IVB KL CARB Repsol - Prices - Simulation - 27 - 7 - 2013 - 05.52.36
IVB KL CARB Repsol - Prices - Simulation - 27 - 7 - 2013 - 05.52.36
Exchange Rate
Currency Name Symbol Short Text Distribution Type Min ML Max
US Dollars $ USD Spike 1.0000
Pounds Sterling £ GBP Spike 1.0000
Australian Dollars AU$ AUD Spike 1.0000
Norway Kroner kr NOK Spike 1.0000
Euro € EUR Spike 1.0000
Depth
Feature Name Distribution Type Min ML Max Comments
Rig Move and Rig Up Rig capacity
Slab :2,000 HP
on surface
12 1/4" Hole section Spike 400 Circulation
Cased Hole losses
Wireline Logging -12 1/4" Hole Spike 400 - GR with Cement Evaluation Log Tool during the acquisition of logs of 16” hole
9 5/8" Casing to 400 Spike 400 Low ROP while drilling Visean
8 1/2" Hole Section Spike 1600 -Gas presence
Resistivity log in front of Visean-B and Tournaisian intervals
Wireline Logging 8 1/2" Hole Spike 1600 - Four-arm Caliper
7" Casing Spike 1600 0,46% of CO2 in gas composition
6" Hole Spike 2500 Very low
Open ROP
Hole belowProgram
Optional Tournasian
(special logs)
Wireline Logging 6" Hole Spike 2500
4 1/2" Liner Spike 2500
Well test Spike 2500 The completion phase will finish when the Christmas tree is tested
Completion Spike 2500 -Completion fluid as per BOD. Filtration unit and specialist will be at rig site during completion phase
Rig Release
Variable
Pre-defined Event Name Unit Type Distribution Type A B C Comments
Running 7" Liner Trip-Csg(Jts/Hr) PERT (Min, ML, Max) 7 10 15
Tripping speed for drill pipe in open hole Trip-DP(Std/Hr) PERT (Min, ML, Max) 8 12 15
Tripping speed for drill pipe in cased hole Trip-DP(Std/Hr) PERT (Min, ML, Max) 12 15 18
Running 9 5/8" casing Trip-Csg(Jts/Hr) PERT (Min, ML, Max) 9 11 17
Running 7" Liner Trip-Csg(Jts/Hr) PERT (Min, ML, Max) 6 9 24
Running 4 1/2" Liner Hours PERT (Min, ML, Max) 6 9 24
Predefined Event 4 Hours
Predefined Event 5 Hours
Distribution
Name Prob Risk Type Distribution Type A B C Phase
Rig Repair 100 Days PERT (Min, ML, Max) 2.5 6.28 12 3,6,9
Waiting on equipment 40 Days PERT (Min, ML, Max) 1 1.5 2.5 13
WOW 10 Days Spike (ML) 1 3,4,5,6,7,8,9,10,11,12,13
Explosives 100 Days PERT (Min, ML, Max) 2 7 12 12
NPT (excluding Rig repair) 40 Percentage Spike (ML) 1 3,6,9
P0
P10
P20
P30
P40
P50
P60
P70
P80
P90
P100
70 75 80 85 90 95 100 105 110
Time [Days]
P0
P10
P20
P30
P40
P50
P60
P70
P80
P90
P100
16,184,662 17,184,662 18,184,662 19,184,662 20,184,662 21,184,662 22,184,662 23,184,662
Costs [US Dollars]
5
Probability [%]
0
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
- 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 7 - 8 - 8 - 8 - 8 - 8 - 8 - 8 - 8 - 8 - 8 - 9 - 9 - 9 - 9 - 9 - 9 - 9 - 9 - 9 - 9 - 10 - 10 - 10 - 10 - 10 - 10 - 10 - 10 - 10 - 10 - 11 - 11 - 11 - 11 - 11 - 11 - 11 - 11 - 11 - 11 - 12 - 12
7 7 7 2 7 3 7 4 7 5 7 6 7 7 7 8 7 9 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1 9 2 9 3 9 4 9 5 9 6 9 7 9 8 9 9 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20
0 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Time [Days]
14
12
Probability [%]
10
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6 50 7 00 7 50 8 00 8 50 9 00 9 50 0 00 0 50 1 00 1 50 2 00 2 50 3 00 3 50 4 00 4 50 5 00 5 50
-1 -1 -1 -1 -1 -1 -1 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
00 50 00 50 00 50 00 50 00 50 00 50 00 50 00 50 00 50 00
16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25
Cost [US Dollars k]
0 5 10 15 20 25 30
Well Test
Completion
Well Test
Completion
0 20 40 60 80 100 120
Well Test
Completion
0 00 00 00 00
, 00 0 ,0 0 ,0 0 ,0 0 ,0
0 00 , 00 , 00 , 00 , 00
0 5, 10 15 20 25
Well Test
Completion
0
Measured Depth (m)
500
1,000
P10
1,500 P50
P90
2,000
2,500
3,000
0 20 40 60 80 100 120
Time [Days]
0
Measured Depth (m)
500
1,000
P10
1,500 P50
P90
2,000
2,500
3,000
0 5,000,000 10,000,000 15,000,000 20,000,000 25,000,000
Cost [US Dollars]
Pre Install Conductor 20" Conductor pipe will be installed during the wellsite construction at +/-15m TVD
Events
Costs
Well Site Supervision
Drilling Supervisors
Project Management
Security Services
Waste Management
Fuel and Lubricants
Catering and Lodging
Catering & Lodging (not incl. in other contract)
Communication Systems
Logistic Base
Air Transportation
Rig Mob/Demb
Transportation of Repsol 3rd Party Equipment
Surface Rental Equipment
Solids Control
Directional Drilling
Personnel
Downhole Drilling rental tools Redress Charges
D.H.T- 12 1/4"
D.H.T- 8 1/2"
D.H.T 6"
Liner Hangers
Cementing Services
Equipment
Personnel
Cementing services initial mobilization
Cement Slurry
9 5/8"
7"
4 1/2"
Wellhead
Personnel
Wellhead Equipment
Casing Hanger
Drilling Fluids
Personnel
Mud Chemicals
Casing & Accessories
9 5/8"
7"
4 1/2"
Casing/ Tubing Running Services
9 5/8"
7"
4 1/2" Casing
Casing running Personnel
TAM- Tools Rental
Tubing run services
Inspections
Mud Logging
Mud Logging Services
Unit + personnel
Mud Logging services mobilization
Drilling Rig
Water Supply
Fishing Tools
Bits
8 1/2" Bits
6" Bits
Rig up slickline and set plug body and prong 8.89 10.20 11.76 Rig up slickline and set plug body and prong in lower nipple - Pressure tubing string to set packer - Annulus test above packer
Increase pressure to Max Setting Pressure in 1000psi increments and hold for 30mins, pressure annulus to confirm set, if no test POOH
Unable to set Production Packer at first attempt 0.00 0.00 0.00 and Run Back-Up Packer
Pressure test the hanger seals 2.47 3.10 3.94 Pressure test the hanger seals then lock down the tubing hanger, Pull test on hanger.
Mean P5 P10 P15 P20 P25 P30 P35 P40 P45 P50 P55 P60 P65 P70 P75 P80 P85 P90 P95 Depth To
Pre Install Conductor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
Mobilization and Rig Up 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 0
12 1/4" Hole section to 400m 6.39 5.02 5.28 5.50 5.69 5.85 5.96 6.07 6.19 6.29 6.41 6.52 6.61 6.73 6.86 6.97 7.09 7.23 7.37 7.69 400
Wireline Logging - 12 1/4" hole section 0.73 0.59 0.61 0.63 0.65 0.66 0.68 0.69 0.70 0.71 0.72 0.74 0.75 0.76 0.77 0.80 0.81 0.83 0.86 0.89 400
9 5/8" , 53.5ppf P110 ,BTC 3.21 2.46 2.59 2.66 2.74 2.82 2.89 2.97 3.04 3.12 3.20 3.26 3.32 3.38 3.45 3.53 3.63 3.74 3.92 4.19 400
8 1/2" Hole section to 1600m 12.79 9.39 10.17 10.62 10.94 11.20 11.55 11.87 12.12 12.39 12.62 12.89 13.17 13.46 13.81 14.11 14.61 15.11 15.87 16.63 1,600
Wireline Logging - 8 1/2" section 1.90 1.57 1.62 1.67 1.71 1.74 1.77 1.80 1.82 1.85 1.88 1.91 1.94 1.97 2.00 2.05 2.10 2.14 2.20 2.28 1,600
7", 32 ppf, P-110, Premium 4.10 3.06 3.23 3.35 3.46 3.55 3.66 3.75 3.84 3.92 4.02 4.12 4.24 4.33 4.45 4.57 4.72 4.89 5.06 5.39 1,600
Drill 6"hole to 2500m 13.22 9.64 10.39 10.83 11.18 11.51 11.97 12.24 12.58 12.83 13.11 13.41 13.68 14.00 14.37 14.66 15.09 15.62 16.13 17.30 2,500
Wireline Logging 6" hole section 2.64 2.17 2.24 2.30 2.35 2.41 2.46 2.50 2.55 2.60 2.64 2.68 2.72 2.76 2.81 2.84 2.90 2.97 3.04 3.16 2,500
4 1/2",13% Cr 110 gas tight conn, Liner 3.20 2.32 2.47 2.60 2.70 2.77 2.84 2.91 3.00 3.06 3.15 3.22 3.29 3.37 3.47 3.55 3.67 3.82 4.02 4.29 2,500
Well Test 20.37 15.81 16.70 17.26 17.79 18.20 18.73 19.05 19.39 19.74 20.09 20.37 20.78 21.14 21.70 22.20 22.89 23.54 24.42 25.88 2,500
Completion 7.81 5.81 6.11 6.37 6.58 6.74 6.91 7.11 7.30 7.47 7.66 7.83 8.00 8.18 8.35 8.54 8.91 9.20 9.77 10.44 2,500
Rig Down and Rig Release 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,500
Mean P5 P10 P15 P20 P25 P30 P35 P40 P45 P50 P55 P60 P65 P70 P75 P80 P85 P90 P95 Depth To
Pre Install Conductor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
Mobilization and Rig Up 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 0
12 1/4" Hole section to 400m 21.39 20.02 20.28 20.50 20.69 20.85 20.96 21.07 21.19 21.29 21.41 21.52 21.61 21.73 21.86 21.97 22.09 22.23 22.37 22.69 400
Wireline Logging - 12 1/4" hole section 22.12 20.67 20.93 21.17 21.39 21.52 21.65 21.77 21.90 22.02 22.14 22.26 22.36 22.48 22.61 22.75 22.88 23.02 23.21 23.49 400
9 5/8" , 53.5ppf P110 ,BTC 25.33 23.27 23.67 23.97 24.21 24.42 24.63 24.83 24.97 25.15 25.34 25.52 25.67 25.85 26.03 26.23 26.40 26.65 26.96 27.51 400
8 1/2" Hole section to 1600m 38.12 33.45 34.23 34.88 35.46 35.93 36.40 36.77 37.15 37.41 37.88 38.33 38.74 39.18 39.62 40.11 40.63 41.51 42.27 43.51 1,600
Wireline Logging - 8 1/2" section 40.02 35.13 35.90 36.60 37.24 37.74 38.20 38.59 38.99 39.27 39.70 40.25 40.69 41.12 41.61 42.07 42.74 43.60 44.37 45.72 1,600
7", 32 ppf, P-110, Premium 44.12 38.40 39.33 40.03 40.79 41.34 41.92 42.42 42.85 43.39 43.76 44.34 44.89 45.49 46.02 46.49 47.31 48.26 49.16 50.71 1,600
Drill 6"hole to 2500m 57.34 49.27 50.60 51.70 52.55 53.60 54.32 54.98 55.62 56.26 56.97 57.70 58.39 59.04 59.88 60.83 61.85 63.05 64.20 66.93 2,500
Wireline Logging 6" hole section 59.98 51.49 52.93 53.99 55.03 56.06 56.80 57.49 58.17 58.82 59.64 60.37 61.07 61.80 62.57 63.72 64.74 65.93 67.16 69.99 2,500
4 1/2",13% Cr 110 gas tight conn, Liner 63.18 53.89 55.56 56.61 57.70 58.80 59.75 60.48 61.19 61.99 62.72 63.54 64.34 65.12 66.09 67.17 68.40 69.59 71.09 74.30 2,500
Well Test 83.55 71.15 73.11 75.00 76.07 77.50 78.64 79.72 80.97 82.16 83.18 84.17 85.22 86.40 87.75 88.95 90.51 92.14 94.17 97.63 2,500
Completion 91.36 77.38 80.31 82.09 83.31 84.94 86.20 87.17 88.45 89.72 90.97 92.03 93.16 94.51 96.10 97.37 99.08 100.72 102.83 106.90 2,500
Rig Down and Rig Release 91.36 77.38 80.31 82.09 83.31 84.94 86.20 87.17 88.45 89.72 90.97 92.03 93.16 94.51 96.10 97.37 99.08 100.72 102.83 106.90 2,500
Mean P5 P10 P15 P20 P25 P30 P35 P40 P45 P50 P55 P60 P65 P70 P75 P80 P85 P90 P95 Depth To
Pre Install Conductor 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Mobilization and Rig Up 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 0
12 1/4" Hole section to 400m 1,063,037 860,681 898,449 931,024 960,200 982,583 999,226 1,016,073 1,033,875 1,048,824 1,066,257 1,083,006 1,097,123 1,114,281 1,132,637 1,149,263 1,167,307 1,187,961 1,209,451 1,257,188 400
Wireline Logging - 12 1/4" hole section 139,501 118,705 122,326 125,022 127,397 129,480 131,596 133,242 135,041 136,536 138,456 140,339 141,675 143,624 146,005 149,077 151,535 154,519 158,059 163,270 400
9 5/8" , 53.5ppf P110 ,BTC 725,472 608,575 627,475 638,607 651,311 664,445 675,149 687,623 698,852 710,837 723,213 731,983 742,076 751,238 763,161 774,428 790,711 807,261 836,020 876,993 400
8 1/2" Hole section to 1600m 2,354,285 1,857,437 1,971,437 2,036,620 2,084,673 2,121,636 2,173,240 2,218,500 2,255,739 2,295,507 2,328,208 2,369,559 2,409,073 2,452,045 2,503,450 2,545,315 2,620,623 2,691,972 2,806,984 2,914,660 1,600
Wireline Logging - 8 1/2" section 602,275 553,984 561,397 568,495 573,878 579,007 582,566 586,717 591,092 594,765 599,173 604,386 608,549 612,924 617,588 624,252 631,810 638,277 646,973 658,104 1,600
7", 32 ppf, P-110, Premium 1,063,570 899,580 926,426 945,986 963,240 977,212 993,462 1,007,893 1,022,568 1,034,509 1,051,395 1,067,458 1,085,152 1,100,621 1,118,896 1,138,195 1,160,836 1,189,132 1,215,021 1,267,726 1,600
Drill 6"hole to 2500m 2,369,934 1,822,717 1,937,577 2,004,309 2,057,885 2,108,522 2,177,712 2,220,184 2,271,336 2,312,102 2,352,935 2,398,115 2,439,102 2,490,166 2,545,896 2,591,050 2,657,017 2,734,884 2,812,422 2,990,249 2,500
Wireline Logging 6" hole section 807,398 737,945 748,977 757,391 766,013 773,587 780,684 787,356 793,783 801,653 807,382 813,203 819,216 825,385 832,037 837,395 845,467 855,199 866,688 883,887 2,500
4 1/2",13% Cr 110 gas tight conn, Liner 1,252,172 1,070,384 1,099,799 1,128,189 1,148,511 1,164,108 1,178,503 1,193,025 1,211,569 1,224,693 1,242,800 1,257,032 1,271,497 1,288,722 1,307,916 1,325,473 1,349,657 1,382,682 1,423,012 1,480,274 2,500
Well Test 5,161,079 4,054,857 4,269,873 4,406,370 4,533,767 4,633,647 4,763,114 4,839,045 4,923,003 5,007,042 5,092,275 5,160,867 5,259,772 5,345,883 5,483,276 5,603,864 5,770,481 5,928,326 6,142,118 6,495,625 2,500
Completion 1,973,195 1,650,644 1,699,427 1,740,396 1,774,641 1,800,503 1,829,003 1,860,256 1,892,228 1,919,210 1,949,110 1,976,783 2,003,513 2,033,907 2,061,218 2,092,073 2,150,503 2,198,062 2,288,987 2,397,617 2,500
Rig Down and Rig Release 84,880 84,880 84,880 84,880 84,880 84,880 84,880 84,880 84,880 84,880 84,880 84,880 84,880 84,880 84,880 84,880 84,880 84,880 84,880 84,880 2,500
Mean P5 P10 P15 P20 P25 P30 P35 P40 P45 P50 P55 P60 P65 P70 P75 P80 P85 P90 P95 Depth To
Pre Install Conductor 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Mobilization and Rig Up 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 2,364,978 0
12 1/4" Hole section to 400m 3,428,015 3,225,659 3,263,427 3,296,002 3,325,178 3,347,561 3,364,204 3,381,051 3,398,853 3,413,802 3,431,235 3,447,984 3,462,101 3,479,259 3,497,615 3,514,241 3,532,285 3,552,939 3,574,429 3,622,166 400
Wireline Logging - 12 1/4" hole section 3,567,516 3,351,948 3,391,809 3,427,078 3,458,839 3,478,807 3,497,409 3,515,900 3,534,866 3,553,200 3,570,308 3,588,878 3,602,860 3,621,107 3,640,059 3,661,012 3,679,740 3,701,449 3,728,635 3,769,802 400
9 5/8" , 53.5ppf P110 ,BTC 4,292,989 3,981,872 4,041,650 4,087,196 4,124,174 4,155,701 4,186,296 4,217,362 4,237,688 4,264,985 4,293,817 4,320,838 4,343,190 4,368,937 4,396,904 4,428,010 4,454,486 4,493,778 4,536,194 4,621,306 400
8 1/2" Hole section to 1600m 6,647,274 5,955,549 6,068,858 6,165,983 6,252,810 6,324,585 6,392,536 6,447,687 6,503,352 6,544,275 6,610,482 6,677,106 6,739,347 6,802,655 6,867,003 6,940,988 7,017,810 7,150,095 7,257,967 7,445,410 1,600
Wireline Logging - 8 1/2" section 7,249,549 6,527,536 6,637,542 6,744,182 6,838,497 6,914,264 6,979,822 7,037,242 7,094,621 7,138,629 7,201,391 7,282,665 7,350,516 7,409,612 7,484,525 7,550,252 7,651,724 7,775,405 7,892,292 8,086,452 1,600
7", 32 ppf, P-110, Premium 8,313,119 7,462,826 7,597,316 7,704,404 7,817,959 7,900,917 7,985,727 8,054,595 8,127,018 8,205,163 8,263,071 8,345,193 8,428,409 8,514,837 8,600,433 8,667,311 8,789,786 8,929,946 9,071,138 9,291,126 1,600
Drill 6"hole to 2500m 10,683,054 9,464,392 9,674,481 9,828,191 9,968,643 10,112,877 10,230,897 10,325,920 10,423,328 10,513,614 10,633,080 10,731,401 10,842,173 10,942,915 11,070,925 11,208,211 11,351,559 11,548,652 11,723,977 12,120,029 2,500
Wireline Logging 6" hole section 11,490,451 10,206,355 10,431,837 10,592,840 10,745,472 10,896,538 11,008,778 11,126,187 11,215,629 11,321,817 11,440,399 11,549,177 11,650,027 11,767,621 11,878,648 12,047,240 12,198,639 12,389,403 12,566,315 12,989,766 2,500
4 1/2",13% Cr 110 gas tight conn, Liner 12,742,624 11,289,414 11,565,003 11,722,707 11,893,728 12,058,563 12,208,779 12,321,156 12,432,559 12,553,683 12,676,815 12,800,271 12,919,336 13,048,837 13,185,465 13,367,077 13,557,330 13,714,648 13,972,259 14,469,329 2,500
Well Test 17,903,703 15,671,593 16,010,514 16,342,320 16,596,056 16,806,018 16,979,480 17,199,414 17,413,783 17,650,280 17,846,859 18,023,283 18,207,549 18,415,195 18,631,717 18,896,564 19,188,524 19,444,988 19,824,937 20,557,022 2,500
Completion 19,876,898 17,449,163 17,892,372 18,187,892 18,457,559 18,741,912 18,914,097 19,147,548 19,370,972 19,597,504 19,816,811 19,998,823 20,214,334 20,423,461 20,682,932 20,979,164 21,290,451 21,565,953 21,913,237 22,571,636 2,500
Rig Down and Rig Release 19,961,778 17,534,043 17,977,252 18,272,772 18,542,439 18,826,792 18,998,977 19,232,428 19,455,852 19,682,384 19,901,691 20,083,703 20,299,214 20,508,341 20,767,812 21,064,044 21,375,331 21,650,833 21,998,117 22,656,516 2,500
Time Range [days] Probability (%) Cost Range [US Dollars k] Probability (%)
70 - 71 0.2 16000 - 16500 0.7
71 - 72 0.4 16500 - 17000 1.2
72 - 73 0.3 17000 - 17500 2.8
73 - 74 0.4 17500 - 18000 5.5
74 - 75 0.6 18000 - 18500 9.1
75 - 76 1.1 18500 - 19000 10.7
76 - 77 0.9 19000 - 19500 11.1
77 - 78 2.1 19500 - 20000 12.5
78 - 79 1.5 20000 - 20500 11.1
79 - 80 1.2 20500 - 21000 9.4
80 - 81 3.2 21000 - 21500 8.7
81 - 82 2.9 21500 - 22000 7.3
82 - 83 4.2 22000 - 22500 4
83 - 84 2.9 22500 - 23000 1.9
84 - 85 3.3 23000 - 23500 1.6
85 - 86 4.1 23500 - 24000 1.3
86 - 87 4.7 24000 - 24500 0.5
87 - 88 4.3 24500 - 25000 0.4
88 - 89 4.1 25000 - 25500 0.2
89 - 90 3.8
90 - 91 3.9
91 - 92 4.8
92 - 93 4.2
93 - 94 4.4
94 - 95 3
95 - 96 3
96 - 97 3.9
97 - 98 3.4
98 - 99 3.1
99 - 100 2.7
100 - 101 3
101 - 102 2.5
102 - 103 2.6
103 - 104 1.3
104 - 105 1.1
105 - 106 1.1
106 - 107 1.1
107 - 108 1.1
108 - 109 0.2
109 - 110 0.7
110 - 111 0.3
111 - 112 0.5
112 - 113 0.6
113 - 114 0.7
114 - 115 0
115 - 116 0.1
116 - 117 0
117 - 118 0.1
118 - 119 0
119 - 120 0.3
120 - 121 0.1