DEMOBILIZATION CHECKLIST

PROJECT LIGHTENING - Cable route layout plan & cross section - Mirfa (Zakum Cluster: 2x1GW Symmetrical Monopolar HVDC VSC
Project Name
Link)

Procurer Abu Dhabi National Oil Company (ADNOC) Engineer SNC LAVALIN

Sub-
Company Abu Dhabi Offshore Power Transmission Company Limited LLC ADSO LLC
Contractor
NDRC-
Contractor Samsung C&T Corporation and Jan De Nul Consortium International Foundation Group (IFG) LLC
Contractor

Checklist Title: Demobilization - HDD Equipment & Related Items

Works Location: Mirfa Abu Dhabi

Status - Acceptable
SN Description of checking to be carried out Remarks
Yes No NA

1 Check the listed items (HDD Machines, Equipment & Tools)

2 Check all the items are cleaned, rolled/binded & Stored in ready condition)

Check demobilization vehicles, loaders, lowbed trailers are arranged

3 Demobilzation schedule is plannned and conveyed to relevant work force

4 Check the equipment had been demobilized from site as planned

5 Check the site had beed cleared

Remarks:

Accompanying document :

For Contractor
For Supervision Consulant (Engineer)
Quality Inspector Quality Engineer
Name
Designation
Date