Thuyet Minh Eng
Thuyet Minh Eng
I. purposes
Cung cÊp c¸c sè liÖu vÒ täa ®é, cao ®é, tr¾c däc, tr¾c ngang
liªn quan ®Õn tuyÕn ®êng cho ®¬n vÞ thiÕt kÕ.
In order to provide data on co-ordinates, elevation, profile, cross section related
to the road alignment for design consultant.
II. legal basis
- C¨n cø vµo ®Ò c¬ng vµ dù to¸n chi phÝ kh¶o s¸t thiÕt kÕ
x©y dùng Quèc lé 3 míi vµ m¹ng ®êng bé liªn quan §o¹n : Hµ Néi –
Th¸i Nguyªn (Giai ®o¹n 1) cña Tæng c«ng ty t vÊn thiÕt kÕ Giao
th«ng vËn t¶i.
- C¨n cø híng dÉn kü thuËt phÇn kh¶o s¸t ®Þa h×nh thuû v¨n
cña V¨n phßng T vÊn dù ¸n Quèc lé 3 míi.
- C¨n cø vµo hîp ®ång sè .... ngµy .... th¸ng .... n¨m 2006 gi÷a
TEDI vµ C«ng ty cæ phÇn t vÊn thiÕt kÕ x©y
dùng giao th«ng thñy.
- C¨n cø th«ng b¸o giao nhiÖm vô sè 100/QLDANN ngµy 12
th¸ng 01 n¨m 2006 cña Tæng c«ng ty t vÊn thiÕt kÕ GTVT.
- Pursuant to the Terms of Reference (TOR) and cost estimation for design and
survey works for New National Highway No.3 and Regional Road Network
Construction Project. Section: Hanoi – Thai Nguyen (phase 1) made by TEDI.
- Pursuant to technical guidlines on hydrological and topographical survey
issued by New NH3 Consultant Bureau.
- Pursuant to Joint Venture Contract No: dated..........., 2006 between
TEDI and Nippon Koei on topographical survey for New National Highway No.3 and
Regional Road Network Construction Project. Section: Hanoi – Thai Nguyen (phase 1)
- Pursuant to Assignment notice No. 100/QLDANN dated January 12th, 2006
made by TEDI. The code project: NH3/DD/TEDI/05.
Iv. ®Æc ®iÓm t×nh h×nh khu vùc kh¶o s¸t ®Þa h×nh
IV. Topographical Features of surveyed areas
4.1 Topographical survey location/Ph¹m vi thùc hiÖn cña dù
¸n
§iÓm ®Çu tuyÕn t¹i lý tr×nh Km45+000 vµ ®iÓm cuèi
tuyÕn cã lý tr×nh Km 61+313.207.
The begining of alignment at Station at Km45+000 and the ending of the
alignment at Km 61+313.207.
This route pass-throuhg has geographical co-ordinates:
+ Longitude: 105047’ – 105052’
+ Latitude: 21002’ – 21004’
- Section Km45+000 – Km45+723: this route passes through Bai Bong Town
region, Pho Yen district, Thai Nguyen Province
- Section Km45+723 – Km50+500: this route passes through Hong Tien
Commune region, Pho Yen district, Thai Nguyen Province
- Section Km50+500 – Km53+530: this route passes through Luong Son
commune region, Thai Nguyen City, Thai Nguyen Province.
- Section Km53+530 – Km55+793: this route passes through Tan Quang
commune region, Song cong Town, Thai Nguyen Province.
- Section Km55+793 – Km59+120: this route passes through Tich Luong
commune region, Thai Nguyen City, Thai Nguyen Province.
- Section Km59+120 – Km59+500: this route passes through Thinh Duc
commune region, Thai Nguyen City, Thai Nguyen Province.
- Section Km59+500 – Km60+880: this route passes through Tan Lap ward
region, Thai Nguyen city, Thai Nguyen Province.
- Section Km60+880 to the end of route belonging to Thinh Dan ward region,
Thai Nguyen City, Thai Nguyen Province
6.4.5 Kh¶o s¸t ®iÒu tra GPMB /Survey and data collection of land
acquisition
TiÕn hµnh thèng kª GPMB theo mÉu: cét ®iÖn, nhµ, ®Êt, c©y,
må m¶, ®Òn chïa, c«ng tr×nh kh¸c (cã b¶ng thèng kª kÌm theo),
ph¹m vi ®iÒu tra tõ tim tuyÕn ra mçi bªn 50m däc theo toµn tuyÕn.
Land acquisition survey shall be carried out and compiled in form of a report:
electric pole, buildings, trees, fences, tombs, pagodas and other constructions (attached
with quatity table), the surveyed interval is at least 50 metres to each side of the
centerline throughout the project route.
vii. KÕt luËn vµ kiÕn nghÞ Conclusions and commetns
Hå s¬ kh¶o s¸t c«ng tr×nh Dù ¸n x©y dùng quèc lé 3 míi vµ
m¹ng ®êng bé liªn quan ®o¹n Hµ Néi – Th¸i Nguyªn ph©n ®o¹n
Km45+000 ®Õn Km61+313.207 do XN Kh¶o s¸t ®Þa h×nh thñy h¶i
v¨n – C«ng ty cæ phÇn t vÊn thiÕt kÕ x©y dùng giao th«ng thñy
thùc hiÖn ®óng, ®Çy ®ñ theo ®Ò c¬ng, quy tr×nh, quy ph¹m hiÖn
hµnh. §©y lµ sè liÖu c¬ së phôc vô cho bíc TKKT trong ®o¹n tuyÕn
trªn.
Topographical Report of New National Highway No.3 and Regional Road Network
Construction Project. Section Hanoi – Thai Nguyen(1) from Km45+000 to
Km61+313.207 undertaken by hydrological and topographical survey – Waterway
Engineering Consultant Joint Stock company was strictly established in accordance
with TOR, existing regulations and standards for survey and design. This is a basic
data for detailed design stage throughout the project route.
viii. tæng hîp khèi lîng/ summarise of topographical
quantities
Prepared by