Professional Documents
Culture Documents
5021 Road Design For Construction
5021 Road Design For Construction
W S
PC: 26
263+
263+1
P123
W
PT: 26
180.0
3+164
E
60.00
263
PT
3+144
N
263+340.00
:
+14
E
2
.32
63
PT:
26
P126
+1
.00
3+
N
.1
91
2
2
6
2
263+
.37
00
3+34
.0
26
MAT
263+
3+
360.
300.0
6.86
32
SE
0
263+
2
CHL
0.0
MAT
RV
63
00
PC
263+420
PT: 2 CH
PT: 263
ICE
0
LINE
263+400.00
22
380.
63+2
:
INE
-39
RO
2
9
0.0
26 2.79
63+
AD
-38
00
3+
0
28
387.
+414.37
.00
0.0
26
PC: 2
263+253.0
0
3+
63+3
02
06.52
240
.00
MATCH
263+
300.0
0
MANGO & UNKNOWN TREES 0
MAT
PC
TO BE RETAINED CHLI
LINE-40
:2
P125 NE-3
PT
9
63
PC
:2
+2
63
:2
76
TO BE DEMOLISHED. PROPOSED SM HW ON BOTH
+2
6
.62
3
71
P127
+2
SIDE L=2.50m.
.57
263+260
42
.29
PROPOSED STONE MASONRY SLOPE
P124 PROTECTION STRUCTURE L=7.0m
.00
S:263+254.50 - E:263+261.50
TO BE DEMOLISHED. PROPOSED SM HW AT BS L=2.5m.
221.000 216.000
BVCE = 212.44
EVCE = 212.44
PVI ELEV = 217.12 PVI ELEV = 212.44 PVI ELEV = 212.44
BVCE = 211.34
EVCE = 219.72
EVCE = 215.79
EVCE = 211.34
Mo = 0.316 Mo = 0.501 Mo = -0.275
BVC STA. 263+150.00
218.028 218.502
215.968 216.534
214.756 215.118
213.462 213.836
212.435 212.945
212.002 212.606
211.880 212.499
211.965 212.443
212.043 212.443
212.237 212.443
212.417 212.432
211.977 212.168
211.167 211.552
210.361 210.835
210.453 210.627
MATCHLINE-21
MATCHLINE-20
FINISHED
GRADE
EXISTING
GRADE
VERTICAL
g = -13.00% LVC = 40.00 g = -6.69% LVC = 60.00 g = 0.00% LVC = 50.00 g = -4.40% LVC = 50.00
GEOMETRY
PROVINCIAL GOVERNMENT: PREPARED: CHECKED AND SUBMITTED: APPROVAL RECOMMENDED : APPROVED: PROJECT TITLE: SHEET CONTENTS: SHEET NO:
BAYOMBONG, NUEVA VIZCAYA ENGINEER II ENGINEER III ACTING PROVINCIAL ENGINEER GOVERNOR LOCATION: DUPAX DEL SUR & ARITAO, NUEVA VIZCAYA SEPTEMBER 2020