DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED TRIPLE ROOMS ECD (27.6X9)
Education Facilities
Item Description Qnty Unit Rate Kshs
EARTHWORKS
CONCRETE
Carried to Collection
C Column bases 0 CM
D Substructural columns 0 CM
Reinforcement
F 8 mm Bars 0 KG
G 8 mm Bars 0 KG
H 10 mm Bars 485 KG
Carried to Collection
Sawn formwork: to
Walls
Hardcore
Murram Fill
Carried to Collection
Anti-termite Treatment
Blinding
DPM
Plinth Finishes
D Plinths: externally 42 SM
E Plinths: externally 42 SM
Carried to Collection
Collection
From page 1
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 20 Lm
Carried to Collection
A 200 mm wide 15 Lm
B 150 mm wide 0 Lm
C 100 mm wide 0 Lm
Carried to Collection
Collection
From page 6
From page 7
Steel reinforcement
B 8 mm Bars 144 Kg
C 12 mm Bars 331 Kg
Sawn formwork: to
ROOF STRUCTURE
ROOF COVERING
Carried to collection
Rainwater goods
Wrot cypress
Carried to collection
Collection
From page 9
From page 10
From page 11
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 38 Lm
I 25 mm Quadrant 38 Lm
Carried to collection
Ironmongery
Carried to collection
Collection
From page 13
From page 14
Wrot hardwood
D 50 x 25mm battern 25 Lm
E 12mm beading 25 Lm
Carried to collection
Windows
Burglar proofing
Carried to collection
B Ditto externally 25 Sm
Collection
From page 16
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
A
15mm thick: to walls and concrete: externally to receive paint 140 Sm
Key pointing
Ceiling Finishes
D Soffits 271 Sm
Cornice
Carried to Collection
A Soffits 271 Sm
Collection
From page 20
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
EARTHWORKS
CONCRETE
Carried to Collection
C Column bases 0 CM
D Substructural columns 0 CM
Reinforcement
F 8 mm Bars 0 KG
G 8 mm Bars 0 KG
H 10 mm Bars 216 KG
Carried to Collection
Sawn formwork: to
Walls
Hardcore
Murram Fill
Carried to Collection
Blinding
DPM
Plinth Finishes
D Plinths: externally 13 SM
E Plinths: externally 13 SM
Carried to Collection
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 0 Sm
Carried to Collection
A 200 mm wide 38 Lm
B 150 mm wide 0 Lm
C 100 mm wide 0 Lm
Carried to Collection
From page 6
From page 7
Steel reinforcement
B 8 mm Bars 70 Kg
C 12 mm Bars 194 Kg
Sawn formwork: to
ROOF STRUCTURE
ROOF COVERING
Carried to collection
Wrot cypress
Carried to collection
From page 9
From page 10
From page 11
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 7.5 Lm
I 25 mm Quadrant 7.5 Lm
Carried to collection
Ironmongery
Carried to collection
From page 13
From page 14
Wrot hardwood
D 50 x 25mm battern 7 Lm
E 12mm beading 7 Lm
Carried to collection
Burglar proofing
Carried to collection
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
A
15mm thick: to walls and concrete: externally to receive paint 110 Sm
Key pointing
Ceiling Finishes
D Soffits 86 Sm
Cornice
Carried to Collection
A Soffits 86 Sm
From page 20
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
EARTHWORKS
CONCRETE
Carried to Collection
C Column bases 0 CM
D Substructural columns 0 CM
Reinforcement
F 8 mm Bars 0 KG
G 8 mm Bars 0 KG
H 10 mm Bars 216 KG
Carried to Collection
Sawn formwork: to
Walls
Hardcore
Murram Fill
Carried to Collection
Blinding
DPM
Plinth Finishes
D Plinths: externally 13 SM
E Plinths: externally 13 SM
Carried to Collection
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 0 Sm
Carried to Collection
A 200 mm wide 38 Lm
B 150 mm wide 0 Lm
C 100 mm wide 0 Lm
Carried to Collection
From page 6
From page 7
Steel reinforcement
B 8 mm Bars 70 Kg
C 12 mm Bars 194 Kg
Sawn formwork: to
ROOF STRUCTURE
ROOF COVERING
Carried to collection
Wrot cypress
Carried to collection
From page 9
From page 10
From page 11
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 7.5 Lm
I 25 mm Quadrant 7.5 Lm
Carried to collection
Ironmongery
Carried to collection
From page 13
From page 14
Wrot hardwood
D 50 x 25mm battern 7 Lm
E 12mm beading 7 Lm
Carried to collection
Burglar proofing
Carried to collection
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
A
15mm thick: to walls and concrete: externally to receive paint 110 Sm
Key pointing
Ceiling Finishes
D Soffits 86 Sm
Cornice
Carried to Collection
A Soffits 86 Sm
From page 20
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
EARTHWORKS
CONCRETE
Carried to Collection
C Column bases 0 CM
D Substructural columns 0 CM
Reinforcement
F 8 mm Bars 0 KG
G 8 mm Bars 0 KG
H 10 mm Bars 330 KG
Carried to Collection
Sawn formwork: to
Walls
Hardcore
Murram Fill
Carried to Collection
Blinding
DPM
Plinth Finishes
D Plinths: externally 58 LM
E Plinths: externally 58 Lm
Carried to Collection
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 0 Lm
Carried to Collection
B 150 mm wide 0 Lm
C 100 mm wide 0 Lm
Carried to Collection
From page 7
Steel reinforcement
B 8 mm Bars 100 Kg
C 12 mm Bars 216 Kg
Sawn formwork: to
ROOF STRUCTURE
ROOF COVERING
Carried to collection
Wrot cypress
Carried to collection
From page 10
From page 11
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 26 Lm
I 25 mm Quadrant 26 Lm
Carried to collection
Ironmongery
Carried to collection
From page 14
Wrot hardwood
D 50 x 25mm battern 12 Lm
E 12mm beading 12 Lm
Carried to collection
Burglar proofing
Carried to collection
B Ditto externally 17 Sm
From page 16
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
A
15mm thick: to walls and concrete: externally to receive paint 132 Sm
Key pointing
Ceiling Finishes
D Soffits 156 Sm
Cornice
Carried to Collection
A Soffits 156 Sm
From page 20
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
EARTHWORKS
CONCRETE
Carried to Collection
C Column bases 0 CM
D Substructural columns 0 CM
Reinforcement
F 8 mm Bars 0 KG
G 8 mm Bars 0 KG
H 10 mm Bars 485 KG
Carried to Collection
Sawn formwork: to
Walls
Hardcore
Murram Fill
Carried to Collection
Blinding
DPM
Plinth Finishes
D Plinths: externally 42 SM
E Plinths: externally 42 SM
Carried to Collection
From page 1
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 20 Lm
Carried to Collection
A 200 mm wide 15 Lm
B 150 mm wide 20 Lm
C 100 mm wide 0 Lm
Carried to Collection
From page 6
From page 7
Steel reinforcement
B 8 mm Bars 144 Kg
C 12 mm Bars 331 Kg
Sawn formwork: to
ROOF STRUCTURE
ROOF COVERING
Carried to collection
Wrot cypress
Carried to collection
From page 9
From page 10
From page 11
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 38 Lm
I 25 mm Quadrant 38 Lm
Carried to collection
Ironmongery
Carried to collection
From page 13
From page 14
Wrot hardwood
D 50 x 25mm battern 25 Lm
E 12mm beading 25 Lm
Carried to collection
Burglar proofing
Carried to collection
B Ditto externally 25 Sm
From page 16
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
A
15mm thick: to walls and concrete: externally to receive paint 140 Sm
Key pointing
Ceiling Finishes
D Soffits 271 Sm
Cornice
Carried to Collection
A Soffits 271 Sm
From page 20
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
EARTHWORKS
CONCRETE
Carried to Collection
C Column bases 0 CM
D Substructural columns 0 CM
Reinforcement
F 8 mm Bars 0 KG
G 8 mm Bars 0 KG
H 10 mm Bars 646 KG
Carried to Collection
Sawn formwork: to
Walls
Hardcore
Murram Fill
Carried to Collection
Blinding
DPM
Plinth Finishes
Carried to Collection
From page 1
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 0 Lm
Carried to Collection
B 150 mm wide 30 Lm
C 100 mm wide 0 Lm
Carried to Collection
From page 7
Steel reinforcement
B 8 mm Bars 185 Kg
C 12 mm Bars 413 Kg
Sawn formwork: to
ROOF STRUCTURE
ROOF COVERING
Carried to collection
Wrot cypress
Carried to collection
From page 9
From page 10
From page 11
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 52 Lm
I 25 mm Quadrant 52 Lm
Carried to collection
Ironmongery
Carried to collection
From page 14
Wrot hardwood
D 50 x 25mm battern 24 Lm
E 12mm beading 24 Lm
Carried to collection
Burglar proofing
Carried to collection
B Ditto externally 34 Sm
From page 16
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
A
15mm thick: to walls and concrete: externally to receive paint 170 Sm
Key pointing
Ceiling Finishes
D Soffits 271 Sm
Cornice
Carried to Collection
A Soffits 271 Sm
From page 20
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
EARTHWORKS
CONCRETE
C Ditto to steps 3 CM
Carried to Collection
F Entrance steps 20 CM
Reinforcement
F 8 mm Bars 0 KG
G 10 mm Bars 1350 KG
H 12 mm Bars 200 KG
Carried to Collection
Sawn formwork: to
D Side of steps 30 SM
Walls
Hardcore
Murram Fill
Carried to Collection
Blinding
DPM
Plinth Finishes
Carried to Collection
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 10 Lm
Carried to Collection
B 150 mm wide 40 Lm
C 100 mm wide 0 Lm
Carried to Collection
From page 7
B Columns 2.5 Cm
Steel reinforcement
C 8 mm Bars 570 Kg
D 12 mm Bars 1200 Kg
Sawn formwork: to
ROOF STRUCTURE
ROOF COVERING
Carried to collection
Wrot cypress
Carried to collection
From page 9
From page 10
From page 11
Panel doors
A 1050 x 1750 mm overall - double leaf but opened one side 8 No.
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
I 50 x 20 mm Architrave 102 Lm
J 25 mm Quadrant 102 Lm
Carried to collection
Ironmongery
Carried to collection
From page 13
From page 14
Wrot hardwood
D 50 x 25mm battern 74 Lm
E 12mm beading 74 Lm
Carried to collection
Burglar proofing
Carried to collection
B Ditto externally 90 Sm
From page 16
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
A
15mm thick: to walls and concrete: externally to receive paint 400 Sm
Key pointing
Ceiling Finishes
D Soffits 542 Sm
Cornice
Carried to Collection
A Soffits 542 Sm
From page 20
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
EARTHWORKS
CONCRETE
Carried to Collection
C Column bases 0 CM
D Substructural columns 0 CM
Reinforcement
F 8 mm Bars 0 KG
G 8 mm Bars 0 KG
H 10 mm Bars 220 KG
Carried to Collection
Sawn formwork: to
Walls
Hardcore
Murram Fill
Carried to Collection
Blinding
DPM
Plinth Finishes
D Plinths: externally 13 SM
E Plinths: externally 13 SM
Carried to Collection
From page 1
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 0 Sm
Carried to Collection
A 200 mm wide 38 Lm
B 150 mm wide 0 Lm
C 100 mm wide 0 Lm
Carried to Collection
From page 6
From page 7
Steel reinforcement
B 8 mm Bars 70 Kg
C 12 mm Bars 194 Kg
Sawn formwork: to
ROOF STRUCTURE
ROOF COVERING
Carried to collection
Wrot cypress
Carried to collection
From page 9
From page 10
From page 11
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 7.5 Lm
I 25 mm Quadrant 7.5 Lm
Carried to collection
Ironmongery
Carried to collection
From page 13
From page 14
Wrot hardwood
D 50 x 25mm battern 7 Lm
E 12mm beading 7 Lm
Carried to collection
Burglar proofing
Carried to collection
From page 16
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
A
15mm thick: to walls and concrete: externally to receive paint 110 Sm
Key pointing
Ceiling Finishes
D Soffits 86 Sm
Cornice
Carried to Collection
A Soffits 86 Sm
From page 20
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
EARTHWORKS
CONCRETE
Carried to Collection
C Column bases 0 CM
D Substructural columns 0 CM
Reinforcement
F 8 mm Bars 0 KG
G 8 mm Bars 0 KG
H 10 mm Bars 330 KG
Carried to Collection
Sawn formwork: to
Walls
Hardcore
Murram Fill
Carried to Collection
Blinding
DPM
Plinth Finishes
D Plinths: externally 58 LM
E Plinths: externally 58 Lm
Carried to Collection
From page 1
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 0 Lm
Carried to Collection
B 150 mm wide 0 Lm
C 100 mm wide 0 Lm
Carried to Collection
From page 7
Steel reinforcement
B 8 mm Bars 98 Kg
C 12 mm Bars 216 Kg
Sawn formwork: to
ROOF STRUCTURE
ROOF COVERING
Carried to collection
Wrot cypress
Carried to collection
From page 10
From page 11
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 26 Lm
I 25 mm Quadrant 26 Lm
Carried to collection
Ironmongery
Carried to collection
From page 13
From page 14
Wrot hardwood
D 50 x 25mm battern 12 Lm
E 12mm beading 12 Lm
Carried to collection
Burglar proofing
Carried to collection
B Ditto externally 17 Sm
From page 16
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
A
15mm thick: to walls and concrete: externally to receive paint 132 Sm
Key pointing
Ceiling Finishes
D Soffits 156 Sm
Cornice
Carried to Collection
A Soffits 156 Sm
From page 20
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
EARTHWORKS
CONCRETE
Carried to Collection
C Column bases 0 CM
D Substructural columns 0 CM
Reinforcement
F 8 mm Bars 0 KG
G 8 mm Bars 0 KG
H 10 mm Bars 485 KG
Carried to Collection
Sawn formwork: to
Walls
Hardcore
Murram Fill
Carried to Collection
Blinding
DPM
Plinth Finishes
D Plinths: externally 42 SM
E Plinths: externally 42 SM
Carried to Collection
From page 1
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 20 Lm
Carried to Collection
A 200 mm wide 15 Lm
B 150 mm wide 20 Lm
C 100 mm wide 0 Lm
Carried to Collection
From page 6
From page 7
Steel reinforcement
B 8 mm Bars 144 Kg
C 12 mm Bars 331 Kg
Sawn formwork: to
ROOF STRUCTURE
ROOF COVERING
Carried to collection
Wrot cypress
Carried to collection
From page 9
From page 10
From page 11
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 38 Lm
I 25 mm Quadrant 38 Lm
Carried to collection
Ironmongery
Carried to collection
From page 13
From page 14
Wrot hardwood
D 50 x 25mm battern 25 Lm
E 12mm beading 25 Lm
Carried to collection
Burglar proofing
Carried to collection
B Ditto externally 25 Sm
From page 16
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
A
15mm thick: to walls and concrete: externally to receive paint 140 Sm
Key pointing
Ceiling Finishes
D Soffits 271 Sm
Cornice
Carried to Collection
A Soffits 271 Sm
From page 20
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
EARTHWORKS
CONCRETE
Carried to Collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
A Ditto to column bases 0 SM
C Column bases 0 CM
D Substructural columns 0 CM
Reinforcement
F 8 mm Bars 0 KG
G 8 mm Bars 0 KG
H 10 mm Bars 425 KG
Carried to Collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Mesh reinforcement No. A142 weighing 2.22 kg per square
A metre: in floor slab: including all necessary supports: allow for
laps and bonding to existing slabs 145 SM
Sawn formwork: to
Walls
Hardcore
Murram Fill
Carried to Collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Anti-termite Treatment
Blinding
DPM
Plinth Finishes
D Plinths: externally 50 SM
E Plinths: externally 50 SM
Carried to Collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Collection
From page 1
From page 2
From page 3
From page 4
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
ELEMENT NO. 2: WALLING
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 0 Lm
Carried to Collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Bituminous hessian base to BS 743 type A: or other equal
approved damp-proof course: in cement/ sand (1:3) mortar
A 200 mm wide 15 Lm
B 150 mm wide 40 Lm
C 100 mm wide 0 Lm
Carried to Collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Collection
From page 6
From page 7
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
ELEMENT NO. 3: SUPERSTRUCTURE CONCRETE
A Columns 10.0 Cm
Steel reinforcement
B 8 mm Bars 180.0 Kg
C 12 mm Bars 480.0 Kg
Sawn formwork: to
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
ELEMENT NO. 4: ROOF
ROOF STRUCTURE
12mm diameter high density rag bolt 150mm long built into
H
beam: including nut and washer 100 No.
ROOF COVERING
I Roof covering 40 Sm
Carried to collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Rainwater goods
Galvanised iron metal sheet: gauge 24: pre-painted
Wrot cypress
Carried to collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Collection
From page 9
From page 10
From page 11
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
ELEMENT NO. 5: DOORS
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 100 Lm
I 25 mm Quadrant 100 Lm
Carried to collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Prepare surfaces and apply one coat (undercoat) and two
coats polyurethene clear lacquer paint as "Crown Paints" or
other equal approved: on wood surfaces: to
Ironmongery
Carried to collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Collection
From page 13
From page 14
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
ELEMENT NO.6: WINDOWS
Wrot hardwood
D 50 x 25mm battern 22 Lm
E 12mm beading 22 Lm
Carried to collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Windows
Burglar proofing
Carried to collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Prepare surfaces: apply undercoat and two finishing coats
first grade gloss paint as "Crown Paints" or other equal
approved metallic paint: on metal surfaces Burgler proofing
grilles: to
B Ditto externally 36 Sm
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Collection
From page 16
From page 17
From page 18
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
ELEMENT NO. 7: FINISHES
Floor finishes
Wrot Hardwood:
Carried to Collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
External wall finishes
A
15mm thick: to walls and concrete: externally to receive paint 150 Sm
Key pointing
Ceiling Finishes
D Soffits 126 Sm
Cornice
Carried to Collection
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Prepare surfaces and apply undercoat and two finishing coats
silk vinyl emulsion paint as " Crown Paints" or other equal
approved on gypsum ceiling surfaces: to
A Soffits 126 Sm
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
Collection
From page 20
From page 21
From page 22
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
ELEMENT NO.8: PRIME COST & PROVISIONAL SUMS
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 42 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
EARTHWORKS
CONCRETE
Carried to Collection
C Column bases 0 CM
D Substructural columns 0 CM
Reinforcement
F 8 mm Bars 0 KG
G 8 mm Bars 0 KG
H 10 mm Bars 545 KG
Carried to Collection
Sawn formwork: to
Walls
Hardcore
Murram Fill
Carried to Collection
Blinding
DPM
Plinth Finishes
D Plinths: externally 65 SM
E Plinths: externally 65 SM
Carried to Collection
From page 1
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 9 Lm
Carried to Collection
A 200 mm wide 20 Lm
B 150 mm wide 95 Lm
C 100 mm wide 0 Lm
Carried to Collection
From page 6
From page 7
A Columns 6.0 Cm
Steel reinforcement
B 8 mm Bars 225.0 Kg
C 12 mm Bars 600.0 Kg
Sawn formwork: to
ROOF STRUCTURE
Sawn cypress: second grade: clean: pre-treated with wood
preservative to engineers approval: including jointing and
connections as necessary
12mm diameter high density rag bolt 150mm long built into
H
beam: including nut and washer 125 No.
ROOF COVERING
Carried to collection
Wrot cypress
Carried to collection
From page 9
From page 10
From page 11
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 62 Lm
I 25 mm Quadrant 62 Lm
Carried to collection
Ironmongery
Carried to collection
From page 13
From page 14
Wrot hardwood
D 50 x 25mm battern 48 Lm
E 12mm beading 48 Lm
Carried to collection
Burglar proofing
Carried to collection
B Ditto externally 78 Sm
From page 16
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
A
15mm thick: to walls and concrete: externally to receive paint 331 Sm
Key pointing
Ceiling Finishes
D Soffits 277 Sm
Cornice
Carried to Collection
A Soffits 277 Sm
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
DEVELOPMENT OF STANDARDISED
DESIGNS FOR WASH AND BUILDING CONSTRUCTION PROJECTS
PROPOSED 90 BED DORMITORY
Accomodation Facilities
Item Description Qnty Unit Rate Kshs
EARTHWORKS
CONCRETE
Carried to Collection
C Column bases 0 CM
D Substructural columns 0 CM
Reinforcement
F 8 mm Bars 0 KG
G 8 mm Bars 0 KG
H 10 mm Bars 950 KG
Carried to Collection
Sawn formwork: to
Walls
Hardcore
Murram Fill
Carried to Collection
Blinding
DPM
Plinth Finishes
Carried to Collection
From page 1
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 9 Lm
Carried to Collection
A 200 mm wide 20 Lm
B 150 mm wide 95 Lm
C 100 mm wide 0 Lm
Carried to Collection
From page 6
From page 7
A Columns 10.0 Cm
Steel reinforcement
B 8 mm Bars 390.0 Kg
C 12 mm Bars 1050.0 Kg
Sawn formwork: to
ROOF STRUCTURE
12mm diameter high density rag bolt 150mm long built into
H
beam: including nut and washer 218 No.
ROOF COVERING
Carried to collection
Wrot cypress
Carried to collection
From page 9
From page 10
From page 11
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 102 Lm
I 25 mm Quadrant 102 Lm
Carried to collection
Ironmongery
Carried to collection
From page 13
From page 14
Wrot hardwood
D 50 x 25mm battern 48 Lm
E 12mm beading 48 Lm
Carried to collection
Burglar proofing
Carried to collection
B Ditto externally 78 Sm
Collection
From page 16
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
A
15mm thick: to walls and concrete: externally to receive paint 331 Sm
Key pointing
Ceiling Finishes
D Soffits 277 Sm
Cornice
Carried to Collection
A Soffits 277 Sm
From page 20
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
EARTHWORKS
CONCRETE
Carried to Collection
A Ditto to column bases 0 SM
C Column bases 0 CM
D Substructural columns 0 CM
Reinforcement
F 8 mm Bars 0 KG
G 8 mm Bars 0 KG
H 10 mm Bars 1187 KG
Carried to Collection
Mesh reinforcement No. A142 weighing 2.22 kg per square
A metre: in floor slab: including all necessary supports: allow for
laps and bonding to existing slabs 399 SM
Sawn formwork: to
Walls
Hardcore
Murram Fill
Carried to Collection
Anti-termite Treatment
Blinding
DPM
Plinth Finishes
Carried to Collection
Collection
From page 1
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 11 Lm
Carried to Collection
Bituminous hessian base to BS 743 type A: or other equal
approved damp-proof course: in cement/ sand (1:3) mortar
A 200 mm wide 25 Lm
C 100 mm wide 0 Lm
Carried to Collection
Collection
From page 6
From page 7
A Columns 12.5 Cm
Steel reinforcement
B 8 mm Bars 487.5 Kg
C 12 mm Bars 1312.5 Kg
Sawn formwork: to
ROOF STRUCTURE
12mm diameter high density rag bolt 150mm long built into
H beam: including nut and washer
273 No.
ROOF COVERING
Carried to collection
Rainwater goods
Wrot cypress
Carried to collection
Collection
From page 9
From page 10
From page 11
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 159 Lm
I 25 mm Quadrant 159 Lm
Carried to collection
Prepare surfaces and apply one coat (undercoat) and two
coats polyurethene clear lacquer paint as "Crown Paints" or
other equal approved: on wood surfaces: to
Ironmongery
Carried to collection
Collection
From page 13
From page 14
Wrot hardwood
D 50 x 25mm battern 60 Lm
E 12mm beading 60 Lm
Carried to collection
Windows
Burglar proofing
Carried to collection
Prepare surfaces: apply undercoat and two finishing coats
first grade gloss paint as "Crown Paints" or other equal
approved metallic paint: on metal surfaces Burgler proofing
grilles: to
B Ditto externally 98 Sm
From page 16
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
External wall finishes
Key pointing
Ceiling Finishes
D Soffits 433 Sm
Cornice
Carried to Collection
Prepare surfaces and apply undercoat and two finishing coats
silk vinyl emulsion paint as " Crown Paints" or other equal
approved on gypsum ceiling surfaces: to
A Soffits 541 Sm
From page 20
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
EARTHWORKS
CONCRETE
Carried to Collection
Reinforced concrete class 20/20: vibrated: in.
C Column bases 14 CM
D Ramp 4 CM
Reinforcement
F 8 mm Bars 0 KG
G 10 mm Bars 1800 KG
H 12 mm Bars 595 KG
Carried to Collection
Mesh reinforcement No. A142 weighing 2.22 kg per square
A metre: in floor slab: including all necessary supports: allow for
laps and bonding to existing slabs 1804 SM
Sawn formwork: to
D Sides: ramp 30 SM
Walls
Hardcore
Murram Fill
Carried to Collection
Anti-termite Treatment
Blinding
DPM
Plinth Finishes
D Plinths: externally 37 SM
E Plinths: externally 37 SM
Carried to Collection
Collection
From page 1
From page 2
From page 3
From page 4
EXTERNAL WALLS
INTERNAL WALLS
G Joint filler 42 Lm
Carried to Collection
Bituminous hessian base to BS 743 type A: or other equal
approved damp-proof course: in cement/ sand (1:3) mortar
B 150 mm wide 22 Lm
C 100 mm wide 0 Lm
Carried to Collection
Collection
From page 6
From page 7
A Columns 12.0 Cm
Steel reinforcement
B 8 mm Bars 620.0 Kg
C 12 mm Bars 1850.0 Kg
Sawn formwork: to
12mm diameter high density rag bolt 150mm long built into
H beam: including nut and washer
56 No.
ROOF COVERING
Carried to collection
ROOF STRUCTURE - STEEL SECTION
F 75 x 50 mm RHS member 63 Lm
10mm diameter high density rag bolt 250mm long built into
H beam: including nut and washer
44 No.
ROOF COVERING
Carried to collection
Rainwater goods
Wrot cypress
Carried to collection
Collection
From page 9
From page 10
From page 11
Panel doors
Flush doors
45 mm Thick flush door: Solid core hardwood veneer facing
to both sides: hardwood lipped edges
H 50 x 20 mm Architrave 225 Lm
I 25 mm Quadrant 225 Lm
Carried to collection
Prepare surfaces and apply one coat (undercoat) and two
coats polyurethene clear lacquer paint as "Crown Paints" or
other equal approved: on wood surfaces: to
Ironmongery
Carried to collection
Collection
From page 13
From page 14
Wrot hardwood
D 50 x 25mm battern 35 Lm
E 12mm beading 35 Lm
Carried to collection
Windows
Burglar proofing
Carried to collection
Prepare surfaces: apply undercoat and two finishing coats
first grade gloss paint as "Crown Paints" or other equal
approved metallic paint: on metal surfaces Burgler proofing
grilles: to
B Ditto externally 30 Sm
From page 16
From page 17
From page 18
Floor finishes
Wrot Hardwood:
Carried to Collection
External wall finishes
Key pointing
Ceiling Finishes
D Soffits 1804 Sm
Cornice
Carried to Collection
Prepare surfaces and apply undercoat and two finishing coats
silk vinyl emulsion paint as " Crown Paints" or other equal
approved on gypsum ceiling surfaces: to
A Soffits 1804 Sm
From page 20
From page 21
From page 22
ELECTRICAL WORKS
MECHANICAL WORKS
SEPTIC TANK
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
SUMMARY
1 SUBSTRUCTURES
2 WALLING
3 SUPERSTRUCTURE CONCRETE
4 ROOFING
5 DOORS
6 WINDOWS
7 FINISHES
Carried to Collection
Carried to Collection
H
Reinforced concrete grade 25/20 - 6000 X 600* 200mm m3 0.00
column footing
K
Reinforced concrete grade 25/20 in 300mm X 150Thk ring m3 0.50
beam
Carried to Collection
Formwork
Carried to Collection
Timber Work
All structure truss members shall be in seasoned eucalyptus
wood and painted two coats of anti termite solution and shall
be tight fixed with top tie beam with 6mm diameter plain bar.
Carried to Collection
2000 X 1000 steel door including locks and hinges to details No 1.00
A
1000 X 1000 steel swing window including locks and hinges No 1.00
B
to details
Carried to Collection
Carried to Collection
A
Pointing to all External wall surfaces with cement sand m2 16.00
mortar 1:2
D Provide three coats of gloss paint to all plastered wall faces m2 16.00
Carried to Collection
C 4" X 8 X 18" lining block to the site of the catch pit m 2.4
D 100mm thick mass concrete for catch pit base slab m2 0.4
Catch pit grating made from welded to form 25mm square No. 1
F
mesh on 50mm steel frame
Provide and install 4.0m3 approved plastic tank on top of the No. 1
I kiosk roof complete with all fitting and float valve
Carried to Collection
ELECTRICAL WORKS
MECHANICAL WORKS
TOTAL FOR PRIME COST & PROVISIONAL SUMS CARRIED TO BUILDERS WORK
SUMMARY
2 MASONRY WORK
3 CONCRETE WORK
4 CONCRETE ANCILLARIES
6 FINISHES
External Internal
177 154 331 Dinning hall
External
200
40
42
5.6
5.2
3.4
11.2
8
5
2.5
10.3
32.1
5
7.25
3
180.55
External Internal
8.1 8.1
4 20
2.8 9.2
7.9 2.8
11.8 7.9
7.9 4.7
2.2 1.2
3.2 9.2
12 18.8
8.1 3.2
3 36.8
1.5 15.8
11.2 1.7
4.5 12.8
11.8
100 152.2
50 x 150 mm Rafter: in trusses 95 9.5 8.5 16 140
154.9
Internal
200 150
80 5.5
24 9.6
11.7 2.6
5 2.5
6.6 1.6
2.5
3.5
8
60
2.2
5.3
3
25.2
6.7
243.7 21.8 446.05
8 32 107 40 40 496
12 54 130 30 30 677
0 20 0 0 57
18 0 80 40 40 266.5