RIDE 4 Sales Tax Commission

Recommended Projects (as of December 2023)

(RIDE 3 Project Currently Under Construction)

www.horrycountysc.gov/RIDE-4
RIDE 4 SALES TAX COMMISSION PROPOSED PROJECTS MAP

Pave 200 Miles of Pave 200 Miles of Dirt Roads


Dirt Roads $250,000,000

Resurface 400 Miles Resurface 400 Miles of Existing


of Existing Roadway Roadway (800 lane miles): to be
apportioned between County and
Municipalities based on locally
maintained road mileage in each $185,000,000
jurisdiction. All jurisdictions get at least
4 miles (8 lane miles).

Local Intersection Local Intersection Safety and Capacity


Safety and Capacity Improvements: 20 locations -
Improvements ($15 M / each) - individual project $300,000,000
locations to be determined by future
studies

Local Transportation Local Transportation Enhancement


Enhancement Improvements: 20 locations - ($15 M $300,000,000
Improvements / each) - individual project locations
to be determined by future studies

Mass Transit Mass Transit: 5.45% of annual $299,000,000


collections
RIDE 4 SALES TAX COMMISSION PROPOSED PROJECTS LIST

Map
ID Project Name Project Description Estimated 2035 Costs

Completion of Underfunded RIDE III Projects Completion of Underfunded RIDE III Projects, if any $150,000,000

East Cox Ferry Road: widen to 4-lanes with turn lanes at intersections (SC
A East Cox Ferry Road Widening $97,000,000
Hwy 90 to SC Hwy 544)
SC Hwy 90 Widening from East Cox Ferry Road to SC Hwy 90: widen to 4-lanes with turn lanes at intersections (East Cox
B $745,000,000
Little River Ferry Road to US Hwy 17)
Robert Edge Parkway / Sandridge Road Connector: construct new
C Robert Edge Parkway / Sandridge Road Connector connection from Sandridge Road to Robert Edge Parkway at traffic signal $22,000,000
including multimodal facilities
Possum Trot Road Extension: construct new access from US Hwy 17 to
D Possum Trot Road Extension $23,000,000
Madison Drive including necessary improvements on Madison Drive
Barefoot Landing Swing Bridge Replacement over Barefoot Landing Swing Bridge: replace bridge and approaches over
E $132,000,000
Intracoastal Waterway Intracoastal Waterway
th
US Hwy 17 in Windy Hill: widen to accommodate dual left turn lanes at 46
th
F US Hwy 17 Widening in Windy Hill Avenue South towards Barefoot Resort Bridge Road and 48 Avenue South in $24,000,000
th
both directions (46 Avenue South to Ocean Creek)
River Oaks Drive: widen to 4-lanes with turn lanes at intersections
G River Oaks Drive Widening $142,000,000
including multimodal facilities (entire length)
US Hwy 17 Bypass / Robert Grissom Parkway Interchange
US Hwy 17 Bypass / Robert Grissom Parkway
H Improvements: build cloverleaf ramp from Robert Grissom Parkway $53,000,000
Interchange Improvements
Southbound to US Hwy 17 Bypass Northbound
th
38 Avenue North: widen between Robert Grissom Parkway and Kings
I 38th Avenue North Widening $22,000,000
Highway including multimodal facilities
Seaboard Street: widen between US Hwy 501 and Mr. Joe White Avenue;
J Seaboard Street Widening include multimodal facilities between the intersections of Mr. Joe White $33,000,000
Avenue and Oak Forest Lane
Kings Highway: improve US Hwy 17 Business from Farrow Parkway to 31st
K Kings Highway Improvements Avenue North (GSATS corridor study: access management, streetscape and $105,000,000
complete streets / multimodal improvements)
Big Block Road: widen / realign roadway to improve safety and capacity
L Big Block Road Widening $44,000,000
including new multimodal facilities (entire length)
Horry County Hospitality Projects: SC Hwy 31 Interchange at Augusta
Horry County Hospitality Projects - Financial
M Plantation / Revolutionary War Way and Garden City Resiliency Project - $50,000,000
Backstop
Financial Backstop
SC Hwy 22 Extension: environmental mitigation and construction of a new
SC Hwy 22 Extension from US Hwy 501 (near
N highway from US Hwy 501 (near Aynor) to Surfside / Murrells Inlet area $1,560,000,000
Aynor) to Surfside / Murrells Inlet Area

New Conway River Crossing - New Highway Across New Conway River Crossing: construct new highway across Waccamaw
O $860,000,000
Waccamaw River River near Conway (final location to be determined by study)
US Hwy 501 Bypass - New Off-Ramp to 3rd Avenue US Hwy 501 Bypass: construct new off-ramp to 3rd Avenue and Marina
P $53,000,000
and Marina Drive in Conway Drive from US Hwy 501 Northbound
Cultra Road: widen from US Hwy 501 to US Hwy 701 with median and
Q Cultra Road Widening $102,000,000
multimodal facilities

Hardwick Road: improve existing road including intersection improvements


on US Hwy 501 and SC Hwy 319 to support new Horry County Multi-Use
R Hardwick Road Improvements $24,000,000
Sports & Recreational Complex (including multimodal facilities)

S US Hwy 501 at SC Hwy 319 Acceleration Lane US Hwy 501 at SC Hwy 319: construct acceleration lane $18,000,000

Interstate Connector from SC Hwy 22 to Marion Interstate Connector: I-73 from SC Hwy 22 to Marion County line (local
T $450,000,000
County Line match funding)
US Hwy 701 Widening from SC Hwy 22 to SC Hwy 410 US Hwy 701: widen to 4-lanes with turn lanes at intersections (SC Hwy 22
U $80,000,000
to SC Hwy 410)
US Hwy 701 Widening from SC Hwy 9 Bypass to US Hwy 701: widen to 4-lanes with turn lanes at intersections (SC Hwy 9
V $163,000,000
NC State Line Bypass to NC State Line)

Pave 200 Miles of Dirt Roads Pave 200 Miles of Dirt Roads $250,000,000

Resurface 400 Miles of Existing Roadway (800 lane miles): to be


apportioned between County and Municipalities based on locally maintained
Resurface 400 Miles of Existing Roadway $185,000,000
road mileage in each jurisdiction. All jurisdictions get at least 4 miles (8 lane
miles).
Local Intersection Safety and Capacity Local Intersection Safety and Capacity Improvements: 20 locations -
$300,000,000
Improvements ($15 M / each) - individual project locations to be determined by future studies

Local Transportation Enhancement Improvements: 20 locations - ($15 M /


Local Transportation Enhancement Improvements $300,000,000
each) - individual project locations to be determined by future studies

Mass Transit Mass Transit: 5.45% of annual collections $299,000,000


RIDE 4 SALES TAX COMMISSION

Public Information Meetings


Maps of the road projects being considered will be on display and
representatives from the RIDE 4 Sales Tax Commission, SCDOT, Horry
County, and others will be available to answer questions from the
community.

Sales Tax Commission Overview & Mission


The RIDE 4 Sales Tax Commission is comprised of six members, three
appointed by Horry County Council and three appointed by the cities as
defined by South Carolina state law.

The commission was tasked by Horry County Council to prepare a final list
of projects that may be funded by a 1% local sales and use tax, referred to
as a ‘transportation tax,’ with an allowable collection period of up to 25
years. Once a list of specific transportation projects is determined, Horry
County Council will then have the option to move the final list to a
referendum vote by the citizens of Horry County on the November 2024
General Election ballot.

If approved by voters, the RIDE 4 program would go into effect May 1, 2025,
after completion of the RIDE 3 collections.

Public Feedback
The RIDE 4 Sales Tax Commission encourages feedback from the public on the
proposed projects. A formal feedback card will be available during the meeting.
Community members can also email comments to RIDE4@horrycountysc.gov
or go online to www.horrycountysc.gov/RIDE-4. All comments will be accepted
until February 18, 2024.

SALES TAX COMMISSION MEMBERS

Robert Wilfong, Chairman Cecil Patrick


Appointed by: Horry County Appointed by: City of Myrtle Beach

William Goldfinch IV, Vice Chair Jody Prince


Appointed by: City of Conway Appointed by: Horry County

Jay Baldwin Chad Prosser


Appointed by: City of North Myrtle Beach Appointed by: Horry County

WWW.HORRYCOUNTYSC.GOV
oad mprovement & evelopment ffort
1996-2018 RIDE Hospitality Fee County Council Ordinance $1.3B
 Conway Bypass (SC Hwy 22) from US Hwy 501 (Aynor) to US Hwy 17  Fantasy Harbor Bridge & Interchanges
 Carolina Bays Parkway (SC Hwy 31) from SC Hwy 9 to SC Hwy 544  Grissom Parkway & Harrelson Boulevard (MB)
 US Hwy 501 Interchanges & Frontage Roads  Conway Perimeter Road ‐ Phase 1
 Robert Edge Parkway & Bridge (NMB)  Others
 SC Hwy 544 Widening from SC Hwy 501 to SC Hwy 17

2007-2014 RIDE 2 2006 Sales Tax Referendum (61.4% Voter Approval) $651M
 Carolina Bays Parkway (SC Hwy 31) from SC Hwy 544 to SC Hwy 707  Aynor Overpass
 US Hwy 17 Bypass/SC Hwy 707 Interchange at Old Air Force Base Backgate  Interna onal Drive from River Oaks Drive to SC Hwy 90
 Widen SC Hwy 707 from Enterprise Road to County Line  Resurfacing (67 miles)
 Widen Glenns Bay Road with Interchange @ US Hwy 17 Bypass  Dirt Road Paving (100 miles)

2017-2025 RIDE 3 2016 Sales Tax Referendum (69.1% Voter Approval) $814M
 Carolina Bays Parkway (SC Hwy 31) from SC Hwy 9 to NC State Line  US Hwy 17 Business Intersec on Improvements (Garden City)
 Forestbrook Road Widening  Conway Perimeter Road ‐ Phase II
 Palme o Pointe Boulevard Extension to SC Hwy 544  SC Hwy 9 East Widening (Loris)
 SC Hwy 22 Extension EIS & ROW  US Hwy 701 North Widening (Loris)
 US Hwy 701 North Widening (Conway)  US Hwy 501 Realignment (MB)
 US Hwy 501 Widening & Frontage Roads  Resurfacing (100 miles)
 Fred Nash Boulevard  Dirt Road Paving (100 miles)
 Carolina Forest Boulevard Widening
6
Y7
HW

Legend
RIDE 1 Projects

RIDE 2 Projects

HWY 917

RIDE 2 Paving

HW
Y
RIDE 2 Resurfacing

9
Hwy 701 Widening - North of Loris

Hwy 9 East Widening

H
W
Y

RIDE 3 Projects
9

BUILD
ENVIRONMENTAL
RIDE 3 Paving
Hwy 31 &
Hwy 66

Aynor
Overpass
RIDE 3 Resurfacing
HW

HW
Y5

Y
01

319

Veterans
Hwy

Highway 701 N. Widening

SC 31 / CBP Ext. To NC

SC Hwy 90
Intersection
Improvements

0
Y9
Conway HW
Perimeter Rd Hwy 17 N
Widening
Robert
Edge Pkwy

HW Y 378 Hwy 501/Hwy 378


Intersection

Conway Perimeter Road Phase II

Singleton Ridge International Dr


Rd Intersection

Highway 501 Improv. Middle Ridge Ave.

Gardner Lacy
Intersetion
Carolina
Hwy 501 Improvements (State)
Bays Pkwy

Carolina
Forest
Intersection
Carolina
Highway 501 Improv. Postal Way Forest Blvd.
Waccamaw Pines Widening
Intersection
SC Hwy 544
Y 701

Widening
S HW

Hwy 501
Improvements

Fantasy Harbor
Interchange

US Hwy
Bypass 17
501 &
Widening
Frontage Rds

10th
Forestbrook Rd Widening Ave
Grissom
Pkwy

Fred Nash Blvd. Connection to Harrelson Blvd.

Realignment of Hwy 501


Hwy
Harrelson
707/Hwy 17 3rd Ave N
Blvd
Interchange Widening
Hwy 544/Hwy 707
Intersection

Palmetto Pointe Blvd. Ext.

SC Hwy 544
(US Hwy 17
to Bridge)

®
Southern Evacuation Lifeline (SELL)
Hwy 17
Interchange Glenns Bay
Widening Rd Widening

Hwy 707
Widening

Hwy 17 Bus. Intersection Improvements

Date: 1/18/2024
Road Improvement & Development Effort
RIDE 4 - Proposed Projects
Map
ID Project Name Project Descrip on Es mated 2035 Costs
Completion of Underfunded RIDE III Projects Completion of Underfunded RIDE III Projects, if any $150,000,000

East Cox Ferry Road: widen to 4-lanes with turn lanes at


A East Cox Ferry Road Widening $97,000,000
intersections (SC Hwy 90 to SC Hwy 544)
SC Hwy 90 Widening from East Cox Ferry SC Hwy 90: widen to 4-lanes with turn lanes at intersections
B $745,000,000
Road to Little River (East Cox Ferry Road to US Hwy 17)
Robert Edge Parkway / Sandridge Road Connector: con-
Robert Edge Parkway / Sandridge Road
C struct new connection from Sandridge Road to Robert Edge Park- $22,000,000
Connector
way at traffic signal including multimodal facilities
Possum Trot Road Extension: constr uct new access from US
D Possum Trot Road Extension Hwy 17 to Madison Drive including necessary improvements on $23,000,000
Madison Drive
Barefoot Landing Swing Bridge Replacement Barefoot Landing Swing Bridge: replace br idge and ap-
E $132,000,000
over Intracoastal Waterway proaches over Intracoastal Waterway
US Hwy 17 in Windy Hill: widen to accommodate dual left
turn lanes at 46th Avenue South towards Barefoot Resort Bridge
F US Hwy 17 Widening in Windy Hill $24,000,000
Road and 48th Avenue South in both directions (46th Avenue
South to Ocean Creek)
River Oaks Drive: widen to 4-lanes with turn lanes at
G River Oaks Drive Widening $142,000,000
intersections including multimodal facilities (entire length)
US Hwy 17 Bypass / Robert Grissom Parkway Interchange
US Hwy 17 Bypass / Robert Grissom Parkway
H Improvements: build clover leaf r amp from Rober t Gr issom $53,000,000
Interchange Improvements
Parkway Southbound to US Hwy 17 Bypass Northbound
38th Avenue North: widen between Rober t Gr issom Par kway
I 38th Avenue North Widening $22,000,000
and Kings Highway including multimodal facilities
Seaboard Street: widen between US Hwy 501 and Mr. J oe
J Seaboard Street Widening White Avenue; include multimodal facilities between the $33,000,000
intersections of Mr. Joe White Avenue and Oak Forest Lane
Kings Highway: improve US Hwy 17 Business from Far row
Parkway to 31st Avenue North (GSATS corridor study: access
K Kings Highway Improvements $105,000,000
management, streetscape and complete streets / multimodal
improvements)
Big Block Road: widen / realign roadway to improve safety
L Big Block Road Widening $44,000,000
and capacity including new multimodal facilities (entire length)
Horry County Hospitality Projects: SC Hwy 31 Interchange
Horry County Hospitality Projects - Financial
M at Augusta Plantation / Revolutionary War Way and Garden City $50,000,000
Backstop
Resiliency Project - Financial Backstop
SC Hwy 22 Extension: environmental mitigation and
SC Hwy 22 Extension from US Hwy 501 (near
N construction of a new highway from US Hwy 501 (near Aynor) to $1,560,000,000
Aynor) to Surfside / Murrells Inlet Area
Surfside / Murrells Inlet area
New Conway River Crossing: constr uct new highway across
New Conway River Crossing - New Highway
O Waccamaw River near Conway (final location to be determined $860,000,000
Across Waccamaw River
by study)
US Hwy 501 Bypass - New Off-Ramp to 3rd US Hwy 501 Bypass: constr uct new off-ramp to 3rd Avenue and
P $53,000,000
Avenue and Marina Drive in Conway Marina Drive from US Hwy 501 Northbound
Cultra Road: widen from US Hwy 501 to US Hwy 701 with
Q Cultra Road Widening $102,000,000
median and multimodal facilities
Hardwick Road: improve existing road including inter section
improvements on US Hwy 501 and SC Hwy 319 to support new
R Hardwick Road Improvements $24,000,000
Horry County Multi-Use Sports & Recreational Complex
(including multimodal facilities)
S US Hwy 501 at SC Hwy 319 Acceleration Lane US Hwy 501 at SC Hwy 319: constr uct acceler ation lane $18,000,000

Interstate Connector from SC Hwy 22 to Interstate Connector: I-73 from SC Hwy 22 to Marion County
T $450,000,000
Marion County Line line (local match funding)
US Hwy 701 Widening from SC Hwy 22 to SC US Hwy 701: widen to 4-lanes with turn lanes at intersections
U $80,000,000
Hwy 410 (SC Hwy 22 to SC Hwy 410)
US Hwy 701 Widening from SC Hwy 9 Bypass US Hwy 701: widen to 4-lanes with turn lanes at intersections
V $163,000,000
to NC State Line (SC Hwy 9 Bypass to NC State Line)

Pave 200 Miles of Dirt Roads Pave 200 Miles of Dirt Roads $250,000,000

Resurface 400 Miles of Existing Roadway (800 lane miles): to


be apportioned between County and Municipalities based on
Resurface 400 Miles of Existing Roadway $185,000,000
locally maintained road mileage in each jurisdiction. All
jurisdictions get at least 4 miles (8 lane miles).
Local Intersection Safety and Capacity Improvements: 20
Local Intersection Safety and Capacity
locations - ($15 M / each) - individual project locations to be $300,000,000
Improvements
determined by future studies
Local Transportation Enhancement Improvements: 20
Local Transportation Enhancement
locations - ($15 M / each) - individual project locations to be $300,000,000
Improvements
determined by future studies
Mass Transit Mass Transit: 5.45% of annual collections $299,000,000
76
WY
H

Y
N I CHOLS HW

HW
Y9
N
Project Name Project Description

EEN SEA RD
GR

HW
Pave 200 Miles of Dirt Roads Pave 200 Miles of Dirt Roads

19Y
CHOLS

Resurface 400 Miles of Existing Roadway (800 lane miles): to be apportioned between County and Municipalities
Resurface 400 Miles of Existing Roadway

N GREEN SEA RD
V
based on locally maintained road mileage in each jurisdiction. All jurisdictions get at least 4 miles (8 lane miles).
HW Y

Local Intersection Safety and Capacity Local Intersection Safety and Capacity Improvements: 20 locations - ($15 M / each) - individual project locations to be
S NI

Improvements determined by future studies

HW Y 91
7 Local Transportation Enhancement Local Transportation Enhancement Improvements: 20 locations - ($15 M / each) - individual project locations to be

W
Improvements determined by future studies
HW
Y9

701
BU
RD N

S
Mass Transit Mass Transit: 5.45% of annual collections

WY
W
EE

HW
MA

NH
E IN
PE
D

WH

Y
ST

9
WY
19 EM
AIN
T ST EH
WY

WY
9B
OLS H

US

RE
NI C H

S GREEN SEA RD

DB
LU
FF
RD
S

Y 19
E HW
ELM S
T

6
Y6
HW
U N HW Y 90 5
PEE DEE RD S

HW

22
HWY 22
Y5

HWY
01

HW Y 905
S
N
701
HW

HWY 50
Y
Y

HW
3 19

57
W
Y1

H
HW
905 11 M
IN
Y
HW AV E

OL
57 S

E
Y

A
7
Q W Y 1
SH HW
P EE D

OL D
RE
AVES
M AI N ST
EE H

FER
RY
RD B 17
W

90
Y

Y
HW

Y
C

HW
HW Y 378
P

N
HW
CH U

Y
50
RC

ST 1 17
B
D
Y
H

A
W
E H Map ID Project Description
IN S
US

TE
O
F
A East Cox Ferry Road: widen to 4-lanes with turn lanes at intersections (SC Hwy 90 to SC Hwy 544)
RN
AT I O

PKWY

B SC Hwy 90: widen to 4-lanes with turn lanes at intersections (East Cox Ferry Road to US Hwy 17)
N

ET
O

L
NA

G ER YS
D

N A
S I DG
Robert Edge Parkway / Sandridge Road Connector: construct new connection from Sandridge Road to Robert
LD

B
C
R D NA
Edge Parkway at traffic signal including multimodal facilities
R I
R
I

GE OL
MYRTL RID R
Possum Trot Road Extension: construct new access from US Hwy 17 to Madison Drive including necessary
A
D
E LVD C
CAROLINA F O REST B
improvements on Madison Drive
Y 701

M
E Barefoot Landing Swing Bridge: replace bridge and approaches over Intracoastal Waterway
R

H
S
S HW

44

K
D

US Hwy 17 in Windy Hill: widen to accommodate dual left turn lanes at 46th Avenue South towards Barefoot Resort
OA
F
HW Y 5

ER
th th
Bridge Road and 48 Avenue South in both directions (46 Avenue South to Ocean Creek)

N RI V
G
I
G River Oaks Drive: widen to 4-lanes with turn lanes at intersections including multimodal facilities (entire length)

YP
B
17
US Hwy 17 Bypass / Robert Grissom Parkway Interchange Improvements: build cloverleaf ramp from Robert
Y
H
W
Grissom Parkway Southbound to US Hwy 17 Bypass Northbound
H
RD

OK
RO 38 th Avenue North: widen between Robert Grissom Parkway and Kings Highway including multimodal facilities
Y

B
I

ST
HW

J
S

Seaboard Street: widen between US Hwy 501 and Mr. Joe White Avenue; include multimodal facilities between the
RE

FO
NG

J
intersections of Mr. Joe White Avenue and Oak Forest Lane
KI
N

Kings Highway: improve US Hwy 17 Business from Farrow Parkway to 31st Avenue North (GSATS corridor study:
EE B LVD
K
AS T
HA BLV D

S OC
access management, streetscape and complete streets / multimodal improvements)

K
RR

Big Block Road: widen / realign roadway to improve safety and capacity including new multimodal facilities (entire
L
EL

SO
length)
FA N
RO
Horry County Hospitality Projects: SC Hwy 31 Interchange at Augusta Plantation / Revolutionary War Way and
W
L
R

M
Garden City Resiliency Project - Financial Backstop
PK
Y
SC Hwy 22 Extension: environmental mitigation and construction of a new highway from US Hwy 501 (near Aynor)
DI
N
CK
to Surfside / Murrells Inlet area
New Conway River Crossing: construct new highway across Waccamaw River near Conway (final location to be
O
PO

determined by study)
ND

P US Hwy 501 Bypass: construct new off-ramp to 3rd Avenue and Marina Drive from US Hwy 501 Northbound
HOLMEST
RD

®
OW
MC

N
Q Cultra Road: widen from US Hwy 501 to US Hwy 701 with median and multimodal facilities
RD
DO E
W L

Hardwick Road: improve existing road including intersection improvements on US Hwy 501 and SC Hwy 319 to
17
07

R
support new Horry County Multi-Use Sports & Recreational Complex (including multimodal facilities)
Y
Y7

HW
LS
HW

S US Hwy 501 at SC Hwy 319: construct acceleration lane


HOR TC RD

T Interstate Connector: I-73 from SC Hwy 22 to Marion County line (local match funding)
UT

M
U US Hwy 701: widen to 4-lanes with turn lanes at intersections (SC Hwy 22 to SC Hwy 410)

V US Hwy 701: widen to 4-lanes with turn lanes at intersections (SC Hwy 9 Bypass to NC State Line)

Date: 1/18/2024
Transportation Sales Tax 2025-2050 $6.6B
Regional Projects ‐ New Connec vity Intersec on / Interchange Improvements
 SC Hwy 22 Extension from US Hwy 501 (near Aynor) to Surfside / Murrells Inlet Area  US Hwy 17 Bypass / Robert Grissom Parkway Interchange
 New Conway River Crossing ‐ New Highway Across Waccamaw River  Robert Edge Parkway / Sandridge Road Connector
 Interstate Connector from SC Hwy 22 to Marion County Line (Local Matching Funds)  Possum Trot Road Extension
 SC Hwy 31 Interchange with Augusta Planta on Drive / Revolu onary War Way ‐  US Hwy 501 Bypass ‐ New Off‐Ramp to 3rd Avenue and Marina Drive in Conway
(Hospitality Project Financial Backstop)
 US Hwy 501 at SC Hwy 319 Accelera on Lane
Major Widening Projects Complete Streets and Mul modal Projects
 SC Hwy 90 from East Cox Ferry Road to Li le River
 Kings Hwy ‐ Farrow Pkwy to 31st Ave North
 East Cox Ferry Road
 Waccamaw Drive / Atlan c Ave in Garden City (Hospitality Project Financial Backstop)
 River Oaks Drive
 Mass Transit
 US Hwy 17 in Windy Hill
 38th Avenue North Major Improvement Projects
 Seaboard Street  Barefoot Landing Swing Bridge Replacement over Intracoastal Waterway
 Big Block Road  Hardwick Road (supports Horry County Mul ‐Use Sports & Recrea onal Complex)

 Cultra Road  Pave 200 Miles of Dirt Roads


 US Hwy 701 from SC Hwy 22 to SC Hwy 410  Resurface 400 Miles of Exis ng Roadway
 US Hwy 701 from SC Hwy 9 Bypass to NC State Line  Local Intersec on Safety and Capacity Improvements
‐ 20 loca ons ‐ ($15 M / each) ‐ individual project loca ons to be determined by future studies
Revenue Es mates  Local Transporta on Enhancement Improvements
Transporta on Sales Tax $5.5B ‐ 20 loca ons ‐ ($15 M / each) ‐ individual project loca ons to be determined by future studies

State and Federal $1.1B


Total Revenue $6.6B
Total Project Costs $6.6B (includes con ngency)

Road Improvement & Development Effort


PROJECT A

HW
Y9
0

HW
Y
50
1
BU
S

ct : A
HWY 5 Pr oj e
01
HWY 544

®
SS
PA 4
OV Y 54
ER
HW

East Cox Ferry Road


East Cox Ferry Road: widen to 4-lanes with turn
lanes at intersections (SC Hwy 90 to SC Hwy 544)

Date Printed 01/05/2024


PROJECT B

UF F RD
S HWY 905

Y 66

RED BL
HW
57
WY
H
19

N
HWY

HW
905
Y

Y
HW

9
HW
17S

Y
57 Y
Y HW

22
W
SH

ect : B
Pr oj
Y 90 17

RO E P
HW

ED
Y
H W

BE KY
G
N

RT
cam aw Ri ver

EE

K
CR
USE

HO
W ac

Y 17
W
SH

an
Oce
c
nt i
A tl a

OL INA
BA
YS
PK
W
Y

®
R
T BLVD CA
CAROLINA FORES
HW
Y

SC Hwy 90
50
1

Y
HW

SC Hwy 90: widen to 4-lanes with turn lanes at


S
NG

intersections (East Cox Ferry Rd to US Hwy 17)


KI
N

B YP
17
WY
Date Printed 01/05/2024 H
PROJECT C

Y
W
PK
YS
BA
NA
LI
RO
CA

ROBERT EDG
E P KY

17
Y
W
Project : C

H
N
y
rwa
W at e
al
as t
ac o
Int r

®
17
Y
W
H
S

Robert Edge Parkway / Sandridge Road Connector


Robert Edge Parkway / Sandridge Road Connector: construct new connection from Sandridge
Road to Robert Edge Parkway at traffic signal including multimodal facilities

Date Printed 01/05/2024


PROJECT D

PO
SSU
MT
RO
TR
D

13
TH
AV
ES
Y 17
W
SH

Project : D

14T
HA
VE
S
15
TH

DR
AV

G E
E

ED
S

MA
DI SO N DR
®
Possum Trot Road Extension
16
TH

Possum Trot Road Extension: construct new access from US Hwy 17 to Madison Dr including
AV
E

necessary improvements on Madison Dr


S

Date Printed 01/05/2024


PROJECT E CAROL IN A B AYS PK WY

CL
UB
CO
UR
ED S
BA

R
RE
F
BR OO
ID T
G RE
E
RD SOR
T

y
rwa
W ate
l
s ta
r ac oa
Int

WINDY HILL
ROAD EXT
Project : E

Y 17
W
SH

®
Barefoot Landing Swing Bridge
Y
Barefoot Landing Swing Bridge: replace bridge and approaches over Intracoastal
HW Waterway
IN GS
N K

Date Printed 01/05/2024


DG
E
RD

PROJECT F

WINDY HILL
ROAD EXT

rway
tal W ate
c oas
Intra

Y 17
W
SH

Project : F

H WY
GS
IN
NK

®
48
OC

TH
EA

AV
N

E
CR

S
EE
K
DR

US Hwy 17 Widening in Windy Hill


US Hwy 17 Widening in Windy Hill: widen to accommodate dual left turn lanes at 46th Avenue
South towards Barefoot Resort Bridge Road and 48th Avenue South in both directions
(46th Avenue South to Ocean Creek)
a n
Oc e
nt ic
A t la
Date Printed 01/05/2024
PROJECT G B LVD
ST
F O RE
OL INA
C AR

IN
TE
RN
AT
O I
NA
L
DR
CAROL
INA BA
YS PKW
Y

Project : G

y
wa
at er
W
t al
as
raco
Int

YP
B
17
Y
H W

HW
Y
50
1 ®

Y
W
H
S
G
IN
Y

K
PK

N
River Oaks Drive
P
O
SH
BI
E

River Oaks Drive: widen to 4-lanes with turn lanes at intersections including multimodal
RG

n
c ea
facilities (entire length)
EO

nt i c

O
A t la
G

Date Printed 01/05/2024


PKY
PROJECT H
K Y

ISSOM
P
I NA
AR
M

B E RT M G R
RO
y
rwa
at e
lW
s ta
c oa
ra
Int

62
ND
AV
E
N

B YP
Y 17
HW

Project : H
Y
PK

®
48

Y
M

W
TH

H
SS
AV

S
RI

G
E

IN
G
N

K
M

N
RT
BE
RO

US Hwy 17 Bypass / Robert Grissom Parkway


Interchange Improvements
US Hwy 17 Bypass / Robert Grissom Parkway Interchange Improvements: build cloverleaf
ramp from Robert Grissom Parkway SB to US Hwy 17 Bypass NB

ean
Oc
nt ic
A t la
Date Printed 01/05/2024
PROJECT I

YP
B
17
Y
H W

44
TH
AV
E
N

Project : I
Y
PK
OM

Y
S

W
IS

H
GR

S
G
M

IN
RT

K
N
BE
RO

29
TH
ST

®
AV
AK

E
N
O
N

an
ce
ti c

O
l an
At

38th Avenue North


38th Avenue North: widen between Robert Grissom Parkway and Kings Hwy including
multimodal facilities

Date Printed 01/05/2024


PROJECT J

B YP
Y 17
HW

M
R
JO
E
Project : J
W
HI
T E
AV
E

HW
Y
OA 50

®
K 1
FO
RE
ST OM PKY
LN G RIS S
OB E RT M
R

Seaboard Street
Seaboard Street: widen between US Hwy 501 and Mr. Joe White Avenue; include multimodal
facilities between the intersections of Mr. Joe White Ave and Oak Forest Lane

Date Printed 01/05/2024


PROJECT K 31

GE
ST
AV

O
M E
R

R
JO N
G EB E
W
SH P HI
OP BY T
17 E
I

PK Y AV
HW
y
wa

E
er

Y
at
lW
ta
as
co
rt a
In

M P KY
RIS S O
G
OB E RT M
R

Y
W
H
HW

S
Y5

G
01

IN
K
N
H
AR

an
ce
REL

O
ic
nt
la
At
SON BLV D

17
Y
HW

®
Kings Highway
FA
R
R

Project : K
O
W

Kings Highway: improve US Hwy 17 Business from Farrow Parkway to 31st Ave North
PK
Y

(GSATS corridor study: access management, streetscape and complete


streets / multimodal improvements)

Date Printed 01/05/2024


PROJECT L

7
70
Y
HW

HW
Y
54 4
Project : L

®
Big Block Road
Big Block Road: widen / realign roadway to improve safety and capacity including new
multimodal facilities (entire length)

Date Printed 01/05/2024


PROJECT M
T B LVD
OR ES
IN A F
OL
CAR

Project : M

K WY
AYSP
LIN AB
R O
CA

®
VILLAG
E PKWY

Horry County Hospitality Projects - SC Hwy 31 Interchange


Horry County Hospitality Projects: SC Hwy 31 Interchange at Augusta Plantation / Revolutionary
War Way - Financial Backstop

Date Printed 01/05/2024


PROJECT M M
EL
O
DY
LN

17
Y
W
H

Project : M

n
ea
Oc
t ic
At lan

AT
LA
NT
I C
AV
E

®
Horry County Hospitality Projects - Garden City
Horry County Hospitality Projects: Garden City Resiliency Project - Financial Backstop
COUNTY LINE

Date Printed 01/05/2024


22

HW
Y
HW

Y3
PROJECT N

19
(
!(
Þ !

N
(
!

1
!
(

HW Y 70
!
( (
!
(
!

19
(
!

HW Y
(
! (
!
(
!! (
!
!
(! (
(
!( (
!(
!
(
! !
( !
(!

5
Y

90
HW
!
((!( (
(
!(!( !
!
(( !

MA RCH ST
WR
I GH

CHU
!(

IN
TB
LV
!

ST
D
(
!

HW Y 378
(
!

HW
(
!

Y
!
(

50
1
!
(!

BU HW
PE

Y9
(!

S 0
ED

(
EE

(
!(

e
Lake B us be
!(
HW

!!
Y

(!
(!

SS
4
OV Y 54
(!

PA
((

ER
HW
!(
!(!(
!!(!

HW
(!

Y
(

50
(
!(

1
!(
!!( !
(!

Y 701
(!

A FORES T
IN
(

L
RO LVD
!
((

S HW

CA B
!(
(!
!!(!
( !
(!(

Project : N
!
(!

Y
(

W
PK
((
!

YS
Wa
!

cc

A
am

B
aw
!
(!

NA
Ri

I
ve
(

L
O
!
(!

R
HW Y 544
(

CA
!
((

RD
!

OK
(
!!

RO
(

S TB
(!
! (

RE
!
((

FO
!

Int rac oasta


lW
!
((

ate
rwa
y
!
!
((! (!
!

ASTEE BLV D
(

SOC
!
(
!
(
!
(
!
(
!
(
!
(
(
!
!
(
!(

(!
(
!

!
(
(!
!
(
!
(
!
(
!
(
!
(
(
!
!
(
YP

!
( !!
(
7B

( !(
(
Y1

! !(
(
HW

! !(
( !
707

!(
( ! !!
( (
HWY

!(
( ! !(
( ! !
((! !
(!( !
((! !!
( ( !!
( ((
! !
(!((
! Þ
17

®
Y
HW

M
EL
SC Hwy 22 Extension
an
Oc e

O
DY
nt ic
A t la

SC Hwy 22 Extension: environmental mitigation and construction of a new LN


highway from US Hwy 501 (near Aynor) to Surfside / Murrells Inlet area

AT
Date Printed 01/05/2024
LA
NT
I C
A
HWY
701 N
PROJECT O

905
WY
H

MA
IN
ST
HWY 378

CHURCH
WR
I GH
TB
LV
D

ST
V E
A
I RD
TH R
D
I NA
A R
M HW HWY 90
Y
50
1
BU
S
Lak e
B u s b ee

S PAS
ER
Project : O

OV
Y 544
HW
S HW Y 70
1

HW
Y
50
1
HWY 544
W
ac
ca
m
aw R iv
er

CAROL I NA F ORES T BLVD


®
New Conway River Crossing PK WY
B AYS
New Conway River Crossing: construct new highway across Waccamaw River near Conway OLIN A VILLAG
E PKWY
A R
(final location to be determined by study) C

Date Printed 01/05/2024


PROJECT P I RD
AV
E

TH

701
W Y
S H

Project : P

DR
I NA
A R
M

CH
UR
CH
ST
r
ve
Ri
w
ma
c ca
Wa

Wacc amaw River


®
La
ke

US Hwy 501 Bypass


Bu

ee
sb

ac
ca

W
m
aw
Ri
ve
r

US Hwy 501 Bypass: construct new off-ramp to 3rd Ave and Marina Drive from US Hwy 501 NB

Date Printed 01/05/2024


PROJECT Q

Project : Q

701 N
HWY
MAIN ST
HW
Y5
01
®
Cultra Road
Cultra Road: widen from US Hwy 501 to US Hwy 701 with median and multimodal
facilities

Date Printed 01/05/2024


PROJECT R

HW Y 319
Project : R

®
HW

Hardwick Road
Y
50
1

Hardwick Road: improve existing road including intersection improvements on US


Hwy 501 and SC Hwy 319 to support new Horry County Multi-Use Sports &
Recreational Complex (including multimodal facilities)
Date Printed 01/05/2024
PROJECT S

HW
Y5
01
Project : S

EL
M
ST

®
US Hwy 501 at SC Hwy 319
US Hwy 501 at SC Hwy 319: construct acceleration lane

Date Printed 01/05/2024


PROJECT T

HW
Y9
WY
SH
L
O

CH
NI
N

HWY 19
HW Y
N
EE RD

OLS
E D

S NI CH
PE

HWY
917

W HW Y
19
HW Y

Project : T
OLS
NI CH

ELM S
T
HW
Y5
01

HW
Y 319 HWY 22

HW Y 2
2
®
N
701

Interstate Connector
Y
HW

Interstate Connector: I-73 from SC Hwy 22 to Marion County line (local match funding)

Date Printed 01/05/2024


PROJECT U

S GR
EEN
SEA
D R
Project : U

701 N
HWY

HWY 22
®
US Hwy 701
US Hwy 701: widen to 4-lanes with turn lanes at intersections (SC Hwy 22 to SC Hwy 410)

Date Printed 01/05/2024


PROJECT V
RD
GREEN S E A

Project : V

N HWY 701

6
HW

Y6
Y9

HW
US Hwy 701
US Hwy 701: widen to 4-lanes with turn lanes at intersections
(SC Hwy 9 Bypass to NC State Line)
Date Printed 01/05/2024