Professional Documents
Culture Documents
BPL-DD-SUM-PPL-SPE-002 - NDT Specification
BPL-DD-SUM-PPL-SPE-002 - NDT Specification
This document has been generated by an Electronic Document System. When printed it is considered asfor information only copy. The” controlled copy” is the
screen version and it is the holder’s responsibility that he/she holds the latest valid version.
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
REVISION DESCRIPTION
00
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
CONTENTS
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
1.0 INTRODUCTION
1.1 Project Description
Belemaoil Producing Limited (BPL) is a world class indigenous independent exploration
and production (E&P) company operating in the Niger Delta Region of Nigeria with a host
of strong partners across the globe. Belemaoil Producing Limited (BPL) is the operator of
the Oil Mining Lease OML 55, in the east of the country’s Niger Delta Basin.
OML 55 covers an area of approximately 840km² and is located in the swamp to shallow
water offshore areas in the south eastern Niger Delta. The block contains five producing
fields (Robertkiri, Inda, Belema North, Idama and Jokka). The majority of production on
the block is from the Robertkiri, Idama and Inda fields. The Robertkiri field is located in the
swamp at a water depth of five meters and has a production platform and utility platform
installed. Production capacity at the Robertkiri facilities is 20,000 bpd and 10 MMscfd.
Production facilities at the Idama field comprise a jack-up mobile offshore production unit
(‘MOPU’) and riser platform that have a capacity of 30,000 bpd of total fluids and 34
MMscfd. The Jokka field is produced through a manifold tied-back to the Idama facilities.
Production facilities at the Inda field comprise a MOPU with a capacity of 30,000 bpd of
Overall, the infrastructure on OML 55 comprises three flow stations, a network of flowlines,
and two eight-inch pipelines that connect to the third party operated infrastructure.
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
1.2 Objectives
This specification covers the minimum requirements for non-destructive testing of welds
and metallic materials in company installations of pipelines for the Belema Export Pipeline
and Offloading Platform Project.
Radiographic, ultrasonic, magnetic particle and dye-penetrant methods of non-destructive
testing are included within the scope of this specification.
1.3 Responsibilities
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
a) For performance by the Contractor: The Contractor shall supply all materials, labour
and equipment necessary for the execution of non-destructive testing and the
production of test results for issue to the Inspection Agency.
b) For performance by the Inspection Agency: The Inspection Agency shall supply all
materials, labour and equipment necessary for the execution of non-destructive
testing and the production of test results. Additionally the Inspection Agency shall
supply all materials, labour and equipment necessary for the interpretation,
acceptance, recording and storage of the test results.
The Contractor shall, in any event, be responsible for the provision of adequate
scaffolding, access and other facilities necessary for the safe and efficient performance of
the non-destructive testing.
Regardless of the delegation of responsibilities with respect to materials, labour and
equipment the Inspection Agency shall have the right at all times to carry out spot checks
on non-destructive testing techniques, materials, equipment and personnel to verify
compliance with this specification and with the contract documents.
The Inspection Agency shall also have the right to interpretation of all test results and the
right to reject the corresponding welds or construction materials without the Contractor
being thereby relieved in any way from his responsibility for satisfactory welding and
inspection.
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
Sub – Contractor Is the party who performs the works at site (if different from
EPC Contractor.
Supplier Is the party who produces /or supplies the materials and
equipment to perform the duties as specified by the Client
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
ISO 13847:2000 Petroleum and natural gas industries – Pipeline transportation systems
– Welding of pipelines
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
3.2 Radiography
All pipeline/piping weld radiographs shall be inspected in accordance with ISO 13847, ISO
1106-3. The Contractor shall be responsible for securing all necessary operational permits
needed to comply with the requirements of governing authorities related to the
performance of radiographic services.
In the event X-ray equipment is used, the Contractor shall be responsible for ensuring that
there is sufficient regulated electrical power and adequate space to accommodate the use
of such equipment.
Gamma radiography may be substituted for X-radiography only with the agreement of the
Principal. For critical pipelines and non-critical pipelines, gamma radiography shall be
supplemented by manual ultrasonic examination.
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
and high contrast film shall be used for X-ray radiography. Class I extra fine grain and
high contrast film shall be used for gamma-radiography. The film shall be generally Type I
or 2 as described in ASME Section V; Article 22; SE-94, or as listed under BS 2910 for the
appropriate technique number.
3.2.2 Penetrameters
Wire type penetrameters shall be used and shall be in accordance with ISO 17636 Class
B and Section 8.5.3 Table 6 of ISO 13847.
3.2.3 Illuminators
Only viewing illuminators that can produce light intensity (110 volt-high intensity) sufficient
to provide the following result shall be used. All portions of the radiography of the weld
and base metal shall transmit sufficient light to reveal the pertinent details of the
radiographs having H&D densities up to 4.0.
Such equipment shall also be equipped with a variable intensity regulator.
Quality Indicators - Three radiographs shall be made of the first production weld to
establish the quality level for all production radiographs. BPL acceptance of these
radiographs shall result in qualification of the procedure. Should any variables in
the procedure specification change, the radiographic procedure shall be re-
qualified.
For procedure qualification, image quality indicators (IQI) shall be placed on both the
source side and the film side of the welds. IQI sensibility shall be as follows, based on wire
penetrameters:
During radiographic procedure qualification, wire-type IQIs shall be placed both on the
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
source side and on the film side. Only one IQI is required for each radiograph for short film
lengths where the distance between IQIs would be less than 100 mm.
IQIs shall be wire type. IQI sensitivities for source-side penetrameters shall, for both
single-side and double-side techniques, be in accordance with ISO 1106-3 Class B and
Table 6 of ISO 13847.
At least two radiographs shall be taken during the procedure qualification.
All relevant data on the qualification tests, including results, shall be documented.
Radiographs from the procedure qualification shall be kept available on site for reference
throughout the period of
Defects Reports - The defects noted from the radiographs shall be recorded on
daily report forms, identical to the forms to be used during the production
inspections. Three copies of this report, together with the copies of the test
radiographs, plus three copies of the radiographic procedure shall be submitted to
BPL for review and approval.
Only personnel qualified to Level 2 or Level 3 shall interpret the test results. A Level
3 qualified inspector shall be available to give supervision and assist in the
interpretation of ambiguous indications.
If, in the opinion of the Principal, welding examination or NDE personnel fail to
perform to a satisfactory standard, they shall be disqualified from the works until
such time that it can be demonstrated by the Contractor that they have achieved a
satisfactory standard by undertaking a test by a third party agency approved by the
Principal.
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
The procedure for qualification of AUT personnel shall be agreed with the Principal.
Film Orientation/Identification - For pipe welded in the fixed horizontal position, the
zero datum shall be the top of the pipe. The orientation of the film shall be defined
and be the same for all films.
Safety Precautions and Protection - it shall ensure that all work is carried out in
accordance with the relevant health and safety regulations.
The area exposed to radiation shall be posted.
The radiographer shall be responsible for the protection and monitoring of all personnel
working near x-ray or gamma-radiation equipment.
An adequate supply of nrc (nuclear regulatory commission) approved "danger" or "caution"
signs shall be displayed during any radiographic work on the pipeline.
Adequate measures shall also be put in place to protect the general public and the
construction contractor's personnel from harm.
Film Processing - Film shall be exposed so that the average H&D density shall not
be less than 2.0 and the density through the thickest part of the sound weld metal
shall not be less than 1.5.
Radiographs shall be free from all defects caused by bending, dirt, faulty screens, static
marks, light leakage and handling. Any film containing defects interfering with the
interpretation of the radiograph shall be discarded and the weld shall be re-radiographed.
Radiographs shall be processed in accordance with ISO standards to allow storage of film
without discoloration for at least three years. The processing chemical shall be changed
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
regularly and care shall be exercised during processing to prevent scratches on the film.
Careful attention shall be given to the possibilities of sparking from the source of
magnetisation, particularly when the technique is being used in potentially hazardous
areas.
All equipment shall be maintained in good working order and adequately rated for the work
required.
3.3.3 Magnetization
Unless otherwise directed by BPL or its representative, the procedure for magnetization
shall be in accordance with ISO 13847.
a. Linear indications are evaluated as cracks, including crater cracks or star cracks.
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
manufacturer’s instructions. Since penetration time is critical to the success of the testing,
a time shall be established in the procedures which will give satisfactory results for the
prevailing surface temperature of the test piece.
For surface temperatures outside the recommended usage range of the penetrant, a new
procedure shall be qualified (Ref. to section T-660 in ASME V).
After the penetration time specified in the procedure has elapsed, excess penetrant,
insofar as possible, shall be removed by wiping with a cloth or absorbent paper, repeating
the operation until most traces of penetrant have been removed. The remaining traces
shall be removed by wiping the surface lightly with cloth or absorbent paper moistened
with solvent. To minimize removal of penetrant from discontinuities, care shall be taken to
avoid the use of excess solvent. Flushing the surface with solvent, prior to developing is
prohibited.
3.4.3 Examination
The type and size of any discontinuity may be difficult to evaluate if the penetrant diffuses
excessively into the developer. Consequently, it is good practice to observe the surface
during the application of the developer to detect the nature of any indications, which tend
to bleed out profusely.
Final interpretation shall be made after allowing the penetrant to bleed out for up to 30
minutes. If bleed-out does not alter the examination results, longer periods are permitted.
If the surface to be examined is so large as to preclude complete examination within the
prescribed time, only portions of the surface shall be examined at any one time.
a. Linear indications are evaluated as cracks, including crater cracks or star cracks.
be investigated to determine the location, shape, extent and type of reflectors and shall be
evaluated according to the following criteria:
c. Linear indications (other than cracks) interpreted to be buried within the weld are
unacceptable if they exceed 50 mm in length, or if they exceed 50 mm in total
length in a continuous 300 mm length of weld, or if they exceed 8 percent of the
weld length.
3.6.2.1 General
Before repairs are made, the defects necessitating the repair shall be entirely removed to
sound metal. All slag and scale shall then also be removed.
The removal of weld metal or portions of the base metal may be done by machining,
grinding, chipping, oxygen gouging or air carbon-arc gouging. When thermal gouging
methods are used the appropriate pre-heating (determined from the WPS) shall be
applied. Thermal gouging methods shall not be used for removal of the weld root. The
unacceptable portions of the weld shall be removed without substantial removal of the
base metal and in such a manner that the remaining weld metal or base metal is not
nicked or undercut. Where thermal gouging is used, the edges shall be dressed to remove
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.
BelemaOil Producing Limited (BPL) DOCUMENT NUMBER:
exception of these shallow crater cracks, any weld containing cracks, regardless of size or
location, shall be removed.Procedure for repair,qualification,preparation and authorization
for repair shall be in accordance with Section 10 of ISO 13847
“This document is the property of BPL. It must not be reproduced or transmitted to others without written authorization from the Company”.