FLOW PROCESS CHART

SUBJECT CHARTED_RELIEF VALVE BODY CHART NO. 1021


DRAWING NO . A - 520612 PART NO. 16150 CHART TYPE
CHART BEGINS _Barstock
Storage CHARTED BY J.
Smith
CHART ENDS . Assembly Department Storeroom DATE 9-9-43

___
OPERATION TRANSPORTATION SHEET NO._1 OF___1___SHEETS
COST UNIT Valve Body

1
INSPECTION

UNIT CHART
D DELAY STORAGE

DIST
Proposed
.

IN TIME IN SYM- PROCESS DESCRIPTION OF METHOD


FEET Hours BOLS
..

Stored in bar stock storage until requisitioned


Bars loaded on truck upon receipt of requisition
10.0002 from machine shop men

2
(

)
210 0002 Moved to 301 machine
#
,

10.0002 Bars unloaded to bar stock rack near 301 machine

#
4.00 Delayed waiting for operation to begin
3
.0550 Drill bore tap seat file and cut off
8

,
,

,
2
2.00 Delayed awaiting drill press operator
2

20.00002 Moved to drill press by operator


4

8.0350 Drill holes


8

2:00 3 Delayed awaiting moveman


3

300.0011
.0011 Moved to burring department

1.50
4 Delayed awaiting burring operation
5

6.0100 Burr

2.00 5 Delayed awaiting moveman

550.00054 Moved to seat lapping machine in detail department


6

6.00 Delayed awaiting operator


0-6
6.1700 UNS-
Lap seat test and inspect
,

7
2.00 Delayed awaiting moveman

400.0004 Moved to paint booth


8
6.00 Delayed awaiting painter

15.0380
7

Mask prime paint dry unmask and pack in box


,
,

,
,

425 Sent by conveyor to assembly department storeroom

60.0 Stored until requisitioned