RESUME

Divino Edgar D. Lacambra


5A-10-10 Apartment D’ Kiara
Jln Wawasan 4/12 Pusat Bandar Puchong
47160 Puchong, Selangor Darul Ehsan, Malaysia
E-mail: divinoedgar2@yahoo.com
Contact No. +60-0193546830 (Malaysia)
+63-0744223210 (Philippines)

POSITION APPLIED: COST CONTROL MANAGER

PERSONAL PARTICULARS

Age : 48 years old


Nationality : Filipino
Marital Status : Married
Residence : Philippines
Date of Birth : 03 March 1968
Gender : Male
Passport No. : EB8284159 (Philippine Passport)
Permanent Address : AE-66 West Buyagan, La Trinidad Benguet
2601 Philippines

EDUCATION
 Graduate Studies in Civil Engineering (Structural Design) Partial Units Taken (6 Units)
Pamantasan ng Lungsod ng Maynila, Manila Philippines (2nd Trimester 1992)
 Bachelor of Science in Civil Engineering – Feati University, Manila Philippines (1983-1988)
 Secondary Education – Saint Anthony High School, Luna Apayao,Philippines(1979-1983)
 Primary Education - San Francisco Elementary School, Luna Apayao, Philippines (1973-1979)

OTHERS COURSES / SEMINARS ATTENDED


 Computer Aided Cost Estimating– 1990
 Computer Aided Structural Analysis and Design– 1990
 Safety Training Course For Offshore Works - 1995
 Training in Overture Estimating Software– 2001
 Training in Online Project Costing System (OPCS)-2001
 Internal Auditors Training Course– 2002
 Bullet Proof EOTs (Extension Of Time) – 2006
 Contract Administration Training - 2009
 Civil 3DTraining Program –2015
 Primavera P6 Training Program - 2015

EMPLOYMENT HISTORY

LION DRI SDN BHD (Malaysia)


Position: Senior Executive (Planning & Plant Infrastructure Maintenance)
June 2008 to Present

Project: Various Expansion Facilities For 1.54 MTPY Lion DRI (Direct Reduced Iron) Plant
Various small and medium sized infrastructures and plant facilities to support operation and
maintenance of 1.54 MTPY Lion DRI Plant. These facilities are the Mechanical Maintenance
Workshop, E&I Maintenance Workshop, Plant Warehouse Facilities, Additional Iron Ore Storage
Bay & Jetty Facilities (for receiving shipment of iron ore materials).

Page 1
Job Description

 Performs cost control functions for additional facilities for the steel plant and various works
necessary for plant maintenance
 Estimates budgetary cost for plant expansion facilities needed for the plant operation.
 Issue out tender notices for the additional plant facilities and participates in the contractor
interviews & qualification process.
 Participate in tender technical clarifications, commercial negotiations and finalization of works to
award to contractors.
 Performs post contract administrative functions after contracts are awarded until work completion
and finalization of accounts.
 Coordinates with purchasing for procurement of equipment for the plant from generation of
requisitions, follow up issuance of orders and monitor delivery schedules.
 Oversee and supervise plant store personnel in their functions (inventory, receiving of deliveries,
material issuance and monitoring)
 Prepare detail works schedules for maintenance works during main plant shutdowns

MEGASTEEL SDN BHD (Malaysia)


Project Planning And Control
Position: Senior Executive (Planning & Project Control)
May 2005 to May 2008

Project:1.54 MTPY Lion DRI (Direct Reduced Iron) Plant Project


KawasanPerindustrianOlakLempit, Banting, Selangor, Malaysia

Job Description

 Implements planning, scheduling, progress forecasting and project coordination works.


 Develops and monitors project schedules, depicting the sequence of events, dependencies, and
interfaces of activities to clearly illustrate the strategy of the program to meet the requirements of
the Program Master Schedule
 Performs various cost control functions for the project.
 Initialization and setting up of standard cost of accounts and estimated budgets for each
accounts.
 Monitors and tracks costs for various construction activities and make comparisons on actual cost
commitments (i.e. equipment purchased, site works contracts issued for different disciplines such
as Civil and Structural, Mechanical, Piping, Electrical & Instrumentation, other project running
cost) against the budgeted provisions as project progresses.
 Prepares and generates periodic cost and expenditure reports, cost trends for the purpose of
assessing and projecting the eventual anticipated cost of the project at completion.
 Prepares periodic cash flow projections, values of work done analysis, prepares and revises cost
estimates, update forecast and trends if there are significant deviations of current cost
commitments against the budget.
 Highlights to management if there are significant cost deviations and prepares reports explaining
and detailing the reasons for the changes for management information and necessary action.

Page 2
PENTA-SHIMIZU-TOA JOINT VENTURE (Philippines)
Project Planning Department
Position: Planning Engineer
May 2004 to April 2005

Project:Subic Bay Port Development Project


Subic Bay Zambales, Philippines
A project for the construction of a new container terminal and its associated ship berthing
facilities. The project consists of reclamation, dredging, equipment procurement, onshore and
marine civil construction works.

Job Description

 Implements planning, scheduling, progress forecasting and project coordination works.


 Performs a major role enforcing contractual responsibilities of subcontractors planning,
scheduling and progress performance.
 Monitors, advises and directs subcontractors in planning, scheduling and reporting
matters, collecting, evaluating and forecasting data as requested by management.
 Develops and monitors project schedules, depicting the sequence of events,
dependencies, and interfaces of activities to clearly illustrate the strategy of the program
to meet the requirements of the Program Master Schedule.
 Reviews, analyzes and recommends approval or disapproval disposition of
subcontractors detailed schedules, including manpower and equipment loading.
 Analyzes input and identifies areas where requirements are not being met, bringing any
scheduling problems to the attention of project management with proposed solutions.
 Identifies potential contract changes and develops appropriate logic schedule.

SEMBCORP ENGINEERS & CONSTRUCTORS PTE LTD (Singapore)


Project Control Department
Position: Construction Engineer (Project Cost Engineer)
June 1999 to November 2003

Projects:
 Akzo Nobel Quat Ammonia Plant
Jurong Island, Singapore
 PCK3 / EPSC2 Peciko III Onshore Development Project
Extension of Existing Peciko Gas Processing Unit
Senipah, Kalimantan, Indonesia
 Merck Sharpe & Dohme (MSD) Pharmaceutical Plant
Non Process and Utilities Area
Tuas View, Singapore

Job Description:

 Monitoring of daily progress for periodic progress report generation.


 Measurement, verification and review of quantities for billing to client.
 Verification and certification of subcontractor progress claims and assists in preparation
of monthly cost reports.
 Prepares initial cost plans and set up periodic reporting procedures for management
review and approval.
 Set up project WBS code of accounts (until level 3 details) and coordinates with
estimating department for inputs on budget for each code of accounts.
 Monitors and tracks committed cost against budget provision for each cost of accounts
for the whole duration of the project.

Page 3
 Prepares periodic cost and expenditure reports, cost trending and periodic cash flow
projections.
 Constantly update, review and prepares estimate of project anticipated cost at
completion for management timely information and review as this is necessary should
there be significant cost deviations from the original estimated budget. Revises from
time to time forecast on project anticipated cost at completion.
 Provides timely review of cost and impact of changes, modifications, or alternatives to
management in anticipation of added cost due to these changes.
 Provides timely cost information to management to ensure that the information provided
fits the project needs in a cost effective manner.

SEMBCORP ENGINEERING PTE LTD (Singapore)


Project Control Department
Position: Construction Engineer (Cost Engineer)
August 1996 to May 1999

Projects:
 PT Petro Oxo Nusantara Gresik Octanol Plant
Gresik, East Java, Indonesia
 100,000 MTPY Synthetic Latex and Alkyd Resin Plant
Gresik, East Java, Indonesia

Job Description: Planning Engineer (100,000 MTPY Snthetic Latex and Alkyd Resin Plant)
Cost Engineer (PT Petro Oxo Nusantara Gresik Octanol Plant)

 Develops and monitors project schedules, depicting the sequence of events,


dependencies, and interfaces of activities to clearly illustrate the strategy of the program
to meet the client requirements.
 Monitors and gathers data for weekly progress report for submission to client.
 Attends weekly meetings with client together with project management team to sort out
problems and identify bottlenecks causing delays to the project.
 Reviews, analyzes and recommends approval or disapproval disposition of
subcontractors detailed schedules, including manpower and equipment loading.
 Set up project WBS code of accounts (until level 3 details) and coordinates with
estimating department for inputs on budget for each code of accounts.
 Monitors and tracks committed cost against budget provision for each cost of accounts
for the whole duration of the project.
 Prepares periodic cost and expenditure reports, cost trending and periodic cash flow
projections.
 Constantly update, review and prepares estimate of project anticipated cost at
completion for management timely information and review as this is necessary should
there be significant cost deviations from the original estimated budget. Revises from
time to time forecast on project anticipated cost at completion.

Page 4
BELLELI SAUDI HEAVY INDUSTRIES(Jubail, Saudi Arabia)
BELLELI SPA QATAR (Umm Said, Qatar)
Project Planning &Control Department
Position: Quantity Surveyor (Jubail, Saudi Arabia)
Position: Estimating / Cost Engineer (Umm Said, Qatar)
March 1993 1996 to March 1996

Projects:
 Qatar Fertilizer Company (QAFCO III) Expansion Project
Umm Said, Qatar
 Saudi Aramco Safaniya GOSP 4 Project – Offshore Hook Up Work
Safaniya, Saudi Arabia
 Saudi Aramco Safaniya GOSP 4 Project – Onshore Platform Fabrication Work
Belleli Module Yard, Jubail Industrial City, Saudi Arabia

Job Description:

 Monitoring of daily progress for periodic progress report generation.


 Measurement and review of quantities for billing to client.
 Verification and certification of subcontractor progress claims and assists in preparation
of monthly cost reports.
 Prepares job cards for various offshore hook up activities, monitors if there are
significant changes to the estimates during actual offshore hook up works for
reconciliation.
 Estimate cost projection for offshore hook up works job cards.

GRANDSPAN DEVELOPMENT CORPORATION (Rizal, Philippines)


Estimating Department
Position: Estimating Engineer
March 1990 to February 1993

Projects:
 Asia Brewery Beer Processing Plant
El Salvador, Negros Oriental, Philippines
 Asia Brewery Bottling Plant
Cabuyao, Laguna, Philippines
 300 MW Combined Cycle Power Plant
Limay, Bataan, Philippines

Job Description:

 Performs quantity take-off for various steel fabrication works.


 Estimates steel materials required for various steel fabrication works.
 Estimates manpower and equipment required for site erection works.
 Prepares pricing sheets & estimates for various steel fabrication and erection works.

Other Skills / Qualifications


Project supervision, coordination, document control. Knowledgeable in using personal computer
programs such as Windows, Microsoft Word, Microsoft Excel, Primavera P6.