Professional Documents
Culture Documents
5.anexo 1.1. Calculo Hvac 1er Piso
5.anexo 1.1. Calculo Hvac 1er Piso
Prepared By:
Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 4 0.350 No Sí
2 4 0.350 No Sí
3 1 1.000 No Sí
5 13 1.080 No No
6 1 0.213 No No
Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 A 0.350 D
Master Partitions
Partition Partition Cool Heat
No. U-Factor T-D T-D
1 0.381 8 20
2 0.081 8 20
Master Glass
Glass Summer Winter Glass Interior Interior
No. U-Factor U-Factor Shd.Coef. Shading Shd.Coef
1 1.000 0.900 0.700 2 0.700
2 1.000 0.900 0.400 1 0.400
3 1.000 0.900 0.600 1 0.600
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 4
Check Figures
Total Building Supply Air (based on a 19° TD): 13,635 CFM
Total Building Vent. Air (89.28% of Supply): 12,173 CFM
Total Conditioned Air Space: 16,257 Sq.ft
Supply Air Per Unit Area: 0.8387 CFM/Sq.ft
Area Per Cooling Capacity: 328.3776 Sq.ft/Ton
Cooling Capacity Per Area: 0.0030 Tons/Sq.ft
Heating Capacity Per Area: 45.47 Btuh/Sq.ft
Total Heating Required With Outside Air: 739,242 Btuh
Total Cooling Required With Outside Air: 49.51 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 5
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 3,202 CFM
Total Air Handler Vent. Air (27.01% of Supply): 865 CFM
Total Conditioned Air Space: 2,637 Sq.ft
Supply Air Per Unit Area: 1.2142 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 26.50 Btuh/Sq.ft
Total Heating Required With Outside Air: 69,869 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 7
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 551 CFM
Total Air Handler Vent. Air (33.92% of Supply): 187 CFM
Total Conditioned Air Space: 569 Sq.ft
Supply Air Per Unit Area: 0.9671 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 22.87 Btuh/Sq.ft
Total Heating Required With Outside Air: 13,021 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 9
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 532 CFM
Total Air Handler Vent. Air (19.49% of Supply): 104 CFM
Total Conditioned Air Space: 316 Sq.ft
Supply Air Per Unit Area: 1.6832 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 33.38 Btuh/Sq.ft
Total Heating Required With Outside Air: 10,546 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 11
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 439 CFM
Total Air Handler Vent. Air (19.84% of Supply): 87 CFM
Total Conditioned Air Space: 266 Sq.ft
Supply Air Per Unit Area: 1.6536 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 32.95 Btuh/Sq.ft
Total Heating Required With Outside Air: 8,749 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 13
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 456 CFM
Total Air Handler Vent. Air (21.29% of Supply): 97 CFM
Total Conditioned Air Space: 296 Sq.ft
Supply Air Per Unit Area: 1.5407 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 31.29 Btuh/Sq.ft
Total Heating Required With Outside Air: 9,252 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 15
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 895 CFM
Total Air Handler Vent. Air (29.57% of Supply): 265 CFM
Total Conditioned Air Space: 807 Sq.ft
Supply Air Per Unit Area: 1.1094 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 24.96 Btuh/Sq.ft
Total Heating Required With Outside Air: 20,140 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 17
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 378 CFM
Total Air Handler Vent. Air (19.31% of Supply): 73 CFM
Total Conditioned Air Space: 222 Sq.ft
Supply Air Per Unit Area: 1.6984 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 33.61 Btuh/Sq.ft
Total Heating Required With Outside Air: 7,474 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 19
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 455 CFM
Total Air Handler Vent. Air (18.18% of Supply): 83 CFM
Total Conditioned Air Space: 252 Sq.ft
Supply Air Per Unit Area: 1.8038 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 35.15 Btuh/Sq.ft
Total Heating Required With Outside Air: 8,865 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 21
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 248 CFM
Total Air Handler Vent. Air (14.22% of Supply): 35 CFM
Total Conditioned Air Space: 108 Sq.ft
Supply Air Per Unit Area: 2.3060 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 42.53 Btuh/Sq.ft
Total Heating Required With Outside Air: 4,580 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 23
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 388 CFM
Total Air Handler Vent. Air (17.46% of Supply): 68 CFM
Total Conditioned Air Space: 207 Sq.ft
Supply Air Per Unit Area: 1.8790 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 36.26 Btuh/Sq.ft
Total Heating Required With Outside Air: 7,494 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 25
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 893 CFM
Total Air Handler Vent. Air (35.29% of Supply): 315 CFM
Total Conditioned Air Space: 961 Sq.ft
Supply Air Per Unit Area: 0.9294 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 22.31 Btuh/Sq.ft
Total Heating Required With Outside Air: 21,437 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 27
Check Figures
Total Air Handler Supply Air (based on a 18° TD): 1,035 CFM
Total Air Handler Vent. Air (10.34% of Supply): 107 CFM
Total Conditioned Air Space: 131 Sq.ft
Supply Air Per Unit Area: 7.9319 CFM/Sq.ft
Area Per Cooling Capacity: 83.2372 Sq.ft/Ton
Cooling Capacity Per Area: 0.0120 Tons/Sq.ft
Heating Capacity Per Area: 0.00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 1.57 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 29
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 254 CFM
Total Air Handler Vent. Air (15.77% of Supply): 40 CFM
Total Conditioned Air Space: 122 Sq.ft
Supply Air Per Unit Area: 2.0799 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 39.21 Btuh/Sq.ft
Total Heating Required With Outside Air: 4,783 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 31
P1- Laboratorio De
248 5,279 13,153 1,100 100% 100%
13 Microbiologia
5 360 915 0 0 0
12am October
2,440 1.45 3.69 0 360 915
P1- Laboratorio De
177 5,717 16,450 440 100% 100%
14 Bioquimica
2 389 1,144 0 0 0
10am October
1,739 2.20 6.47 0 389 1,144
P1- Laboratorio de
193 7,649 14,236 440 100% 100%
15 Hematol./inmunologia
2 521 990 0 0 0
12am October
1,899 2.70 5.13 0 521 990
P1- Registro De
112 7,177 5,649 440 100% 100%
16 Laboratorio Clinico
2 489 393 0 0 0
3pm October
1,102 4.36 3.51 0 489 393
P1- Lavado Y
113 3,814 3,854 440 100% 100%
18 Desinfeccion
2 260 268 0 0 0
12am October
1,115 2.29 2.36 0 260 268
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 5,623 CFM
Total Air Handler Vent. Air (100.00% of Supply): 5,623 CFM
Total Conditioned Air Space: 1,834 Sq.ft
Supply Air Per Unit Area: 3.0659 CFM/Sq.ft
Area Per Cooling Capacity: 83.4511 Sq.ft/Ton
Cooling Capacity Per Area: 0.0120 Tons/Sq.ft
Heating Capacity Per Area: 85.80 Btuh/Sq.ft
Total Heating Required With Outside Air: 157,370 Btuh
Total Cooling Required With Outside Air: 21.98 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 33
P1- Toma De
106 4,860 5,283 440 12/Hr 12/Hr
40 Medicamentos
2 331 356 0 208 208
6pm October
1,040 3.13 3.37 0 208 222
P1- Consultorio-
Prevencion Control 161 6,837 6,687 660 12/Hr 12/Hr
41 Tbc 3 466 451 0 317 317
6pm October 1,584 2.89 2.80 0 292 281
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 1,414 CFM
Total Air Handler Vent. Air (62.24% of Supply): 880 CFM
Total Conditioned Air Space: 447 Sq.ft
Supply Air Per Unit Area: 3.1619 CFM/Sq.ft
Area Per Cooling Capacity: 103.9602 Sq.ft/Ton
Cooling Capacity Per Area: 0.0096 Tons/Sq.ft
Heating Capacity Per Area: 98.07 Btuh/Sq.ft
Total Heating Required With Outside Air: 43,847 Btuh
Total Cooling Required With Outside Air: 4.30 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 35
P1-EsterilizacionDe
151 4,220 7,031 220 100% 100%
5 Productos Biologicos
1 287 494 0 0 0
12am October
1,486 1.90 3.27 0 287 494
P1- Recep.De
Unidades De Sangre 123 3,923 4,049 440 100% 100%
6 Y Hemoco 2 267 285 0 0 0
12am October 1,210 2.17 2.31 0 267 285
P1-Recep.de
Soli.transfunc.yDesp 123 3,923 4,049 440 100% 100%
7 acho Uni 2 267 285 0 0 0
12am October 1,210 2.17 2.31 0 267 285
P1-Alm.de Unid.De
Sangre Y 269 5,852 8,987 440 100% 100%
8 Hemocomponent 2 399 632 0 0 0
12am October 2,648 1.48 2.35 0 399 632
P1- Almacen De
142 3,930 4,351 440 100% 100%
10 Materiales
2 268 306 0 0 0
12am October
1,398 1.88 2.15 0 268 306
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,918 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,918 CFM
Total Conditioned Air Space: 1,423 Sq.ft
Supply Air Per Unit Area: 2.7530 CFM/Sq.ft
Area Per Cooling Capacity: 93.7959 Sq.ft/Ton
Cooling Capacity Per Area: 0.0107 Tons/Sq.ft
Heating Capacity Per Area: 73.65 Btuh/Sq.ft
Total Heating Required With Outside Air: 104,826 Btuh
Total Cooling Required With Outside Air: 15.17 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 37
P1- Consultorio-
Prevencion Control 146 7,004 6,776 880 100% 100%
43 Vih 4 477 464 0 0 0
7pm October 1,436 3.27 3.18 0 477 464
P1- Almacen De
70 4,362 3,831 440 100% 100%
45 Medicamentos
2 297 262 0 0 0
7pm October
688 4.25 3.75 0 297 262
Air Handler #69 - UTA-1-03 Control De Vih Sida - Total Load Summary
Air Handler Description: UTA-1-03 Control De Vih Sida Variable Air Volume
Sensible Heat Ratio: 0.89 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 7pm in October.
Outdoor Conditions: 75° DB, 71° WB, 160.67 grains
Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in October at 6pm is different
from the total system peak time, hence the air system CFM was computed using a zone sensible load of 24,043.
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Zone Space sensible loss: 25,742 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 46,335 Btuh 1,753 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 72,076 Btuh
Heating Supply Air: 25,742 / (.680 X 1.08 X 20) = 1,753 CFM
Winter Vent Outside Air (100.0% of supply) = 1,753 CFM
Zone space sensible gain: 24,035 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 24,035 Btuh
Cooling Supply Air: 24,043 / (.680 X 1.1 X 20) = 1,645 CFM
Summer Vent Outside Air (100.0% of supply) = 1,645 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 1,645 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 24,035 Btuh
Zone space latent gain: 2,860 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 51,559 Btuh
Total latent gain on air handling system: 54,419 Btuh
Total system sensible and latent gain: 78,454 Btuh
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 1,645 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,645 CFM
Total Conditioned Air Space: 499 Sq.ft
Supply Air Per Unit Area: 3.2951 CFM/Sq.ft
Area Per Cooling Capacity: 76.3432 Sq.ft/Ton
Cooling Capacity Per Area: 0.0131 Tons/Sq.ft
Heating Capacity Per Area: 144.41 Btuh/Sq.ft
Total Heating Required With Outside Air: 72,076 Btuh
Total Cooling Required With Outside Air: 6.54 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 39
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 276 CFM
Total Air Handler Vent. Air (16.95% of Supply): 47 CFM
Total Conditioned Air Space: 141 Sq.ft
Supply Air Per Unit Area: 1.9671 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 37.69 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,296 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 41
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 242 CFM
Total Air Handler Vent. Air (13.56% of Supply): 33 CFM
Total Conditioned Air Space: 98 Sq.ft
Supply Air Per Unit Area: 2.4573 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 44.89 Btuh/Sq.ft
Total Heating Required With Outside Air: 4,413 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 43
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 266 CFM
Total Air Handler Vent. Air (16.37% of Supply): 44 CFM
Total Conditioned Air Space: 131 Sq.ft
Supply Air Per Unit Area: 2.0361 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 38.70 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,051 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 45
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 279 CFM
Total Air Handler Vent. Air (18.50% of Supply): 52 CFM
Total Conditioned Air Space: 155 Sq.ft
Supply Air Per Unit Area: 1.8020 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 35.27 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,466 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 47
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 281 CFM
Total Air Handler Vent. Air (16.61% of Supply): 47 CFM
Total Conditioned Air Space: 140 Sq.ft
Supply Air Per Unit Area: 2.0063 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 38.27 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,357 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 49
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 276 CFM
Total Air Handler Vent. Air (15.33% of Supply): 42 CFM
Total Conditioned Air Space: 129 Sq.ft
Supply Air Per Unit Area: 2.1392 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 40.08 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,178 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 51
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 296 CFM
Total Air Handler Vent. Air (19.14% of Supply): 57 CFM
Total Conditioned Air Space: 172 Sq.ft
Supply Air Per Unit Area: 1.7140 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 33.83 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,834 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 53
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 284 CFM
Total Air Handler Vent. Air (16.88% of Supply): 48 CFM
Total Conditioned Air Space: 146 Sq.ft
Supply Air Per Unit Area: 1.9430 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 37.20 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,431 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 55
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 388 CFM
Total Air Handler Vent. Air (20.94% of Supply): 81 CFM
Total Conditioned Air Space: 248 Sq.ft
Supply Air Per Unit Area: 1.5661 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 31.66 Btuh/Sq.ft
Total Heating Required With Outside Air: 7,852 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 57
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 442 CFM
Total Air Handler Vent. Air (27.96% of Supply): 124 CFM
Total Conditioned Air Space: 377 Sq.ft
Supply Air Per Unit Area: 1.1730 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 25.89 Btuh/Sq.ft
Total Heating Required With Outside Air: 9,761 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 59
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 263 CFM
Total Air Handler Vent. Air (16.62% of Supply): 44 CFM
Total Conditioned Air Space: 134 Sq.ft
Supply Air Per Unit Area: 1.9735 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 37.64 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,026 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 61
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 447 CFM
Total Air Handler Vent. Air (16.56% of Supply): 74 CFM
Total Conditioned Air Space: 226 Sq.ft
Supply Air Per Unit Area: 1.9804 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 37.75 Btuh/Sq.ft
Total Heating Required With Outside Air: 8,516 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 63
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 321 CFM
Total Air Handler Vent. Air (20.05% of Supply): 64 CFM
Total Conditioned Air Space: 196 Sq.ft
Supply Air Per Unit Area: 1.6356 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 32.68 Btuh/Sq.ft
Total Heating Required With Outside Air: 6,406 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 65
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 645 CFM
Total Air Handler Vent. Air (35.99% of Supply): 232 CFM
Total Conditioned Air Space: 708 Sq.ft
Supply Air Per Unit Area: 0.9113 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 22.05 Btuh/Sq.ft
Total Heating Required With Outside Air: 15,616 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 67
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 322 CFM
Total Air Handler Vent. Air (14.27% of Supply): 46 CFM
Total Conditioned Air Space: 140 Sq.ft
Supply Air Per Unit Area: 2.2986 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 42.42 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,939 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 69
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 502 CFM
Total Air Handler Vent. Air (11.96% of Supply): 60 CFM
Total Conditioned Air Space: 183 Sq.ft
Supply Air Per Unit Area: 2.7421 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 48.93 Btuh/Sq.ft
Total Heating Required With Outside Air: 8,954 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 71
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 376 CFM
Total Air Handler Vent. Air (21.11% of Supply): 79 CFM
Total Conditioned Air Space: 242 Sq.ft
Supply Air Per Unit Area: 1.5541 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 31.49 Btuh/Sq.ft
Total Heating Required With Outside Air: 7,625 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 73
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 396 CFM
Total Air Handler Vent. Air (24.09% of Supply): 95 CFM
Total Conditioned Air Space: 291 Sq.ft
Supply Air Per Unit Area: 1.3613 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 28.66 Btuh/Sq.ft
Total Heating Required With Outside Air: 8,339 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 75
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 329 CFM
Total Air Handler Vent. Air (21.41% of Supply): 71 CFM
Total Conditioned Air Space: 215 Sq.ft
Supply Air Per Unit Area: 1.5319 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 31.16 Btuh/Sq.ft
Total Heating Required With Outside Air: 6,699 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 77
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 361 CFM
Total Air Handler Vent. Air (22.71% of Supply): 82 CFM
Total Conditioned Air Space: 250 Sq.ft
Supply Air Per Unit Area: 1.4446 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 29.88 Btuh/Sq.ft
Total Heating Required With Outside Air: 7,470 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 79
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 304 CFM
Total Air Handler Vent. Air (18.04% of Supply): 55 CFM
Total Conditioned Air Space: 167 Sq.ft
Supply Air Per Unit Area: 1.8181 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 35.36 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,906 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 81
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 409 CFM
Total Air Handler Vent. Air (11.24% of Supply): 46 CFM
Total Conditioned Air Space: 140 Sq.ft
Supply Air Per Unit Area: 2.9181 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 51.51 Btuh/Sq.ft
Total Heating Required With Outside Air: 7,212 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 83
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 306 CFM
Total Air Handler Vent. Air (10.07% of Supply): 31 CFM
Total Conditioned Air Space: 94 Sq.ft
Supply Air Per Unit Area: 3.2567 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 56.49 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,310 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 85
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 212 CFM
Total Air Handler Vent. Air (13.48% of Supply): 29 CFM
Total Conditioned Air Space: 87 Sq.ft
Supply Air Per Unit Area: 2.4336 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 44.40 Btuh/Sq.ft
Total Heating Required With Outside Air: 3,866 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 87
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 304 CFM
Total Air Handler Vent. Air (14.53% of Supply): 44 CFM
Total Conditioned Air Space: 135 Sq.ft
Supply Air Per Unit Area: 2.2573 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 41.81 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,634 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 89
Check Figures
Total Air Handler Supply Air (based on a 20° TD): 333 CFM
Total Air Handler Vent. Air (21.33% of Supply): 71 CFM
Total Conditioned Air Space: 216 Sq.ft
Supply Air Per Unit Area: 1.5379 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 31.25 Btuh/Sq.ft
Total Heating Required With Outside Air: 6,757 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 91
Air System #69 (UTA-1-03 Control De Vih Sida) Psychrometric Analysis (G)
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,860 3.762 24,043 19.552 1,645
Sensible Reserve 0 0.000 0
Zone Condition 2,860 95.760 24,043 75.000 1,645
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 1,645 CFM 51,559 60.277 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 54,419 156.037 24,043 75.000 1,645
Air System #69 (UTA-1-03 Control De Vih Sida) Psychrometric Chart (G)
ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Cooling process could not be added.