PPM MDB
PPM MDB
Examine Resistors And Devices Prone To Overheating, Where And When Possible, Without Shut
5دقيقة
ting Down The Essential Loads -Check With The Supervising Engineer- . 2
Inspect Earthing Connections, Power Terminations And Control Circuits Without Shutting Down
5دقيقة
The Mdb And As Per Engineer`S Instruction. 3
Remove All Dust And Debris Inside Cubicles Or Enclosures Where Possible With The Aid Of A Va
5دقيقة
cuum Cleaner. 4
5دقيقة Check That Pacb`S Stored Energy Mechanisms Are Charged. Correct Any Defects. 5
Check Electrical And/
Or Mechanical Operation Of Withdrawable Main Pacb At A Time, In The Test Position And In Co
5دقيقة
nnected Position, Strictly In Accordance With Engineer`S Instructions, When The Mdb Is Not In 6
Use.
Check Operation Of Mccb`S, Pacb`S Using Their Integral Switching Arrangements To Ensure Me
5دقيقة
chanisms Are In Sound Good Order. 7
Check Operation Of All Fuse Switches And Isolators And Ensure Mechanisms Are In Sound Work
5دقيقة
ing Order. Correct Any Defects. Remove All Dust And Debris With The Aid Of Vacuum Cleaner. 8
Check Fuse Links, Carriers, Bridges, For Signs Of Arcing. Ensure Correct Grade Of Fuse Is Fitted.
5دقيقة
Correct Any Defects. 9
Check That All Metering Instruments Are Functioning. Note Readings And Compare With Those
5دقيقة
Taken Previously. 10
5دقيقة Check That Operating Tools/Handles, Keys Are Readily Available In Switchboard. 11
صيانة نصف سنوية
5دقيقة Inspect Switchboard Or Circuit Breakers Enclosure For Undue Heating. 1
Check For Undue Noise, Overheating Or Vibration, Loose Parts, Tightness Of Screws/
5دقيقة
Bolts And Warping, And Report To The Management For Correction Or Repair. 2
Visually Check Pacb`S, Mccb`S Fuse Switches Or Isolators, For Signs Of Arcing/ Burning. -
5دقيقة Checking Of The Pacb`S May Only Be Done If The Circuit Breaker Is Permitted To Be Opened For 3
Servicing And Only Under The Instruction Of The Engineer In Charge-
Examine Resistors And Devices Prone To Overheating, Where And When Possible, Without Shut
5دقيقة
ting Down The Essential Loads -Check With The Supervising Engineer- . 4
Inspect Earthing Connections, Power Terminations And Control Circuits Without Shutting Down
5دقيقة
The Mdb And As Per Engineer`S Instruction. 5
Remove All Dust And Debris Inside Cubicles Or Enclosures Where Possible With The Aid Of A Va
5دقيقة
cuum Cleaner. 6
5دقيقة Check That Pacb`S Stored Energy Mechanisms Are Charged. Correct Any Defects. 7
Check Electrical And/
Or Mechanical Operation Of Withdrawable Main Pacb At A Time, In The Test Position And In Co
5دقيقة
nnected Position, Strictly In Accordance With Engineer`S Instructions, When The Mdb Is Not In 8
Use.
Check Operation Of Mccb`S, Pacb`S Using Their Integral Switching Arrangements To Ensure Me
5دقيقة
chanisms Are In Sound Good Order. 9
Check Operation Of All Fuse Switches And Isolators And Ensure Mechanisms Are In Sound Work
5دقيقة
ing Order. Correct Any Defects. Remove All Dust And Debris With The Aid Of Vacuum Cleaner. 10
Check Fuse Links, Carriers, Bridges, For Signs Of Arcing. Ensure Correct Grade Of Fuse Is Fitted.
5دقيقة
Correct Any Defects. 11
صيانة سنوية
5دقيقة Substation Must Be Shut Down And Dead Before Annually Tasks Are Carried Out 1
Check That All Metering Instruments Are Functioning. Note Readings And Compare With Those
5دقيقة
Taken Previously. 2
5دقيقة Check That Operating Tools/Handles, Keys Are Readily Available In Switchboard. 3
5دقيقة Inspect Switchboard Or Circuit Breakers Enclosure For Undue Heating. 4
Check For Undue Noise, Overheating Or Vibration, Loose Parts, Tightness Of Screws/
5دقيقة
Bolts And Warping, And Report To The Management For Correction Or Repair. 5
Visually Check Pacb`S, Mccb`S Fuse Switches Or Isolators, For Signs Of Arcing/ Burning. -
5دقيقة Checkinng Of The Pacb`S May Only Be Done If The Circuit Breaker Is Permitted To Be Opened F 6
or Servicing And Only Under The Innstruction Of The Engineer In Charg
Examine Resistors And Devices Prone To Overheating, Where And When Possible, Without Shut
5دقيقة
ting Down The Essential Loads -Check With The Supervising Engineer- . 7
Inspect Earthing Connections, Power Terminations And Control Circuits Without Shutting Down
5دقيقة
The Mdb And As Per Engineer`S Instruction. 8
Remove All Dust And Debris Inside Cubicles Or Enclosures Where Possible With The Aid Of A Va
5دقيقة
cuum Cleaner. 9
5دقيقة Check That Pacb`S Stored Energy Mechanisms Are Charged. Correct Any Defects. 10
Check Electrical And/
Or Mechanical Operation Of Withdrawable Main Pacb At A Time, In The Test Position And In Co
5دقيقة
nnected Position, Strictly In Accordance With Engineer`S Instructions, When The Mdb Is Not In 11
Use.
Check Operation Of Mccb`S, Pacb`S Using Their Integral Switching Arrangements To Ensure Me
5دقيقة
chanisms Are In Sound Good Order. 12
Check Operation Of All Fuse Switches And Isolators And Ensure Mechanisms Are In Sound Work
5دقيقة
ing Order. Correct Any Defects. Remove All Dust And Debris With The Aid Of Vacuum Cleaner. 13
Check Fuse Links, Carriers, Bridges, For Signs Of Arcing. Ensure Correct Grade Of Fuse Is Fitted.
5دقيقة
Correct Any Defects. 14
Inspect Electrical Primary And Secondary Connections, Cables And Supports, Insulation For Disc
5دقيقة oloration, Excessive Corrosion, Secure Connections, Clean Contacts, Insulation Chafing And Em 15
broiled And Discoloured Cable Or Insulator. Correct Any Defects
Clean The Stationary Part Of The Switchgear With A Clean Cloth, Use Compressed Dry Air For In
5دقيقة
accessible Areas. Clean Out Debris Or Dust With The Aid Of A Vacuum Cleaner. 16
Examine All Air Filters For Dust Content, Flush With Water & Recoat With Super Coat Adhesive
5دقيقة
As Recommended By Manufacturer. 17
Check That All Conduit And Cable Gland Terminations Associated With The Switchboard Are Se
5دقيقة
cure. ********Withdrawable Lv Switchgear******** 18
5دقيقة Manually Discharge -For Safety- And Draw Out The Circuit Breakers. 19
5دقيقة Check, Clean And Lubricate The Carriages. 20
5دقيقة Check All Stationary Primary Disconnects For Evidence Of Overheating 21
5دقيقة Arcing Or Corrosion. Clean Or Replace And Apply Protective Coating As 22
5دقيقة Recommended. Check Secondary Disconnects And Clean/Adjust As Necessary. 23
5دقيقة Inspect All Circuit Breaker`S Drawout Captive Positions, Interlocks And 24
5دقيقة Shutter Mechanism Operation. ********All Circuit Breakers******** 25
5دقيقة Check Anti Pump Relay Operation. 26
5دقيقة Check And Clean Insulated Parts Using A Mild Detergent, A 27
5دقيقة Lint-Free-Cloth, Rinsing With Clear Water And Dry. 28
5دقيقة Inspect Arc Chutes And Contacts Of Circuit Breakers, Fuse-Switches, 29
5دقيقة Isolators, And Repair Or Replace As Per Manufacturer`S Procedures. 30
5دقيقة Check Security Of All Electrical Terminations And Connections And Tighten A Necessary. 31
5دقيقة Check That All Barriers And Guards Are In Place And Secure. 32
5دقيقة Check That Phase Discs And Labels Giving Circuit References Are Securely 33
5دقيقة Fixed. Replace Any Missing Items And Update Information As Necessary. 34
5دقيقة Ensure That 380 Volt And Other Warning Labels Are Position Where Applicable. 35
5دقيقة Check Door Interlocks And That Doors Can Be Securely Closed. 36
5دقيقة If A Lock Is Provided, Check That It Functions Correctly. 37
5دقيقة Check Enclosure For Paint Work Condition And Signs Of Corrosion. 38
5دقيقة Correct Any Defects. 39
5دقيقة Visually Inspect Under Voltage Relay, Clean And Carry Out Simulation 40
5دقيقة Visually Inspect, Clean And Simulate Test Of Auto-Throw-Over-System-Where Applicable. 41
After Energizing The Substation, Check The Loading Of All Outgoing Circuits On The Lv Circuit Br
5دقيقة
eakers And Record Readings. 42
Check That The Rating Of The Circuit Breakers And Setting Of The Micro-Processor -
5دقيقة Mps- Overcurrent And Ground Fault Relay Are Correct With Regard To Loading, Cabling, Type 43
Of Load, Etc.
Check Relys, Fuses And Other Control Elements For Their Proper Functioning And Signs For Any
5دقيقة
Abnormalities Like Over-Heating/Arcing Etc. 44