Professional Documents
Culture Documents
Draft Survey in Use 2016 16.06.2016
Draft Survey in Use 2016 16.06.2016
DEPARTURE INFORMATION CARGO DISTRIBUTION PORT OPS FUEL (M3) BALLAST (MT)
M.V. LUGANO PRODUCT HOLD M.T. LOAD DISCH TANK M3 TANK M.T.
VOYAGE NO: 47 L WHEAT 1 1309.00 X H.F.O.#1© 336.00 DB 1. P 342.17
AT THE PORT OF: Nea Karvali WHEAT 2 5887.00 H.F.O.#2© 336.00 DB 1.S 340.35
DATE: 4-Sep-11 WHEAT 3 5884.00 X H.F.O.#3© 2.24
E.T.D: 5-Sep-11 WHEAT 4 5100.00 H.F.O. SETT. 14.00
NEXT PORT: SINGAPORE NO.1 H.F.O. SVC 16.00
E.T.A: 26-Sep-11 NO.2 H.F.O. SVC 16.00
DRAFT FOR'D: 7.90 H.F.O. O/F 8.00
DRAFT AFT: 10.20 TOTAL 728.24
MEAN DRAFT: 9.05
FREEBOARD: 3.95 D.O.# 1 P 23.50
VSL WILL RISE IN SW (MM): #DIV/0! D.O.# 1 S 23.50
I.F.O. ON BOARD: 728.24 D.O.# 2 P 0.05
M.G.O. ON BOARD: 56.05 D.O.# 2 S 0.05
F.W. ON BOARD: 159.2 D.O. SETT 2.81
DEPARTURE GM: 2.55 NO.1 D.O. SVC 3.07
ARRIVAL GM NEXT PORT: 2.52 NO.2 D.O. SVC 3.07
TOTAL 56.05
TOTAL 682.52
DiMITIOS KOKONIS
CHIEF OFFICER TOTAL: 18180.000
FINAL SURVEY
DRAFT DISPL TPC MTC LCF LCB
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
TRIM ARM #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! LCG #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
SHIP'S PARTICULARS DRAFT CORRECTIONS
dansen 2007
DBT-4P 5.190 355.230 100.0 % 1.0250 5.64 355.23 364.11 1.40 31.36 0.00
DBT-4S 5.190 355.230 100.0 % 1.0250 5.00 355.23 364.11 1.40 31.36 0.00
TST-1P 5.380 300.290 96.0 % 1.0250 4.59 288.32 295.53 12.10 -49.18 32.03
TST-1S 5.380 300.290 96.0 % 1.0250 4.59 288.31 295.52 12.10 -49.18 32.03
TST-2P 4.380 339.060 100.0 % 1.0250 4.23 339.03 347.51 11.62 -23.65 0.00
TST-2S 4.380 339.060 100.0 % 1.0250 5.00 339.06 347.54 11.62 -23.65 0.00
TST-3P 4.520 338.720 97.9 % 1.0250 4.14 331.59 339.88 11.62 4.35 0.00
TST-3S 4.520 338.720 100.0 % 1.0250 5.00 338.72 347.19 11.62 4.35 0.00
TST-4P 4.480 337.770 88.0 % 1.0250 3.66 297.34 304.77 11.54 32.31 272.81
TST-4S 4.480 337.770 99.8 % 1.0250 4.10 337.02 345.45 11.62 32.32 0.00
APT 2.700 88.346 95.2 % 1.0000 2.53 84.06 84.06 7.78 68.78 531.60
FWT P 2.560 69.473 96.3 % 1.0000 2.30 66.91 66.91 9.98 69.26 74.98
159.21
FWT S 2.560 73.257 11.2 % 1.0000 0.45 8.24 8.24 8.89 68.37 18.56
TOTAL WATER BALLAST 5,818.54 5,964.00 WATER BALLAST IM4 540.39
TOTAL FRESH WATER 159.21 159.21 FRESH WATER IM4 625.14
P MT P MT C/L PORT MT
CH BILGE No.1 CH BILGE No.3
S MT S MT C/L STBD MT
P MT P MT
CH BILGE No.2 CH BILGE No.4
S MT S MT
MV "LUGANO"BASEL"DAILY FRESH WATER SOUNDING
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
FWT P 63 FWT P
S 19 S
APT 65 APT
PRODUCTION PRODUCTION
CONSUMPTION -7 CONSUMPTION
MV LUGANO MV LUGANO
BASEL BASEL
FROM TO FROM TO
FWT P FWT P
S S
APT APT
TOTAL TOTAL
PRODUCTION PRODUCTION
CONSUMPTION CONSUMPTION
WATER BALLAST & FRESH WATER TANK CONDITION
500.00
400.00
300.00
200.00
100.00
0.00
FPT DBT DBT- DBT- DBT- DBT- DBT- DBT- DBT- TST- TST- TST- TST- TST- TST- TST- TST- APT FWT P FWT S
1P 1S 2P 2S 3P 3S 4P 4S 1P 1S 2P 2S 3P 3S 4P 4S
-100.00
MV LUGAN0
BASEL
INITIAL DRAFT DEPARTURE CONDITION FINAL DRAFT ACTUAL ARVL DRAFT DIFFERENCE
S.GRAVITY 1.0200 F.O. 676.00 S.GRAVITY 1.0250 S.GRAVITY 1.0310 FROM ACT.
FWD 5.500 D.O. 4.64 FWD 7.788 FWD 8.79 1.00
AFT 6.200 F.W. 162.87 dansen ® 2003 AFT 5.872 AFT 8.81 2.93
MEAN 5.850 MEAN 6.830 MEAN 8.80 1.96
TRIM 0.700 TRIM -1.92 TRIM 0.020 1.936
DATE TIME
DESC. PREVIOUS PRESENT WEIGHT FWD CORR'N AFT CORR'N FWD DRAFT AFT DRAFT DEPARTURE 02-May 0800H
FOT-1 C 277.00 277.00 0.00 TTL. DISTANCE 1904.3 Miles
FOT-2 C 276.00 276.00 0.00 SPEED 13.50 Knots
FOT-3 C 123.00 96.00 -27.00 0.009 -0.029 5.509 6.171 TTL STMG TIME 04d 21hrs 03min
D.O.TANK 1 4.54 4.54 0.00 E.T.A. 08-May-11 0303H
D.O.TANK 2 0.10 0.10 0.00
F.P.T. 0.45 188.80 188.35 0.320 -0.206 5.829 5.965 CURR. DATE 02-May 1200H
D.B. 1 15.64 682.52 666.89 0.862 -0.437 6.691 5.528 STMG TO DATE 30d 04hrs 00min
D.B. 2 858.47 860.93 2.46 0.002 0.000 6.693 5.528 F.O. PER DAY 22.00 Tons
D.B. 3 0.19 880.14 879.95 0.188 0.443 6.881 5.971 D.O. PER DAY 0.00 Tons
D.B. 4 723.55 728.22 4.68 -0.002 0.005 6.879 5.976 F.W. PER DAY 10.00 Tons
TST 1 0.02 591.05 591.03 0.769 -0.392 7.648 5.584 HRS. STEAMED 4.0 Hrs.
TST 2 685.62 695.05 9.43 0.007 -0.001 7.656 5.583 CONSUMPTIONS: CALC. ACTUAL
TST 3 0.14 687.07 686.93 0.157 0.351 7.813 5.934 F.O. 3.67 649.00
TST 4 681.65 650.22 -31.43 0.010 -0.032 7.823 5.902 D.O. 0.00 4.64
A.P.T. 20.14 84.06 63.92 -0.067 0.113 7.756 6.014 PRESENT R.O.B. F.O. 288.07
F.W.T. 142.73 75.15 -67.58 0.071 -0.120 7.827 5.894 TOTAL CONS. D.O. 54.45
C.H. 1 0.00 129.30 F.O. 676.00
C.H. 2 0.00 0.00 D.O. 4.64
C.H. 3 0.00
C.H. 4 0.00
MV MARTIGNY
BASEL
(Time period & reason for stoppage) DRAFT SURVEY SHIFTING TO CH No. 3
(Any operational problems such as cargo claims, 12 / 2000 - 2030 STOP DISCHARGING FOR DRAFT SURVEY
/ -
NOTE:
AT 0800H
CH No.2 0.0 mt CH 2 =
CH No.4 0.0 mt CH 4 =
CH No.5 0.0 mt CH 5 =
TOTAL = 3,248.0 mt Total = 3,248.0 mt
MV LUGANO
BASEL
L.)Remarks 13 / 1600 - 2400 NO DISCHARGING OPERATIONS. STEV K.O. FOR THE DAY
(Any operational problems such as cargo claims, 14 / 0000 - 0800 NO DISCHARGING OPERATIONS.
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
CH No.1 2,496.000 mt CH 1 =
CH No.2 0.000 mt CH 2 =
CH No.3 2,223.000 mt CH 3 = 1,471.000 mt
CH No.4 0.000 mt CH 4 =
CH No.5 0.000 mt CH 5 =
TOTAL = 4,719.000 mt Total = 1,471.0 mt
MV LUGANO
BASEL
K.) ETC/S: 13 JUNE '11 @ 0600H 11 / 0800 - 1600 DISCHARGING IN CH No. 1 & 3
(Any operational problems such as cargo claims, 11 / 1700 - 1800 DISCHARGING IN CH No. 1 & 3
/ -
/ -
/ -
/ -
/ -
/ -
/ -
CH No.2 0.000 mt CH 2 =
CH No.4 0.000 mt CH 4 =
CH No.5 0.000 mt CH 5 =
TOTAL = 7,334.000 mt Total = 2,615.0 mt
TOTAL TIME 24.0 Hrs.
w working time
ss shifting shore
sv shifting vsl
r rain
sd shore stoppage
vd vsl stoppage
w 08 00 16 00 8
r 16 00 17 00 16
w 17 00 18 00 17
18 00 18
w 18 00 24 00 18
w 00 00 08 00 0
1 / Jan '10
2 / Feb '10
3 / Mar '10
1 4 / Apr '10
5 / May '10
6 / Jun '10
7 / Jul '10
8 / Aug '10
9 / Sep '10
10 / Oct '10
11 / Nov '10
12 / Dec '10
16 8
17 1
18 1
24 6
8 8
23
155.66666
shifting vsl
rain
shore stoppage
vsl stoppage 0
MV LUGANO
BASEL
(Any operational problems such as cargo claims, 12 / 1330 - 2400 DISCHARGING IN CH No. 3
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
/ -
CH No.1 3,117.000 mt CH 1 =
CH No.2 0.000 mt CH 2 =
CH No.4 0.000 mt CH 4 =
CH No.5 0.000 mt CH 5 =
(Any operational problems such as cargo claims, 13 / 0000 - 0545 DISCHARGING IN CH No. 2 & 4
CH No.1 3,117.000 mt CH 1 =
CH No.3 5,978.000 mt CH 3 =
CH No.5 0.000 mt CH 5 =
(Any operational problems such as cargo claims, 13 / 1750 - 1935 DISCHARGING IN CH No. 2 & 4
CH No.1 3,117.000 mt CH 1 =
CH No.3 5,978.000 mt CH 3 =
(Any operational problems such as cargo claims, 14 / 1730 - 1835 NO DISCHARGING. STEV. BREAK
CH No.1 3,117.000 mt CH 1 =
CH No.2 2,967.000 mt CH 2 =
CH No.3 5,978.000 mt CH 3 =
(Any operational problems such as cargo claims, 18 / 0035 - 0345 DISCHARGING IN CH No. 4 & 5
CH No.2 2,967.000 mt CH 2 =
CH No.3 5,978.000 mt CH 3 =
(Any operational problems such as cargo claims, 18 / 1330 - 1655 NO DISCHARGING IN CH No. 1 & 5, STEV. BREAK
CH No.2 2,967.000 mt CH 2 =
CH No.3 5,978.000 mt CH 3 =
CH No.4 4,078.000 mt CH 4 =
K.) ETC/S / -
L.)Remarks / -
/ -
/ -
/ -
/ -
CH No.1 5,317.000 mt CH 1 =
CH No.2 2,967.000 mt CH 2 =
CH No.3 5,978.000 mt CH 3 =
CH No.4 4,078.000 mt CH 4 =
CH No.5 6,459.000 mt CH 5 =
K.) ETC/S / -
L.)Remarks / -
/ -
/ -
/ -
/ -
CH No.1 5,317.000 mt CH 1 =
CH No.2 2,967.000 mt CH 2 =
CH No.3 5,978.000 mt CH 3 =
CH No.4 4,078.000 mt CH 4 =
CH No.5 6,459.000 mt CH 5 =
K.) ETC/S / -
L.)Remarks / -
/ -
/ -
/ -
/ -
CH No.1 5,317.000 mt CH 1 =
CH No.2 2,967.000 mt CH 2 =
CH No.3 5,978.000 mt CH 3 =
CH No.4 4,078.000 mt CH 4 =
CH No.5 6,459.000 mt CH 5 =
The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when opening this workbook in
an earlier version of Excel or if you save this workbook in an earlier file format.
Some cells contain conditional formatting with the 'Stop if True' option cleared. 6
Earlier versions of Excel do not recognize this option and will stop after the first
true condition.
DRAFT SURVEY'!E16
DRAFT SURVEY'!G16
One or more cells in this workbook contain data validation rules which refer to 1
values on other worksheets. These data validation rules will not be saved.
Some formulas in this workbook are linked to other workbooks that are 263
closed. When these formulas are recalculated in earlier versions of Excel Defined Names
without opening the linked workbooks, characters beyond the 255-character
limit cannot be returned.
Some cells or styles in this workbook contain formatting that is not supported 45
by the selected file format. These formats will be converted to the closest
format available.
Version
Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003