Power plant : PLTU Tembilahan


Record Number : 1675962000 STATUS
Equipment : Secondary Air Fan 1A
Asset Register : 170605TM10HLB30AN002
CRITICAL
VESO : Essential
Test date : 10-02-2023

DATA EQUIPMENT STANDARD EPRI


Manufacturer :
Capacity :
Power :
Rotation :
Voltage :
Current :

OVERALL THERMOGRAPHY OPERATING CONDITIONS


Point Value (°C) Parameter Unit Value
Winding 36.7
Fasa R Outgoing 34.9
Fasa S Outgoing 34.4
Fasa T Outgoing 36.0
Bearing M1 37.8
Bearing M2 37.8
Bearing F1 74.8
Bearing F2 124.1
PHOTO 1 PHOTO 2

Caption 1 Caption 2

TRENDING
PT. PEMBANGKITAN JAWA BALI
Form number : FM-KP-4.1.4.05
SERVICES
SIAP INTEGRATED MANAGEMENT
Revised status :1
SYSTEM
Date of issue : 01-02-2018
THERMOGRAPHY REPORT
Page : 1/2

140
Bearing M1
Bearing M2
120 Bearing F1
Bearing F2
Winding
Fasa R Outgoing
100
Fasa S Outgoing
Fasa T Outgoing
Value

80

60

40

20

ANALYSIS RECOMMENDATION
Terjadi over temperature di permukaan bearing fan sisi NDE
1. Monitoring temperature permukaan bearing fan NDE
mencapai 124 derajat Celcius
2. Lakukan pengecekan kondisi bearing & cleareance pada MO
Delta temperature antara permukan bearing fan DE & NDE > 40
terdekat
derajat Celcius
3. Lakukan pengecekan & perbaikan kondisi isolasi ducting SA
Indikasi radiasi dari panas sekitar SA Fan (kemungkinan pengaruh
Fan saat MO terdekat
dari udara pembakaran FD Fan yang menuju furnace)

CBA
Kerugian unit derating akibat SA Fan rusak.

Asumsi derating 4MW selama 12 jam dan harga jual listrik Rp 1.655:

= Rp 79.440.000

Biaya pelaksanaan FDT.

Estimasi biaya penggantian bearing dan biaya pemeliharaan lainnya: Rp 40.000.000

Saving:

Rp 39.440.000