 15m 31/E -V 50m 31/E -V 50m 31/E -V 15m 31/E -V 50m 31/E -V 50m 31/E -V 50m 31/E BACKUP TIME AT FULL LOAD SHALL NOT BE
LESS THAN 5 MINUTES.
[4P/125A] [4P/125A] [4P/125A] [4P/125A] [4P/80]
MOBILE LOAD 6. REFER TO DMC-DH-E-020 FOR TYPICAL PDU
PDU-D2-G BANK AND BUSWAY INSTALLATION.
N: 50kW [50kW] SEAL
5N/4: 63kW D O L D O L D O L D O L DB-GF-D2 D O L
FORM 2B TYPE 2 TCL: 25kW 7. THE POWER FACTOR DURING ANY MODE OF
POWER ROOM D1 MD: 25kW OPERATION SHALL NOT BE BELOW 0.95 LAG
M M M M M MEASURED AT MV BUS.
CRAC-GF-04 CRAC-GF-09 CRAC-GF-21 CRAC-GF-28 CRAC-1F-04
50kW 50kW 14kW 5kW 38kW 8. ALL CONTROL CABLING BETWEEN UPS
–FLA –FLA –FLA –FLA –FLA UNITS, UPS OUTPUT OVERCORRECT
–LRA –LRA –LRA –LRA –LRA PROTECTIVE DEVICES, AND INTERFACE UNIT
TO UPS OUTPUT PANEL SHALL BE
INSTALLED BY UPS SUPPLIER.
13 6
9. THE AUTOMATIC CHANGEOVER OF
SOURCES SHALL BE OVER "PAIRED" AIR
PDU-D2-1 PDU-D2-2 PDU-D2-3 PDU-D2-4 PDU-D2-5 PDU-D2-6 PDU-D2-7 SDB-CC-D2-FF SDB-D2-RF CIRCUIT BREAKERS AND THEIR ASSOCIATED
Q-PDU-D2-1 N: 156kW [156kW] Q-PDU-D2-2 N: 156kW [156kW] Q-PDU-D2-3 N: 78kW [78kW] Q-PDU-D2-4 N: 156kW [156kW] Q-PDU-D2-5 N: 156kW [156kW] Q-PDU-D2-6 N: 156kW [156kW] Q-PDU-D2-7 N: 156kW [156kW] SW-SDB-CC-D2-FF N: 66kW [66kW] N: 42kW [42kW] SW-SDB-D2-RF
3P3d 3P3d 3P3d 3P3d 3P3d 3P3d 3P3d TYPE CONTRACTORS. NO EXTERNAL CONTROL
5N/4: 312kW 5N/4: 312kW 5N/4: 156kW 5N/4: 312kW 5N/4: 234kW 5N/4: 312kW 5N/4: 312kW 4P 5N/4: 66kW 5N/4: 42kW 4P GENERAL NOTES
In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 In: 630A 400kVA, K-4 160A 2+3 FORM 2B TYPE 2 FORM 2B TYPE 2 100A SUPPLY VOLTAGE (i.e. STATION BATTERIES)
Ir: 630A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 400A ELEC COR. FF-1 Ir: 630A ELEC COR. FF-1 Ir: 500A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 Ir: 630A ELEC COR. FF-2 : FF MECH. COORIDOR ROOF (IP68) : ARE TO BE USED. POWER FOR MOTOR
Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA Icu: 35kA 1. DO NOT SCALE FROM DRAWINGS. IF IN
LSI LSI LSI LSI LSI LSI LSI 160A/400Y/230V/4P/35kA FOR 1sec 100A/400Y/230V/4P/50kA FOR 1sec OPERATIONS AND CONTROLS ARE TO BE
DOUBT, REQUEST MORE FURTHER
CB-D2-CC-1 CB-D2-CC-2 CB-D2-CC-3 CB-D2-CC-4 CB-D2-CC-5 CB-SDB-D2-RF-1 CB-SDB-D2-RF-2 TAKEN FROM INCOMING SIDE OF THE
TYPE TYPE TYPE TYPE TYPE TYPE TYPE INFORMATION.
XFMR-PDU-D2-1 XFMR-PDU-D2-2 XFMR-PDU-D2-3 XFMR-PDU-D2-4 XFMR-PDU-D2-5 XFMR-PDU-D2-6 XFMR-PDU-D2-7 3P 3P 3P 3P 3P 3P 3P DEVICE BEING POWERED.
2+3 2+3 2+3 2+3 2+3 2+3 2+3 In: 40A In: 40A In: 40A In: 40A In: 40A In: 80A In: 40A
400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN 400kVA AN Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 40A Ir: 80A Ir: 40A 2. THIS DRAWING SHALL BE READ IN
60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 60Hz/Dyn11 LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 3
Icu: 35kA LEVEL 4
Icu: 50kA LEVEL 4
Icu: 50kA 10. MASTER-SLAVE CONFIGURATION AND WITH
PMU PMU PMU PMU PMU PMU PMU CONJUNCTION WITH THE CONTRACT
400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V 400Δ:400Y/230V LSI LSI LSI LSI LSI LSI LSI 4.3% DE-TUNEING EACH.
CONDITIONS, THE SPECIFICATIONS,
3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% 3Φ, 4W, %uk=6% EQUIPMENT SCHEDULES AND THE
Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE Cu/DRY-TYPE XLPE / SWA / PVC XLPE / SWA / PVC
11. LRA SHALL NOT EXCEED FLA.
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC ARCHITECTURAL DRAWINGS.
TN-S TN-S TN-S TN-S TN-S TN-S TN-S 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 16 1R ☓ 4C ☓ 25 1R ☓ 4C ☓ 16
1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 1R ☓ 1C ☓ 16 12. ACTIVE HARMONIC FILTERS ARE SUBJECT
5.6V 45m 31/E 5.6V 45m 31/E 5.6V 45m 31/E FROM 5.6V 45m 31/E 5.6V 45m 31/E -V 50m 31/E -V 50m 31/E
TO THE POWER QUALITY ASSESSMENT BY 3. REFER TO THE ARCHITECTURAL
CB-BW-D2-1 CB-BW-D2-2 CB-BW-D2-3 CB-BW-D2-4 CB-BW-D2-5 CB-BW-D2-S CB-BW-D2-6 CB-BW-D2-7 CB-BW-D2-8 CB-BW-D2-9 CB-BW-D2-10 CB-BW-D2-11 CB-BW-D2-12 CB-BW-D2-13
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d SDB-CC-B2-FF THE MEP CONTRACTOR SHALL BE BASED ON DRAWINGS FOR DETAILS OF ALL SETTING
In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A In: 400A ISO-CRFW ISO-CRFW ISO-CRFW ISO-CRFW [4P/80] [4P/40] FINAL EQUIPMENT SELECTION AND OUT INFORMATION. NO DIMENSIONS SHALL
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 400A -1F-22 -1F-29 -1F-34 -1F-34 SEC/SPARK HARMONIC LIMITS FOR BE MEASURED FROM THIS DRAWINGS.
LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2
Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA Icu: 10kA [4P/40A] [4P/40A] [4P/40A]
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI
PMU
LSI [4P/40A] VOLTAGE AND CURRENT DISTORTIONS.'
FEEDING FEEDING CONTROL CONTROL 4. ALL DIMENSIONS IN MILLIMETER AND
PANEL PANEL
SOFT SOFT CRFW-1F-26 CRFW-1F-30 13. LONG LEAD TIME SCOPE. ELEVATIONS IN METERS UNLESS
1/31/2022 10:33:16 PM BIM 360://Damac Data Center/DMC20001M_SHG_ELEC_R20_CENTRAL.rvt
XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF XLPE / SWA / LSF M OTHERWISE SPECIFIED.
1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 1R ☓ 4C ☓ 240 M
14. THE UPS SHALL MAINTAIN ITS OPERATION,
1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 1R ☓ 1C ☓ 120 M M SOFT
0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E 0.6V 15m 31/E SERVICE SERVICE THE PHASE ROTATION AND PHASE BALANCE 5. ANY COMMUNICATION WITH SPECIALIZED
CRFW-1F-22 CRFW-1F-29 ELEVATOR ELEVATOR UNDER FLOATING NEUTRAL CONDITION DUE DISCIPLINES SHOWN IN THE DRAWINGS
22kW 22kW M 36kW 6kW TO MAIN LV SWITCHBOARD 4-POLE SHALL BE THROUGH THE ENGINEER.
40 FLA 40 FLA SWITCHING. THIS CONDITION SHALL NOT
CRFW-1F-34 IMPACTING UPS DOWNSTREAM CIRCUITS.
40 LRA 40 LRA
22kW MARK DATE DESCRIPTION
BW-D2-1/4P/400A/Icu: 10kA/400Y/230V
BW-D2-2/4P/400A/Icu: 10kA/400Y/230V
BW-D2-3/4P/400A/Icu: 10kA/400Y/230V
BW-D2-4/4P/400A/Icu: 10kA/400Y/230V
BW-D2-5/4P/400A/Icu: 10kA/400Y/230V
BW-D2-6/4P/400A/Icu: 10kA/400Y/230V
BW-D2-7/4P/400A/Icu: 10kA/400Y/230V
BW-D2-8/4P/400A/Icu: 10kA/400Y/230V
BW-D2-9/4P/400A/Icu: 10kA/400Y/230V
BW-D20-6/4P/400A/Icu: 10kA/400Y/230V
BW-D2-11/4P/400A/Icu: 10kA/400Y/230V
BW-D2-12/4P/400A/Icu: 10kA/400Y/230V
BW-D2-13/4P/400A/Icu: 10kA/400Y/230V
1. MAINS SUPPLY RETURNS. 1. MAINS SUPPLY FAILS. 1. THE PROGRAMING OF MSB SWITCHBOARD 1. ANY CHANGES TO THE DISTRIBUTION
FOR ASSETS REGISTER REFER CONTROLLER SHALL BE DONE IN A WAY BOARDS DURING CONSTRUCTION MUST BE
1 TO DMM-1-E-RPT-08
GEN-IN-E2 2. GENERATOR CONTINUES TO WORK FOR THE 2. TRANSFORMER INCOMER CIRCUIT BREAKER THAT "SWINGING"" BETWEEN GENERATOR SUBMITTED AS "REVISION" ON APPROVED
4P4d GEN-E2 NEXT 5 MINUTES ON MAIN LV SWITCHBOARD OPENS. AND TRANSFORMER SOURCES IS AVOIDED. DRAWINGS TO SPARK FOR APPROVAL
In: 5000A 3125kVA DATA CENTRE & CLOUD SERVICES
M XFMR-E2 BEFORE PROCUREMENT OF THESE PANELS.
BUILDING A
13 2 3 Ir: 5000A 2500kW (0.8 PF)
Icu: 50kA TVRT TYPE 3. MAINS HEALTHY TIMER (5 MINUTES 3. REMOTE SIGNAL "TO START" IS SENT TO 2. THE SWITCHING TIME BETWEEN THE TWO EDGNEX DMM-1 Data Center
LSIG [TU-6] 5000A/400Y/230V/4P/50kA@1sec 60Hz/400Y/230V
3150kVA AN @ 50DegC MINIMUM) TIMES OUT AND OPEN GENERATOR CONTROL PANEL. SOURCES OF THE RMU (AT 13.8kV LEVEL) 2. LEGEND: REFER TO DRAWING DMM-1-E-001. G+2+R | PLOT EI_028 & EI_029
LBB-GEN-E2 GEN-OUT-E2 3Φ, 4W, Xd'' = 12% 60Hz/Dyn11 LONG LEAD ITEM GENERATOR INCOMER CIRCUIT BREAKER SHALL NOT BE TREATED AS A UTILITY King Salman Energy Park (SPARK), Dammam
4P4d 4P4d DCP RATED 13.8kV/400Y/230V SCOPE OF WORK AT MSB SWITCHBOARD AND CLOSES 4. GENERATOR STARTS, STABILIZES AND FAILURE. 2. FOR LOAD SCHEDULES REFER TO DRAWING
In: 5000A In: 5000A Kingdom of Saudi Arabia
M M @ 55DegC (EXCLUDED FROM MEP TRANSFORMER INCOMER CIRCUIT BREAKER "READY" SIGNAL IS ISSUED. DMM-1-E-RPT-02.
3Φ, 4W, %uk=8%
PHASE 2
Ir: 5000A Ir: 5000A www.edgnex.com
OPERATING CONTRACTOR SCOPE) AT MSB SWITCHBOARD. THIS TRANSITION 3. EACH MSB SWITCHBOARD SHALL HAVE A
Icu: 50kA LEVEL 2 Icu: 50kA CAST-RESIN
LSIG [TU-6] P M U LSIG [TU-6] TEMP. REFER TO ASSOCIATED SHALL BE DONE WITH MINIMUM TIME DELAY 5. GENERATOR INTERNAL CIRCUIT BREAKER DUAL CONTROLLERS FOR REDUNDANCY. 3. THIS DRAWING SHOWS SYSTEM AND
DRY-TYPE CLIENT
IP21 RESPONSIBILITY ON MAIN LV SWITCHBOARD. CLOSES. PRINCIPLE, IF THE DRAWING DOES NOT
TN-C-S 13 MATRIX. 4. VOLTAGE SENSING AT MSB SWITCHBOARD MEET THE MINIMUM REQUIREMENTS OF THE
TAP-CHANGER: 4 x 2.5% 4. GENERATOR SYSTEM RUNS DOWN. 6. GENERATOR INCOMER CIRCUIT BREAKER INCOMERS SHALL CONSIDER EITHER VT OR LOCAL REGULATIONS, THE CONTRACTOR
BI-DIRECTIONAL CONNECTION
(MOBILE LOAD BANK AND
HOOK-UP GENERATOR)
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
XLPE / AWA / PVC
24R ☓ 1C ☓ 630
-R ☓ 1C ☓ -
5. THE SITE RETURNS TO NORMAL AND
SUPPORTED BY MAINS.
ON MAIN LV SWITCHBOARD CLOSES. VOLTAGE SENIORS. SHALL ADD COMPONENTS TO MEET THESE
REQUIREMENTS. KHAZZAN
0.8V 50m 34/F 0.4V 25m 34/F 4. NO PIPING, DUCTS OR EQUIPMENT FOREIGN Kingdom of Saudi Arabia
TO ELECTRICAL EQUIPMENT SHALL BE www.damacproperties.com
PERMITTED TO BE LOCATED WITHIN THE
MSB-E2 9
N: 1745kW [1745kW] CB-GEN-E2 CB-XFMR-E2 DEDICATED SPACE ABOVE THE ELECTRICAL
4P4d 4P4d TYPE EQUIPMENT.
5N/4: 2250kW
FORM 4B TYPE 6 In: 5000A M M
In: 5000A 1+2+3 LEAD CONSULTANT
POWER ROOM E1 Ir: 5000A AMF WITH Ir: 5000A
Icu: 65kA LEVEL 1 E&M INTERLOCK LEVEL 1 Icu: 65kA 5. INSULATED ECC/CPC COPPER GROUNDING
5000A/400Y/230V/4P/65kA FOR 1sec LSIG [TU-6] PMU PMU LSIG [TU-6] CONDUCTOR SHALL BE INSTALLED IN ALL
CB-ACCH-RF-32 CB-ACCH-RF-23 CB-ACCH-RF-35 CB-ACCH-RF-20 BIB-E2 RIB-E2-1 SIB-E2-1 RIB-E2-2 SIB-E2-2 RIB-E2-3 BIB-E2-3 BYPASS-E2 CB-SDB-E2-GF CB-PFC-E2-1 CB-HF-E2 CB-SDB-E2-FF FINAL CIRCUITS AND FEEDERS.
4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 4P4d 3P3d 4P4d 4P4d
In: 400A In: 400A In: 400A In: 400A In: 3200A In: 1600A In: 1600A In: 1600A In: 1600A In: 250A In: 250A In: 250A In: 400A In: 630A In: 630A In: 250A 6. ALL EXTERIOR ELECTRICAL EQUIPMENT
Ir: 400A Ir: 400A Ir: 400A Ir: 400A Ir: 3200A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 1600A Ir: 225A Ir: 225A Ir: 250A Ir: 350A Ir: 500A Ir: 630A Ir: 200A
LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA LEVEL 2 Icu: 65kA LEVEL 2 Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA Icu: 65kA SHALL BE IP68 WEATHERPROOF. R
LEVEL 2 LEVEL 2
PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] PMU LSI [TU-3] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] PMU LSI [TU-6] LSI [TU-6] LSI [TU-6] PMU LSI [TU-6]
7. ALL CIRCUITS FEEDING LIFE SAFETY AND
FIRE EQUIPMENT SHALL BE UNDERTAKEN
XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC XLPE / SWA / PVC USING FIRE-RATED, MECHANICALLY
1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 1R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 4C ☓ 300 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 4R ☓ 1C ☓ 185 XLPE / SWA / PVC 2R ☓ 4C ☓ 120 XLPE / SWA / PVC XLPE / SWA / PVC PROTECTED CABLES TO BS 8519:2010.
1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 1R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 4R ☓ 1C ☓ 150 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 1R ☓ 1C ☓ 95 1R ☓ 4C ☓ 240 2R ☓ 1C ☓ 75 2R ☓ 4C ☓ 185 1R ☓ 4C ☓ 95
7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 7.9V 100m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.4V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 0.6V 10m 31/E 1R ☓ 1C ☓ 120 -V 15m 31/E 2R ☓ 1C ☓ 95 1R ☓ 1C ☓ 50
A MEMBER OF SYSKA HENNESSY GROUP, INC.
-V 15m 31/E -V 15m 31/E 1.7V 15m 31/E 8. ALL INDUCTIVE LOAD SHALL BE EQUIPPED www.syska.com
WITH 100mA OR 300mA RCD.
FROM
MSB-D2 – – – – – – –
9. ALL NON-INDUCTIVE LOADS SHALL BE CSA CONSULTANT
ISO-ACCH ISO-ACCH ISO-ACCH ISO-ACCH 12 EQUIPPED WITH 30mA RCD.
FEEDING
-RF-32 -RF-32 -RF-23 -RF-35 + +
5
+ + +
5
+ +
ACCH-RF-20 PFC-E2-1 AHF-E2
[4P/400A] [4P/400A] [4P/400A] [4P/400A] 10. PROVIDE UNDERVOLTAGE RELAY AND ART
IP66 IP66 IP66 IP66 250kVAR 600A FOR CRAH, CRFW, CHILLERS AND ALL
5X 50kVAR OTHER MOTOR LOADS.
V F D V F D
· WORST-CASE REACTIVE