HOSPITAL HUARI HVAC PRIMER PISO

HVAC Load Analysis


for

Prepared By:

jueves, 25 de Junio de 2020


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 2

General Project Data Input


General Project Information
Project file name: \\Desktop-o002dcd\f\SERVER 2019\12.HOSPITAL
HUARI\1.DOCUMENTOS\2.MEMORIA DE CALCULO\ELITE\ELITE
SOLO CALEFACCION\ANEXO 1.1. CALCULO HVAC 1ER
PISO.CHV
Project title: HOSPITAL HUARI HVAC PRIMER PISO
Project date: jueves, 25 de Junio de 2020
Weather reference city: HUARI, ANCASH, PERU
Barometric pressure: 20.339 in.Hg.
Altitude: 10301 feet
Latitude: -9 Degrees
Mean daily temperature range: 11.5 Degrees
Starting & ending time for HVAC load calculations: 1am - 12am
Number of unique zones in this project: 61

Building Default Values


Calculations performed: Both heating and cooling loads
Lighting requirements: 2.32 Watts per square foot
Equipment requirements: 1.86 Watts per square foot
People sensible load multiplier: 250 Btuh per person
People latent load multiplier: 200 Btuh per person
Zone sensible safety factor: 10 %
Zone latent safety factor: 10 %
Zone heating safety factor: 10 %
People diversity factor: 100 %
Lighting profile number: 1
Equipment profile number: 1
People profile number: 1
Building default ceiling height: 10.00 feet
Building default wall height: 9.84 feet

Internal Operating Load Profiles (C = 100)


hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 C C C C C C C C C C C C C C C C C C C C C C C C
2 C C C C C C C C C C C C C C C C C C C C C C C C
3 C C C C C C C C C C C C C C C C C C C C C C C C
4 C C C C C C C C C C C C C C C C C C C C C C C C
5 C C C C C C C C C C C C C C C C C C C C C C C C
6 C C C C C C C C C C C C C C C C C C C C C C C C
7 C C C C C C C C C C C C C C C C C C C C C C C C
8 C C C C C C C C C C C C C C C C C C C C C C C C
9 C C C C C C C C C C C C C C C C C C C C C C C C
10 C C C C C C C C C C C C C C C C C C C C C C C C
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 3

General Project Data Input (cont'd)


Building-Level Design Conditions
Design Outdoor Outdoor Indoor Indoor Grains In/Outdoor
Month Dry Bulb Wet Bulb Rel.Hum Dry Bulb Diff Correction
October 79 71 50% 75 64.59 -9
Winter 39 75

Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 4 0.350 No Sí
2 4 0.350 No Sí
3 1 1.000 No Sí
5 13 1.080 No No
6 1 0.213 No No

Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 A 0.350 D

Master Partitions
Partition Partition Cool Heat
No. U-Factor T-D T-D
1 0.381 8 20
2 0.081 8 20

Master Glass
Glass Summer Winter Glass Interior Interior
No. U-Factor U-Factor Shd.Coef. Shading Shd.Coef
1 1.000 0.900 0.700 2 0.700
2 1.000 0.900 0.400 1 0.400
3 1.000 0.900 0.600 1 0.600
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 4

Building Summary Loads


Building peaks in October at 6pm.
Bldg Load Area Sen %Tot Lat Sen Net %Net
Descriptions Quan Loss Loss Gain Gain Gain Gain
Roof 1,434 19,875 2.69 0 5,565 5,565 0.94
Wall 2,486 34,454 4.66 0 4,242 4,242 0.71
Glass 168 5,979 0.81 0 2,912 2,912 0.49
Floor Slab 0 0 0.00 0 0 0 0.00
Skin Loads 60,309 8.16 0 12,719 12,719 2.14
Lighting 37,716 0 0.00 0 37,740 37,740 6.35
Equipment 43,477 0 0.00 0 79,948 79,948 13.46
People 262 0 0.00 16,417 20,521 36,938 6.22
Partition 40,689 337,342 45.63 0 43,743 43,743 7.36
Cool. Pret. 0 0 0.00 0 0 0 0.00
Heat. Pret. 0 0 0.00 0 0 0 0.00
Cool. Vent. 12,173 0 0.00 373,325 9,662 382,987 64.47
Heat. Vent. 12,925 341,591 46.21 0 0 0 0.00
Cool. Infil. 0 0 0.00 0 0 0 0.00
Heat. Infil. 0 0 0.00 0 0 0 0.00
Draw-Thru Fan 0 0 0.00 0 0 0 0.00
Blow-Thru Fan 0 0 0.00 0 0 0 0.00
Reserve Cap. 0 0 0.00 0 3 3 0.00
Reheat Cap. 0 0 0.00 0 0 0 0.00
Supply Duct 0 0 0.00 0 0 0 0.00
Return Duct 0 0 0.00 0 0 0 0.00
Misc. Supply 0 0 0.00 0 0 0 0.00
Misc. Return 0 0 0.00 0 0 0 0.00
Building Totals 739,242 100.00 389,742 204,336 594,077 100.00

Building Sen %Tot Lat Sen Net %Net


Summary Loss Loss Gain Gain Gain Gain
Ventilation 341,591 46.21 373,325 9,662 382,987 64.47
Infiltration 0 0.00 0 0 0 0.00
Pretreated Air 0 0.00 0 0 0 0.00
Zone Loads 397,651 53.79 16,417 194,674 211,091 35.53
Plenum Loads 0 0.00 0 0 0 0.00
Fan & Duct Loads 0 0.00 0 0 0 0.00
Building Totals 739,242 100.00 389,742 204,336 594,077 100.00

Check Figures
Total Building Supply Air (based on a 19° TD): 13,635 CFM
Total Building Vent. Air (89.28% of Supply): 12,173 CFM
Total Conditioned Air Space: 16,257 Sq.ft
Supply Air Per Unit Area: 0.8387 CFM/Sq.ft
Area Per Cooling Capacity: 328.3776 Sq.ft/Ton
Cooling Capacity Per Area: 0.0030 Tons/Sq.ft
Heating Capacity Per Area: 45.47 Btuh/Sq.ft
Total Heating Required With Outside Air: 739,242 Btuh
Total Cooling Required With Outside Air: 49.51 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 5

Air Handler #1 - FC-1-36/FC-1-37/FC-1-38/FC-1-39/40/41 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Circulacion Tec
2,637 47,010 0 0 2/Hr 2/Hr
60 PCL_103/ Hall Sucio
30 3,202 0 0 865 0
-
25,948 1.21 0.00 0 865 0

Zone Peak Totals: 2,637 47,010 0 0


Total Zones: 1 30 3,202 0 0 865 0
Unique Zones: 1 25,948 1.21 0.00 0 865 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 6

Air Handler #1 - FC-1-36/FC-1-37/FC-1-38/FC-1-39/40/41 - Total Load Summary


Air Handler Description: FC-1-36/FC-1-37/FC-1-38/FC-1-39/40/41 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 47,010 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 22,859 Btuh 865 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 69,869 Btuh
Heating Supply Air: 47,010 / (.680 X 1.08 X 20) = 3,202 CFM
Winter Vent Outside Air (27.0% of supply) = 865 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 3,202 CFM
Total Air Handler Vent. Air (27.01% of Supply): 865 CFM
Total Conditioned Air Space: 2,637 Sq.ft
Supply Air Per Unit Area: 1.2142 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 26.50 Btuh/Sq.ft
Total Heating Required With Outside Air: 69,869 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 7

Air Handler #2 Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
Alamcen
Especializado De 569 8,085 0 0 2/Hr 2/Hr
59 Productos Farma 15 551 0 0 187 0
- 5,603 0.97 0.00 0 187 0

Zone Peak Totals: 569 8,085 0 0


Total Zones: 1 15 551 0 0 187 0
Unique Zones: 1 5,603 0.97 0.00 0 187 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 8

Air Handler #2 Total Load Summary


Air Handler Description: Variable Air Volume
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 8,085 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 4,936 Btuh 187 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 13,021 Btuh
Heating Supply Air: 8,085 / (.680 X 1.08 X 20) = 551 CFM
Winter Vent Outside Air (33.9% of supply) = 187 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 551 CFM
Total Air Handler Vent. Air (33.92% of Supply): 187 CFM
Total Conditioned Air Space: 569 Sq.ft
Supply Air Per Unit Area: 0.9671 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 22.87 Btuh/Sq.ft
Total Heating Required With Outside Air: 13,021 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 9

Air Handler #4 - FC-1-42 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
61 P1- Corredor ND-105 316 7,807 0 0 2/Hr 2/Hr
- 8 532 0 0 104 0
3,109 1.68 0.00 0 104 0
Zone Peak Totals: 316 7,807 0 0
Total Zones: 1 8 532 0 0 104 0
Unique Zones: 1 3,109 1.68 0.00 0 104 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 10

Air Handler #4 - FC-1-42 - Total Load Summary


Air Handler Description: FC-1-42 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 7,807 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 2,738 Btuh 104 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 10,546 Btuh
Heating Supply Air: 7,807 / (.680 X 1.08 X 20) = 532 CFM
Winter Vent Outside Air (19.5% of supply) = 104 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 532 CFM
Total Air Handler Vent. Air (19.49% of Supply): 104 CFM
Total Conditioned Air Space: 316 Sq.ft
Supply Air Per Unit Area: 1.6832 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 33.38 Btuh/Sq.ft
Total Heating Required With Outside Air: 10,546 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 11

Air Handler #32 - FC-1-27 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Oficina Tecnico
266 6,447 0 0 2/Hr 2/Hr
49 Infraestructura
2 439 0 0 87 0
-
2,613 1.65 0.00 0 87 0

Zone Peak Totals: 266 6,447 0 0


Total Zones: 1 2 439 0 0 87 0
Unique Zones: 1 2,613 1.65 0.00 0 87 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 12

Air Handler #32 - FC-1-27 - Total Load Summary


Air Handler Description: FC-1-27 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 6,447 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 2,302 Btuh 87 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 8,749 Btuh
Heating Supply Air: 6,447 / (.680 X 1.08 X 20) = 439 CFM
Winter Vent Outside Air (19.8% of supply) = 87 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 439 CFM
Total Air Handler Vent. Air (19.84% of Supply): 87 CFM
Total Conditioned Air Space: 266 Sq.ft
Supply Air Per Unit Area: 1.6536 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 32.95 Btuh/Sq.ft
Total Heating Required With Outside Air: 8,749 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 13

Air Handler #33 - FC-1-28 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Taller De
Equipos 296 6,688 0 0 2/Hr 2/Hr
50 Electromecanicos 2 456 0 0 97 0
- 2,909 1.54 0.00 0 97 0

Zone Peak Totals: 296 6,688 0 0


Total Zones: 1 2 456 0 0 97 0
Unique Zones: 1 2,909 1.54 0.00 0 97 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 14

Air Handler #33 - FC-1-28 - Total Load Summary


Air Handler Description: FC-1-28 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 6,688 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 2,563 Btuh 97 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 9,252 Btuh
Heating Supply Air: 6,688 / (.680 X 1.08 X 20) = 456 CFM
Winter Vent Outside Air (21.3% of supply) = 97 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 456 CFM
Total Air Handler Vent. Air (21.29% of Supply): 97 CFM
Total Conditioned Air Space: 296 Sq.ft
Supply Air Per Unit Area: 1.5407 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 31.29 Btuh/Sq.ft
Total Heating Required With Outside Air: 9,252 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 15

Air Handler #34 - FC-1-29 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
51 P1- Comedor 807 13,144 0 0 2/Hr 2/Hr
- 24 895 0 0 265 0
7,941 1.11 0.00 0 265 0
Zone Peak Totals: 807 13,144 0 0
Total Zones: 1 24 895 0 0 265 0
Unique Zones: 1 7,941 1.11 0.00 0 265 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 16

Air Handler #34 - FC-1-29 - Total Load Summary


Air Handler Description: FC-1-29 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 13,144 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 6,995 Btuh 265 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 20,140 Btuh
Heating Supply Air: 13,144 / (.680 X 1.08 X 20) = 895 CFM
Winter Vent Outside Air (29.6% of supply) = 265 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 895 CFM
Total Air Handler Vent. Air (29.57% of Supply): 265 CFM
Total Conditioned Air Space: 807 Sq.ft
Supply Air Per Unit Area: 1.1094 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 24.96 Btuh/Sq.ft
Total Heating Required With Outside Air: 20,140 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 17

Air Handler #35 - FC-1-30 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Sala De
222 5,546 0 0 2/Hr 2/Hr
21 Monitoreo Fetal
2 378 0 0 73 0
-
2,188 1.70 0.00 0 73 0

Zone Peak Totals: 222 5,546 0 0


Total Zones: 1 2 378 0 0 73 0
Unique Zones: 1 2,188 1.70 0.00 0 73 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 18

Air Handler #35 - FC-1-30 - Total Load Summary


Air Handler Description: FC-1-30 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 5,546 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,928 Btuh 73 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 7,474 Btuh
Heating Supply Air: 5,546 / (.680 X 1.08 X 20) = 378 CFM
Winter Vent Outside Air (19.3% of supply) = 73 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 378 CFM
Total Air Handler Vent. Air (19.31% of Supply): 73 CFM
Total Conditioned Air Space: 222 Sq.ft
Supply Air Per Unit Area: 1.6984 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 33.61 Btuh/Sq.ft
Total Heating Required With Outside Air: 7,474 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 19

Air Handler #36 - FC-1-31 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Comedor Para
Personal Del a 252 6,679 0 0 2/Hr 2/Hr
52 Unidad 3 455 0 0 83 0
- 2,482 1.80 0.00 0 83 0

Zone Peak Totals: 252 6,679 0 0


Total Zones: 1 3 455 0 0 83 0
Unique Zones: 1 2,482 1.80 0.00 0 83 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 20

Air Handler #36 - FC-1-31 - Total Load Summary


Air Handler Description: FC-1-31 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 6,679 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 2,186 Btuh 83 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 8,865 Btuh
Heating Supply Air: 6,679 / (.680 X 1.08 X 20) = 455 CFM
Winter Vent Outside Air (18.2% of supply) = 83 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 455 CFM
Total Air Handler Vent. Air (18.18% of Supply): 83 CFM
Total Conditioned Air Space: 252 Sq.ft
Supply Air Per Unit Area: 1.8038 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 35.15 Btuh/Sq.ft
Total Heating Required With Outside Air: 8,865 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 21

Air Handler #37 - FC-1-32 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
53 P1- Hall CFR-101 108 3,646 0 0 2/Hr 2/Hr
- 3 248 0 0 35 0
1,060 2.31 0.00 0 35 0
Zone Peak Totals: 108 3,646 0 0
Total Zones: 1 3 248 0 0 35 0
Unique Zones: 1 1,060 2.31 0.00 0 35 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 22

Air Handler #37 - FC-1-32 - Total Load Summary


Air Handler Description: FC-1-32 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 3,646 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 934 Btuh 35 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 4,580 Btuh
Heating Supply Air: 3,646 / (.680 X 1.08 X 20) = 248 CFM
Winter Vent Outside Air (14.2% of supply) = 35 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 248 CFM
Total Air Handler Vent. Air (14.22% of Supply): 35 CFM
Total Conditioned Air Space: 108 Sq.ft
Supply Air Per Unit Area: 2.3060 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 42.53 Btuh/Sq.ft
Total Heating Required With Outside Air: 4,580 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 23

Air Handler #38 - FC-1-33 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Recepcion CFR-
207 5,703 0 0 2/Hr 2/Hr
54 106
3 388 0 0 68 0
-
2,034 1.88 0.00 0 68 0

Zone Peak Totals: 207 5,703 0 0


Total Zones: 1 3 388 0 0 68 0
Unique Zones: 1 2,034 1.88 0.00 0 68 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 24

Air Handler #38 - FC-1-33 - Total Load Summary


Air Handler Description: FC-1-33 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 5,703 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,792 Btuh 68 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 7,494 Btuh
Heating Supply Air: 5,703 / (.680 X 1.08 X 20) = 388 CFM
Winter Vent Outside Air (17.5% of supply) = 68 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 388 CFM
Total Air Handler Vent. Air (17.46% of Supply): 68 CFM
Total Conditioned Air Space: 207 Sq.ft
Supply Air Per Unit Area: 1.8790 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 36.26 Btuh/Sq.ft
Total Heating Required With Outside Air: 7,494 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 25

Air Handler #39 - FC-1-34/FC-1-35 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Sala De Espera
961 13,109 0 0 2/Hr 2/Hr
57 ( Procedimientos)
20 893 0 0 315 0
-
9,453 0.93 0.00 0 315 0

Zone Peak Totals: 961 13,109 0 0


Total Zones: 1 20 893 0 0 315 0
Unique Zones: 1 9,453 0.93 0.00 0 315 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 26

Air Handler #39 - FC-1-34/FC-1-35 - Total Load Summary


Air Handler Description: FC-1-34/FC-1-35 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 13,109 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 8,328 Btuh 315 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 21,437 Btuh
Heating Supply Air: 13,109 / (.680 X 1.08 X 20) = 893 CFM
Winter Vent Outside Air (35.3% of supply) = 315 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 893 CFM
Total Air Handler Vent. Air (35.29% of Supply): 315 CFM
Total Conditioned Air Space: 961 Sq.ft
Supply Air Per Unit Area: 0.9294 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 22.31 Btuh/Sq.ft
Total Heating Required With Outside Air: 21,437 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 27

Air Handler #40 - UCD-1-01 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Cuarto De
131 0 13,881 0 5/Hr 5/Hr
58 Telecomunicaciones
0 0 1,035 0 0 107
12am October
1,284 0.00 7.93 0 0 107

Zone Peak Totals: 131 0 13,881 0


Total Zones: 1 0 0 1,035 0 0 107
Unique Zones: 1 1,284 0.00 7.93 0 0 107
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 28

Air Handler #40 - UCD-1-01 - Total Load Summary


Air Handler Description: UCD-1-01 Constant Volume - Sum of Peaks
Sensible Heat Ratio: 1.00 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 7pm in October.
Outdoor Conditions: 75° DB, 71° WB, 160.67 grains
Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in October at 12am is different
from the total system peak time, hence the air system CFM was computed using a zone sensible load of 13,881.
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Zone Space sensible loss: 0 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 0 Btuh
Heating Supply Air: 0 / (.680 X 1.08 X 0) = 0 CFM
Winter Vent Outside Air (0.0% of supply) = 0 CFM
Zone space sensible gain: 13,881 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 13,881 Btuh
Cooling Supply Air: 13,881 / (.680 X 1.1 X 18) = 1,035 CFM
Summer Vent Outside Air (10.3% of supply) = 107 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 560 Btuh 107 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 560 Btuh
Total sensible gain on air handling system: 14,441 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 4,373 Btuh
Total latent gain on air handling system: 4,373 Btuh
Total system sensible and latent gain: 18,814 Btuh

Check Figures
Total Air Handler Supply Air (based on a 18° TD): 1,035 CFM
Total Air Handler Vent. Air (10.34% of Supply): 107 CFM
Total Conditioned Air Space: 131 Sq.ft
Supply Air Per Unit Area: 7.9319 CFM/Sq.ft
Area Per Cooling Capacity: 83.2372 Sq.ft/Ton
Cooling Capacity Per Area: 0.0120 Tons/Sq.ft
Heating Capacity Per Area: 0.00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 1.57 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 29

Air Handler #63 - FC-234 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Almacen De
122 3,726 0 0 2/Hr 2/Hr
38 Medicamentos
2 254 0 0 40 0
-
1,200 2.08 0.00 0 40 0

Zone Peak Totals: 122 3,726 0 0


Total Zones: 1 2 254 0 0 40 0
Unique Zones: 1 1,200 2.08 0.00 0 40 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 30

Air Handler #63 - FC-234 - Total Load Summary


Air Handler Description: FC-234 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 3,726 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,058 Btuh 40 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 4,783 Btuh
Heating Supply Air: 3,726 / (.680 X 1.08 X 20) = 254 CFM
Winter Vent Outside Air (15.8% of supply) = 40 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 254 CFM
Total Air Handler Vent. Air (15.77% of Supply): 40 CFM
Total Conditioned Air Space: 122 Sq.ft
Supply Air Per Unit Area: 2.0799 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 39.21 Btuh/Sq.ft
Total Heating Required With Outside Air: 4,783 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 31

Air Handler #65 - UTA-101 (Patologia Clinica) - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Esclusa
Laboratorio De 56 2,483 2,269 322 100% 100%
12 Microbiologia 1 169 158 0 0 0
12am October 547 3.04 2.84 0 169 158

P1- Laboratorio De
248 5,279 13,153 1,100 100% 100%
13 Microbiologia
5 360 915 0 0 0
12am October
2,440 1.45 3.69 0 360 915

P1- Laboratorio De
177 5,717 16,450 440 100% 100%
14 Bioquimica
2 389 1,144 0 0 0
10am October
1,739 2.20 6.47 0 389 1,144

P1- Laboratorio de
193 7,649 14,236 440 100% 100%
15 Hematol./inmunologia
2 521 990 0 0 0
12am October
1,899 2.70 5.13 0 521 990

P1- Registro De
112 7,177 5,649 440 100% 100%
16 Laboratorio Clinico
2 489 393 0 0 0
3pm October
1,102 4.36 3.51 0 489 393

P1- Corredor PCL-


348 10,015 9,555 2,015 100% 100%
17 109
9 682 664 0 0 0
12am October
3,424 1.96 1.91 0 682 664

P1- Lavado Y
113 3,814 3,854 440 100% 100%
18 Desinfeccion
2 260 268 0 0 0
12am October
1,115 2.29 2.36 0 260 268

P1- Corredor PCL-


587 14,070 17,043 1,760 100% 100%
56 103
8 958 1,185 0 0 0
12am October
5,780 1.63 2.02 0 958 1,185

Zone Peak Totals: 1,834 56,203 82,208 6,957


Total Zones: 8 32 3,828 5,717 0 0 0
Unique Zones: 8 18,048 2.09 3.12 0 3,828 5,717
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 32

Air Handler #65 - UTA-101 (Patologia Clinica) - Total Load Summary


Air Handler Description: UTA-101 (Patologia Clinica) Variable Air Volume
Sensible Heat Ratio: 0.92 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 12pm in October.
Outdoor Conditions: 76° DB, 71° WB, 160.33 grains
Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in October at 10am is different
from the total system peak time, hence the air system CFM was computed using a zone sensible load of 80,859.
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Zone Space sensible loss: 56,203 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 101,166 Btuh 3,828 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 157,370 Btuh
Heating Supply Air: 56,203 / (.680 X 1.08 X 20) = 3,828 CFM
Winter Vent Outside Air (100.0% of supply) = 3,828 CFM
Zone space sensible gain: 80,591 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 80,591 Btuh
Cooling Supply Air: 80,859 / (.680 X 1.1 X 19) = 5,623 CFM
Summer Vent Outside Air (100.0% of supply) = 5,623 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 4,205 Btuh 5,623 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 4,205 Btuh
Total sensible gain on air handling system: 84,795 Btuh
Zone space latent gain: 6,957 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 171,985 Btuh
Total latent gain on air handling system: 178,942 Btuh
Total system sensible and latent gain: 263,738 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 5,623 CFM
Total Air Handler Vent. Air (100.00% of Supply): 5,623 CFM
Total Conditioned Air Space: 1,834 Sq.ft
Supply Air Per Unit Area: 3.0659 CFM/Sq.ft
Area Per Cooling Capacity: 83.4511 Sq.ft/Ton
Cooling Capacity Per Area: 0.0120 Tons/Sq.ft
Heating Capacity Per Area: 85.80 Btuh/Sq.ft
Total Heating Required With Outside Air: 157,370 Btuh
Total Cooling Required With Outside Air: 21.98 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 33

Air Handler #67 - UTA-1-02 Control De TBC - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
39 P1- Sala De Espera 180 8,896 9,001 1,980 12/Hr 12/Hr
8pm October 9 606 607 0 355 355
1,775 3.36 3.37 0 380 378

P1- Toma De
106 4,860 5,283 440 12/Hr 12/Hr
40 Medicamentos
2 331 356 0 208 208
6pm October
1,040 3.13 3.37 0 208 222

P1- Consultorio-
Prevencion Control 161 6,837 6,687 660 12/Hr 12/Hr
41 Tbc 3 466 451 0 317 317
6pm October 1,584 2.89 2.80 0 292 281

Zone Peak Totals: 447 20,592 20,972 3,080


Total Zones: 3 14 1,403 1,415 0 880 880
Unique Zones: 3 4,400 3.14 3.16 0 880 880
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 34

Air Handler #67 - UTA-1-02 Control De TBC - Total Load Summary


Air Handler Description: UTA-1-02 Control De TBC Constant Volume - Sum of Peaks
Sensible Heat Ratio: 0.87 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 6pm in October.
Outdoor Conditions: 76° DB, 71° WB, 159.95 grains
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Zone Space sensible loss: 20,592 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 23,255 Btuh 880 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 43,847 Btuh
Heating Supply Air: 20,592 / (.680 X 1.08 X 20) = 1,403 CFM
Winter Vent Outside Air (62.7% of supply) = 880 CFM
Zone space sensible gain: 20,957 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 3 Btuh
Total sensible gain on supply side of coil: 20,960 Btuh
Cooling Supply Air: 20,960 / (.680 X 1.1 X 20) = 1,414 CFM
Summer Vent Outside Air (62.2% of supply) = 880 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 658 Btuh 880 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 658 Btuh
Total sensible gain on air handling system: 21,618 Btuh
Zone space latent gain: 3,080 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 26,913 Btuh
Total latent gain on air handling system: 29,993 Btuh
Total system sensible and latent gain: 51,611 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 1,414 CFM
Total Air Handler Vent. Air (62.24% of Supply): 880 CFM
Total Conditioned Air Space: 447 Sq.ft
Supply Air Per Unit Area: 3.1619 CFM/Sq.ft
Area Per Cooling Capacity: 103.9602 Sq.ft/Ton
Cooling Capacity Per Area: 0.0096 Tons/Sq.ft
Heating Capacity Per Area: 98.07 Btuh/Sq.ft
Total Heating Required With Outside Air: 43,847 Btuh
Total Cooling Required With Outside Air: 4.30 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 35

Air Handler #68 - UTA-1-04 (hemoterapia Y Banco De Sangre) - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Laboratorio De
258 5,529 16,271 440 100% 100%
4 Inmunohematologia
2 377 1,144 0 0 0
12am October
2,542 1.46 4.43 0 377 1,144

P1-EsterilizacionDe
151 4,220 7,031 220 100% 100%
5 Productos Biologicos
1 287 494 0 0 0
12am October
1,486 1.90 3.27 0 287 494

P1- Recep.De
Unidades De Sangre 123 3,923 4,049 440 100% 100%
6 Y Hemoco 2 267 285 0 0 0
12am October 1,210 2.17 2.31 0 267 285

P1-Recep.de
Soli.transfunc.yDesp 123 3,923 4,049 440 100% 100%
7 acho Uni 2 267 285 0 0 0
12am October 1,210 2.17 2.31 0 267 285

P1-Alm.de Unid.De
Sangre Y 269 5,852 8,987 440 100% 100%
8 Hemocomponent 2 399 632 0 0 0
12am October 2,648 1.48 2.35 0 399 632

P1- Almacen De
142 3,930 4,351 440 100% 100%
10 Materiales
2 268 306 0 0 0
12am October
1,398 1.88 2.15 0 268 306

P1- Corredor HBS-


357 10,061 10,996 1,100 100% 100%
55 101
5 685 773 0 0 0
12am October
3,510 1.92 2.17 0 685 773

Zone Peak Totals: 1,423 37,438 55,735 3,520


Total Zones: 7 16 2,550 3,918 0 0 0
Unique Zones: 7 14,004 1.79 2.75 0 2,550 3,918
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 36

Air Handler #68 - UTA-1-04 (hemoterapia Y Banco De Sangre) - Total Load


Summary
Air Handler Description: UTA-1-04 (hemoterapia Y Banco De Sangre) Variable Air Volume
Sensible Heat Ratio: 0.94 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 7pm in October.
Outdoor Conditions: 75° DB, 71° WB, 160.67 grains
Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in October at 12am is different
from the total system peak time, hence the air system CFM was computed using a zone sensible load of 55,735.
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Zone Space sensible loss: 37,438 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 67,388 Btuh 2,550 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 104,826 Btuh
Heating Supply Air: 37,438 / (.680 X 1.08 X 20) = 2,550 CFM
Winter Vent Outside Air (100.0% of supply) = 2,550 CFM
Zone space sensible gain: 55,735 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 55,735 Btuh
Cooling Supply Air: 55,735 / (.680 X 1.1 X 19) = 3,918 CFM
Summer Vent Outside Air (100.0% of supply) = 3,918 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 3,918 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 55,735 Btuh
Zone space latent gain: 3,520 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 122,827 Btuh
Total latent gain on air handling system: 126,347 Btuh
Total system sensible and latent gain: 182,082 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 3,918 CFM
Total Air Handler Vent. Air (100.00% of Supply): 3,918 CFM
Total Conditioned Air Space: 1,423 Sq.ft
Supply Air Per Unit Area: 2.7530 CFM/Sq.ft
Area Per Cooling Capacity: 93.7959 Sq.ft/Ton
Cooling Capacity Per Area: 0.0107 Tons/Sq.ft
Heating Capacity Per Area: 73.65 Btuh/Sq.ft
Total Heating Required With Outside Air: 104,826 Btuh
Total Cooling Required With Outside Air: 15.17 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 37

Air Handler #69 - UTA-1-03 Control De Vih Sida - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
42 P1- Sala De Espera 193 8,669 8,077 1,100 100% 100%
6pm October 5 590 552 0 0 0
1,901 3.06 2.86 0 590 552

P1- Consultorio-
Prevencion Control 146 7,004 6,776 880 100% 100%
43 Vih 4 477 464 0 0 0
7pm October 1,436 3.27 3.18 0 477 464

44 P1- Targa 90 5,707 5,396 440 100% 100%


6pm October 2 389 369 0 0 0
886 4.32 4.10 0 389 369

P1- Almacen De
70 4,362 3,831 440 100% 100%
45 Medicamentos
2 297 262 0 0 0
7pm October
688 4.25 3.75 0 297 262

Zone Peak Totals: 499 25,742 24,080 2,860


Total Zones: 4 13 1,753 1,647 0 0 0
Unique Zones: 4 4,911 3.51 3.30 0 1,753 1,647
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 38

Air Handler #69 - UTA-1-03 Control De Vih Sida - Total Load Summary
Air Handler Description: UTA-1-03 Control De Vih Sida Variable Air Volume
Sensible Heat Ratio: 0.89 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 7pm in October.
Outdoor Conditions: 75° DB, 71° WB, 160.67 grains
Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in October at 6pm is different
from the total system peak time, hence the air system CFM was computed using a zone sensible load of 24,043.
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Zone Space sensible loss: 25,742 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 46,335 Btuh 1,753 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 72,076 Btuh
Heating Supply Air: 25,742 / (.680 X 1.08 X 20) = 1,753 CFM
Winter Vent Outside Air (100.0% of supply) = 1,753 CFM
Zone space sensible gain: 24,035 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 24,035 Btuh
Cooling Supply Air: 24,043 / (.680 X 1.1 X 20) = 1,645 CFM
Summer Vent Outside Air (100.0% of supply) = 1,645 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 1,645 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 24,035 Btuh
Zone space latent gain: 2,860 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 51,559 Btuh
Total latent gain on air handling system: 54,419 Btuh
Total system sensible and latent gain: 78,454 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 1,645 CFM
Total Air Handler Vent. Air (100.00% of Supply): 1,645 CFM
Total Conditioned Air Space: 499 Sq.ft
Supply Air Per Unit Area: 3.2951 CFM/Sq.ft
Area Per Cooling Capacity: 76.3432 Sq.ft/Ton
Cooling Capacity Per Area: 0.0131 Tons/Sq.ft
Heating Capacity Per Area: 144.41 Btuh/Sq.ft
Total Heating Required With Outside Air: 72,076 Btuh
Total Cooling Required With Outside Air: 6.54 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 39

Air Handler #70 - FC-1-01 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1-Recep.y Almac.
De Muest-tomas 141 4,058 0 0 2/Hr 2/Hr
1 Muestra 2 276 0 0 47 0
- 1,405 1.97 0.00 0 47 0

Zone Peak Totals: 141 4,058 0 0


Total Zones: 1 2 276 0 0 47 0
Unique Zones: 1 1,405 1.97 0.00 0 47 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 40

Air Handler #70 - FC-1-01 - Total Load Summary


Air Handler Description: FC-1-01 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 4,058 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,238 Btuh 47 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 5,296 Btuh
Heating Supply Air: 4,058 / (.680 X 1.08 X 20) = 276 CFM
Winter Vent Outside Air (16.9% of supply) = 47 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 276 CFM
Total Air Handler Vent. Air (16.95% of Supply): 47 CFM
Total Conditioned Air Space: 141 Sq.ft
Supply Air Per Unit Area: 1.9671 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 37.69 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,296 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 41

Air Handler #71 - FC-1-02 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Entrega de
98 3,547 0 0 2/Hr 2/Hr
2 Resultados
2 242 0 0 33 0
-
983 2.46 0.00 0 33 0

Zone Peak Totals: 98 3,547 0 0


Total Zones: 1 2 242 0 0 33 0
Unique Zones: 1 983 2.46 0.00 0 33 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 42

Air Handler #71 - FC-1-02 - Total Load Summary


Air Handler Description: FC-1-02 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 3,547 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 866 Btuh 33 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 4,413 Btuh
Heating Supply Air: 3,547 / (.680 X 1.08 X 20) = 242 CFM
Winter Vent Outside Air (13.6% of supply) = 33 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 242 CFM
Total Air Handler Vent. Air (13.56% of Supply): 33 CFM
Total Conditioned Air Space: 98 Sq.ft
Supply Air Per Unit Area: 2.4573 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 44.89 Btuh/Sq.ft
Total Heating Required With Outside Air: 4,413 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 43

Air Handler #72 - FC-1-03 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
3 P1- Jefatura 131 3,901 0 0 2/Hr 2/Hr
- 2 266 0 0 44 0
1,305 2.04 0.00 0 44 0
Zone Peak Totals: 131 3,901 0 0
Total Zones: 1 2 266 0 0 44 0
Unique Zones: 1 1,305 2.04 0.00 0 44 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 44

Air Handler #72 - FC-1-03 - Total Load Summary


Air Handler Description: FC-1-03 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 3,901 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,150 Btuh 44 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 5,051 Btuh
Heating Supply Air: 3,901 / (.680 X 1.08 X 20) = 266 CFM
Winter Vent Outside Air (16.4% of supply) = 44 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 266 CFM
Total Air Handler Vent. Air (16.37% of Supply): 44 CFM
Total Conditioned Air Space: 131 Sq.ft
Supply Air Per Unit Area: 2.0361 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 38.70 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,051 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 45

Air Handler #73 - FC-1-04 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Control De
155 4,101 0 0 2/Hr 2/Hr
9 Calidad
2 279 0 0 52 0
-
1,550 1.80 0.00 0 52 0

Zone Peak Totals: 155 4,101 0 0


Total Zones: 1 2 279 0 0 52 0
Unique Zones: 1 1,550 1.80 0.00 0 52 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 46

Air Handler #73 - FC-1-04 - Total Load Summary


Air Handler Description: FC-1-04 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 4,101 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,365 Btuh 52 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 5,466 Btuh
Heating Supply Air: 4,101 / (.680 X 1.08 X 20) = 279 CFM
Winter Vent Outside Air (18.5% of supply) = 52 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 279 CFM
Total Air Handler Vent. Air (18.50% of Supply): 52 CFM
Total Conditioned Air Space: 155 Sq.ft
Supply Air Per Unit Area: 1.8020 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 35.27 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,466 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 47

Air Handler #74 - FC-1-05 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
11 P1- Jefatura 140 4,124 0 0 2/Hr 2/Hr
- 2 281 0 0 47 0
1,400 2.01 0.00 0 47 0
Zone Peak Totals: 140 4,124 0 0
Total Zones: 1 2 281 0 0 47 0
Unique Zones: 1 1,400 2.01 0.00 0 47 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 48

Air Handler #74 - FC-1-05 - Total Load Summary


Air Handler Description: FC-1-05 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 4,124 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,233 Btuh 47 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 5,357 Btuh
Heating Supply Air: 4,124 / (.680 X 1.08 X 20) = 281 CFM
Winter Vent Outside Air (16.6% of supply) = 47 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 281 CFM
Total Air Handler Vent. Air (16.61% of Supply): 47 CFM
Total Conditioned Air Space: 140 Sq.ft
Supply Air Per Unit Area: 2.0063 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 38.27 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,357 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 49

Air Handler #75 - FC-1-06 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
19 P1- Jefatura 129 4,058 0 0 2/Hr 2/Hr
- 2 276 0 0 42 0
1,271 2.14 0.00 0 42 0
Zone Peak Totals: 129 4,058 0 0
Total Zones: 1 2 276 0 0 42 0
Unique Zones: 1 1,271 2.14 0.00 0 42 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 50

Air Handler #75 - FC-1-06 - Total Load Summary


Air Handler Description: FC-1-06 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 4,058 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,120 Btuh 42 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 5,178 Btuh
Heating Supply Air: 4,058 / (.680 X 1.08 X 20) = 276 CFM
Winter Vent Outside Air (15.3% of supply) = 42 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 276 CFM
Total Air Handler Vent. Air (15.33% of Supply): 42 CFM
Total Conditioned Air Space: 129 Sq.ft
Supply Air Per Unit Area: 2.1392 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 40.08 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,178 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 51

Air Handler #76 - FC-1-07 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Sala De
172 4,339 0 0 2/Hr 2/Hr
20 Ecografia Obstetricia
4 296 0 0 57 0
-
1,697 1.71 0.00 0 57 0

Zone Peak Totals: 172 4,339 0 0


Total Zones: 1 4 296 0 0 57 0
Unique Zones: 1 1,697 1.71 0.00 0 57 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 52

Air Handler #76 - FC-1-07 - Total Load Summary


Air Handler Description: FC-1-07 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 4,339 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,495 Btuh 57 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 5,834 Btuh
Heating Supply Air: 4,339 / (.680 X 1.08 X 20) = 296 CFM
Winter Vent Outside Air (19.1% of supply) = 57 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 296 CFM
Total Air Handler Vent. Air (19.14% of Supply): 57 CFM
Total Conditioned Air Space: 172 Sq.ft
Supply Air Per Unit Area: 1.7140 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 33.83 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,834 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 53

Air Handler #77 - FC-1-08 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1-Seguimiento
Farmacoterapeutico 146 4,165 0 0 2/Hr 2/Hr
26 Ambula 2 284 0 0 48 0
- 1,437 1.94 0.00 0 48 0

Zone Peak Totals: 146 4,165 0 0


Total Zones: 1 2 284 0 0 48 0
Unique Zones: 1 1,437 1.94 0.00 0 48 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 54

Air Handler #77 - FC-1-08 - Total Load Summary


Air Handler Description: FC-1-08 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 4,165 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,266 Btuh 48 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 5,431 Btuh
Heating Supply Air: 4,165 / (.680 X 1.08 X 20) = 284 CFM
Winter Vent Outside Air (16.9% of supply) = 48 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 284 CFM
Total Air Handler Vent. Air (16.88% of Supply): 48 CFM
Total Conditioned Air Space: 146 Sq.ft
Supply Air Per Unit Area: 1.9430 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 37.20 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,431 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 55

Air Handler #78 - FC-1-09 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Gestion De
248 5,703 0 0 2/Hr 2/Hr
25 Programacion
3 388 0 0 81 0
-
2,440 1.57 0.00 0 81 0

Zone Peak Totals: 248 5,703 0 0


Total Zones: 1 3 388 0 0 81 0
Unique Zones: 1 2,440 1.57 0.00 0 81 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 56

Air Handler #78 - FC-1-09 - Total Load Summary


Air Handler Description: FC-1-09 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 5,703 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 2,150 Btuh 81 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 7,852 Btuh
Heating Supply Air: 5,703 / (.680 X 1.08 X 20) = 388 CFM
Winter Vent Outside Air (20.9% of supply) = 81 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 388 CFM
Total Air Handler Vent. Air (20.94% of Supply): 81 CFM
Total Conditioned Air Space: 248 Sq.ft
Supply Air Per Unit Area: 1.5661 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 31.66 Btuh/Sq.ft
Total Heating Required With Outside Air: 7,852 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 57

Air Handler #79 - FC-1-10 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
27 P1- Dosis Unitaria 377 6,493 0 0 2/Hr 2/Hr
- 3 442 0 0 124 0
3,710 1.17 0.00 0 124 0
Zone Peak Totals: 377 6,493 0 0
Total Zones: 1 3 442 0 0 124 0
Unique Zones: 1 3,710 1.17 0.00 0 124 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 58

Air Handler #79 - FC-1-10 - Total Load Summary


Air Handler Description: FC-1-10 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 6,493 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 3,268 Btuh 124 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 9,761 Btuh
Heating Supply Air: 6,493 / (.680 X 1.08 X 20) = 442 CFM
Winter Vent Outside Air (28.0% of supply) = 124 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 442 CFM
Total Air Handler Vent. Air (27.96% of Supply): 124 CFM
Total Conditioned Air Space: 377 Sq.ft
Supply Air Per Unit Area: 1.1730 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 25.89 Btuh/Sq.ft
Total Heating Required With Outside Air: 9,761 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 59

Air Handler #80 - FC-1-11 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
24 P1- Jefatura 134 3,868 0 0 2/Hr 2/Hr
- 2 263 0 0 44 0
1,314 1.97 0.00 0 44 0
Zone Peak Totals: 134 3,868 0 0
Total Zones: 1 2 263 0 0 44 0
Unique Zones: 1 1,314 1.97 0.00 0 44 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 60

Air Handler #80 - FC-1-11 - Total Load Summary


Air Handler Description: FC-1-11 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 3,868 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,157 Btuh 44 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 5,026 Btuh
Heating Supply Air: 3,868 / (.680 X 1.08 X 20) = 263 CFM
Winter Vent Outside Air (16.6% of supply) = 44 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 263 CFM
Total Air Handler Vent. Air (16.62% of Supply): 44 CFM
Total Conditioned Air Space: 134 Sq.ft
Supply Air Per Unit Area: 1.9735 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 37.64 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,026 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 61

Air Handler #81 - FC-1-12 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Control De
226 6,560 0 0 2/Hr 2/Hr
37 Suministros
2 447 0 0 74 0
-
2,220 1.98 0.00 0 74 0

Zone Peak Totals: 226 6,560 0 0


Total Zones: 1 2 447 0 0 74 0
Unique Zones: 1 2,220 1.98 0.00 0 74 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 62

Air Handler #81 - FC-1-12 - Total Load Summary


Air Handler Description: FC-1-12 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 6,560 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,956 Btuh 74 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 8,516 Btuh
Heating Supply Air: 6,560 / (.680 X 1.08 X 20) = 447 CFM
Winter Vent Outside Air (16.6% of supply) = 74 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 447 CFM
Total Air Handler Vent. Air (16.56% of Supply): 74 CFM
Total Conditioned Air Space: 226 Sq.ft
Supply Air Per Unit Area: 1.9804 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 37.75 Btuh/Sq.ft
Total Heating Required With Outside Air: 8,516 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 63

Air Handler #82 - FC-1-13 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
36 P1- Jefatura 196 4,707 0 0 2/Hr 2/Hr
- 2 321 0 0 64 0
1,929 1.64 0.00 0 64 0
Zone Peak Totals: 196 4,707 0 0
Total Zones: 1 2 321 0 0 64 0
Unique Zones: 1 1,929 1.64 0.00 0 64 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 64

Air Handler #82 - FC-1-13 - Total Load Summary


Air Handler Description: FC-1-13 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 4,707 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,699 Btuh 64 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 6,406 Btuh
Heating Supply Air: 4,707 / (.680 X 1.08 X 20) = 321 CFM
Winter Vent Outside Air (20.1% of supply) = 64 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 321 CFM
Total Air Handler Vent. Air (20.05% of Supply): 64 CFM
Total Conditioned Air Space: 196 Sq.ft
Supply Air Per Unit Area: 1.6356 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 32.68 Btuh/Sq.ft
Total Heating Required With Outside Air: 6,406 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 65

Air Handler #83 - FC-1-14 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Oficina De
Mantenimiento Eq 708 9,476 0 0 2/Hr 2/Hr
35 Biomedic 2 645 0 0 232 0
- 6,969 0.91 0.00 0 232 0

Zone Peak Totals: 708 9,476 0 0


Total Zones: 1 2 645 0 0 232 0
Unique Zones: 1 6,969 0.91 0.00 0 232 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 66

Air Handler #83 - FC-1-14 - Total Load Summary


Air Handler Description: FC-1-14 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 9,476 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 6,140 Btuh 232 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 15,616 Btuh
Heating Supply Air: 9,476 / (.680 X 1.08 X 20) = 645 CFM
Winter Vent Outside Air (36.0% of supply) = 232 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 645 CFM
Total Air Handler Vent. Air (35.99% of Supply): 232 CFM
Total Conditioned Air Space: 708 Sq.ft
Supply Air Per Unit Area: 0.9113 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 22.05 Btuh/Sq.ft
Total Heating Required With Outside Air: 15,616 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 67

Air Handler #84 - FC-1-15 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Habitacion
140 4,725 0 0 2/Hr 2/Hr
34 Hombres 2 Camas
2 322 0 0 46 0
-
1,378 2.30 0.00 0 46 0

Zone Peak Totals: 140 4,725 0 0


Total Zones: 1 2 322 0 0 46 0
Unique Zones: 1 1,378 2.30 0.00 0 46 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 68

Air Handler #84 - FC-1-15 - Total Load Summary


Air Handler Description: FC-1-15 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 4,725 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,214 Btuh 46 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 5,939 Btuh
Heating Supply Air: 4,725 / (.680 X 1.08 X 20) = 322 CFM
Winter Vent Outside Air (14.3% of supply) = 46 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 322 CFM
Total Air Handler Vent. Air (14.27% of Supply): 46 CFM
Total Conditioned Air Space: 140 Sq.ft
Supply Air Per Unit Area: 2.2986 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 42.42 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,939 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 69

Air Handler #85 - FC-1-16 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Habitacion
183 7,368 0 0 2/Hr 2/Hr
33 Mujeres 2 Camas
2 502 0 0 60 0
-
1,801 2.74 0.00 0 60 0

Zone Peak Totals: 183 7,368 0 0


Total Zones: 1 2 502 0 0 60 0
Unique Zones: 1 1,801 2.74 0.00 0 60 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 70

Air Handler #85 - FC-1-16 - Total Load Summary


Air Handler Description: FC-1-16 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 7,368 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,586 Btuh 60 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 8,954 Btuh
Heating Supply Air: 7,368 / (.680 X 1.08 X 20) = 502 CFM
Winter Vent Outside Air (12.0% of supply) = 60 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 502 CFM
Total Air Handler Vent. Air (11.96% of Supply): 60 CFM
Total Conditioned Air Space: 183 Sq.ft
Supply Air Per Unit Area: 2.7421 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 48.93 Btuh/Sq.ft
Total Heating Required With Outside Air: 8,954 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 71

Air Handler #86 - FC-1-17 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
32 P1- Comedor/cocina 242 5,526 0 0 2/Hr 2/Hr
- 10 376 0 0 79 0
2,383 1.55 0.00 0 79 0
Zone Peak Totals: 242 5,526 0 0
Total Zones: 1 10 376 0 0 79 0
Unique Zones: 1 2,383 1.55 0.00 0 79 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 72

Air Handler #86 - FC-1-17 - Total Load Summary


Air Handler Description: FC-1-17 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 5,526 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 2,099 Btuh 79 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 7,625 Btuh
Heating Supply Air: 5,526 / (.680 X 1.08 X 20) = 376 CFM
Winter Vent Outside Air (21.1% of supply) = 79 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 376 CFM
Total Air Handler Vent. Air (21.11% of Supply): 79 CFM
Total Conditioned Air Space: 242 Sq.ft
Supply Air Per Unit Area: 1.5541 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 31.49 Btuh/Sq.ft
Total Heating Required With Outside Air: 7,625 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 73

Air Handler #92 - FC-1-18 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Salud
291 5,816 0 0 2/Hr 2/Hr
30 Ocupacional
5 396 0 0 95 0
-
2,863 1.36 0.00 0 95 0

Zone Peak Totals: 291 5,816 0 0


Total Zones: 1 5 396 0 0 95 0
Unique Zones: 1 2,863 1.36 0.00 0 95 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 74

Air Handler #92 - FC-1-18 - Total Load Summary


Air Handler Description: FC-1-18 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 5,816 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 2,523 Btuh 95 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 8,339 Btuh
Heating Supply Air: 5,816 / (.680 X 1.08 X 20) = 396 CFM
Winter Vent Outside Air (24.1% of supply) = 95 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 396 CFM
Total Air Handler Vent. Air (24.09% of Supply): 95 CFM
Total Conditioned Air Space: 291 Sq.ft
Supply Air Per Unit Area: 1.3613 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 28.66 Btuh/Sq.ft
Total Heating Required With Outside Air: 8,339 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 75

Air Handler #93 - FC-1-19 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
29 P1- Salud Ambiental 215 4,836 0 0 2/Hr 2/Hr
- 5 329 0 0 71 0
2,116 1.53 0.00 0 71 0
Zone Peak Totals: 215 4,836 0 0
Total Zones: 1 5 329 0 0 71 0
Unique Zones: 1 2,116 1.53 0.00 0 71 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 76

Air Handler #93 - FC-1-19 - Total Load Summary


Air Handler Description: FC-1-19 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 4,836 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,864 Btuh 71 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 6,699 Btuh
Heating Supply Air: 4,836 / (.680 X 1.08 X 20) = 329 CFM
Winter Vent Outside Air (21.4% of supply) = 71 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 329 CFM
Total Air Handler Vent. Air (21.41% of Supply): 71 CFM
Total Conditioned Air Space: 215 Sq.ft
Supply Air Per Unit Area: 1.5319 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 31.16 Btuh/Sq.ft
Total Heating Required With Outside Air: 6,699 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 77

Air Handler #94 - FC-1-20 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Jefatura De
Mantenimiento+plano 250 5,303 0 0 2/Hr 2/Hr
31 teca 2 361 0 0 82 0
- 2,460 1.44 0.00 0 82 0

Zone Peak Totals: 250 5,303 0 0


Total Zones: 1 2 361 0 0 82 0
Unique Zones: 1 2,460 1.44 0.00 0 82 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 78

Air Handler #94 - FC-1-20 - Total Load Summary


Air Handler Description: FC-1-20 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 5,303 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 2,167 Btuh 82 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 7,470 Btuh
Heating Supply Air: 5,303 / (.680 X 1.08 X 20) = 361 CFM
Winter Vent Outside Air (22.7% of supply) = 82 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 361 CFM
Total Air Handler Vent. Air (22.71% of Supply): 82 CFM
Total Conditioned Air Space: 250 Sq.ft
Supply Air Per Unit Area: 1.4446 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 29.88 Btuh/Sq.ft
Total Heating Required With Outside Air: 7,470 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 79

Air Handler #95 - FC-1-21 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
28 P1- Soporte Tecnico 167 4,458 0 0 2/Hr 2/Hr
- 4 304 0 0 55 0
1,643 1.82 0.00 0 55 0
Zone Peak Totals: 167 4,458 0 0
Total Zones: 1 4 304 0 0 55 0
Unique Zones: 1 1,643 1.82 0.00 0 55 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 80

Air Handler #95 - FC-1-21 - Total Load Summary


Air Handler Description: FC-1-21 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 4,458 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,448 Btuh 55 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 5,906 Btuh
Heating Supply Air: 4,458 / (.680 X 1.08 X 20) = 304 CFM
Winter Vent Outside Air (18.0% of supply) = 55 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 304 CFM
Total Air Handler Vent. Air (18.04% of Supply): 55 CFM
Total Conditioned Air Space: 167 Sq.ft
Supply Air Per Unit Area: 1.8181 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 35.36 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,906 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 81

Air Handler #96 - FC-1-22 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Oficina
140 5,998 0 0 2/Hr 2/Hr
23 Administrativa
2 409 0 0 46 0
-
1,378 2.92 0.00 0 46 0

Zone Peak Totals: 140 5,998 0 0


Total Zones: 1 2 409 0 0 46 0
Unique Zones: 1 1,378 2.92 0.00 0 46 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 82

Air Handler #96 - FC-1-22 - Total Load Summary


Air Handler Description: FC-1-22 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 5,998 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,214 Btuh 46 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 7,212 Btuh
Heating Supply Air: 5,998 / (.680 X 1.08 X 20) = 409 CFM
Winter Vent Outside Air (11.2% of supply) = 46 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 409 CFM
Total Air Handler Vent. Air (11.24% of Supply): 46 CFM
Total Conditioned Air Space: 140 Sq.ft
Supply Air Per Unit Area: 2.9181 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 51.51 Btuh/Sq.ft
Total Heating Required With Outside Air: 7,212 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 83

Air Handler #97 - FC-1-23 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
22 P1- Alm-108 Jefatura 94 4,495 0 0 2/Hr 2/Hr
- 2 306 0 0 31 0
925 3.26 0.00 0 31 0
Zone Peak Totals: 94 4,495 0 0
Total Zones: 1 2 306 0 0 31 0
Unique Zones: 1 925 3.26 0.00 0 31 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 84

Air Handler #97 - FC-1-23 - Total Load Summary


Air Handler Description: FC-1-23 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 4,495 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 815 Btuh 31 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 5,310 Btuh
Heating Supply Air: 4,495 / (.680 X 1.08 X 20) = 306 CFM
Winter Vent Outside Air (10.1% of supply) = 31 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 306 CFM
Total Air Handler Vent. Air (10.07% of Supply): 31 CFM
Total Conditioned Air Space: 94 Sq.ft
Supply Air Per Unit Area: 3.2567 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 56.49 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,310 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 85

Air Handler #98 - FC-1-24 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Recepcion Y
87 3,111 0 0 2/Hr 2/Hr
46 Despacho
2 212 0 0 29 0
-
857 2.43 0.00 0 29 0

Zone Peak Totals: 87 3,111 0 0


Total Zones: 1 2 212 0 0 29 0
Unique Zones: 1 857 2.43 0.00 0 29 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 86

Air Handler #98 - FC-1-24 - Total Load Summary


Air Handler Description: FC-1-24 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 3,111 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 755 Btuh 29 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 3,866 Btuh
Heating Supply Air: 3,111 / (.680 X 1.08 X 20) = 212 CFM
Winter Vent Outside Air (13.5% of supply) = 29 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 212 CFM
Total Air Handler Vent. Air (13.48% of Supply): 29 CFM
Total Conditioned Air Space: 87 Sq.ft
Supply Air Per Unit Area: 2.4336 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 44.40 Btuh/Sq.ft
Total Heating Required With Outside Air: 3,866 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 87

Air Handler #99 - FC-1-25 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
P1- Almacen De
135 4,466 0 0 2/Hr 2/Hr
47 Medicamentos
2 304 0 0 44 0
-
1,326 2.26 0.00 0 44 0

Zone Peak Totals: 135 4,466 0 0


Total Zones: 1 2 304 0 0 44 0
Unique Zones: 1 1,326 2.26 0.00 0 44 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 88

Air Handler #99 - FC-1-25 - Total Load Summary


Air Handler Description: FC-1-25 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 4,466 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,168 Btuh 44 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 5,634 Btuh
Heating Supply Air: 4,466 / (.680 X 1.08 X 20) = 304 CFM
Winter Vent Outside Air (14.5% of supply) = 44 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 304 CFM
Total Air Handler Vent. Air (14.53% of Supply): 44 CFM
Total Conditioned Air Space: 135 Sq.ft
Supply Air Per Unit Area: 2.2573 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 41.81 Btuh/Sq.ft
Total Heating Required With Outside Air: 5,634 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 89

Air Handler #100 - FC-1-26 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
48 P1- Almacen General 216 4,883 0 0 2/Hr 2/Hr
- 3 333 0 0 71 0
2,128 1.54 0.00 0 71 0
Zone Peak Totals: 216 4,883 0 0
Total Zones: 1 3 333 0 0 71 0
Unique Zones: 1 2,128 1.54 0.00 0 71 0
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 90

Air Handler #100 - FC-1-26 - Total Load Summary


Air Handler Description: FC-1-26 Constant Volume - Sum of Peaks
Outdoor Conditions: 39° DB (System is Heating Only)
Winter: Ventilation controls outside air.
Zone Space sensible loss: 4,883 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 1,874 Btuh 71 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 6,757 Btuh
Heating Supply Air: 4,883 / (.680 X 1.08 X 20) = 333 CFM
Winter Vent Outside Air (21.3% of supply) = 71 CFM
Zone space sensible gain: 0 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 0 Btuh
Cooling Supply Air: 0 / (.680 X 1.1 X 0) = 0 CFM
Summer Vent Outside Air (0.0% of supply) = 0 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 0 Btuh 0 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 0 Btuh
Total sensible gain on air handling system: 0 Btuh
Zone space latent gain: 0 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 0 Btuh
Total latent gain on air handling system: 0 Btuh
Total system sensible and latent gain: 0 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 333 CFM
Total Air Handler Vent. Air (21.33% of Supply): 71 CFM
Total Conditioned Air Space: 216 Sq.ft
Supply Air Per Unit Area: 1.5379 CFM/Sq.ft
Area Per Cooling Capacity: 0.0000 Sq.ft/Ton
Cooling Capacity Per Area: 0.0000 Tons/Sq.ft
Heating Capacity Per Area: 31.25 Btuh/Sq.ft
Total Heating Required With Outside Air: 6,757 Btuh
Total Cooling Required With Outside Air: 0.00 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 91

Air System #1 (FC-1-36/FC-1-37/FC-1-38/FC-1-39/40/41) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 69,869 / ( 20.00 x 500 ) = 7.0 GPM
Steam Req. = 69,869 / 970 = 72.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 65.27
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 92

Air System #1 (FC-1-36/FC-1-37/FC-1-38/FC-1-39/40/41) Psychrometric Analysis


(G)
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 69,869 / ( 20.00 x 500 ) = 7.0 GPM
Steam Req. = 69,869 / 970 = 72.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 65.27
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 93

Air System #2 () Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 13,021 / ( 20.00 x 500 ) = 1.3 GPM
Steam Req. = 13,021 / 970 = 13.4 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 62.79
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 94

Air System #2 () Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 13,021 / ( 20.00 x 500 ) = 1.3 GPM
Steam Req. = 13,021 / 970 = 13.4 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 62.79
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 95

Air System #4 (FC-1-42) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 10,546 / ( 20.00 x 500 ) = 1.1 GPM
Steam Req. = 10,546 / 970 = 10.9 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 67.98
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 96

Air System #4 (FC-1-42) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 10,546 / ( 20.00 x 500 ) = 1.1 GPM
Steam Req. = 10,546 / 970 = 10.9 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 67.98
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 97

Air System #32 (FC-1-27) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 8,749 / ( 20.00 x 500 ) = 0.9 GPM
Steam Req. = 8,749 / 970 = 9.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 67.86
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 98

Air System #32 (FC-1-27) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 8,749 / ( 20.00 x 500 ) = 0.9 GPM
Steam Req. = 8,749 / 970 = 9.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 67.86
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 99

Air System #33 (FC-1-28) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 9,252 / ( 20.00 x 500 ) = 0.9 GPM
Steam Req. = 9,252 / 970 = 9.5 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 67.34
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 100

Air System #33 (FC-1-28) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 9,252 / ( 20.00 x 500 ) = 0.9 GPM
Steam Req. = 9,252 / 970 = 9.5 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 67.34
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 101

Air System #34 (FC-1-29) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 20,140 / ( 20.00 x 500 ) = 2.0 GPM
Steam Req. = 20,140 / 970 = 20.8 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 64.36
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 102

Air System #34 (FC-1-29) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 20,140 / ( 20.00 x 500 ) = 2.0 GPM
Steam Req. = 20,140 / 970 = 20.8 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 64.36
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 103

Air System #35 (FC-1-30) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 7,474 / ( 20.00 x 500 ) = 0.7 GPM
Steam Req. = 7,474 / 970 = 7.7 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 68.05
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 104

Air System #35 (FC-1-30) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 7,474 / ( 20.00 x 500 ) = 0.7 GPM
Steam Req. = 7,474 / 970 = 7.7 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 68.05
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 105

Air System #36 (FC-1-31) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 8,865 / ( 20.00 x 500 ) = 0.9 GPM
Steam Req. = 8,865 / 970 = 9.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 68.45
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 106

Air System #36 (FC-1-31) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 8,865 / ( 20.00 x 500 ) = 0.9 GPM
Steam Req. = 8,865 / 970 = 9.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 68.45
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 107

Air System #37 (FC-1-32) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 4,580 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 4,580 / 970 = 4.7 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 69.88
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 108

Air System #37 (FC-1-32) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 4,580 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 4,580 / 970 = 4.7 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 69.88
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 109

Air System #38 (FC-1-33) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 7,494 / ( 20.00 x 500 ) = 0.7 GPM
Steam Req. = 7,494 / 970 = 7.7 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 68.72
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 110

Air System #38 (FC-1-33) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 7,494 / ( 20.00 x 500 ) = 0.7 GPM
Steam Req. = 7,494 / 970 = 7.7 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 68.72
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 111

Air System #39 (FC-1-34/FC-1-35) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 21,437 / ( 20.00 x 500 ) = 2.1 GPM
Steam Req. = 21,437 / 970 = 22.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 62.29
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 112

Air System #39 (FC-1-34/FC-1-35) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 0.000 0.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 0
Sensible Reserve 0 0.000 0
Zone Condition 0 0.000 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 0.000 0 0.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 0.000 - 0.000 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 0.000 - 0.000 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 0.000 - 0.000 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 21,437 / ( 20.00 x 500 ) = 2.1 GPM
Steam Req. = 21,437 / 970 = 22.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 62.29
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: .00 Dry bulb temperature: 95.00
Wet bulb temperature: .00
Relative humidity: .00
Enthalpy: .00 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 113

Air System #40 (UCD-1-01) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 75.190 50.065
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 13,881 17.935 1,035
Sensible Reserve 0 0.000 0
Zone Condition 0 75.190 13,881 68.000 1,035
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 107 CFM 4,373 8.358 560 0.724
Blow-Thru Fan 0 0.000
Entering Coil Condition 4,373 83.548 14,441 68.724 1,035

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 1,035 x( 68.724 - 50.065 )= 14,441 Btuh


TLH = 0.680 x 0.68 x 1,035 x( 83.548 - 75.190 )= 3,999 Btuh
----------
SUM = 18,440 Btuh
GTH = 0.680 x 4.50 x 1,035 x( 29.524 - 23.653 )= 18,588 Btuh
Total System Load = 18,814 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 18,588 / ( 10.00 x 500 ) = 3.7 GPM
Heating GPM = 0 /( 20.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 68.72 Dry bulb temperature: 75.00
Wet bulb temperature: 56.96
Relative humidity: 54.08
Enthalpy: 29.52 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 50.07 Dry bulb temperature: 75.00
Wet bulb temperature: 49.18
Relative humidity: 95.00
Enthalpy: 23.65 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 114

Air System #40 (UCD-1-01) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 75.190 50.065
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 13,881 17.935 1,035
Sensible Reserve 0 0.000 0
Zone Condition 0 75.190 13,881 68.000 1,035
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 107 CFM 4,373 8.358 560 0.724
Blow-Thru Fan 0 0.000
Entering Coil Condition 4,373 83.548 14,441 68.724 1,035

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 1,035 x( 68.724 - 50.065 )= 14,441 Btuh


TLH = 0.680 x 0.68 x 1,035 x( 83.548 - 75.190 )= 3,999 Btuh
----------
SUM = 18,440 Btuh
GTH = 0.680 x 4.50 x 1,035 x( 29.524 - 23.653 )= 18,588 Btuh
Total System Load = 18,814 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 18,588 / ( 10.00 x 500 ) = 3.7 GPM
Heating GPM = 0 /( 20.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 68.72 Dry bulb temperature: 75.00
Wet bulb temperature: 56.96
Relative humidity: 54.08
Enthalpy: 29.52 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 50.07 Dry bulb temperature: 75.00
Wet bulb temperature: 49.18
Relative humidity: 95.00
Enthalpy: 23.65 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 115

Air System #63 (FC-234) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 75.190 50.065
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,035
Sensible Reserve 0 0.000 0
Zone Condition 0 75.190 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 7.877 0 0.103
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 83.067 0 68.103 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 68.103 - 50.065 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 83.067 - 75.190 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 29.297 - 23.653 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 4,783 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 4,783 / 970 = 4.9 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 68.10 Dry bulb temperature: 69.32
Wet bulb temperature: 56.69
Relative humidity: 54.96
Enthalpy: 29.30 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 50.07 Dry bulb temperature: 95.00
Wet bulb temperature: 49.18
Relative humidity: 95.00
Enthalpy: 23.65 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 116

Air System #63 (FC-234) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 75.190 50.065
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,035
Sensible Reserve 0 0.000 0
Zone Condition 0 75.190 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 7.877 0 0.103
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 83.067 0 68.103 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 68.103 - 50.065 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 83.067 - 75.190 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 29.297 - 23.653 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 4,783 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 4,783 / 970 = 4.9 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 68.10 Dry bulb temperature: 69.32
Wet bulb temperature: 56.69
Relative humidity: 54.96
Enthalpy: 29.30 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 50.07 Dry bulb temperature: 95.00
Wet bulb temperature: 49.18
Relative humidity: 95.00
Enthalpy: 23.65 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 117

Air System #65 (UTA-101 (Patologia Clinica)) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 93.097 55.769
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 6,957 2.677 80,859 19.231 5,623
Sensible Reserve 0 0.000 0
Zone Condition 6,957 95.773 80,859 75.000 5,623
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 5,623 CFM 171,985 58.615 4,205 1.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 178,942 154.388 85,063 76.000 5,623

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 5,623 x( 76.000 - 55.769 )= 85,063 Btuh


TLH = 0.680 x 0.68 x 5,623 x( 154.388 - 93.097 )= 159,307 Btuh
----------
SUM = 244,370 Btuh
GTH = 0.680 x 4.50 x 5,623 x( 42.389 - 27.827 )= 250,475 Btuh
Total System Load = 263,738 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 250,475 / ( 10.00 x 500 ) = 50.1 GPM
Heating GPM = 157,370 / ( 20.00 x 500 ) = 15.7 GPM
Steam Req. = 157,370 / 970 = 162.2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 76.00 Dry bulb temperature: 39.00
Wet bulb temperature: 70.00
Relative humidity: 76.95
Enthalpy: 42.39 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.77 Dry bulb temperature: 95.00
Wet bulb temperature: 54.81
Relative humidity: 95.00
Enthalpy: 27.83 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 118

Air System #65 (UTA-101 (Patologia Clinica)) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 93.097 55.769
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 6,957 2.677 80,859 19.231 5,623
Sensible Reserve 0 0.000 0
Zone Condition 6,957 95.773 80,859 75.000 5,623
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 5,623 CFM 171,985 58.615 4,205 1.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 178,942 154.388 85,063 76.000 5,623

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 5,623 x( 76.000 - 55.769 )= 85,063 Btuh


TLH = 0.680 x 0.68 x 5,623 x( 154.388 - 93.097 )= 159,307 Btuh
----------
SUM = 244,370 Btuh
GTH = 0.680 x 4.50 x 5,623 x( 42.389 - 27.827 )= 250,475 Btuh
Total System Load = 263,738 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 250,475 / ( 10.00 x 500 ) = 50.1 GPM
Heating GPM = 157,370 / ( 20.00 x 500 ) = 15.7 GPM
Steam Req. = 157,370 / 970 = 162.2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 76.00 Dry bulb temperature: 39.00
Wet bulb temperature: 70.00
Relative humidity: 76.95
Enthalpy: 42.39 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.77 Dry bulb temperature: 95.00
Wet bulb temperature: 54.81
Relative humidity: 95.00
Enthalpy: 27.83 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 119

Air System #67 (UTA-1-02 Control De TBC) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.059 55.172
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 3,080 4.713 20,957 19.825 1,414
Sensible Reserve 3 0.003 0
Zone Condition 3,080 95.772 20,960 75.000 1,414
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 880 CFM 26,913 36.483 658 0.622
Blow-Thru Fan 0 0.000
Entering Coil Condition 29,993 132.255 21,618 75.622 1,414

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 1,414 x( 75.622 - 55.172 )= 21,618 Btuh


TLH = 0.680 x 0.68 x 1,414 x( 132.255 - 91.059 )= 26,921 Btuh
----------
SUM = 48,538 Btuh
GTH = 0.680 x 4.50 x 1,414 x( 38.834 - 27.364 )= 49,598 Btuh
Total System Load = 51,611 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 49,598 / ( 10.00 x 500 ) = 9.9 GPM
Heating GPM = 43,847 / ( 20.00 x 500 ) = 4.4 GPM
Steam Req. = 43,847 / 970 = 45.2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 75.62 Dry bulb temperature: 52.41
Wet bulb temperature: 66.82
Relative humidity: 67.07
Enthalpy: 38.83 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.17 Dry bulb temperature: 95.00
Wet bulb temperature: 54.22
Relative humidity: 95.00
Enthalpy: 27.36 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 120

Air System #67 (UTA-1-02 Control De TBC) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.058 55.172
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 3,080 4.714 20,957 19.828 1,414
Sensible Reserve 0 0.000 0
Zone Condition 3,080 95.772 20,957 75.000 1,414
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 880 CFM 26,913 36.489 658 0.623
Blow-Thru Fan 0 0.000
Entering Coil Condition 29,993 132.261 21,615 75.623 1,414

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 1,414 x( 75.623 - 55.172 )= 21,615 Btuh


TLH = 0.680 x 0.68 x 1,414 x( 132.261 - 91.058 )= 26,921 Btuh
----------
SUM = 48,535 Btuh
GTH = 0.680 x 4.50 x 1,414 x( 38.835 - 27.364 )= 49,595 Btuh
Total System Load = 51,608 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 49,595 / ( 10.00 x 500 ) = 9.9 GPM
Heating GPM = 43,847 / ( 20.00 x 500 ) = 4.4 GPM
Steam Req. = 43,847 / 970 = 45.2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 75.62 Dry bulb temperature: 52.41
Wet bulb temperature: 66.82
Relative humidity: 67.09
Enthalpy: 38.83 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.17 Dry bulb temperature: 95.00
Wet bulb temperature: 54.22
Relative humidity: 95.00
Enthalpy: 27.36 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 121

Air System #68 (UTA-1-04 (hemoterapia Y Banco De Sangre)) Psychrometric


Analysis
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 93.812 55.975
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 3,520 1.944 55,735 19.025 3,918
Sensible Reserve 0 0.000 0
Zone Condition 3,520 95.756 55,735 75.000 3,918
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 3,918 CFM 122,827 60.281 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 126,347 156.037 55,735 75.000 3,918

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 3,918 x( 75.000 - 55.975 )= 55,735 Btuh


TLH = 0.680 x 0.68 x 3,918 x( 156.037 - 93.812 )= 112,690 Btuh
----------
SUM = 168,425 Btuh
GTH = 0.680 x 4.50 x 3,918 x( 42.397 - 27.989 )= 172,680 Btuh
Total System Load = 182,082 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 172,680 / ( 10.00 x 500 ) = 34.5 GPM
Heating GPM = 104,826 / ( 20.00 x 500 ) = 10.5 GPM
Steam Req. = 104,826 / 970 = 108.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 75.00 Dry bulb temperature: 39.00
Wet bulb temperature: 70.00
Relative humidity: 80.37
Enthalpy: 42.40 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.98 Dry bulb temperature: 95.00
Wet bulb temperature: 55.01
Relative humidity: 95.00
Enthalpy: 27.99 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 122

Air System #68 (UTA-1-04 (hemoterapia Y Banco De Sangre)) Psychrometric


Analysis (G)
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 93.812 55.975
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 3,520 1.944 55,735 19.025 3,918
Sensible Reserve 0 0.000 0
Zone Condition 3,520 95.756 55,735 75.000 3,918
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 3,918 CFM 122,827 60.281 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 126,347 156.037 55,735 75.000 3,918

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 3,918 x( 75.000 - 55.975 )= 55,735 Btuh


TLH = 0.680 x 0.68 x 3,918 x( 156.037 - 93.812 )= 112,690 Btuh
----------
SUM = 168,425 Btuh
GTH = 0.680 x 4.50 x 3,918 x( 42.397 - 27.989 )= 172,680 Btuh
Total System Load = 182,082 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 172,680 / ( 10.00 x 500 ) = 34.5 GPM
Heating GPM = 104,826 / ( 20.00 x 500 ) = 10.5 GPM
Steam Req. = 104,826 / 970 = 108.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 75.00 Dry bulb temperature: 39.00
Wet bulb temperature: 70.00
Relative humidity: 80.37
Enthalpy: 42.40 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.98 Dry bulb temperature: 95.00
Wet bulb temperature: 55.01
Relative humidity: 95.00
Enthalpy: 27.99 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 123

Air System #69 (UTA-1-03 Control De Vih Sida) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,860 3.762 24,043 19.552 1,645
Sensible Reserve 0 0.000 0
Zone Condition 2,860 95.760 24,043 75.000 1,645
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 1,645 CFM 51,559 60.277 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 54,419 156.037 24,043 75.000 1,645

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 1,645 x( 75.000 - 55.448 )= 24,043 Btuh


TLH = 0.680 x 0.68 x 1,645 x( 156.037 - 91.998 )= 48,683 Btuh
----------
SUM = 72,727 Btuh
GTH = 0.680 x 4.50 x 1,645 x( 42.397 - 27.578 )= 74,553 Btuh
Total System Load = 78,454 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 74,553 / ( 10.00 x 500 ) = 14.9 GPM
Heating GPM = 72,076 / ( 20.00 x 500 ) = 7.2 GPM
Steam Req. = 72,076 / 970 = 74.3 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 75.00 Dry bulb temperature: 39.00
Wet bulb temperature: 70.00
Relative humidity: 80.37
Enthalpy: 42.40 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 124

Air System #69 (UTA-1-03 Control De Vih Sida) Psychrometric Analysis (G)
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 2,860 3.762 24,043 19.552 1,645
Sensible Reserve 0 0.000 0
Zone Condition 2,860 95.760 24,043 75.000 1,645
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 1,645 CFM 51,559 60.277 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 54,419 156.037 24,043 75.000 1,645

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 1,645 x( 75.000 - 55.448 )= 24,043 Btuh


TLH = 0.680 x 0.68 x 1,645 x( 156.037 - 91.998 )= 48,683 Btuh
----------
SUM = 72,727 Btuh
GTH = 0.680 x 4.50 x 1,645 x( 42.397 - 27.578 )= 74,553 Btuh
Total System Load = 78,454 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 74,553 / ( 10.00 x 500 ) = 14.9 GPM
Heating GPM = 72,076 / ( 20.00 x 500 ) = 7.2 GPM
Steam Req. = 72,076 / 970 = 74.3 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 75.00 Dry bulb temperature: 39.00
Wet bulb temperature: 70.00
Relative humidity: 80.37
Enthalpy: 42.40 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 125

Air System #70 (FC-1-01) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,296 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,296 / 970 = 5.5 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 68.90
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 126

Air System #70 (FC-1-01) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,296 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,296 / 970 = 5.5 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 68.90
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 127

Air System #71 (FC-1-02) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 4,413 / ( 20.00 x 500 ) = 0.4 GPM
Steam Req. = 4,413 / 970 = 4.5 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 70.12
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 128

Air System #71 (FC-1-02) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 4,413 / ( 20.00 x 500 ) = 0.4 GPM
Steam Req. = 4,413 / 970 = 4.5 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 70.12
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 129

Air System #72 (FC-1-03) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,051 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,051 / 970 = 5.2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.11
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 130

Air System #72 (FC-1-03) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,051 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,051 / 970 = 5.2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.11
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 131

Air System #73 (FC-1-04) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,466 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,466 / 970 = 5.6 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 68.34
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 132

Air System #73 (FC-1-04) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,466 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,466 / 970 = 5.6 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 68.34
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 133

Air System #74 (FC-1-05) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,357 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,357 / 970 = 5.5 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.02
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 134

Air System #74 (FC-1-05) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,357 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,357 / 970 = 5.5 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.02
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 135

Air System #75 (FC-1-06) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,178 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,178 / 970 = 5.3 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.48
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 136

Air System #75 (FC-1-06) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,178 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,178 / 970 = 5.3 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.48
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 137

Air System #76 (FC-1-07) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,834 / ( 20.00 x 500 ) = 0.6 GPM
Steam Req. = 5,834 / 970 = 6.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 68.11
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 138

Air System #76 (FC-1-07) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,834 / ( 20.00 x 500 ) = 0.6 GPM
Steam Req. = 5,834 / 970 = 6.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 68.11
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 139

Air System #77 (FC-1-08) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,431 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,431 / 970 = 5.6 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 68.92
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 140

Air System #77 (FC-1-08) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,431 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,431 / 970 = 5.6 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 68.92
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 141

Air System #78 (FC-1-09) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 7,852 / ( 20.00 x 500 ) = 0.8 GPM
Steam Req. = 7,852 / 970 = 8.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 67.46
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 142

Air System #78 (FC-1-09) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 7,852 / ( 20.00 x 500 ) = 0.8 GPM
Steam Req. = 7,852 / 970 = 8.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 67.46
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 143

Air System #79 (FC-1-10) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 9,761 / ( 20.00 x 500 ) = 1.0 GPM
Steam Req. = 9,761 / 970 = 10.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 64.93
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 144

Air System #79 (FC-1-10) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 9,761 / ( 20.00 x 500 ) = 1.0 GPM
Steam Req. = 9,761 / 970 = 10.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 64.93
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 145

Air System #80 (FC-1-11) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,026 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,026 / 970 = 5.2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.02
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 146

Air System #80 (FC-1-11) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,026 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,026 / 970 = 5.2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.02
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 147

Air System #81 (FC-1-12) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 8,516 / ( 20.00 x 500 ) = 0.9 GPM
Steam Req. = 8,516 / 970 = 8.8 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.04
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 148

Air System #81 (FC-1-12) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 8,516 / ( 20.00 x 500 ) = 0.9 GPM
Steam Req. = 8,516 / 970 = 8.8 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.04
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 149

Air System #82 (FC-1-13) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 6,406 / ( 20.00 x 500 ) = 0.6 GPM
Steam Req. = 6,406 / 970 = 6.6 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 67.78
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 150

Air System #82 (FC-1-13) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 6,406 / ( 20.00 x 500 ) = 0.6 GPM
Steam Req. = 6,406 / 970 = 6.6 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 67.78
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 151

Air System #83 (FC-1-14) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 15,616 / ( 20.00 x 500 ) = 1.6 GPM
Steam Req. = 15,616 / 970 = 16.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 62.04
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 152

Air System #83 (FC-1-14) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 15,616 / ( 20.00 x 500 ) = 1.6 GPM
Steam Req. = 15,616 / 970 = 16.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 62.04
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 153

Air System #84 (FC-1-15) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,939 / ( 20.00 x 500 ) = 0.6 GPM
Steam Req. = 5,939 / 970 = 6.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.86
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 154

Air System #84 (FC-1-15) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,939 / ( 20.00 x 500 ) = 0.6 GPM
Steam Req. = 5,939 / 970 = 6.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.86
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 155

Air System #85 (FC-1-16) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 8,954 / ( 20.00 x 500 ) = 0.9 GPM
Steam Req. = 8,954 / 970 = 9.2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 70.69
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 156

Air System #85 (FC-1-16) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 8,954 / ( 20.00 x 500 ) = 0.9 GPM
Steam Req. = 8,954 / 970 = 9.2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 70.69
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 157

Air System #86 (FC-1-17) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 7,625 / ( 20.00 x 500 ) = 0.8 GPM
Steam Req. = 7,625 / 970 = 7.9 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 67.40
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 158

Air System #86 (FC-1-17) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 7,625 / ( 20.00 x 500 ) = 0.8 GPM
Steam Req. = 7,625 / 970 = 7.9 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 67.40
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 159

Air System #92 (FC-1-18) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 8,339 / ( 20.00 x 500 ) = 0.8 GPM
Steam Req. = 8,339 / 970 = 8.6 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 66.33
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 160

Air System #92 (FC-1-18) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 8,339 / ( 20.00 x 500 ) = 0.8 GPM
Steam Req. = 8,339 / 970 = 8.6 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 66.33
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 161

Air System #93 (FC-1-19) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 6,699 / ( 20.00 x 500 ) = 0.7 GPM
Steam Req. = 6,699 / 970 = 6.9 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 67.29
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 162

Air System #93 (FC-1-19) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 6,699 / ( 20.00 x 500 ) = 0.7 GPM
Steam Req. = 6,699 / 970 = 6.9 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 67.29
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 163

Air System #94 (FC-1-20) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 7,470 / ( 20.00 x 500 ) = 0.7 GPM
Steam Req. = 7,470 / 970 = 7.7 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 66.83
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 164

Air System #94 (FC-1-20) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 7,470 / ( 20.00 x 500 ) = 0.7 GPM
Steam Req. = 7,470 / 970 = 7.7 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 66.83
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 165

Air System #95 (FC-1-21) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,906 / ( 20.00 x 500 ) = 0.6 GPM
Steam Req. = 5,906 / 970 = 6.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 68.51
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 166

Air System #95 (FC-1-21) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,906 / ( 20.00 x 500 ) = 0.6 GPM
Steam Req. = 5,906 / 970 = 6.1 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 68.51
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 167

Air System #96 (FC-1-22) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 7,212 / ( 20.00 x 500 ) = 0.7 GPM
Steam Req. = 7,212 / 970 = 7.4 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 70.95
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 168

Air System #96 (FC-1-22) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 7,212 / ( 20.00 x 500 ) = 0.7 GPM
Steam Req. = 7,212 / 970 = 7.4 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 70.95
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 169

Air System #97 (FC-1-23) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,310 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,310 / 970 = 5.5 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 71.37
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 170

Air System #97 (FC-1-23) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,310 / ( 20.00 x 500 ) = 0.5 GPM
Steam Req. = 5,310 / 970 = 5.5 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 71.37
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 171

Air System #98 (FC-1-24) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 3,866 / ( 20.00 x 500 ) = 0.4 GPM
Steam Req. = 3,866 / 970 = 4.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 70.15
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 172

Air System #98 (FC-1-24) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 3,866 / ( 20.00 x 500 ) = 0.4 GPM
Steam Req. = 3,866 / 970 = 4.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 70.15
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 173

Air System #99 (FC-1-25) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,634 / ( 20.00 x 500 ) = 0.6 GPM
Steam Req. = 5,634 / 970 = 5.8 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.77
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 174

Air System #99 (FC-1-25) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 5,634 / ( 20.00 x 500 ) = 0.6 GPM
Steam Req. = 5,634 / 970 = 5.8 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 69.77
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 175

Air System #100 (FC-1-26) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 6,757 / ( 20.00 x 500 ) = 0.7 GPM
Steam Req. = 6,757 / 970 = 7.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 67.32
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 176

Air System #100 (FC-1-26) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 91.998 55.448
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 0 0.000 1,645
Sensible Reserve 0 0.000 0
Zone Condition 0 95.760 0 75.000 0
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 CFM 0 55.626 0 -6.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 151.386 0 69.000 0

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.680 x 1.10 x 0 x( 69.000 - 55.448 )= 0 Btuh


TLH = 0.680 x 0.68 x 0 x( 151.386 - 91.998 )= 0 Btuh
----------
SUM = 0 Btuh
GTH = 0.680 x 4.50 x 0 x( 40.173 - 27.578 )= 0 Btuh
Total System Load = 0 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 0 /( 10.00 x 500 ) = 0.0 GPM
Heating GPM = 6,757 / ( 20.00 x 500 ) = 0.7 GPM
Steam Req. = 6,757 / 970 = 7.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 69.00 Dry bulb temperature: 67.32
Wet bulb temperature: 68.00
Relative humidity: 95.64
Enthalpy: 40.17 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.45 Dry bulb temperature: 95.00
Wet bulb temperature: 54.49
Relative humidity: 95.00
Enthalpy: 27.58 Btu/lbm
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 177

Air System #1 (FC-1-36/FC-1-37/FC-1-38/FC-1-39/40/41) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 178

Air System #1 (FC-1-36/FC-1-37/FC-1-38/FC-1-39/40/41) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 179

Air System #2 () Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 180

Air System #2 () Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 181

Air System #4 (FC-1-42) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 182

Air System #4 (FC-1-42) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 183

Air System #32 (FC-1-27) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 184

Air System #32 (FC-1-27) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 185

Air System #33 (FC-1-28) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 186

Air System #33 (FC-1-28) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 187

Air System #34 (FC-1-29) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 188

Air System #34 (FC-1-29) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 189

Air System #35 (FC-1-30) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 190

Air System #35 (FC-1-30) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 191

Air System #36 (FC-1-31) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 192

Air System #36 (FC-1-31) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 193

Air System #37 (FC-1-32) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 194

Air System #37 (FC-1-32) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 195

Air System #38 (FC-1-33) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 196

Air System #38 (FC-1-33) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 197

Air System #39 (FC-1-34/FC-1-35) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 198

Air System #39 (FC-1-34/FC-1-35) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 199

Air System #40 (UCD-1-01) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 200

Air System #40 (UCD-1-01) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 201

Air System #63 (FC-234) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 202

Air System #63 (FC-234) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 203

Air System #65 (UTA-101 (Patologia Clinica)) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Cooling process could not be added.

Results out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 204

Air System #65 (UTA-101 (Patologia Clinica)) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Cooling process could not be added.

Results out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 205

Air System #67 (UTA-1-02 Control De TBC) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Cooling process could not be added.

Results out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 206

Air System #67 (UTA-1-02 Control De TBC) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Cooling process could not be added.

Results out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 207

Air System #68 (UTA-1-04 (hemoterapia Y Banco De Sangre)) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Cooling process could not be added.

Results out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 208

Air System #68 (UTA-1-04 (hemoterapia Y Banco De Sangre)) Psychrometric Chart


(G)
ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Cooling process could not be added.

Results out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 209

Air System #69 (UTA-1-03 Control De Vih Sida) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Cooling process could not be added.

Results out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 210

Air System #69 (UTA-1-03 Control De Vih Sida) Psychrometric Chart (G)
ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Cooling process could not be added.

Results out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 211

Air System #70 (FC-1-01) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 212

Air System #70 (FC-1-01) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 213

Air System #71 (FC-1-02) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 214

Air System #71 (FC-1-02) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 215

Air System #72 (FC-1-03) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 216

Air System #72 (FC-1-03) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 217

Air System #73 (FC-1-04) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 218

Air System #73 (FC-1-04) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 219

Air System #74 (FC-1-05) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 220

Air System #74 (FC-1-05) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 221

Air System #75 (FC-1-06) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 222

Air System #75 (FC-1-06) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 223

Air System #76 (FC-1-07) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 224

Air System #76 (FC-1-07) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 225

Air System #77 (FC-1-08) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 226

Air System #77 (FC-1-08) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 227

Air System #78 (FC-1-09) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 228

Air System #78 (FC-1-09) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 229

Air System #79 (FC-1-10) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 230

Air System #79 (FC-1-10) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 231

Air System #80 (FC-1-11) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 232

Air System #80 (FC-1-11) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 233

Air System #81 (FC-1-12) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 234

Air System #81 (FC-1-12) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 235

Air System #82 (FC-1-13) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 236

Air System #82 (FC-1-13) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 237

Air System #83 (FC-1-14) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 238

Air System #83 (FC-1-14) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 239

Air System #84 (FC-1-15) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 240

Air System #84 (FC-1-15) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 241

Air System #85 (FC-1-16) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 242

Air System #85 (FC-1-16) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 243

Air System #86 (FC-1-17) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 244

Air System #86 (FC-1-17) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 245

Air System #92 (FC-1-18) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 246

Air System #92 (FC-1-18) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 247

Air System #93 (FC-1-19) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 248

Air System #93 (FC-1-19) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 249

Air System #94 (FC-1-20) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 250

Air System #94 (FC-1-20) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 251

Air System #95 (FC-1-21) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 252

Air System #95 (FC-1-21) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 253

Air System #96 (FC-1-22) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 254

Air System #96 (FC-1-22) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 255

Air System #97 (FC-1-23) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 256

Air System #97 (FC-1-23) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 257

Air System #98 (FC-1-24) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 258

Air System #98 (FC-1-24) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 259

Air System #99 (FC-1-25) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 260

Air System #99 (FC-1-25) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 261

Air System #100 (FC-1-26) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr HOSPITAL HUARI HVAC PRIMER PISO
Hell Page 262

Air System #100 (FC-1-26) Psychrometric Chart (G)


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition
One or more points or processes failed to be added to the chart:
Zone process could not be added.

Data out of range.