FOOTING SCHEDULE OF F1 F2 F3

FOOTING SCHEDULE
Len T a De ear
id T ic ne S e ic ne ein rcemen De ai B m
FOOTING F in F in e ca a i n
Inde in in in
A B d D=d H a b
F1-C1 5'-6" 5'-6" 15" 3" 18" 7'-0"
16 mm Ø
@ 4.5" c/c main
16 mm Ø
@ 4.5" c/c main P.L.
5.5" Thick RCC G. Floor
10mm Ø @ 8" C/C
Grade Brick Flat Soiling
F2-C2 6'-0" 7'-0" 18" 3" 21" 8'-0" 16 mm Ø
@ 4" c/c main
16 mm Ø
@ 4" c/c main
Beam
Sand Filling

??
F3-C3 5'-0" 5'-0" 12" 3" 15" 7'-0"
16 mm Ø
@ 5" c/c main
16 mm Ø
@ 5" c/c main
10mm Ø
Stirrups E. G. L.
@ 5" C/C

NOTES :

H
s
R.C.C. Casting of Column = 1:1.5:3
Ston Chips = 3/4" Down Grade.
Sand = 2.5 FM A 15"

D
d
Cement =.
3" CC Casting
a 12" Sand Filling
Clear Cover: X X AXB
b
Below P.L. : SECTION X-X

B
Footing Base =122" To 3"= 62mm to 75mm
1
Column = "2 To 2 2" = 50mm to 62 mm

fy= 60 Psi TOP IE


f'c= 3.5 Psi
66'-0"
61'-0"

44'-4"
a
61'-0"

10mm 6" c/c 10mm 6" c/c 10mm 6" c/c 10mm 6" c/c 10mm 6" c/c
8"

8"

Note
thickness=5"
a 10mm 8" c/c
1 10mm 8" c/c

GROUND FLOOR LAYOUT PLAN