FUNDAMENTAL ENGINEERING SURVEYING GSS130

UNIVERSITI TEKNOLOGI MARA


FUNDAMENTAL ENGINEERING SURVEYING
FIELD PRACTICAL 2

TASK : TRAVERSING SURVEY


PLACE : UiTM KAMPUS ARAU
DURATION : 4-5 WEEKS

OBJECTIVES

 To become familiar in handling Total Station.


 To determine close traverse. The purpose of the traverse survey is providing the
necessary data for horizontal control in all surveying works.

EQUIPMENT

 1 x Total Station.  Picket.


 3 x Tripod.  Tape
 2 x prism.  Field Book.

INSTRUCTION:

1. Reconnaissance
- Selection of practical site
- identify traverse stations (at least 5 to 6 station )

2. Perimeter survey
- 1st class survey
- Form close traverses using total station.
- bookings
** Procedures Observation: Basics procedure for traverse survey.

3. Processing/ Traverse Calculation


- Bearing Adjustments
i. C correction
ii. M correction
- Latitude and Departure
- Linear Misclose

4. Report Submission
- group report
- due before _____ week

®Zaki A.D, UiTM Perlis.