Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

FILE NO.

7
MARINSA DENİZCİLİK A.Ş.
HELICOPTER OPERATIONS CHECK LIST

Vessel : Voyage Number :


Date : Position :
From : To :

N
NO DESCRIPTION Y N
A
Have you carried out the Risk Assessment ?
If yes, Risk Assessment Reference no :

A. Action
Provide helicopter company and pilot with details of the vessel’s construction, landing
1.
area, obstructions, course, speed, true and relative wind direction and force
2. Agree procedures with pilot
Hoist windsock or pennant at masthead or where it can be best seen to indicate wind
3.
direction. At night shine a light on it
4. Fire party stand by with portable extinguishers etc.

5. Rescue Boat party stand by in case of helicopter crash

6. Record all events in appropriate Bridge bell Book

7. Secure or remove all objects and fittings in the area of the operations

8. Make sure the readiness of the ship in order to perform the operations
The responsible of operations has been provided with a portable VHF in order to establish
9.
a communication line with the Bridge
10. Fire pumps running and fire main under pressure

11. Get ready the fire hoses nearby the area but without interfere
Prepare foam applicator. Connect nozzles to the fire hoses and to the foam component.
12. Aim such devices toward the outside of operations in such a way to avoid problems in case
of sudden opening of valves

13. Turn on deck lights in the operation area, direct them downward

The following equipment is available: large axe, jemmy bar, wire plier, red and white light
signalling flashlight, first aid kit, adjustable wrench, Fire blanket, cutters, bolt, 60 cm,
14. hook, grab or salving, hacksaw, heavy duty complete with 6 spare blades, ladder, lift line 5
mm diameter and 15 m in length, pliers/Plate cutter side-cutting, set of assorted
screwdrivers and harness knife complete with sheath.
15. Make sure that fire party members wear fireman outfit, helmets

16. Means of escape from the area are clear of obstructions

17. The Officer in charge has read the ICS “Guide to Helicopter ship Operations

* This form must be must be filled 2 hrs before and during the helicopter operation.
ISM Forms/MS-I-86 Page 1 of 2 01 01.2019/Rev.1
FILE NO. 7
MARINSA DENİZCİLİK A.Ş.
HELICOPTER OPERATIONS CHECK LIST

B. Other

Prepared by Master
Name:
Signature:

* This form must be must be filled 2 hrs before and during the helicopter operation.
ISM Forms/MS-I-86 Page 2 of 2 01 01.2019/Rev.1

You might also like