Professional Documents
Culture Documents
Lampiran RKS Electrical
Lampiran RKS Electrical
4
JOB LIST TA-22 KILANG PT.TPPI TUBAN
PT. Trans Pasific Petrochemical Indotama
Turnaround - Relita Department
CRETERIA REFERENCE
NO. EQUIPMENT NO. SERVICE JOB LIST RECOMMENDATION-INSP/REL/PE REASON MAIN JOB TA-22
PI MI INSP OPT
NO. DESCRIPTION
Normalize double
feeder incomer feeder
A dan B dari source
CTG serta Normalize ke source CTG untuk incomer
Menaikkan kehandalan jaringan listrik Normalize ke source CTG untuk incomer feeder A &B
637 menambahkan Sumber listrik di SS 800 feeder A &B serta Provide incomer r feeder A x IOM-REL-003 Pengajuan Job List TA 2022
Tidak handal karena source CTG hanya single feeder di bus B saja serta Provide incomer incomer feeder A dari PLN
incomer feeder A dari dari PLN
source PLN
Status : MOC
20000070
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
3. Inspect enclosure, power and control cable
915 800-SWGR-011 6.3kV MV SWITCHGEAR BUS TIE SS-200
Periodic maintenance, inspection MW SWGR IOM-REL-003 Pengajuan Job List TA 2022 Periodic maintenance and inspection
4. Inspect and test vacuum circuit breaker
5. Secondary relay test injection
6. Check and verification CT / PT
Equipment obsoleted 1. Isolated of power supply and put in rack out position
Incase terjadi trouble relay protection tidak bisa di perbaiki, Potensi terjadi interuption dan 2. Inspect jointing and re tighten bus bar
Improvement dan upgrade relay protection
Medium voltage 6.3KV switchgear PIR TA 2017 Post Implementation Review peralatan loss of protection 3. Inspect enclosure, power and control cable
916 200-SWGR-011A system di switchgear 6.3KV 0 1 0 0
di SS 200 IOM-REL-003 Pengajuan Job List TA 2022 Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus 4. Inspect and test vacuum circuit breaker
Internal Inspection & Periodic Maintenance
dalam kondisi shutdown/ 5. Secondary relay test injection
Terjadi unplan breakdown dan catastropic failure 6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
Improvement dan upgrade relay protection
Medium voltage 6.3KV switchgear PIR TA 2017 Post Implementation Review Equipment obsoleted 3. Inspect enclosure, power and control cable
917 200-SWGR-011B system di switchgear 6.3KV 0 1 0 0
di SS 200 IOM-REL-003 Pengajuan Job List TA 2022 4. Inspect and test vacuum circuit breaker
Internal Inspection & Periodic Maintenance
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
35kV HV SWITCHGEAR BUS A TO Retrofit relay protection system REF 542 di PIR TA 2017 Post Implementation Review 3. Inspect enclosure, power and control cable
918 800-SWGR-001 0 1 0 0 Part obsoleted
200-XFMR-002A switchgear 6.3KV IOM-REL-003 Pengajuan Job List TA 2022 4. Inspect and test vacuum circuit breaker
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
35kV HV SWITCHGEAR BUS A TO Periodic maintenance, inspection MW SWGR 3. Inspect enclosure, power and control cable
919 800-SWGR-001A IOM-REL-003 Pengajuan Job List TA 2022 Periodic maintenance and inspection
200-XFMR-002A & retrofit relay protection 4. Inspect and test vacuum circuit breaker
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
35kV HV SWITCHGEAR BUS A TO Periodic maintenance, inspection MW SWGR 3. Inspect enclosure, power and control cable
920 800-SWGR-001B IOM-REL-003 Pengajuan Job List TA 2022 Periodic maintenance and inspection
200-XFMR-002B & retrofit relay protection 4. Inspect and test vacuum circuit breaker
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
Medium voltage 6.3KV switchgear Retrofit relay protection system REF 542 di PIR TA 2017 Post Implementation Review 3. Inspect enclosure, power and control cable
922 800-SWGR-011A 0 1 0 0 Part obsoleted
di SS 800 switchgear 6.3KV IOM-REL-003 Pengajuan Job List TA 2022 4. Inspect and test vacuum circuit breaker
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
Medium voltage 6.3KV switchgear Retrofit relay protection system REF 542 di PIR TA 2017 Post Implementation Review 3. Inspect enclosure, power and control cable
923 800-SWGR-011B 0 1 0 0 Part obsoleted
di SS 800 switchgear 6.3KV IOM-REL-003 Pengajuan Job List TA 2022 4. Inspect and test vacuum circuit breaker
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
Periodic maintenance, inspection MW SWGR 3. Inspect enclosure, power and control cable
924 860-SWGR-011 6.3kV MV SWITCHGEAR BUS VT SS-860 IOM-REL-003 Pengajuan Job List TA 2022 Periodic maintenance and inspection
& retrofit relay protection 4. Inspect and test vacuum circuit breaker
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
Medium voltage 6.3KV switchgear PIR TA 2017 Post Implementation Review Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus 3. Inspect enclosure, power and control cable
925 860-SWGR-011A Internal inspection and periodic maintenance 0 1 0 0
di SS 860 IOM-REL-003 Pengajuan Job List TA 2022 dalam kondisi shutdown/Terjadi unplan breakdown dan catastropic failure 4. Inspect and test vacuum circuit breaker
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
Medium voltage 6.3KV switchgear PIR TA 2017 Post Implementation Review Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus 3. Inspect enclosure, power and control cable
926 860-SWGR-011B Internal inspection and periodic maintenance 0 1 0 0
di SS 860 IOM-REL-003 Pengajuan Job List TA 2022 dalam kondisi shutdown/Terjadi unplan breakdown dan catastropic failure 4. Inspect and test vacuum circuit breaker
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
Medium voltage 6.3KV switchgear PIR TA 2017 Post Implementation Review Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus 3. Inspect enclosure, power and control cable
927 900-SWGR-011 Internal inspection and periodic maintenance 0 1 0 0
di SS 900 IOM-REL-003 Pengajuan Job List TA 2022 dalam kondisi shutdown/Terjadi unplan breakdown dan catastropic failure 4. Inspect and test vacuum circuit breaker
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus
3. Inspect enclosure, power and control cable
928 900A-SWGR-011 Medium voltage 6.3KV switchgear di SS 900A inspection and periodic maintenance
Internal x IOM-REL-003 Pengajuan Job List TA 2022 dalam kondisi shutdown
4. Inspect and test vacuum circuit breaker
Terjadi unplan breakdown dan catastropic failure
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
Medium voltage 6.3KV switchgear PIR TA 2017 Post Implementation Review Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus 3. Inspect enclosure, power and control cable
929 980-SWGR-011 Internal inspection and periodic maintenance 0 1 0 0
di SS 980 IOM-REL-003 Pengajuan Job List TA 2022 dalam kondisi shutdown/Terjadi unplan breakdown dan catastropic failure 4. Inspect and test vacuum circuit breaker
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
3. Inspect enclosure, power and control cable
930 980-SWGR-011A 6.3kV MV SWITCHGEAR BUS VT SS-809
Periodic maintenance, inspection MW SWGR IOM-REL-003 Pengajuan Job List TA 2022 Periodic maintenance and inspection
4. Inspect and test vacuum circuit breaker
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
3. Inspect enclosure, power and control cable
931 980-SWGR-011B 6.3kV MV SWITCHGEAR BUS VT SS-809
Periodic maintenance, inspection MW SWGR IOM-REL-003 Pengajuan Job List TA 2022 Periodic maintenance and inspection
4. Inspect and test vacuum circuit breaker
5. Secondary relay test injection
6. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
3. Inspect enclosure, power and control cable
PIR TA 2017 Post Implementation Review Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus
932 200-MCC-101 Low voltage 0.4KV MCC di SS 200 Internal inspection and periodic maintenance 0 1 0 0 4. Inspect and test air circuit breaker
IOM-REL-003 Pengajuan Job List TA 2022 dalam kondisi shutdown/ Terjadi unplan breakdown dan catastropic failure
5. Inspect and test MCCB and main contactor
6. Verification thermal over load relay
7. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
3. Inspect enclosure, power and control cable
PIR TA 2017 Post Implementation Review Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus
933 200-MCC-101A Low voltage 0.4KV MCC di SS 200 Internal inspection and periodic maintenance 0 1 0 0 4. Inspect and test air circuit breaker
IOM-REL-003 Pengajuan Job List TA 2022 dalam kondisi shutdown/ Terjadi unplan breakdown dan catastropic failure
5. Inspect and test MCCB and main contactor
6. Verification thermal over load relay
7. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
3. Inspect enclosure, power and control cable
PIR TA 2017 Post Implementation Review Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus
934 200-MCC-101B Low voltage 0.4KV MCC di SS 200 Internal inspection and periodic maintenance 0 1 0 0 4. Inspect and test air circuit breaker
IOM-REL-003 Pengajuan Job List TA 2022 dalam kondisi shutdown/ Terjadi unplan breakdown dan catastropic failure
5. Inspect and test MCCB and main contactor
6. Verification thermal over load relay
7. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
3. Inspect enclosure, power and control cable
PIR TA 2017 Post Implementation Review Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus
935 200-MCC-102 Low voltage 0.4KV MCC di SS 200 Internal inspection and periodic maintenance 0 1 0 0 4. Inspect and test air circuit breaker
IOM-REL-003 Pengajuan Job List TA 2022 dalam kondisi shutdown/ Terjadi unplan breakdown dan catastropic failure
5. Inspect and test MCCB and main contactor
6. Verification thermal over load relay
7. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
3. Inspect enclosure, power and control cable
PIR TA 2017 Post Implementation Review Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus
936 200-MCC-102A Low voltage 0.4KV MCC di SS 200 Internal inspection and periodic maintenance 0 1 0 0 4. Inspect and test air circuit breaker
IOM-REL-003 Pengajuan Job List TA 2022 dalam kondisi shutdown/ Terjadi unplan breakdown dan catastropic failure
5. Inspect and test MCCB and main contactor
6. Verification thermal over load relay
7. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
3. Inspect enclosure, power and control cable
PIR TA 2017 Post Implementation Review Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus
937 200-MCC-102B Low voltage 0.4KV MCC di SS 200 Internal inspection and periodic maintenance 0 1 0 0 4. Inspect and test air circuit breaker
IOM-REL-003 Pengajuan Job List TA 2022 dalam kondisi shutdown/ Terjadi unplan breakdown dan catastropic failure
5. Inspect and test MCCB and main contactor
6. Verification thermal over load relay
7. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
3. Inspect enclosure, power and control cable
PIR TA 2017 Post Implementation Review Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus
938 200-MCC-103 Low voltage 0.4KV MCC di SS 200 Internal inspection and periodic maintenance 0 1 0 0 4. Inspect and test air circuit breaker
IOM-REL-003 Pengajuan Job List TA 2022 dalam kondisi shutdown/ Terjadi unplan breakdown dan catastropic failure
5. Inspect and test MCCB and main contactor
6. Verification thermal over load relay
7. Check and verification CT / PT
1. Isolated of power supply and put in rack out position
2. Inspect jointing and re tighten bus bar
3. Inspect enclosure, power and control cable
PIR TA 2017 Post Implementation Review Inspection dan periodic maintenance tidak bisa di lakukan dalam kondisi energize dan harus
939 200-MCC-103A Low voltage 0.4KV MCC di SS 200 Internal inspection and periodic maintenance 0 1 0 0 4. Inspect and test air circuit breaker
IOM-REL-003 Pengajuan Job List TA 2022 dalam kondisi shutdown/ Terjadi unplan breakdown dan catastropic failure
5. Inspect and test MCCB and main contactor
6. Verification thermal over load relay
7. Check and verification CT / PT