This document provides information about a regulatory project at VIA University College. The regulatory project involves upgrading a project proposal drawing to meet BR 18 requirements in order to obtain final approval from local authorities. Regulatory project drawings are submitted together with a building permit application and must include plans like a site plan, floor plans, elevations, sections, and detail drawings. The regulatory project is performed digitally and as a group work, with an expectation of collaboration between team members.
This document provides information about a regulatory project at VIA University College. The regulatory project involves upgrading a project proposal drawing to meet BR 18 requirements in order to obtain final approval from local authorities. Regulatory project drawings are submitted together with a building permit application and must include plans like a site plan, floor plans, elevations, sections, and detail drawings. The regulatory project is performed digitally and as a group work, with an expectation of collaboration between team members.
This document provides information about a regulatory project at VIA University College. The regulatory project involves upgrading a project proposal drawing to meet BR 18 requirements in order to obtain final approval from local authorities. Regulatory project drawings are submitted together with a building permit application and must include plans like a site plan, floor plans, elevations, sections, and detail drawings. The regulatory project is performed digitally and as a group work, with an expectation of collaboration between team members.
1 Regulatory project Regulatory project is popularly called the Local Authority Project, and is executed on the basis, of the approved Project proposal Proposal. The Project proposal drawings must, therefore be processed and upgraded with all BR 18 information, so that it can form the basis for the final approval of the project by the Local Authority.
Regulatory project is also a integrated part of the tender project.
Regulatory project drawings are handed in to the local Authorities
together with the application for building permit.
Detail I 26. marts 2023
2 To do list for BDS application for building permit groundplan, scale 1:100 fire plan (s) 1 floor plan, scale 1:100 roof plan, scale 1:100 elevations, scale 1:100 elevations with recesses and holes, scale 1:100 (see examples at ITS) cross sestion(s), scale 1:50 gable section(s), scale 1:50 site plan, scale 1:500 building site plan 1:500 detail, foundation, scale 1:5 detail, eave, scale 1:5 Wood or concrete corner detail (horizontal), scale 1:5 – s m g d te ra fo lik K
26. marts 2023
3 Regulary Project – RP is performed as a group work
– RP is performed 100 % digital.
– Though you are individually responsible for the work that
you perform, we expect to see collaboration in the teams.