Rasio Material Vs Upah Konstruksi

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Rasio per Kg

NO DESCRITION VOL SAT


MATRIAL/UPAH
STEEL STRUCTURE WORK
1 Bottom Plate (ASTM A283 Grade C)
a. Plate m/s 10 mm thk, 5' x 20', Annular Plate 7.875,90 kg 2,94
b. Plate m/s 8 mm thk, 5' x 20' 13.301,90 kg 2,94
c. Flat bar 3 mm thk, 50 mm width 11,41 kg 2,94
2 Shell Plate (ASTM A283 Grade C)
a. Plate m/s 10 mm thk, 5' x 20' (shell # 1 & # 2) 19.600,00 kg 1,87
b. Plate m/s 8 mm thk, 5' x 20' (shell # 3 & # 4) 16.800,00 kg 1,87
c. Plate m/s 6 mm thk, 5' x 20' (shell # 5, # 6 & # 7) 21.002,40 kg 1,87
d. Plate m/s 4.5 mm thk, 5' x 20' (shell # 8,# 9,# 10, # 11) 22.403,20 kg 1,87
f. UNP 120 x 55 x 6 x 6000mm (Ring top) 675,00 kg 2,12
g. Besi siku 80 x 80 x 8 mm (Bottom Ring) 521,64 kg 2,12
3 Truss
Main Rafter & Crown Ring
a. Main rafter UNP 200x80x7.5 2.583,00 kg 3,33
b. Rafter UNP 75x40x5 816,70 kg 3,33
b. Plate m/s 8 mm thk,6' x 20' (Stiffener & Cleat Plate truss) 160,69 kg 2,94
c. Plate m/s 10 mm thk, 4' x 8' (Gusset) 248,31 kg 2,94
d. Plate m/s 10 mm thk, 6' x 20' (Gusset & Crown ring) 175,73 kg 1,87
e. Flange 1020 OD x 900 ID, plate 12 mm thk. 154,52 kg 1,87
Purlin
a. Purlin No.1 UNP 75x40x5 258,38 kg 3,33
b. Purlin No.2 UNP 75x40x5 139,89 kg 3,33
c. Purlin No.3 UNP 75x40x5 36,52 kg 3,33
4 Roof plate
a. Plate m/s 4.5 mm thk, 5' x 20' 11.026,40 kg 2,94
b. Flat bar 3 mm thk, 50 mm width 11,41 kg 2,94
c. Vent. Pipe dia. 6" Sch.40 22,50 kg 4,29
d. Elbow Sch. 40 dia. 6" 2,00 nos 8,71
5 Shell Manhole 24" (M1)
a. Plate Mild Steel 1255 x 1255 x 14 mm 173,10 kg 1,87
b. Plate Mild Steel 190 x 1936 x 12 mm 34,65 kg 1,87
c. Plate Mild Steel 820 x 820 x 12 mm 63,34 kg 2,94
d. Flange ANSI 150 lbs dia. 24" (820 OD x 626 ID) 1,00 set 7,33
e. Bolt & Nut m/s M22 x 2 1/2" 20,00 set 18,50
f. Support ( engsel ) u/ penutup Man Hole 1,00 set 2,40
g. Gasket Tombo 1100 ukuran 1270 x 1270 x 3 mm thk 1,00 lbr 8,80
h. Handle RB dia. 16 x 450 1,42 kg 2,09
6 Roof Manhole 20" (M2)
a. Plate Mild Steel 1050 x 1050 x 6 mm 51,93 kg 2,94
b. Plate Mild Steel 200 x 1596 x 6 mm 15,03 kg 1,87
c. Flange ANSI 150 lbs dia. 20" (650 OD) 1,00 set 7,04
d. Bolt & Nut m/s M20 x 2 1/2" 16,00 set 17,00
e. Handle RB dia. 16 x 450 1,42 kg 2,09
f. Support ( engsel ) u/ penutup Man Hole 1,00 set 2,40
g. Gasket Tombo 1100 ukuran 1270 x 1270 x 3 mm thk 1,00 lbr 8,80
7 Shell Inlet Nozzle 6"
a. Plate Mild Steel 400 x 400 x 6 mm, Pad Plate & Cleat Plate 12,83 kg 2,94
b. Pipe NPS 12" Sch.40 dia. 6" 498,60 kg 4,29
c. Flange ANSI 150 lbs dia. 6" 1,00 set 10,17
d. Bolt & Nut m/s M19 x 2 1/2" 8,00 set 16,00
e. Elbow NPS 6" Sch.40 3,00 set 8,71
f. Gasket Tombo 1100 ukuran 1270 x 1270 x 3 mm thk 1,00 lbr 8,80
g. Besi siku 50 x 50 x 5 mm 5,67 kg 2,94
h. U bolts Ø 6 mm & nuts dia. 6" 5,00 set 12,00
8 Shell Outlet Nozzle 8" (N2)
a. Plate Mild Steel 585 x 585 x 6 mm 16,12 kg 2,94
b. Pipe NPS 8" Sch.40 374,69 kg 4,29
c. Elbow NPS 8" Sch.40 1,00 set 10,00
d. Flange ANSI 150 lbs dia. 8" 1,00 set 11,67
e. Bolt & Nut m/s M19 x 2 1/2" 10,00 set 16,00
f. Besi siku 50 x 50 x 5 mm 34,97 kg 3,33
g. U bolts Ø 6 mm & nuts (dia. 8") 5,00 set 12,00
f. Gasket Tombo 1100 ukuran 1270 x 1270 x 3 mm thk 1,00 lbr 8,80
9 Drain Pipe 4"
a. Pipe NPS 4" Sch.40 dia. 4" 128,00 kg 4,29
b. Flange ANSI 150 lbs dia. 4" 2,00 set 13,89
c. Bolt & Nut m/s M19 x 2 1/2" 6,00 set 16,00
10 Steam Coil Nozzle 2"
a. SS 304 SUS Sch.10 Seamless Pipe dia. 2" 437,48 m' 4,39
b. SS Pipa Bend 400 mm c/c SUS 304 Sch 10 dia 2 " 34,80 m' 4,39
c. Flange ANSI 150 lbs dia. 2" 5,00 pcs 8,33
d. Bolt & Nut m/s M13 x 2 " 30,00 set 14,00
e. Besi siku 50 x 50 x 5 mm 531,45 kg 3,33
f. U bolts M10 & nuts dia. 2" 272,00 pcs 11,00
11 Shell Over Flow Drain 6"
a. Plate Mild Steel 400 x 400 x 6 mm, Cleat Plate 12,72 kg 2,94
b. Pipe NPS 12" Sch.40 dia. 6" 387,80 kg 4,29
c. Flange ANSI 150 lbs dia. 6" 1,00 set 10,17
d. Bolt & Nut m/s M22 x 2 1/2" 8,00 set 18,50
e. Elbow NPS 6" Sch.40 2,00 set 8,71
f. Besi siku 50 x 50 x 5 mm 7,56 kg 3,33
g. U bolts Ø 6 mm & nuts dia. 6" 4,00 set 12,00
12 Handrail at roof
a. Pipa SGP dia. 1 1/2" (middle rail & post) 558,48 kg 2,73
b. Pipa SGP dia. 1 1/2" (top rail) 193,32 kg 2,73
c. Flat Bar Mild Steel 75 mm x 6 mm x 6 m 402,42 kg 3,10
13 Staircase c/w Handrail & Terminal
a. Expanded Metal Type 50080 uk 1200x2400 (300 x 700 x 6 mm) 286,99 kg 3,10
b. 4 329,31 kg 3,10
c. Pipa SGP dia. 1 1/2" (middle rail & post) 145,63 kg 4,29
d. Pipa SGP dia. 1 1/2" (top rail) 69,81 kg 4,29
e. Flat Bar 25x4.5x6000 mm 154,38 kg 3,10
14 Internal Ladder
a. Round Bar dia. 19 x 600mm 74,93 kg 3,29
15 Pemasangan pipa untuk level switch
a. Pipa Sch 40 dia. 2" 91,20 kg 3,26
b. Flange ANSI 150 lbs dia. 2" 1,00 pcs 1,92
16 Level Indicator c/w float
a. Besi siku 50 x 50 x 5 x 6 m 691,29 kg 3,33
b. Float m/s plate 1 mm thk 1,00 pcs 2,33
c. Roller 2,00 pcs 2,00
d. Wire rope s/s dia. 3 mm 36,00 m 0,86
e. Wire rope s/s dia. 6 mm 36,00 m 2,29
f. Wire rope clip dia. 3 mm 4,00 pcs 1,20
g. Wire rope clip dia. 6 mm 8,00 pcs 2,00

Sub Total 1 s/d 16


FINISHING WORK
1 Sandblasting & Painting 3 times (Inner Shell) 1.314,64 m2 5,33
2 Sandblasting & Painting 3 times (Outer Shell) 1.156,95 m2 5,33
3 Water Test 3.000,00 m3
4 Calibration 1,00 nos -
5 Piping connected to existing system 1,00 lot 10,00
6 Splinker System 1,00 lot 7,50

Sub Total Finishing Work

GRAND TOTAL

Dihitung oleh : Diketahui oleh :

Boy Hidayat Teguh D H