HSE-TBRA-OP15 - Offloading Riser To Storage Yard & Dismantling of Riser

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

JSL International (Trinidad) Limited

Task Based Risk Assessment Record


Each assessment must take into account and record any specific hazards arising from the activity or a particular site, before the assessment is complete.

Manager: Mr. Munesh Beepath Facilitator: Russel Baptiste, Ricky Maharaj


FORM: JSL-F- HSE-TBRA-OP15 Assessors: Russel Baptiste, Ricky Maharaj. Assessment Date: 14th November 2019
Activity/Workplace Assessed: Offloading Riser to Storage Yard & Reynold l. Diaz, Namelia Lutchman, Revised Date: Nil
Dismantling of Riser Christopher Gangar Next Revision Date: 14th November 2020
RISK (with Risk
controls) PRECAUTIONS/CONTROLS
HAZARD Will
JOB STEPS already in place to remove hazard, reduce Additional Controls ALARP
potential for harm Affect
L S R risk level
L S R
Layout work area set up of Uneven surface, collision, Personnel 1 2 2 1. Inspect Riser for potential fall objects. 1. Use LOLER 1998 standards 1 1 1
slings, tools pinch points, change in and 2. Perform toolbox meeting with staff who are for use of Lifting Equipment
weather, slips, trips, restricted equipiment involved in the task and the departmental
and Lifting devices and Ensure proper
work area managers who might be affected.
Mobilise Crane and lifting compliance to CFR 1910.179 for Over
3. Ensure proper Supervision throughout the
equipment (Done by 3rd head and Gantry Crane (3rd External Party
task
Party) Contractor).
4. Stop work if it is unsafe to perform the task.
5. All SIMOPS that might hinder the 2. Adhere to OSHA 29 CFR 1910.132
operations should be cancelled and ensure PPE requirements for the duration of the
that these operations does not impede their task.
operations.
3. Do not operate any defective equipment
6. Ensure that there is sufficient signage and
communication devices. report defects to immediate supervisor.
7. Get all the proper tools and lifting 4. Adhere to Manual Handling Operations
equipment 1992 guidelines for the duration of the
8. Conduct a site survey to ensure that the site Task.
is conducive to start work, stop work if it 5. Stop work if it becomes safe to perform
is unsafe to proceed and reassess same.
the task.

Page 1 of 5 JSL HSE Dept 2019


RISK (with Risk
controls) PRECAUTIONS/CONTROLS
HAZARD Will
JOB STEPS already in place to remove hazard, reduce Additional Controls ALARP
potential for harm Affect
L S R risk level
L S R
Remove Riser from truck Collision, uneven surface, Personnel 2 3 6 1. Perform an Assessment of the area. 1. Use proper lightening when working at 1 2 2
and lay out in storage pinch points, falling objects, and 2. Supervision must be constant during this Night or evening hours. Where light is
location improper training, manual Equipment task. obstructed.
handling 3. Trained, Competent crane operator, riggers
2.Safe Use of Wire Rope Slings 1983,
and banksmen must be employed for this
task. BS6210: 1983,ISBN 0 580 12502 5,
4. Ensure that there is proper communication 3.Standard Steel Wire Ropes –
between riggers, banksman and the Crane Specifications for General Requirements
operators 1987,.BS302: 1987, ISBN 0 580 15632
4. No person should be on the Riser when it is X.
being removed. 4. Specification for Thimbles in Wire
5. Use proper Manual Handling techniques Ropes 1958, BS464: 1958 (work in
when handling the riser.
hand),ISBN 0 580 00885
6. Due Diligence not to damage fingers and
hands when handling riser. 5.Specification for Wire Rope Slings and
7. When the riser is being moved do not Sling Legs for General Lifting Purposes
place hands on same. 1983,BS1290: 1983, ISBN 0 580 12432 0.
8. Use suitable hand tools and chocks where 6.29 CFR 1915.113Gear and Equipment for
applicable to prevent the Riser from Rigging and Materials Handling
moving.
(Shackles and Hooks)
9. Use the appropriate PPE for the duration of
the task (Steel Toe Safety Boots, Safety
Googles, High Vis Vest, Gloves)

Dismantling the Riser in the Collision, uneven surface, Personnel 2 3 6 1. Pre assessment of the task. 1. Adhere to OSHA 29 CFR 1910.132 1 2 2
Storage Yard pinch points, falling objects, and 2. Use proper Manual Handling techniques PPE requirements for the duration of the
improper training, manual equipiment when handling the riser. task.
handling 3. Due Diligence not to damage fingers and
2. Adhere to Manual Handling Operations
hands when handling riser.
1992 guidelines for the duration of the
4. Utilize appropriate PPE
Task.
3. Stop work if it becomes safe to perform
the task.

Page 2 of 5 JSL HSE Dept 2019


RISK (with Risk
controls) PRECAUTIONS/CONTROLS
HAZARD Will
JOB STEPS already in place to remove hazard, reduce Additional Controls ALARP
potential for harm Affect
L S R risk level
L S R
Housekeeping (Clean & Pinch points, manual handling, Personnel 1 2 2 1. Proper Manual handling and lifting 1.Adhere to OSHA 29 CFR 1915.81House 1 1 1
store all tools & remove slips, trips, falls and techniques, Keeping
tonnage ) equipiment 2. Proper PPE to be work when engaged in
house keeping.

The columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for the severity of the hazard, both based on the
following:-

Page 3 of 5 JSL HSE Dept 2019


RISK CONTROL PLAN

Activity/Workplace Assessed: Assessor: Assessment Date:

To be Date
ADDITIONAL CONTROLS NEEDED actioned by: Completed:

GENERAL RESTRICTIONS. TO REDUCE / ELIMINATE RISK. Are there any general restrictions
or controls which are needed, eg No Smoking in area, Wash Hands After Use, etc.

FURTHER PREVENTATIVE MEASURES NEEDED. What else might be done?

PERSONAL PROTECTIVE EQUIPMENT REQUIRED:

TRAINING NEEDED: Which staff need training and in what areas?

MONITORING: Who is to monitor whether or not controls are in place and how?

COMMUNICATION: Who needs to be informed about risks and control measures and by what
means?
JSL International Trinidad Ltd

TBRA

TASK / TBRA REF #____________________________________________________

Date and Time Started:___________________ Date and Time Completed:_____________________

Location:______________________________ Department:________________________________

No Name (Last) First Signature Job Title Date


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

ADDITIONAL SAFETY MEASURES / DISCUSSION

____________________________________________________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
______________

JSL HSE DEPT 2019 SSO

Note: By signing this TBRA you understand and agree to comply with the HSE data presented and recommendations to prevent the occurrence of incident and accident as
outlined in the safety training session and to adhere same in your daily duties. You also agree to comply with the HSEMS of JSL International Ltd and the legal legislation of
the OSH Act of Trinidad and Tobago.