MMC Modular Report Build

( Module Only ) Methodology Pre Manufactured Value Total (%)

Enabling Works On-Site 20


Earthworks and Excavations On-Site 25
Traditional Foundation On-Site 40
Precast Concrete Slab Off-Site 80
Structural Steel Off-Site 100
Precast Floors Off-Site 100
Metal deck / insitu concrete Off-Site 100
Hot Melt Off-Site 100
Standing Seam Off-Site 100
Precast Concrete Off-Site 100
SFS / Brickwork Off-Site 100
Preglazed Off-Site 100
Plasterboard / skim lingings Off-Site 100
Screed Off-Site 100
Vinyl Off-Site 100
Painted / Resin Off-Site 100
Doorsets Off-Site 100
Painting Off-Site 100
Hygienic Off-Site 100
Suspended Ceilings On-Site 50
Plasterboard Mix 75
Manufactured - bespoke Off-Site 100
General FF&E Equipment Off-Site 100
Bespoke Joinery Off-Site 100
WC Cubicles / IPS Panels Off-Site 100
Specialist Equipment Off-Site 100
Traditional Sanitaryware Off-Site 100
On-Site Services On-Site 30
Water Installations Mix 70
Heat Source Off-Site 100
Space Heating and Air Con Off-Site 100
Ventilation Systems Off-Site 100
Electrical Installations Mix 65
Fuel Installations On-Site 85
Fire and Lighting Protection Mix 70
Comm, Security and Control Systems Mix 80
Specialist Installations Mix 70

Mean Average 84.10526316

MMC Traditional Report Build


( Module Only ) Methodology Pre Manufactured Value Total (%)

Enabling Works On-Site 20


Earthworks and Excavations On-Site 25
Traditional Foundation On-Site 40
Precast Concrete Slab Off-Site 80
Structural Steel Off-Site 80
Precast Floors Off-Site 75
Metal deck / insitu concrete On-Site 55
Hot Melt On-Site 45
Standing Seam On-Site 55
Precast Concrete Off-Site 80
SFS / Brickwork On-Site 60
Preglazed On-Site 75
Plasterboard / skim lingings On-Site 55
Screed On-Site 60
Vinyl On-Site 60
Painted / Resin On-Site 40
Doorsets On-Site 65
Painting On-Site 30
Hygienic On-Site 60
Suspended Ceilings On-Site 50
Plasterboard On-Site 50
Manufactured - bespoke Off-Site 80
General FF&E Equipment On-Site 90
Bespoke Joinery On-Site 80
WC Cubicles / IPS Panels On-Site 70
Specialist Equipment On-Site 90
Traditional Sanitaryware On-Site 75
On-Site Services On-Site 30
Water Installations Mix 60
Heat Source Off-Site 60
Space Heating and Air Con On-Site 70
Ventilation Systems On-Site 55
Electrical Installations Mix 40
Fuel Installations On-Site 85
Fire and Lighting Protection On-Site 60
Comm, Security and Control Systems On-Site 60
Specialist Installations On-Site 60

Mean Average 59.5