BOM, MRP, Backscheduling
BOM, MRP, Backscheduling
BOM, MRP, Backscheduling
8 7 6 5
BOM
1 2 3 4 5
A/10/1 Gross Requirements
Scheduled receipts
Projected on hand 10 10 10 10 10
Planned order release
Component/Lead time
A 10 1
B 15 2
C 20 1
D 10 1
E 10 2
F5 3
G0 2
Component/Stock
Lead Time On Hand BOM Ordered Need
A 1 10 1 50 40
B 2 15 2 80 65
C 1 20 3 120 100
Db 1 0 4 130 130
Df 1 10 12 390 380
Eb 2 10 4 130 120
Ec 2 0 6 200 200
F 3 5 6 200 195
G 2 0 6 195 195
Eb
Db
Ec
Df
4 3 2 1
6 7
50
10
40
80
120
200
Material requirement Planning, Bill of Materials and Back scheduling
Back Schedulin
6 5
Product 0/1 1 2 3
Gross Requirement
Projected on hand
Planned order release
A/200/2 1 2 3
Gross Requirement
Projected on hand 200 200
Planned order release 1800
B/350/3 1 2 3
Gross Requirement
Projected on hand 350
Planned order releas 1650
C/50/2 1 2 3
Gross Requirement
Projected on hand 50 50
Planned order release 950
D/190/1 1 2 3
Gross Requirement
Projected on hand 50 50
Planned order release 3190
პანიას არ გააჩნია .
Back Scheduling
E
Product
G
D
H
4 3 2 1
4 5
1000
1000
4 5
2000
4 5
2000
4 5
1000
4 5
3240
Material requirement Planning, Bill of Materials and Back scheduling